CN113404648B - Integral rapid floating installation method for offshore wind turbine - Google Patents

Integral rapid floating installation method for offshore wind turbine Download PDF

Info

Publication number
CN113404648B
CN113404648B CN202110669421.3A CN202110669421A CN113404648B CN 113404648 B CN113404648 B CN 113404648B CN 202110669421 A CN202110669421 A CN 202110669421A CN 113404648 B CN113404648 B CN 113404648B
Authority
CN
China
Prior art keywords
fan
ship
wind turbine
offshore wind
bearing platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110669421.3A
Other languages
Chinese (zh)
Other versions
CN113404648A (en
Inventor
李怀亮
于文太
黄山田
王浩宇
魏佳广
袁晓林
刘顺庆
梁学先
秦立成
孟维超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Offshore Oil Engineering Co Ltd
Original Assignee
Offshore Oil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Offshore Oil Engineering Co Ltd filed Critical Offshore Oil Engineering Co Ltd
Priority to CN202110669421.3A priority Critical patent/CN113404648B/en
Publication of CN113404648A publication Critical patent/CN113404648A/en
Application granted granted Critical
Publication of CN113404648B publication Critical patent/CN113404648B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • F03D13/25Arrangements for mounting or supporting wind motors; Masts or towers for wind motors specially adapted for offshore installation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D1/00Wind motors with rotation axis substantially parallel to the air flow entering the rotor 
    • F03D1/02Wind motors with rotation axis substantially parallel to the air flow entering the rotor  having a plurality of rotors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D80/00Details, components or accessories not provided for in groups F03D1/00 - F03D17/00
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/727Offshore wind turbines

Abstract

The invention provides a method for integrally and quickly floating and installing an offshore wind turbine. The fan supporting device is arranged on the side of the ship and extends out of the ship, the fan clasping mechanism is arranged on the fan supporting device, and the fan clasping mechanism can move up and down along a vertical slide way on the fan supporting device while clasping the fan. The bottom of the supporting device is provided with a telescopic bearing platform for bearing the weight of the whole fan in the transportation process. When the offshore installation is carried out, the fan enclasping mechanism lifts the height of the fan, the bearing telescopic platform is retracted, the ship is moved to enable the fan to be located right above the fan base, the fan is placed to the fan base, the fan is fixed and then the fan enclasping mechanism is loosened, and the connecting rigging is detached. And moving the ship to the next machine position, and repeating the actions to complete the installation of all the integral fans of one voyage.

Description

Integral rapid floating installation method for offshore wind turbine
Technical Field
The invention relates to the field of offshore wind turbine installation, in particular to an integral rapid floating installation method for an offshore wind turbine.
Background
At present, the domestic offshore wind turbine installation mainly comprises split installation and integral installation, and the two schemes both depend on a floating crane ship. The split installation needs a leg type floating crane ship, the split assembly efficiency is low, and the high-altitude operation is greatly influenced by wind. The restriction of integral erection to floating crane resource is bigger, and 5 MW's fan almost reaches the integral erection limit, along with the continuous progress of technique, 8MW, 10MW and even 14 MW's fan constantly emerges. To realize the quick installation of the fan, the development of modularized, standardized and efficient integral fan installation is imperative.
Disclosure of Invention
The present invention is intended to solve the above technical problems to some extent.
In order to solve the technical problem, the invention provides a method for quickly floating and installing the offshore wind turbine integrally, which can be used for quickly installing the offshore wind turbine integrally.
The integral rapid floating installation method of the offshore wind turbine is characterized by comprising the following steps:
a. the method comprises the following steps that (1) a fan is pre-loaded on a ship, the ship is moved, the fan is located in a notch of a supporting device on a ship board, and a holding mechanism fixes the fan on the supporting device;
b. the fan is loaded on a ship, the jacking device acts to drive the enclasping mechanism and the fan to move upwards along the axial direction of the supporting device, the fan leaves the wharf, meanwhile, the telescopic bearing platform on the ship board extends out, the jacking device acts to drive the enclasping mechanism and the fan to move downwards along the axial direction of the supporting device, and the fan falls onto the telescopic bearing platform;
c. moving the ship, and repeating the steps a and b to enable the ship to be fully loaded with the designed number of fans;
d. installing a fan, moving the ship to a specified installation position, enabling the jacking device to act to drive the clasping mechanism and the fan to move upwards or downwards to a specified height, enabling the telescopic bearing platform to contract, moving the ship to enable the fan to be over against a fan base for installation and fixation, and finally loosening the clasping mechanism;
e. and d, repeating the step d to finish the installation of the plurality of fans.
Further, strutting arrangement is including support frame and slide, the support frame is visited the hull and is followed vertical setting, the cross-section of the portion of visiting of support frame is "concave" font, the directional hull outside of opening of "concave" font, the slide sets up the inboard of support frame and edge the axial setting of support frame.
Further, it is a plurality of, a plurality of to hold the mechanism including holding the board tightly, it is a plurality of to hold the fixedly connected with bracing piece between the board tightly, every hold the board tightly and divide into left meniscus and right half meniscus, left side meniscus slides and sets up on the slide, right half meniscus ring is detained on the fan, just left side meniscus with bolted connection between the right half meniscus.
Furthermore, a trapezoid flange is arranged at the bottom of the fan, a rigging connecting hole is formed in the trapezoid flange, and a rigging is connected between the trapezoid flange and the clasping mechanism.
Furthermore, a fan temporary butt joint seat is arranged on the telescopic bearing platform.
Furthermore, the lower extreme of trapezoidal flange is provided with and inserts sharp type buffer, and is corresponding, is provided with the buffer slot on the fan base.
Further, the jacking device comprises a hydraulic cylinder, a cylinder body of the hydraulic cylinder is fixed on the support frame, and a piston rod of the hydraulic cylinder is fixedly connected with the enclasping plate.
Furthermore, the telescopic bearing platform is arranged on a deck of the ship body in a sliding mode, a sliding groove perpendicular to the axial direction of the ship body is formed in the bottom of the telescopic bearing platform, and correspondingly, a sliding rail is fixed on the deck of the ship body.
Further, still including installing the locking device on the support frame, the locking device be used for with the locking mechanism lock is dead on the slide.
The invention has the technical effects that the integral rapid floating installation method of the offshore wind turbine, which is provided by the invention, comprises the following steps:
a. pre-loading a fan, moving the ship to enable the fan to be positioned in a notch of a supporting device on a ship board, and fixing the fan on the supporting device by a holding mechanism; b. the fan is loaded on a ship, the jacking device acts to drive the clasping mechanism and the fan to move upwards along the axial direction of the supporting device, the fan leaves the wharf, meanwhile, the telescopic bearing platform on the ship board extends out, the jacking device acts to drive the clasping mechanism and the fan to move downwards along the axial direction of the supporting device, and the fan falls on the telescopic bearing platform; c. moving the ship, and repeating the steps a and b to enable the ship to be fully loaded with the designed number of fans; d. installing a fan, moving the ship to a specified installation position, enabling a jacking device to act to drive a holding mechanism and the fan to move upwards or downwards to a specified height, enabling a telescopic bearing platform to contract, moving the ship to enable the fan to be over against a fan base to be installed and fixed, and finally loosening the holding mechanism; e. and d, repeating the step d to finish the installation of the plurality of fans. The method can complete the integral quick installation of the fan.
Drawings
FIG. 1 is a three-dimensional view of a mechanical mechanism involved in the overall rapid floating installation method of the offshore wind turbine of the present invention;
FIG. 2 is a partial view of a supporting device of a mechanical mechanism involved in the overall fast floating installation method of the offshore wind turbine according to the present invention;
FIG. 3 is a side view of a mechanical mechanism involved in the overall fast floating installation method of the offshore wind turbine according to the present invention;
FIG. 4 is a partial view of a damping device of a mechanical mechanism involved in the overall fast floating installation method of an offshore wind turbine according to the present invention;
in the figure, 1-blower; 2-a support device; 21-a support frame; 22-a slide; 3-a telescopic bearing platform; 4, a holding mechanism; 5-a trapezoidal flange; 6-rigging; 7-a fan base; 8-a buffer device.
Detailed Description
The present invention is further described below in conjunction with the drawings and the embodiments so that those skilled in the art can better understand the present invention and can implement the present invention, but the embodiments are not to be construed as limiting the present invention.
The specific embodiment of the invention, an integral fast floating installation method of an offshore wind turbine, is shown in fig. 1-4, and comprises the following steps:
a. the method comprises the following steps of pre-loading a fan, moving a ship to enable the fan 1 to be located in a notch of a supporting device 2 on a ship board, and fixing the fan 1 on the supporting device 2 through a holding mechanism 4;
b. the fan is loaded on a ship, the jacking device acts to drive the enclasping mechanism 4 and the fan 1 to move upwards along the axial direction of the supporting device 2, the fan 1 leaves the wharf, meanwhile, the telescopic bearing platform 3 on the ship board extends out, the jacking device acts to drive the enclasping mechanism 4 and the fan 1 to move downwards along the axial direction of the supporting device 2, and the fan 1 falls on the telescopic bearing platform 3;
c. moving the ship, and repeating the steps a and b to enable the ship to be fully loaded with the designed number of fans 1;
d. installing a fan, moving the ship to a specified installation position, enabling a jacking device to act to drive the clasping mechanism 4 and the fan 1 to move upwards or downwards to a specified height, enabling the telescopic bearing table 3 to contract, moving the ship to enable the fan 1 to be over against a base 7 of the fan 1, installing and fixing, and finally loosening the clasping mechanism 4;
e. and d, repeating the step d to finish the installation of the plurality of fans.
The method can complete the integral quick installation of the fan.
According to the specific embodiment of the invention, the integral quick floating installation method of the offshore wind turbine is shown in fig. 1-4, the supporting device 2 comprises a supporting frame 21 and a slideway 22, the supporting frame 21 extends out of the ship body and is vertically arranged, the section of the extending-out part of the supporting frame 21 is in a concave shape, the opening of the concave shape points to the outer side of the ship body, and the slideway 22 is arranged on the inner side of the supporting frame 21 and is arranged along the axial direction of the supporting frame 21. When the fan 1 is preassembled with the ship, the concave opening of the fan 1 supporting structure is aligned with the fan 1 which is pre-positioned at the edge of the wharf, the ship position is adjusted, the fan 1 is arranged in the concave opening, and the fan 1 is tightly held by the fan 1 holding mechanism 4. The support frame 21 is higher than a support structure on a ship deck, so that the offshore berthing operation of the base 7 of the draught fan 1 in different types and the installation requirement of the draught fan 1 are met;
according to the specific embodiment of the invention, the invention provides a method for integrally and quickly floating and installing an offshore wind turbine, which is shown in fig. 1 to 4, and provides a technical scheme of a holding mechanism 4, wherein the holding mechanism 4 comprises a plurality of holding plates, a support rod is fixedly connected between the plurality of holding plates, each holding plate is divided into a left half-moon plate and a right half-moon plate, the left half-moon plate is arranged on a slideway 22 in a sliding manner, the right half-moon plate is buckled on the wind turbine 1 in a surrounding manner, and the left half-moon plate is connected with the right half-moon plate through bolts. Correspondingly, a clamping groove is formed in the tower barrel of the fan 1, the clamping plate is clamped on the tower barrel of the fan 1, and therefore the fan 1 can be prevented from moving in the moving process of the fan 1.
According to the specific embodiment of the invention, the integral quick floating installation method of the offshore wind turbine is shown in fig. 1-4, a trapezoidal flange 5 is arranged at the bottom of the wind turbine 1, a rigging 6 connecting hole is formed in the trapezoidal flange 5, and the rigging 6 is connected between the trapezoidal flange 5 and the clasping mechanism 4. For transferring the load of the fan 1 during lifting/lowering of the fan 1.
According to the embodiment of the invention, the method for quickly floating the offshore wind turbine integrally comprises the steps that as shown in fig. 1-4, a temporary butt joint seat of the wind turbine 1 is arranged on a telescopic bearing platform 3. Can be used for fixing the fan 1 during transportation.
According to the embodiment of the invention, the overall quick floating installation method of the offshore wind turbine is shown in fig. 1-4, the lower end of the trapezoidal flange 5 is provided with a plug-in type buffer device 8, and correspondingly, a buffer device 8 slot is arranged on the wind turbine base 7. The structure has the functions of being used as in-place guiding when the fan 1 is installed and avoiding collision between the fan 1 and a foundation when the fan 1 is installed.
According to the specific embodiment of the invention, the method for integrally and quickly floating and installing the offshore wind turbine is shown in fig. 1-4, the jacking device comprises a hydraulic cylinder, a cylinder body of the hydraulic cylinder is fixed on the support frame 21, and a piston rod of the hydraulic cylinder is fixedly connected with the holding plate. The piston rod of the hydraulic cylinder can lift or lower the fan 1.
According to the specific embodiment of the invention, the method for integrally and quickly floating and installing the offshore wind turbine is shown in fig. 1-4, the telescopic bearing platform 3 is arranged on a deck of a ship body in a sliding mode, the bottom of the telescopic bearing platform 3 is provided with a sliding groove perpendicular to the axial direction of the ship body, and correspondingly, a sliding rail is fixed on the deck of the ship body. The telescopic bearing table 3 can be guided by arranging the sliding grooves and the sliding rails.
According to the specific embodiment of the invention, the method for quickly floating the offshore wind turbine integrally further comprises a locking device arranged on the support frame 21, and the locking device is used for locking the locking mechanism 4 on the slideway 22. The fan 1 is prevented from shaking in the moving process.
The above embodiments are merely preferred embodiments for fully illustrating the present invention, and the scope of the present invention is not limited thereto. The equivalent substitution or change made by the technical personnel in the technical field on the basis of the invention is all within the protection scope of the invention. The protection scope of the invention is subject to the claims.

Claims (6)

1. The integral rapid floating installation method of the offshore wind turbine is characterized by comprising the following steps:
the method comprises the following steps that (1) a fan is pre-loaded on a ship, the ship is moved, the fan is located in a notch of a supporting device on a ship board, and a holding mechanism fixes the fan on the supporting device;
the fan is loaded on a ship, the jacking device acts to drive the enclasping mechanism and the fan to move upwards along the axial direction of the supporting device, the fan leaves the wharf, meanwhile, the telescopic bearing platform on the ship board extends out, the jacking device acts to drive the enclasping mechanism and the fan to move downwards along the axial direction of the supporting device, and the fan falls onto the telescopic bearing platform;
moving the ship, and repeating the steps a and b to enable the ship to be fully loaded with the designed number of fans;
installing a fan, moving the ship to a specified installation position, enabling the jacking device to act to drive the clasping mechanism and the fan to move upwards or downwards to a specified height, enabling the telescopic bearing platform to contract, moving the ship to enable the fan to be over against a fan base for installation and fixation, and finally loosening the clasping mechanism;
d, repeating the step d to finish the installation of a plurality of fans;
the supporting device comprises a supporting frame and a slideway, the supporting frame extends out of the ship body and is vertically arranged, the section of the extending-out part of the supporting frame is in a concave shape, the opening of the concave shape points to the outer side of the ship body, and the slideway is arranged on the inner side of the supporting frame and is arranged along the axial direction of the supporting frame;
the clamping mechanism comprises a plurality of clamping plates, a supporting rod is fixedly connected among the plurality of clamping plates, each clamping plate is divided into a left half-moon plate and a right half-moon plate, the left half-moon plate is arranged on the slideway in a sliding mode, the right half-moon plate is buckled on the fan in a surrounding mode, and the left half-moon plate and the right half-moon plate are connected through bolts;
the jacking device comprises a hydraulic cylinder, a cylinder body of the hydraulic cylinder is fixed on the support frame, and a piston rod of the hydraulic cylinder is fixedly connected with the enclasping plate.
2. The method for quickly floating and installing the offshore wind turbine as a whole according to claim 1, wherein a trapezoidal flange is arranged at the bottom of the wind turbine, a rigging connecting hole is formed in the trapezoidal flange, and a rigging is connected between the trapezoidal flange and the clasping mechanism.
3. The method for quickly floating and installing the offshore wind turbine as a whole according to claim 1, wherein a temporary wind turbine butt-joint seat is arranged on the telescopic bearing platform.
4. The method for quickly floating and assembling the offshore wind turbine integral body according to claim 2, wherein the lower end of the trapezoidal flange is provided with a plug-in type buffer device, and correspondingly, a buffer device slot is formed in the wind turbine base.
5. The method for quickly float-mounting the integral offshore wind turbine according to claim 1, wherein the telescopic load-bearing platform is slidably arranged on a deck of the ship body, a sliding groove perpendicular to the axial direction of the ship body is arranged at the bottom of the telescopic load-bearing platform, and correspondingly, a sliding rail is fixed on the deck of the ship body.
6. The method for quickly floating and installing the offshore wind turbine as a whole according to claim 1, further comprising a locking device installed on the support frame, wherein the locking device is used for locking the locking mechanism on the slideway.
CN202110669421.3A 2021-06-16 2021-06-16 Integral rapid floating installation method for offshore wind turbine Active CN113404648B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110669421.3A CN113404648B (en) 2021-06-16 2021-06-16 Integral rapid floating installation method for offshore wind turbine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110669421.3A CN113404648B (en) 2021-06-16 2021-06-16 Integral rapid floating installation method for offshore wind turbine

Publications (2)

Publication Number Publication Date
CN113404648A CN113404648A (en) 2021-09-17
CN113404648B true CN113404648B (en) 2023-02-28

Family

ID=77684495

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110669421.3A Active CN113404648B (en) 2021-06-16 2021-06-16 Integral rapid floating installation method for offshore wind turbine

Country Status (1)

Country Link
CN (1) CN113404648B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114933255A (en) * 2022-05-13 2022-08-23 海洋石油工程股份有限公司 Integral lifting and mounting method for offshore wind turbine

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102079477A (en) * 2009-11-27 2011-06-01 三一电气有限责任公司 Fan holding and lifting device and mobile overwater operation platform
CN111891299A (en) * 2020-08-14 2020-11-06 招商局海洋装备研究院有限公司 Integral transportation and installation ship and method for offshore wind turbine

Also Published As

Publication number Publication date
CN113404648A (en) 2021-09-17

Similar Documents

Publication Publication Date Title
EP2641825B1 (en) Ship for installing offshore wind turbines, and method for installing offshore wind turbines using same
US8371074B2 (en) Mast assembly for wind turbine
US8413598B2 (en) Sailing ship
US10941023B2 (en) Wave-induced motion compensating crane for use on an offshore vessel, vessel and load transferring method
EP2681400B1 (en) A cantilever system and method of use
CN102105348A (en) Structure for the offshore installation of at least one wind turbine or underwater generator, and methods for transport and offshore installation of at least one wind turbine or underwater generator
CN113404648B (en) Integral rapid floating installation method for offshore wind turbine
JP4896784B2 (en) Wind turbine tower nacelle mounting method and apparatus
EP3715628A1 (en) Overall horizontal preloading-boarding system for offshore wind turbine and preloading-boarding method
CN110254608B (en) Installation device of bulkhead equipment and operation method of installation device
WO2022229455A1 (en) Upend crane and installation vessel
CN112900404A (en) Self-elevating platform system and method for installing booster station block in sliding mode
KR101640901B1 (en) Sea Wind Turbine Cradling and Trsansferring Apparatus And Sea Wind Power Generator Installing Ship therof of it
CN105887787A (en) Hydraulic pin hole type lifting system
EP2653615B1 (en) Jacking system and method for relative movement of a leg with respect to a platform
CN112681144B (en) Self-climbing installation method of steel cable tower
WO2023006711A1 (en) Device and method for offshore arranging of a wind turbine or components thereof
CN208803363U (en) A kind of belt track free cantilever erection steel girder bridge
CN217871878U (en) Truss substep uninstallation device
CN114981200A (en) Marine vessel crane
CN113928475A (en) Tower section supporting tool and tower section supporting module
CN210971456U (en) Wind power installation and dismantling ship
CN112408213A (en) Tower crane and installation method thereof
CN217348184U (en) Adjustable sectional placement portal frame
CN217896438U (en) Offshore operation platform with adjustable height

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant