Intelligent construction method and device and electronic equipment Download PDF

Info

Publication number
CN113378670B
CN113378670B CN202110597025.4A CN202110597025A CN113378670B CN 113378670 B CN113378670 B CN 113378670B CN 202110597025 A CN202110597025 A CN 202110597025A CN 113378670 B CN113378670 B CN 113378670B
Authority
CN
China
Prior art keywords
construction
acquiring
environment
construction environment
preset
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110597025.4A
Other languages
Chinese (zh)
Other versions
CN113378670A (en
Inventor
张瑞坤
王振
杨茹
毛旺安
张赢
代顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Hengyun Technology Co ltd
Original Assignee
Wuhan Hengyun Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Hengyun Technology Co ltd filed Critical Wuhan Hengyun Technology Co ltd
Priority to CN202110597025.4A priority Critical patent/CN113378670B/en
Publication of CN113378670A publication Critical patent/CN113378670A/en
Application granted granted Critical
Publication of CN113378670B publication Critical patent/CN113378670B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N23/00Cameras or camera modules comprising electronic image sensors; Control thereof
    • H04N23/60Control of cameras or camera modules
    • H04N23/695Control of camera direction for changing a field of view, e.g. pan, tilt or based on tracking of objects
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • Multimedia (AREA)
  • Signal Processing (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

An intelligent construction method, device and electronic equipment, wherein the method comprises the following steps: acquiring the construction state of constructors in real time; judging whether the construction state meets a preset standard construction state or not; if yes, acquiring a construction environment corresponding to the constructor; if not, acquiring the real-time position of the constructor and sending the real-time position to a monitoring background; judging whether the construction environment meets a preset standard construction environment or not; if yes, activating preset construction equipment in the construction environment; if not, acquiring the real-time environment parameters of the construction environment and sending the real-time environment parameters to a monitoring background. The application provides a wisdom building site construction method, device and electronic equipment can carry out real-time supervision to constructor's construction state and construction environment's environmental parameter in real time, only can open construction equipment under the condition that both accord with the requirement, has reduced because construction quality hidden danger that nonstandard operation and construction environment are not up to standard brought, has improved the construction standard.

Description

Intelligent construction method and device and electronic equipment
Technical Field
The invention belongs to the technical field of intelligent construction sites, and particularly relates to an intelligent construction site construction method, an intelligent construction site construction device and electronic equipment.
Background
With the development of economy, various building demands are accompanied, and the requirements of ever-increasing substances and spirit of people can be met, but simultaneously, higher requirements are brought to construction quality.
In the construction site, various situations can possibly happen, so that whether the construction operation and the construction environment of constructors meet the construction quality requirements cannot be guaranteed, but the uncertain factors can bring about worry to the construction quality, and property and life losses can be caused.
Disclosure of Invention
In view of the above, the present invention provides an intelligent worksite construction method, apparatus and electronic device that overcomes or at least partially solves the above-mentioned problems.
In order to solve the technical problems, the invention provides an intelligent construction method for a construction site, which comprises the following steps:
acquiring the construction state of constructors in real time;
judging whether the construction state meets a preset standard construction state or not;
if yes, acquiring a construction environment corresponding to the constructor;
if not, acquiring the real-time position of the constructor and sending the real-time position to a monitoring background;
judging whether the construction environment meets a preset standard construction environment or not;
if yes, activating preset construction equipment in the construction environment;
if not, acquiring the real-time environment parameters of the construction environment and sending the real-time environment parameters to a monitoring background.
Preferably, the step of acquiring the construction state of the constructor in real time includes the steps of:
controlling the monitoring lens to face the first direction;
acquiring a first image in a first area corresponding to the first direction;
judging whether constructors exist in the first image;
if yes, acquiring the image information of the constructor;
if not, controlling the monitoring lens to face the second direction;
acquiring a second image in a second area corresponding to the second direction;
judging whether constructors exist in the second image;
if yes, acquiring the image information of the constructor;
if not, returning to the step of controlling the monitoring lens to face the first direction.
Preferably, the controlling the monitoring lens to face the second direction includes the steps of:
acquiring an initial position of the monitoring lens;
acquiring a preset offset angle of the monitoring lens;
acquiring a first position corresponding to the first direction;
calculating the offset direction of the monitoring lens according to the initial position and the first position;
and continuously shifting the preset shifting angle relative to the first position along the shifting direction.
Preferably, the method further comprises the step of, after the step of acquiring the image information of the constructor:
acquiring the definition of the image information;
judging whether the definition meets a preset value or not;
if yes, analyzing the image information;
if not, the focal length of the monitoring lens is adjusted to be high, and the definition step of acquiring the image information is returned.
Preferably, the method further comprises the step of, after said parsing said image information:
acquiring the data volume of the image information;
judging whether the data quantity meets a preset value or not;
if yes, continuing to analyze the image information;
if not, acquiring the current position of the monitoring lens, continuously shifting the preset shifting angle relative to the current position along the shifting direction, and returning to the step of acquiring the data amount of the image information.
Preferably, the step of obtaining the construction environment corresponding to the constructor includes the steps of:
acquiring the current position of the constructor;
acquiring a first construction environment in a preset range around the current position;
acquiring all historical positions of the constructors;
acquiring second construction environments in a preset range around a short-distance historical position closest to the current position in all the historical positions;
and taking the first construction environment and the second construction environment as the construction environments together.
Preferably, the step of obtaining the second construction environment within a preset range around a short-distance historical position closest to the current position among all the historical positions includes the steps of:
acquiring all the short-distance historical positions;
acquiring the frequency corresponding to each short-distance historical position of the constructor in a preset period;
acquiring a third construction environment in a preset range around the high-frequency historical position with highest frequency in all the near-distance historical positions;
and taking the third construction environment as the second construction environment.
The invention also provides an intelligent construction device, which comprises:
the construction state acquisition module is used for acquiring the construction state of constructors in real time;
the judging module is used for judging whether the construction state meets a preset standard construction state or not and judging whether the construction environment meets the preset standard construction environment or not;
the execution module is used for executing preset operation according to the judging result of the judging module;
when the judging module judges whether the construction state meets a preset standard construction state or not, the executing module acquires a construction environment corresponding to the constructor; when the judging module judges whether the construction state meets a preset standard construction state or not, the executing module acquires the real-time position of the constructor and sends the real-time position to a monitoring background; when the judging module judges whether the construction environment meets a preset standard construction environment or not, the executing module activates preset construction equipment in the construction environment; and when the judging module judges whether the construction environment meets the preset standard construction environment or not, the executing module acquires real-time environment parameters of the construction environment and sends the real-time environment parameters to a monitoring background.
The invention also provides an electronic device, which comprises:
at least one processor; the method comprises the steps of,
a memory communicatively coupled to the at least one processor; wherein,,
the memory stores instructions executable by the at least one processor to enable the at least one processor to perform any one of the aforementioned smart worksite construction methods.
The invention also provides a non-transitory computer readable storage medium storing computer instructions for causing the computer to perform any of the aforementioned smart worksite construction methods.
One or more technical solutions in the embodiments of the present invention at least have the following technical effects or advantages: the application provides a wisdom building site construction method, device and electronic equipment can carry out real-time supervision to constructor's construction state and construction environment's environmental parameter in real time, only can open construction equipment under the condition that both accord with the requirement, has reduced because construction quality hidden danger that nonstandard operation and construction environment are not up to standard brought, has improved the construction standard.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for the description of the embodiments will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic flow chart of an intelligent construction method according to an embodiment of the present invention;
FIG. 2 is a schematic diagram of an intelligent construction device according to an embodiment of the present invention;
fig. 3 is a schematic structural diagram of an electronic device according to an embodiment of the present invention;
FIG. 4 is a diagram of an embodiment of the present invention
A schematic structural diagram of a non-transitory computer-readable storage medium.
Detailed Description
The advantages and various effects of the present invention will be more clearly apparent from the following detailed description and examples. It will be understood by those skilled in the art that these specific embodiments and examples are intended to illustrate the invention, not to limit the invention.
Throughout the specification, unless specifically indicated otherwise, the terms used herein should be understood as meaning as commonly used in the art. Accordingly, unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. In case of conflict, the present specification will control.
Unless otherwise specifically indicated, the various raw materials, reagents, instruments, equipment and the like used in the present invention are commercially available or may be prepared by existing methods.
In an embodiment of the present application, as shown in fig. 1, the present invention provides an intelligent construction method, including the steps of:
s1: acquiring the construction state of constructors in real time;
in this embodiment of the present application, the step S1 of acquiring the construction status of the constructor in real time includes the steps of:
controlling the monitoring lens to face the first direction;
acquiring a first image in a first area corresponding to the first direction;
judging whether constructors exist in the first image;
if yes, acquiring the image information of the constructor;
if not, controlling the monitoring lens to face the second direction;
acquiring a second image in a second area corresponding to the second direction;
judging whether constructors exist in the second image;
if yes, acquiring the image information of the constructor;
if not, returning to the step of controlling the monitoring lens to face the first direction.
In the embodiment of the application, a plurality of monitoring lenses are pre-installed in a construction environment, each monitoring lens is connected with a monitoring background, on one hand, the monitoring lens can send various signals such as image information to the monitoring background, and on the other hand, the monitoring background sends monitoring instructions to the monitoring lens to control the operation of the monitoring lens. When the construction state of constructors is required to be acquired in real time, the monitoring background controls the monitoring lens to rotate towards a first direction, and a first image in a first area corresponding to the first direction is acquired; and the monitoring lens judges whether constructors exist in the first image, if so, the image information of the constructors is obtained, and if not, the monitoring background controls the monitoring lens to face the second direction. Obviously, the first direction and the second direction are different directions, for example, the first direction and the second direction may be completely opposite directions, and may be directions with an acute angle or an obtuse angle. When the monitoring lens faces the second direction, the monitoring lens acquires a second image in a second area corresponding to the second direction, judges whether constructors exist in the second image, acquires image information of the constructors if the constructors exist, and returns to the step of controlling the monitoring lens to face the first direction if the constructors do not exist.
In an embodiment of the present application, the controlling the monitoring lens to face the second direction includes the steps of:
acquiring the initial position of the monitoring lens:
acquiring a preset offset angle of the monitoring lens;
acquiring a first position corresponding to the first direction;
calculating the offset direction of the monitoring lens according to the initial position and the first position;
and continuously shifting the preset shifting angle relative to the first position along the shifting direction.
In the embodiment of the present application, when the monitoring lens is controlled to face the second direction, the monitoring lens may be controlled to deviate from the first direction by a predetermined angle along the preset direction. Specifically, a monitoring background acquires an initial position of a monitoring lens, a preset offset angle of the monitoring lens and a first position corresponding to a first direction, and then calculates the offset direction of the monitoring lens according to the initial position and the first position; and then the monitoring background controls the monitoring lens to continuously shift the preset shift angle relative to the first position along the shift direction. For example, the initial position of the monitoring lens is 0 °, the first position corresponding to the first direction is 10 °, the offset direction of the monitoring lens may be calculated to be clockwise, the preset offset angle of the monitoring lens is 20 °, when the monitoring lens needs to be controlled to face the second direction, the monitoring background controls the monitoring lens to deviate 20 ° relative to 10 ° in the clockwise direction, and at this time, the second position corresponding to the second direction is 30 °.
In this embodiment of the present application, after the step of obtaining the image information of the constructor, the method further includes the steps of:
acquiring the definition of the image information;
judging whether the definition meets a preset value or not;
if yes, analyzing the image information;
if not, the focal length of the monitoring lens is adjusted to be high, and the definition step of acquiring the image information is returned.
In this embodiment of the present application, after the image information of the constructor is acquired, it is required to determine whether the sharpness of the image information meets the requirement of the preset value, if yes, the image information is directly analyzed, if not, the monitoring background needs to adjust the focal length of the monitoring lens higher, and returns to the sharpness step of acquiring the image information until the sharpness of the image information meets the requirement.
In an embodiment of the present application, after the parsing the image information, the method further includes the steps of:
acquiring the data volume of the image information;
judging whether the data quantity meets a preset value or not;
if yes, continuing to analyze the image information;
if not, acquiring the current position of the monitoring lens, continuously shifting the preset shifting angle relative to the current position along the shifting direction, and returning to the step of acquiring the data amount of the image information.
In this embodiment of the present application, after the image information is analyzed, it is required to determine whether the data amount of the image information meets a preset value requirement, if yes, the image information is continuously analyzed, if not, the monitoring background needs to obtain the current position of the monitoring lens, then the preset offset angle is continuously offset along the offset direction relative to the current position, and the step of obtaining the data amount of the image information is returned until the data amount of the image information meets the requirement.
S2: judging whether the construction state meets a preset standard construction state or not;
in the embodiment of the application, the monitoring background stores the standard construction state in advance, for example, standard action standard images which are required to be executed by a constructor can be stored, and after the construction state of the constructor is obtained, the monitoring background judges whether the construction state of the constructor meets the preset standard construction state.
S3: if yes, acquiring a construction environment corresponding to the constructor;
in this embodiment of the present application, the step S3 of obtaining the construction environment corresponding to the constructor includes the steps of:
acquiring the current position of the constructor;
acquiring a first construction environment in a preset range around the current position;
acquiring all historical positions of the constructors;
acquiring second construction environments in a preset range around a short-distance historical position closest to the current position in all the historical positions;
and taking the first construction environment and the second construction environment as the construction environments together.
In this embodiment of the present application, when a construction environment corresponding to a constructor needs to be obtained, the monitoring and control monitoring lens firstly obtains a current position of the constructor, then the monitoring and control monitoring lens obtains a first construction environment in a preset range around the current position, then obtains all history positions of the constructor, obtains a second construction environment in a preset range around a short-distance history position closest to the current position in all the history positions, and finally uses the first construction environment and the second construction environment together as the construction environment. For example, the current position of the constructor is A, the monitoring lens firstly acquires the construction environment A 'within the range of 1m around A, all the history positions of the constructor are B and C, the near-distance history position closest to A in B and C is B, the monitoring lens then acquires the construction environment B' within the range of 1m around B, and finally the monitoring lens sends the construction environment A 'and the construction environment B' together as the required construction environment to the monitoring background.
In this embodiment of the present application, the step of obtaining the second construction environment within a preset range around the near-distance historical position closest to the current position in all the historical positions includes the steps of:
acquiring all the short-distance historical positions;
acquiring the frequency corresponding to each short-distance historical position of the constructor in a preset period;
acquiring a third construction environment in a preset range around the high-frequency historical position with highest frequency in all the near-distance historical positions;
and taking the third construction environment as the second construction environment.
In this embodiment of the present application, the current position of the constructor is a, all the history positions of the constructor are B, C and D, and the near-distance history positions closest to a in B, C and D are B and D, and at this time, it is necessary to select a high-frequency history position from a plurality of near-distance history positions in consideration of the frequency of the near-distance history positions. At this time, the monitoring background obtains the frequencies of all the near-distance historical positions, and the higher frequency of the near-distance historical positions is D in the B and D modes, namely, the high-frequency historical position is D. Specifically, the monitoring lens firstly acquires a construction environment A 'within a range of 1m around A, all history positions of constructors are B, C and D, short-distance history positions closest to A in B, C and D are B and D, the next highest of B and D is D, the monitoring lens then acquires a construction environment D' within a range of 1m around D, and finally the monitoring lens sends the construction environment A 'and the construction environment D' together as required construction environments to the monitoring background.
S4: if not, acquiring the real-time position of the constructor and sending the real-time position to a monitoring background;
in this embodiment of the application, the monitoring background can control the monitoring lens to track the constructor and rotate to obtain the real-time position of the constructor and send the real-time position to the monitoring background, and also can control the intelligent terminal (such as an interactive safety helmet, etc.) worn on the constructor to obtain the real-time position of the constructor and send the real-time position to the monitoring background.
S5: judging whether the construction environment meets a preset standard construction environment or not;
in the embodiment of the application, a plurality of environment parameters can be prestored in the monitoring background, and the environment parameters jointly represent the standard construction environment. The monitoring background can control an intelligent terminal (such as various environment parameter acquisition modules) in the construction environment to acquire parameters in the construction environment, and then compare each parameter with the environment parameters stored in the monitoring background in advance, so as to judge whether the construction environment meets the preset standard construction environment.
S6: if yes, activating preset construction equipment in the construction environment;
in this embodiment of the present application, when it is determined that the construction environment meets a preset standard construction environment, it is illustrated that the construction environment is suitable for construction by a constructor at this time, and the monitoring background may activate preset construction equipment in the construction environment at this time, for example, may control the total power supply to supply power to each construction equipment.
S7: if not, acquiring the real-time environment parameters of the construction environment and sending the real-time environment parameters to a monitoring background.
In this application embodiment, when judging that the construction environment does not meet the preset standard construction environment, it is indicated that the construction environment is not suitable for construction personnel to construct at this time, and an intelligent terminal (such as various environment parameter acquisition modules) in the construction environment can acquire real-time environment parameters of the construction environment and send the real-time environment parameters to a monitoring background, and monitoring personnel at the monitoring background can go to a construction site to carry out environment rectification so as to enable the construction environment to meet the standard construction environment.
In an embodiment of the present application, as shown in fig. 2, the present invention further provides an intelligent construction device, including:
a construction state acquisition module 10 for acquiring a construction state of a constructor in real time;
a judging module 20, configured to judge whether the construction state meets a preset standard construction state, and judge whether the construction environment meets a preset standard construction environment;
an execution module 30, configured to execute a preset operation according to a determination result of the determination module 20;
wherein, when the judging module 20 judges whether the construction state meets a preset standard, the executing module 30 obtains a construction environment corresponding to the constructor; when the judging module 20 judges whether the construction state meets the preset standard construction state, the executing module 30 obtains the real-time position of the constructor and sends the real-time position to a monitoring background; when the judging module 20 judges whether the construction environment satisfies a preset standard construction environment, the executing module 30 activates preset construction equipment in the construction environment; when the judging module 20 judges whether the construction environment meets the preset standard construction environment, the executing module 30 obtains the real-time environment parameters of the construction environment and sends the real-time environment parameters to the monitoring background.
In the embodiment of the application, the intelligent construction device provided by the application can execute the intelligent construction method.
Referring to fig. 3, the embodiment of the present disclosure further provides an electronic device 100, including:
at least one processor; the method comprises the steps of,
a memory communicatively coupled to the at least one processor; wherein,,
the memory stores instructions executable by the at least one processor to enable the at least one processor to perform the smart worksite construction method of the foregoing method embodiments.
The disclosed embodiments also provide a non-transitory computer readable storage medium storing computer instructions for causing the computer to perform the foregoing method embodiments.
The disclosed embodiments also provide a computer program product comprising a computer program stored on a non-transitory computer readable storage medium, the computer program comprising program instructions which, when executed by a computer, cause the computer to perform the intelligent worksite construction method of the foregoing method embodiments.
The application provides a wisdom building site construction method, device and electronic equipment can carry out real-time supervision to constructor's construction state and construction environment's environmental parameter in real time, only can open construction equipment under the condition that both accord with the requirement, has reduced because construction quality hidden danger that nonstandard operation and construction environment are not up to standard brought, has improved the construction standard.
Referring now to fig. 3, a schematic diagram of an electronic device 100 suitable for use in implementing embodiments of the present disclosure is shown. The electronic devices in the embodiments of the present disclosure may include, but are not limited to, mobile terminals such as mobile phones, notebook computers, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), in-vehicle terminals (e.g., in-vehicle navigation terminals), and the like, and stationary terminals such as digital TVs, desktop computers, and the like. The electronic device shown in fig. 3 is merely an example and should not be construed to limit the functionality and scope of use of the disclosed embodiments.
As shown in fig. 3, the electronic device 100 may include a processing means (e.g., a central processing unit, a graphics processor, etc.) 101 that may perform various appropriate actions and processes according to a program stored in a Read Only Memory (ROM) 102 or a program loaded from a storage means 108 into a Random Access Memory (RAM) 103. In the RAM103, various programs and data necessary for the operation of the electronic apparatus 100 are also stored. The processing device 101, ROM102, and RAM103 are connected to each other by a bus 104. An input/output (I/0) interface 105 is also connected to bus 104.
In general, the following devices may be connected to the I/0 interface 105: input devices 106 including, for example, a touch screen, touchpad, keyboard, mouse, image sensor, microphone, accelerometer, gyroscope, etc.; an output device 107 including, for example, a Liquid Crystal Display (LCD), a speaker, a vibrator, and the like; storage devices 108 including, for example, magnetic tape, hard disk, etc.; and a communication device 109. The communication means 109 may allow the electronic device 100 to communicate wirelessly or by wire with other devices to exchange data. While an electronic device 100 having various means is shown in the figures, it is to be understood that not all of the illustrated means are required to be implemented or provided. More or fewer devices may be implemented or provided instead.
In particular, according to embodiments of the present disclosure, the processes described above with reference to flowcharts may be implemented as computer software programs. For example, embodiments of the present disclosure include a computer program product comprising a computer program embodied on a computer readable medium, the computer program comprising program code for performing the method shown in the flowcharts. In such an embodiment, the computer program may be downloaded and installed from a network via the communication means 109, or from the storage means 108, or from the ROM 102. The above-described functions defined in the methods of the embodiments of the present disclosure are performed when the computer program is executed by the processing device 101.
Referring now to fig. 4, there is illustrated a schematic diagram of a computer readable storage medium suitable for use in implementing embodiments of the present disclosure, the computer readable storage medium storing a computer program that, when executed by a processor, is capable of implementing a smart worksite construction method as described in any one of the above.
It should be noted that the computer readable medium described in the present disclosure may be a computer readable signal medium or a computer readable storage medium, or any combination of the two. The computer readable storage medium can be, for example, but not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or a combination of any of the foregoing. More specific examples of the computer-readable storage medium may include, but are not limited to: an electrical connection having one or more wires, a portable computer diskette, a hard disk, a Random Access Memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disc read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing. In the context of this disclosure, a computer-readable storage medium may be any tangible medium that can contain, or store a program for use by or in connection with an instruction execution system, apparatus, or device. In the present disclosure, however, the computer-readable signal medium may include a data signal propagated in baseband or as part of a carrier wave, with the computer-readable program code embodied therein. Such a propagated data signal may take any of a variety of forms, including, but not limited to, electro-magnetic, optical, or any suitable combination of the foregoing. A computer readable signal medium may also be any computer readable medium that is not a computer readable storage medium and that can communicate, propagate, or transport a program for use by or in connection with an instruction execution system, apparatus, or device. Program code embodied on a computer readable medium may be transmitted using any appropriate medium, including but not limited to: electrical wires, fiber optic cables, RF (radio frequency), and the like, or any suitable combination of the foregoing.
The computer readable medium may be contained in the electronic device; or may exist alone without being incorporated into the electronic device.
The computer readable medium carries one or more programs which, when executed by the electronic device, cause the electronic device to: acquiring at least two internet protocol addresses; sending a node evaluation request comprising the at least two internet protocol addresses to node evaluation equipment, wherein the node evaluation equipment selects an internet protocol address from the at least two internet protocol addresses and returns the internet protocol address; receiving an Internet protocol address returned by the node evaluation equipment; wherein the acquired internet protocol address indicates an edge node in the content distribution network.
Alternatively, the computer-readable medium carries one or more programs that, when executed by the electronic device, cause the electronic device to: receiving a node evaluation request comprising at least two internet protocol addresses; selecting an internet protocol address from the at least two internet protocol addresses; returning the selected internet protocol address; wherein the received internet protocol address indicates an edge node in the content distribution network.
Computer program code for carrying out operations for aspects of the present disclosure may be written in any combination of one or more programming languages, including an object oriented programming language such as Java, smal ltalk, C++ or the like and conventional procedural programming languages, such as the "C" programming language or similar programming languages. The program code may execute entirely on the user's computer, partly on the user's computer, as a stand-alone software package, partly on the user's computer and partly on a remote computer or entirely on the remote computer or server. In the case of remote computers, the remote computer may be connected to the user computer through any kind of network, including a Local Area Network (LAN) or a Wide Area Network (WAN), or may be connected to an external computer (e.g., connected through the internet using an internet service provider).
The flowcharts and block diagrams in the figures illustrate the architecture, functionality, and operation of possible implementations of systems, methods and computer program products according to various embodiments of the present disclosure. In this regard, each block in the flowchart or block diagrams may represent a module, segment, or portion of code, which comprises one or more executable instructions for implementing the specified logical function(s). It should also be noted that, in some alternative implementations, the functions noted in the block may occur out of the order noted in the figures. For example, two blocks shown in succession may, in fact, be executed substantially concurrently, or the blocks may sometimes be executed in the reverse order, depending upon the functionality involved. It will also be noted that each block of the block diagrams and/or flowchart illustration, and combinations of blocks in the block diagrams and/or flowchart illustration, can be implemented by special purpose hardware-based systems which perform the specified functions or acts, or combinations of special purpose hardware and computer instructions.
The units involved in the embodiments of the present disclosure may be implemented by means of software, or may be implemented by means of hardware. The name of the unit does not in any way constitute a limitation of the unit itself, for example the first acquisition unit may also be described as "unit acquiring at least two internet protocol addresses".
It should be understood that portions of the present disclosure may be implemented in hardware, software, firmware, or a combination thereof.
It should be noted that in this document, relational terms such as "first" and "second" and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one … …" does not exclude the presence of other like elements in a process, method, article, or apparatus that comprises the element. The foregoing is merely a specific embodiment of the application to enable one skilled in the art to understand or practice the application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the application. Thus, the present application is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
In summary, the foregoing description is only a preferred embodiment of the present invention, and is not intended to limit the scope of the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. An intelligent construction method for a construction site is characterized by comprising the following steps:
acquiring the construction state of constructors in real time;
judging whether the construction state meets a preset standard construction state or not;
if yes, acquiring a construction environment corresponding to the constructor;
if not, acquiring the real-time position of the constructor and sending the real-time position to a monitoring background;
judging whether the construction environment meets a preset standard construction environment or not;
if yes, activating preset construction equipment in the construction environment;
if not, acquiring real-time environment parameters of the construction environment and sending the real-time environment parameters to a monitoring background;
the step of obtaining the construction environment corresponding to the constructor comprises the following steps: acquiring the current position of the constructor; acquiring a first construction environment in a preset range around the current position; acquiring all historical positions of the constructors; acquiring second construction environments in a preset range around a short-distance historical position closest to the current position in all the historical positions; the first construction environment and the second construction environment are used as the construction environments together;
the step of obtaining the second construction environment in the preset range around the short-distance historical position closest to the current position in all the historical positions comprises the following steps: acquiring all the short-distance historical positions; acquiring the frequency corresponding to each short-distance historical position of the constructor in a preset period; acquiring a third construction environment in a preset range around the high-frequency historical position with highest frequency in all the near-distance historical positions; and taking the third construction environment as the second construction environment.
2. The intelligent construction method according to claim 1, wherein the acquiring the construction state of the constructor in real time comprises the steps of:
controlling the monitoring lens to face the first direction;
acquiring a first image in a first area corresponding to the first direction;
judging whether constructors exist in the first image;
if yes, acquiring the image information of the constructor;
if not, controlling the monitoring lens to face the second direction;
acquiring a second image in a second area corresponding to the second direction;
judging whether constructors exist in the second image;
if yes, acquiring the image information of the constructor;
if not, returning to the step of controlling the monitoring lens to face the first direction.
3. The intelligent worksite construction method according to claim 2, wherein the controlling the monitoring lens to face the second direction comprises the steps of:
acquiring an initial position of the monitoring lens;
acquiring a preset offset angle of the monitoring lens;
acquiring a first position corresponding to the first direction;
calculating the offset direction of the monitoring lens according to the initial position and the first position;
and continuously shifting the preset shifting angle relative to the first position along the shifting direction.
4. The intelligent construction method according to claim 3, further comprising the step of, after the acquisition of the image information of the constructor:
acquiring the definition of the image information;
judging whether the definition meets a preset value or not;
if yes, analyzing the image information;
if not, the focal length of the monitoring lens is adjusted to be high, and the definition step of acquiring the image information is returned.
5. The intelligent worksite construction method according to claim 4, further comprising the step of, after said parsing said image information:
acquiring the data volume of the image information;
judging whether the data quantity meets a preset value or not;
if yes, continuing to analyze the image information;
if not, acquiring the current position of the monitoring lens, continuously shifting the preset shifting angle relative to the current position along the shifting direction, and returning to the step of acquiring the data amount of the image information.
6. An intelligent worksite construction device, characterized in that the device comprises:
the construction state acquisition module is used for acquiring the construction state of constructors in real time;
the judging module is used for judging whether the construction state meets a preset standard construction state or not and judging whether the construction environment meets the preset standard construction environment or not;
the execution module is used for executing preset operation according to the judging result of the judging module;
when the judging module judges whether the construction state meets a preset standard construction state or not, the executing module acquires a construction environment corresponding to the constructor; when the judging module judges whether the construction state meets a preset standard construction state or not, the executing module acquires the real-time position of the constructor and sends the real-time position to a monitoring background; when the judging module judges whether the construction environment meets a preset standard construction environment or not, the executing module activates preset construction equipment in the construction environment; when the judging module judges whether the construction environment meets a preset standard construction environment or not, the executing module acquires real-time environment parameters of the construction environment and sends the real-time environment parameters to a monitoring background;
the obtaining the construction environment corresponding to the constructor comprises the following steps: acquiring the current position of the constructor; acquiring a first construction environment in a preset range around the current position; acquiring all historical positions of the constructors; acquiring second construction environments in a preset range around a short-distance historical position closest to the current position in all the historical positions; the first construction environment and the second construction environment are used as the construction environments together;
the step of obtaining the second construction environment in the preset range around the short-distance historical position closest to the current position in all the historical positions comprises the following steps: acquiring all the short-distance historical positions; acquiring the frequency corresponding to each short-distance historical position of the constructor in a preset period; acquiring a third construction environment in a preset range around the high-frequency historical position with highest frequency in all the near-distance historical positions; and taking the third construction environment as the second construction environment.
7. An electronic device, the electronic device comprising:
at least one processor; the method comprises the steps of,
a memory communicatively coupled to the at least one processor; wherein,,
the memory stores instructions executable by the at least one processor to enable the at least one processor to perform the intelligent worksite construction method of any one of the preceding claims 1-5.
8. A non-transitory computer readable storage medium storing computer instructions for causing the computer to perform the intelligent worksite construction method of any one of the preceding claims 1-5.
CN202110597025.4A 2021-05-28 2021-05-28 Intelligent construction method and device and electronic equipment Active CN113378670B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110597025.4A CN113378670B (en) 2021-05-28 2021-05-28 Intelligent construction method and device and electronic equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110597025.4A CN113378670B (en) 2021-05-28 2021-05-28 Intelligent construction method and device and electronic equipment

Publications (2)

Publication Number Publication Date
CN113378670A CN113378670A (en) 2021-09-10
CN113378670B true CN113378670B (en) 2023-08-01

Family

ID=77574868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110597025.4A Active CN113378670B (en) 2021-05-28 2021-05-28 Intelligent construction method and device and electronic equipment

Country Status (1)

Country Link
CN (1) CN113378670B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117035265A (en) * 2023-07-03 2023-11-10 中铁济南工程建设监理有限公司 Method and system for monitoring installation of electromechanical equipment in rail transit based on BIM technology

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020056677A1 (en) * 2018-09-20 2020-03-26 中建科技有限公司深圳分公司 Violation detection method, system, and device for building construction site
CN111160700A (en) * 2019-11-27 2020-05-15 国网江苏省电力有限公司盐城供电分公司 Distribution network construction safety quality control method and platform based on ubiquitous power Internet of things
CN111879671A (en) * 2020-07-29 2020-11-03 广联达科技股份有限公司 Environment monitoring method and device, electronic equipment and system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108227667A (en) * 2018-02-12 2018-06-29 立宏安全设备工程(上海)有限公司 A kind of shop equipment management system and management method
CN111506011A (en) * 2020-05-06 2020-08-07 北方工业大学 Construction safety monitoring method and device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020056677A1 (en) * 2018-09-20 2020-03-26 中建科技有限公司深圳分公司 Violation detection method, system, and device for building construction site
CN111160700A (en) * 2019-11-27 2020-05-15 国网江苏省电力有限公司盐城供电分公司 Distribution network construction safety quality control method and platform based on ubiquitous power Internet of things
CN111879671A (en) * 2020-07-29 2020-11-03 广联达科技股份有限公司 Environment monitoring method and device, electronic equipment and system

Also Published As

Publication number Publication date
CN113378670A (en) 2021-09-10

Similar Documents

Publication Publication Date Title
CN111475298B (en) Task processing method, device, equipment and storage medium
US10789033B2 (en) System and method for providing widget
CN111291244B (en) House source information display method, device, terminal and storage medium
CN110287810B (en) Vehicle door motion detection method, device and computer readable storage medium
CN112395188B (en) Test-oriented software project development method and device, electronic equipment and storage medium
CN111738316B (en) Zero sample learning image classification method and device and electronic equipment
CN110795196A (en) Window display method, device, terminal and storage medium
CN113378670B (en) Intelligent construction method and device and electronic equipment
CN111626990B (en) Target detection frame processing method and device and electronic equipment
CN117241092A (en) Video processing method and device, storage medium and electronic equipment
CN115567949A (en) Wireless network topology optimization method and device, electronic equipment and medium
CN112416189B (en) Cross-page focus searching method and device and electronic equipment
CN111625326B (en) Task pipeline execution method and device and electronic equipment
CN114090817A (en) Dynamic construction method and device of face feature database and storage medium
CN110851097B (en) Control method, device, medium and electronic equipment for consistency of handwriting data
CN111857915B (en) Application page display method and device
CN111290812B (en) Display method, device, terminal and storage medium of application control
CN113660699A (en) Intelligent cluster networking method and device and electronic equipment
CN109710911B (en) Content typesetting method and device for cells, electronic equipment and storage medium
CN112732248A (en) Modularized software development method and device, electronic equipment and storage medium
CN110807164B (en) Automatic image area adjusting method and device, electronic equipment and computer readable storage medium
CN113359977A (en) Virtual reality construction training method and device and electronic equipment
CN110851185A (en) Automatic configuration method and device for equipment, electronic equipment and storage medium
CN115908143B (en) Vehicle cross-layer parking method, device, electronic equipment and computer readable medium
CN117473047B (en) Business text generation method and device, electronic equipment and readable storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant