CN113343422A - Rail transit operation simulation method and system - Google Patents
Rail transit operation simulation method and system Download PDFInfo
- Publication number
- CN113343422A CN113343422A CN202110495617.5A CN202110495617A CN113343422A CN 113343422 A CN113343422 A CN 113343422A CN 202110495617 A CN202110495617 A CN 202110495617A CN 113343422 A CN113343422 A CN 113343422A
- Authority
- CN
- China
- Prior art keywords
- target
- rail transit
- data
- operation simulation
- train
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004088 simulation Methods 0.000 title claims abstract description 213
- 238000000034 method Methods 0.000 title claims abstract description 54
- 238000010586 diagram Methods 0.000 claims description 27
- 230000008569 process Effects 0.000 claims description 22
- 238000012544 monitoring process Methods 0.000 claims description 3
- 238000011156 evaluation Methods 0.000 abstract description 7
- 238000004590 computer program Methods 0.000 description 6
- 238000004891 communication Methods 0.000 description 4
- 238000012795 verification Methods 0.000 description 4
- 238000004364 calculation method Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 230000003287 optical effect Effects 0.000 description 2
- 230000001133 acceleration Effects 0.000 description 1
- 238000013473 artificial intelligence Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/40—Business processes related to the transportation industry
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Business, Economics & Management (AREA)
- Geometry (AREA)
- Human Resources & Organizations (AREA)
- Evolutionary Computation (AREA)
- Computer Hardware Design (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Abstract
The invention provides a rail transit operation simulation method and a system, wherein the system comprises the following steps: the scene unit is used for determining a target decision instruction according to the received target operation simulation request; the model unit is connected with the scene unit and used for determining a target operation simulation model adopted by the rail transit vehicle according to the target decision instruction and performing train operation simulation on the rail transit vehicle according to the target operation data; and the data unit is connected with the model unit and used for storing target operation data required by the model unit for train operation simulation. According to the rail transit operation simulation system provided by the invention, through the mutual cooperation of the scene unit, the model unit and the data unit, efficient and accurate simulation and evaluation operation on rail transit vehicles in different scenes can be realized, and operators are assisted to make quick operation decisions.
Description
Technical Field
The invention relates to the technical field of rail transit, in particular to a rail transit operation simulation method and system.
Background
With the acceleration of urbanization pace, the new scale of urban rail transit is rapidly developed, and the quantity of inland open urban rail transit is expected to reach 44 in the end of the year, and the quantity of inland open urban rail transit is expected to reach 60 in cities under construction. At present, the finished investment amount of urban rail transit is continuously increased, more than 2.6 trillion yuan is expected to be realized by 2020, and the total finished passenger transport amount is about 960 million people. Therefore, the responsibility of operation management is increased; in the era of rapid development of artificial intelligence, operation management tends to be intelligent, so that rail transit operation simulation becomes especially important.
Based on the diversity of operation scenes, the operating simulation requirements under different scenes are different in emphasis, but efficient and accurate results are required. For example, in the scene of operation diagram verification, it is desirable to be able to perform driving simulation quickly and efficiently and prompt operation conflict; in a scene of passenger flow deduction, it is desirable to quickly assign passenger flows and calculate a passenger flow congestion section and the like. In the prior art, rail transit operation simulation mainly focuses on efficient operation in a certain scene, and efficient and accurate simulation in different scenes cannot be supported, and diversified performance requirements cannot be met.
Disclosure of Invention
The rail transit operation simulation method and system provided by the invention are used for overcoming at least one problem in the prior art, and can realize efficient and accurate simulation and evaluation operation on rail transit vehicles in different scenes through the mutual cooperation of the scene unit, the model unit and the data unit, so as to assist operators in making quick operation decisions.
The invention provides a rail transit operation simulation system, which comprises:
the scene unit is used for determining a target decision instruction according to the received target operation simulation request;
the model unit is connected with the scene unit and used for determining a target operation simulation model adopted by the rail transit vehicle according to the target decision instruction and performing train operation simulation on the rail transit vehicle according to target operation data;
and the data unit is connected with the model unit and is used for storing the target operation data required by the model unit for train operation simulation.
According to the rail transit operation simulation system provided by the invention, the scene unit comprises:
the scene analyzer is used for determining a target scene and a target scene performance requirement according to the received target operation simulation request and determining the target decision instruction according to the target scene and the target scene performance requirement;
and the scene library is connected with the scene analyzer and is used for storing the target scene and the performance requirement of the target scene.
According to the rail transit operation simulation system provided by the invention, the model unit comprises:
the target operation simulation accurate model is connected with the scene unit and used for simulating the rail transit vehicle according to first target operation data;
the target operation simulation rough model is connected with the scene unit and used for simulating the rail transit vehicle according to second target operation data;
wherein the target operation simulation model comprises the target operation simulation accurate model and the target operation simulation rough model;
the target operational data includes the first target operational data and the second target operational data.
According to the rail transit operation simulation system provided by the invention, the target operation simulation accurate model comprises:
the train control operation process accurate sub-model is connected with the scene unit and used for simulating the train operation process according to the train line data of a first preset level when the first target operation data is the train line data of the first preset level;
and the passenger flow deduction accurate submodel is connected with the scene unit and used for simulating the distribution of the passenger flow of the train according to the passenger flow data of the train at the first preset level when the first target operation data is the passenger flow data of the train at the first preset level.
According to the rail transit operation simulation system provided by the invention, the target operation simulation rough model comprises the following components:
the train control operation process rough sub-model is connected with the scene unit and used for simulating the train operation diagram according to the train operation diagram data of a second preset level when the second target operation data is the train operation diagram data of the second preset level;
and the passenger flow deduction rough submodel is connected with the scene unit and used for simulating the train passenger flow distribution according to the train passenger flow data of a second preset level when the second target operation data is the train passenger flow data of the second preset level.
The rail transit operation simulation system provided by the invention further comprises:
and the interface unit is connected with the model unit and used for providing a target general interface and is connected with a target track traffic external system through the target general interface so that the target track traffic external system can obtain a simulation result of train operation simulation of the track traffic vehicle by the model unit.
According to the rail transit operation simulation system provided by the invention, the target rail transit external system comprises at least one of the following systems:
the system comprises an automatic train monitoring system, a running chart drawing software, a subway gate system and a train control system.
The invention also provides a rail transit operation simulation method, which comprises the following steps:
determining a target decision instruction according to the received target operation simulation request;
determining a target operation simulation model adopted by the rail transit vehicle according to the target decision instruction, and performing train operation simulation on the rail transit vehicle according to target operation data;
the target operation data is train data required for train operation simulation of the rail transit vehicle.
According to the rail transit operation simulation method provided by the invention, the target decision instruction is determined according to the received target operation simulation request, and the method comprises the following steps:
determining a target scene and a target scene performance requirement according to the received target operation simulation request;
and determining the target decision instruction according to the target scene and the target scene performance requirement.
According to the rail transit operation simulation method provided by the invention, the target operation simulation model adopted by the rail transit vehicle is determined according to the target decision instruction, and the train operation simulation is carried out on the rail transit vehicle according to the target operation data, and the method comprises the following steps:
determining that the target operation simulation model adopted by the rail transit vehicle is a target operation simulation accurate model according to the target decision instruction, and simulating the rail transit vehicle according to first target operation data on the basis of the target operation simulation accurate model; and
determining the target operation simulation model adopted by the rail transit vehicle as a target operation simulation rough model according to the target decision instruction, and simulating the rail transit vehicle according to second target operation data based on the target operation simulation rough model;
wherein the target operational data includes the first target operational data and the second target operational data.
According to the rail transit operation simulation method and system provided by the invention, efficient and accurate simulation and evaluation operation of rail transit vehicles in different scenes can be realized through mutual cooperation of the scene unit, the model unit and the data unit, and operators are assisted to make quick operation decisions.
Drawings
In order to more clearly illustrate the technical solutions of the present invention or the prior art, the drawings needed for the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and those skilled in the art can also obtain other drawings according to the drawings without creative efforts.
FIG. 1 is a schematic structural diagram of a rail transit operation simulation system provided by the present invention;
FIG. 2 is a schematic diagram of a scene unit provided in the present invention;
FIG. 3 is a schematic flow chart of a rail transit operation simulation method provided by the present invention;
fig. 4 is a schematic structural diagram of an electronic device provided in the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention clearer, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings, and it is obvious that the described embodiments are some, but not all embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Fig. 1 is a schematic flow diagram of a rail transit operation simulation system provided in the present invention, and as shown in fig. 1, the system includes:
a scene unit 10, configured to determine a target decision instruction according to a received target operation simulation request;
the model unit 11 is connected with the scene unit 10 and used for determining a target operation simulation model adopted by the rail transit vehicle according to the target decision instruction and performing train operation simulation on the rail transit vehicle according to the target operation data;
and the data unit 12 is connected with the model unit 11 and is used for storing target operation data required by the model unit 11 for train operation simulation.
Optionally, the rail transit operation simulation system provided by the present invention includes a scene unit 10, a model unit 11, and a data unit 12, where the scene unit 10 is configured to analyze a received target operation simulation request to determine a target decision instruction, where the target operation simulation request may be a front-end web page and various external systems that are externally connected to receive various operation simulation requests sent by the front-end web page, such as operation diagram verification requests, passenger flow deduction requests, train operation process analysis requests, and other operation simulation requests. Then, the scene unit 10 determines a target decision instruction according to the received target operation simulation request, and sends the target decision instruction to the model unit 11.
It should be noted that the target decision instruction changes according to a change of the received target operation simulation request, specifically, for example, when the target operation simulation request is an operation diagram verification request, the target decision instruction instructs to select a target operation simulation model for performing operation diagram calculation, and when the target operation simulation model is a passenger flow deduction request, the target decision instruction instructs to select a target operation simulation model for performing passenger flow deduction calculation.
The model unit 11 and the scene unit 10 may be connected by a communication connection method, and receive a target decision instruction sent by the scene unit 10, and then the model unit 11 determines a target operation simulation model adopted by the rail transit vehicle according to the received target decision instruction, and performs train operation simulation and evaluation operation on the rail transit vehicle according to target operation data. Wherein the target operational data is stored in the data unit 12.
The data unit 12 is connected to the model unit 11, and provides the model unit 11 with target operation data required for train operation simulation. The target operation data may be specifically train route data, VOBC data of the vehicle controller, and the like generated during the operation of the train, and different types of data are stored in different universal templates of the data unit 12.
It should be noted that the target operation data may be stored in the data unit 12 by using a general data structure, and specifically, the target operation data may be stored in the data unit 12 by using a form such as an array, a linked list, a stack, a queue, a hash table, a tree structure, or a heap structure.
According to the rail transit operation simulation system provided by the invention, through the mutual cooperation of the scene unit, the model unit and the data unit, efficient and accurate simulation and evaluation operation on rail transit vehicles in different scenes can be realized, and operators are assisted to make quick operation decisions.
Further, in an embodiment, as shown in fig. 2, the scene unit 10 may specifically include:
the scene analyzer 101 is configured to determine a target scene and a target scene performance requirement according to the received target operation simulation request, and determine a target decision instruction according to the target scene and the target scene performance requirement;
and the scene library 102 is connected with the scene analyzer 101 and is used for storing the target scene and the target scene performance requirement.
Optionally, the scene unit 10 mainly includes a scene analyzer 101 and a scene library 102, where the scene analyzer 101 is configured to determine a target scene and a target scene performance requirement corresponding to the target scene according to a received target operation simulation request, and determine a target decision instruction according to the target scene and the target scene performance requirement.
The target scenes and the target scene performance requirements corresponding to the target scenes are stored in the scene library 102 in advance, all related scene information is stored in the scene library 102, and each scene information comprises scene input, scene output and scene performance requirements. The scene analyzer 101 extracts relevant information from the scene library 102 according to the input target operation simulation request, and outputs a target decision instruction for the model unit 11 to determine an adopted target operation simulation model according to the target decision instruction.
For example, the following target scenarios and their corresponding target scenario performance requirements are stored in the scenario library 102:
scene 1: when a certain train on the X line breaks down, the state of the whole train changes when the train is guided to be off line under the condition of needing to simulate the X line; because the failure of the train may cause other trains to degrade or stop within the interval, careful simulation of the train operation is required.
Scene 2 is: when an X-line drawing person needs to verify the operation diagram, various operation indexes of the operation diagram need to be obtained. At the moment, the whole train is in a normal state, and at the moment, the operation index of the operation diagram and the line conflict prompt need to be rapidly acquired.
It should be noted that the scenario library 102 may be created by an expert through statistics of different operation scenarios and corresponding performance requirements thereof according to experience.
According to the rail transit operation simulation system provided by the invention, the scene analyzer is utilized to analyze the input simulation request to obtain the target scene and the corresponding performance requirement, and then the target decision instruction is determined according to the target scene and the corresponding performance requirement, so that the model unit can select a proper target operation simulation model according to the target decision instruction to meet diversified simulation operation requirements.
Further, in an embodiment, as shown in fig. 1, the model unit 11 may specifically include:
the target operation simulation accurate model 111 is connected with the scene unit 10 and used for simulating the rail transit vehicle according to the first target operation data;
the target operation simulation rough model 112 is connected with the scene unit 10 and used for simulating the rail transit vehicle according to the second target operation data;
the target operation simulation model comprises a target operation simulation accurate model and a target operation simulation rough model;
the target operational data includes the first target operational data and the second target operational data.
Optionally, the model unit 11 includes a target operation simulation accurate model 111 and a target operation simulation coarse model 112, where the target operation simulation accurate model 111 is connected to the scene unit and is used for performing careful simulation on the rail transit vehicle according to the first target operation data stored in the data unit 12. And the target operation simulation rough model 112 is connected with the scene unit and is used for roughly simulating the rail transit vehicle according to the second target operation data stored in the data unit 12.
For example, when the VOBC data stored in the data unit 12, the target run simulation accurate model 111 and the target run simulation coarse model 112 are used to extract VOBC data, information such as a running direction and an accumulated running distance in the target run simulation data can be obtained, but the data is also hierarchical. The travel direction and the accumulated travel distance may each be divided into first target operational data and second target operational data, wherein the first target operational data is a more detailed explanation of the second target operational data. And after the target operation simulation accurate model 111 acquires the operation direction and the accumulated operation distance data, performing deep analysis, and performing thorough analysis on the rail transit vehicle by using the first target operation data. After the target operation simulation rough model 112 obtains the operation direction and the accumulated operation distance, rough simulation is performed on the rail transit vehicle by analyzing the second target operation data.
The rail transit operation simulation system provided by the invention overcomes the defect of larger simulation efficiency deviation under different scenes due to the fact that the same simulation model is adopted in the face of various scenes in the prior art, and can adapt to performance and function requirements under different scenes by calling different simulation models according to different operation scenes, so that efficient and accurate simulation operation under different scenes is realized.
Further, in an embodiment, the running of the accurate simulation model 111 by the target may specifically include:
the train control operation process accurate sub-model is connected with the scene unit 10 and used for simulating the train operation process according to the train line data of the first preset level when the first target operation data is the train line data of the first preset level;
the passenger flow deduction accurate submodel is connected with the scene unit 10 and used for simulating the distribution of the train passenger flow volume according to the train passenger flow data of the first preset level when the first target operation data is the train passenger flow data of the first preset level.
Optionally, in order to adapt to different scenes, the target running simulation precision model 111 in the model unit 11 includes a plurality of precision submodels supporting different scenes. For example, the train control running process accurate submodel aims at the simulation of the train control running process, and the passenger flow deduction accurate submodel aims at the passenger flow distribution of the train.
The accurate submodel of train operation process, when the first target operation data is the train line data of first preset level, simulate the train operation process according to the train line data of first preset level, for example:
in scenario 1 above: when a certain train on the X line breaks down, the state of the whole train changes when the train is guided to be off line under the condition of needing to simulate the X line; because the fault of the train can cause other trains to be degraded or stop in the interval, the running process of the train needs to be carefully simulated; at the moment, a train control operation process accurate sub-model is needed, train line data including turnout data and signal machine data of the train are obtained, and original speed operation simulation or double speed operation simulation is carried out on the rail transit vehicle. The turnout data and the signal machine data are divided into turnout 1-level data and turnout 2-level data according to the data per se detail degree, the signal machine data are divided into signal machine 1-level data and signal machine 2-level data, and the 2-level data is a more detailed explanation of the 1-level data. The method comprises the steps of deeply analyzing train line data of a first preset level, such as turnout 2 level data, and carrying out careful simulation on the train running process.
The passenger flow deduction accurate submodel realizes the density simulation of the train passenger flow distribution by deeply analyzing the train passenger flow data of a first preset level, such as the passenger flow 2-level data.
The rail transit operation simulation system provided by the invention realizes high-efficiency and accurate simulation of rail transit vehicles under different scenes by utilizing different types of accurate simulation models.
Further, in one embodiment, the running of the simulated coarse model 112 by the target may specifically include:
the train control operation process rough sub-model is connected with the scene unit 10 and used for simulating the train operation diagram according to the train operation diagram data of the second preset level when the second target operation data is the train operation diagram data of the second preset level;
and the passenger flow deduction rough submodel is connected with the scene unit 10 and used for simulating the train passenger flow volume distribution according to the train passenger flow data of the second preset level when the second target operation data is the train passenger flow data of the second preset level.
Optionally, in order to adapt to different scenarios, the target run simulation coarse model 112 in the model unit 11 includes a plurality of coarse submodels supporting different scenarios. For example, a train control operation process rough sub-model for train control operation process simulation, and a passenger flow deduction rough sub-model for train passenger flow volume distribution.
The train control operation process rough sub-model roughly simulates the train operation process according to the train operation diagram data of the second preset level when the second target operation data is the train operation diagram data of the second preset level, such as various operation indexes of the train operation diagram,
for example: in scenario 2 above: when an X-line chart editor needs to verify the operation chart and needs to acquire various operation indexes of the operation chart, and at the moment, the whole train is in a normal state, the train control operation process rough sub-model can be used for analyzing various acquired operation index data of the second preset level operation chart, such as operation index 1 level data, so that the operation indexes of the operation chart and the line conflict prompt are quickly acquired.
And analyzing the passenger flow deduction accurate submodel of the train, such as passenger flow 1-level data, to realize rough simulation of the passenger flow distribution of the train.
The rail transit operation simulation system provided by the invention realizes high-efficiency and accurate simulation of rail transit vehicles in different scenes by utilizing different types of rough simulation models.
Further, in an embodiment, as shown in fig. 1, the rail transit operation simulation system provided by the present invention may further specifically include: and the interface unit 13 is connected with the model unit 11, and is used for providing a target general interface and connecting with a target rail transit external system through the target general interface, so that the target rail transit external system can obtain a simulation result of train operation simulation of the rail transit vehicle by the model unit 11.
Further, in one embodiment, the target track traffic external system comprises at least one of:
the system comprises an automatic train monitoring system, a running chart drawing software, a subway gate system and a train control system.
Optionally, the interface unit 13 is connected to the model unit 11, and the interface unit 13 is mainly used for providing a target general interface and performing data exchange to the outside. Various rail transit systems in use in the market are considered, and a universal interface standard is formulated so as to achieve the purpose of being compatible with various rail transit systems in the market. So that the target external system of rail transit acquires and displays the simulation result and the evaluation index of train operation simulation of the rail transit vehicle by the model unit through the interface unit 13.
For example: the operation diagram verification result can be fed back to the operation diagram compiling software to assist a mapper in operation diagram adjustment, target operation data can be obtained from a target rail transit external system, and a corresponding target operation simulation model is selected through the model unit 11 to carry out simulation synchronization on rail transit vehicles.
For another example, when a fault occurs in the field, various types of operation data can be input from the field train control system, different decision operation deductions based on the current time can be performed, and a dispatcher can be assisted to select an optimal decision to perform dispatching.
The rail transit operation simulation system provided by the invention is externally compatible with various rail transit external systems by providing the universal interface, and assists operators to make quick operation decisions.
The rail transit operation simulation method provided by the invention is described below, and the rail transit operation simulation method described below and the rail transit operation simulation method described above can be referred to correspondingly.
Fig. 3 is a schematic flow chart of a rail transit operation simulation method provided by the present invention, as shown in fig. 3, including:
s1, determining a target decision instruction according to the received target operation simulation request;
s2, determining a target operation simulation model adopted by the rail transit vehicle according to the target decision instruction, and performing train operation simulation on the rail transit vehicle according to the target operation data;
the target operation data is train data required by train operation simulation of the rail transit vehicle.
It should be noted that the execution subject of the method may be a computer device or a rail transit operation simulation system provided by the present invention.
According to the rail transit operation simulation method provided by the invention, through the mutual cooperation of the scene unit, the model unit and the data unit, efficient and accurate simulation and evaluation operation on rail transit vehicles in different scenes can be realized, and operators are assisted to make quick operation decisions.
Further, in an embodiment, the step S1 may specifically include:
s11, determining a target scene and a target scene performance requirement according to the received target operation simulation request;
and S12, determining a target decision instruction according to the target scene and the performance requirement of the target scene.
According to the rail transit operation simulation method provided by the invention, the input simulation request is analyzed to obtain the target scene and the corresponding performance requirement, the target decision instruction is further determined according to the target scene and the corresponding performance requirement, and the appropriate target operation simulation model is selected according to the target decision instruction so as to meet the diversified simulation operation requirements.
Further, in an embodiment, the step S2 may specifically include:
s21, determining a target operation simulation model adopted by the rail transit vehicle as a target operation simulation accurate model according to the target decision instruction, and simulating the rail transit vehicle according to the first target operation data based on the target operation simulation accurate model;
s22, determining a target operation simulation model adopted by the rail transit vehicle as a target operation simulation rough model according to the target decision instruction, and simulating the rail transit vehicle according to second target operation data based on the target operation simulation rough model;
wherein the target operational data includes the first target operational data and the second target operational data.
The rail transit operation simulation method provided by the invention overcomes the defect of larger simulation efficiency deviation under different scenes due to the fact that the same simulation model is adopted in the face of various scenes in the prior art, and can adapt to performance and function requirements under different scenes by calling different simulation models according to different operation scenes, so that efficient and accurate simulation operation under different scenes is realized.
Fig. 4 is a schematic structural diagram of an electronic device provided in the present invention, and as shown in fig. 4, the electronic device may include: a processor (processor)410, a communication interface 411, a memory (memory)412 and a bus (bus)413, wherein the processor 410, the communication interface 411 and the memory 412 complete communication with each other through the bus 413. The processor 410 may call logic instructions in the memory 412 to perform the following method:
determining a target decision instruction according to the received target operation simulation request;
determining a target operation simulation model adopted by the rail transit vehicle according to the target decision instruction, and performing train operation simulation on the rail transit vehicle according to the target operation data;
the target operation data is train data required by train operation simulation of the rail transit vehicle.
In addition, the logic instructions in the memory may be implemented in the form of software functional units and may be stored in a computer readable storage medium when sold or used as a stand-alone product. Based on such understanding, the technical solution of the present invention or a part thereof, which essentially contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium and includes instructions for causing a computer power screen (which may be a personal computer, a server, or a network power screen, etc.) to perform all or part of the steps of the method according to the embodiments of the present invention. And the aforementioned storage medium includes: a U-disk, a removable hard disk, a Read-only Memory (ROM), a Random Access Memory (RAM), a magnetic disk or an optical disk, and the like.
Further, the present invention discloses a computer program product comprising a computer program stored on a non-transitory computer readable storage medium, the computer program comprising program instructions, which when executed by a computer, the computer is capable of executing the rail transit operation simulation method provided by the above-mentioned method embodiments, for example, the computer program comprises:
determining a target decision instruction according to the received target operation simulation request;
determining a target operation simulation model adopted by the rail transit vehicle according to the target decision instruction, and performing train operation simulation on the rail transit vehicle according to the target operation data;
the target operation data is train data required by train operation simulation of the rail transit vehicle.
In another aspect, the present invention further provides a non-transitory computer readable storage medium, on which a computer program is stored, where the computer program is implemented to execute the rail transit operation simulation method provided in the foregoing embodiments, for example, the method includes:
determining a target decision instruction according to the received target operation simulation request;
determining a target operation simulation model adopted by the rail transit vehicle according to the target decision instruction, and performing train operation simulation on the rail transit vehicle according to the target operation data;
the target operation data is train data required by train operation simulation of the rail transit vehicle.
The above-described system embodiments are merely illustrative, and the units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of the present embodiment. One of ordinary skill in the art can understand and implement it without inventive effort.
Through the above description of the embodiments, those skilled in the art will clearly understand that each embodiment can be implemented by software plus a necessary general hardware platform, and certainly can also be implemented by hardware. Based on such understanding, the above technical solutions may be essentially or partially implemented in the form of software products, which may be stored in computer readable storage media, such as ROM/RAM, magnetic disk, optical disk, etc., and include instructions for causing a computer power supply screen (which may be a personal computer, a server, or a network power supply screen, etc.) to execute the method according to the embodiments or some parts of the embodiments.
Finally, it should be noted that: the above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.
Claims (10)
1. A rail transit operation simulation system, comprising:
the scene unit is used for determining a target decision instruction according to the received target operation simulation request;
the model unit is connected with the scene unit and used for determining a target operation simulation model adopted by the rail transit vehicle according to the target decision instruction and performing train operation simulation on the rail transit vehicle according to target operation data;
and the data unit is connected with the model unit and is used for storing the target operation data required by the model unit for train operation simulation.
2. The rail transit operation simulation system according to claim 1, wherein the scene unit comprises:
the scene analyzer is used for determining a target scene and a target scene performance requirement according to the received target operation simulation request and determining the target decision instruction according to the target scene and the target scene performance requirement;
and the scene library is connected with the scene analyzer and is used for storing the target scene and the performance requirement of the target scene.
3. The rail transit operation simulation system according to claim 1, wherein the model unit includes:
the target operation simulation accurate model is connected with the scene unit and used for simulating the rail transit vehicle according to first target operation data;
the target operation simulation rough model is connected with the scene unit and used for simulating the rail transit vehicle according to second target operation data;
wherein the target operation simulation model comprises the target operation simulation accurate model and the target operation simulation rough model;
the target operational data includes the first target operational data and the second target operational data.
4. The rail transit operation simulation system according to claim 3, wherein the target operation simulation accurate model comprises:
the train control operation process accurate sub-model is connected with the scene unit and used for simulating the train operation process according to the train line data of a first preset level when the first target operation data is the train line data of the first preset level;
and the passenger flow deduction accurate submodel is connected with the scene unit and used for simulating the distribution of the passenger flow of the train according to the passenger flow data of the train at the first preset level when the first target operation data is the passenger flow data of the train at the first preset level.
5. The rail transit operation simulation system according to claim 3, wherein the target operation simulation coarse model includes:
the train control operation process rough sub-model is connected with the scene unit and used for simulating the train operation diagram according to the train operation diagram data of a second preset level when the second target operation data is the train operation diagram data of the second preset level;
and the passenger flow deduction rough submodel is connected with the scene unit and used for simulating the train passenger flow distribution according to the train passenger flow data of a second preset level when the second target operation data is the train passenger flow data of the second preset level.
6. The rail transit operation simulation system according to any one of claims 1 to 5, further comprising:
and the interface unit is connected with the model unit and used for providing a target general interface and is connected with a target track traffic external system through the target general interface so that the target track traffic external system can obtain a simulation result of train operation simulation of the track traffic vehicle by the model unit.
7. The rail transit operation simulation system of claim 6, wherein the target rail transit external system comprises at least one of:
the system comprises an automatic train monitoring system, a running chart drawing software, a subway gate system and a train control system.
8. A rail transit operation simulation method is characterized by comprising the following steps:
determining a target decision instruction according to the received target operation simulation request;
determining a target operation simulation model adopted by the rail transit vehicle according to the target decision instruction, and performing train operation simulation on the rail transit vehicle according to target operation data;
the target operation data is train data required for train operation simulation of the rail transit vehicle.
9. The rail transit operation simulation method according to claim 8, wherein the determining a target decision instruction according to the received target operation simulation request includes:
determining a target scene and a target scene performance requirement according to the received target operation simulation request;
and determining the target decision instruction according to the target scene and the target scene performance requirement.
10. The rail transit operation simulation method according to claim 8, wherein the determining a target operation simulation model adopted by a rail transit vehicle according to the target decision instruction and performing train operation simulation on the rail transit vehicle according to target operation data comprises:
determining that the target operation simulation model adopted by the rail transit vehicle is a target operation simulation accurate model according to the target decision instruction, and simulating the rail transit vehicle according to first target operation data on the basis of the target operation simulation accurate model; and
determining the target operation simulation model adopted by the rail transit vehicle as a target operation simulation rough model according to the target decision instruction, and simulating the rail transit vehicle according to second target operation data based on the target operation simulation rough model;
wherein the target operational data includes the first target operational data and the second target operational data.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110495617.5A CN113343422B (en) | 2021-05-07 | 2021-05-07 | Rail transit operation simulation method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110495617.5A CN113343422B (en) | 2021-05-07 | 2021-05-07 | Rail transit operation simulation method and system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113343422A true CN113343422A (en) | 2021-09-03 |
CN113343422B CN113343422B (en) | 2024-10-15 |
Family
ID=77469834
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110495617.5A Active CN113343422B (en) | 2021-05-07 | 2021-05-07 | Rail transit operation simulation method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113343422B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113806962A (en) * | 2021-09-30 | 2021-12-17 | 卡斯柯信号有限公司 | Multi-speed simulation operation control method for rail transit signal system |
CN114715227A (en) * | 2022-03-08 | 2022-07-08 | 通号城市轨道交通技术有限公司 | Method and device for generating train simulation operation diagram |
WO2024139814A1 (en) * | 2022-12-27 | 2024-07-04 | 卡斯柯信号有限公司 | Train operation scenario general simulation method and system, and device and medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20120074060A (en) * | 2010-12-27 | 2012-07-05 | 주식회사 포스코아이씨티 | Apparatus for simulating train operation and system for simulating train operation comprising that apparatus |
RU2685368C1 (en) * | 2018-10-29 | 2019-04-17 | Акционерное общество "Научно-исследовательский и проектно-конструкторский институт информатизации, автоматизации и связи на железнодорожном транспорте" | Device for construction of forecast energy-saving train schedules |
CN110728612A (en) * | 2019-10-10 | 2020-01-24 | 北京全路通信信号研究设计院集团有限公司 | Rail transit emergency simulation evaluation method and system |
CN110766298A (en) * | 2019-10-10 | 2020-02-07 | 北京全路通信信号研究设计院集团有限公司 | Multi-standard multi-service rail transit simulation method and system |
-
2021
- 2021-05-07 CN CN202110495617.5A patent/CN113343422B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20120074060A (en) * | 2010-12-27 | 2012-07-05 | 주식회사 포스코아이씨티 | Apparatus for simulating train operation and system for simulating train operation comprising that apparatus |
RU2685368C1 (en) * | 2018-10-29 | 2019-04-17 | Акционерное общество "Научно-исследовательский и проектно-конструкторский институт информатизации, автоматизации и связи на железнодорожном транспорте" | Device for construction of forecast energy-saving train schedules |
CN110728612A (en) * | 2019-10-10 | 2020-01-24 | 北京全路通信信号研究设计院集团有限公司 | Rail transit emergency simulation evaluation method and system |
CN110766298A (en) * | 2019-10-10 | 2020-02-07 | 北京全路通信信号研究设计院集团有限公司 | Multi-standard multi-service rail transit simulation method and system |
Non-Patent Citations (2)
Title |
---|
田亮等: ""轨道交通调度培训与延误处置仿真 系统设计与开发"", 《上海建设科技》, no. 2, 30 April 2021 (2021-04-30) * |
董皓;康会峰;廖琦;李璇;: "基于多智能体的城市轨道交通列车延误仿真模型及应用", 都市快轨交通, no. 03, 18 June 2016 (2016-06-18) * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113806962A (en) * | 2021-09-30 | 2021-12-17 | 卡斯柯信号有限公司 | Multi-speed simulation operation control method for rail transit signal system |
CN114715227A (en) * | 2022-03-08 | 2022-07-08 | 通号城市轨道交通技术有限公司 | Method and device for generating train simulation operation diagram |
WO2024139814A1 (en) * | 2022-12-27 | 2024-07-04 | 卡斯柯信号有限公司 | Train operation scenario general simulation method and system, and device and medium |
Also Published As
Publication number | Publication date |
---|---|
CN113343422B (en) | 2024-10-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110795818B (en) | Method and device for determining virtual test scene, electronic equipment and storage medium | |
CN113343422A (en) | Rail transit operation simulation method and system | |
CN103529711B (en) | Automatic testing method and system for ATC vehicle-mounted equipment | |
CN113343461A (en) | Simulation method and device for automatic driving vehicle, electronic equipment and storage medium | |
CN110717248A (en) | Method and system for generating automatic driving simulation scene, server and medium | |
CN115599694A (en) | Integrated test method for automatic driving software version | |
CN103457763B (en) | Multi-channel information distribution method based on strategy and system and automatization's operation platform | |
CN114005297B (en) | Vehicle team coordinated driving method based on Internet of vehicles | |
CN113222409A (en) | Intelligent scheduling system and method for urban rail transit | |
CN115017050A (en) | Automatic driving test scene generation system and method | |
CN112233428A (en) | Traffic flow prediction method, traffic flow prediction device, storage medium and equipment | |
Liu et al. | Prediction algorithms for train arrival time in urban rail transit | |
CN112418574A (en) | Artificial intelligence-based urban rail transit operation simulation system and method | |
CN107451342A (en) | A kind of rule verification method and device of rail traffic signal system basic data | |
CN114912854B (en) | Subway train operation adjusting method and device, electronic equipment and storage medium | |
CN114356502B (en) | Unstructured data marking, training and publishing system and method based on edge computing technology | |
CN113793490B (en) | Pressure testing method and device for electronic fence, storage medium and terminal | |
CN112347623A (en) | Online simulation platform for simulating vehicle control and vehicle control method | |
CN114707284A (en) | High-speed railway section passing capacity simulation calculation system | |
CN111874045B (en) | Method and device for determining main line passing capacity of urban rail transit | |
CN114842649A (en) | Traffic control method and system for expressway | |
Venkateswaran et al. | Impact of automation on the capacity of a mainline railway: a preliminary hypothesis and methodology | |
CN112541602B (en) | Urban rail operation and maintenance system data processing method and urban rail operation and maintenance system | |
Bhatnagar et al. | On the challenges of on-the-fly knowledge acquisition for automated planning applications | |
CN116317110B (en) | Power grid dispatching operation previewing method and system considering source load bilateral fluctuation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant |