CN113320134A - Double-composite-layer composite plastic pipe production system and application method thereof - Google Patents

Double-composite-layer composite plastic pipe production system and application method thereof Download PDF

Info

Publication number
CN113320134A
CN113320134A CN202010823592.2A CN202010823592A CN113320134A CN 113320134 A CN113320134 A CN 113320134A CN 202010823592 A CN202010823592 A CN 202010823592A CN 113320134 A CN113320134 A CN 113320134A
Authority
CN
China
Prior art keywords
plastic pipe
traction
composite
protective tape
protective
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010823592.2A
Other languages
Chinese (zh)
Inventor
崔宝山
潘永才
刘兴月
丁晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Fiberglass Group Co Ltd
Original Assignee
Shandong Fiberglass Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Fiberglass Group Co Ltd filed Critical Shandong Fiberglass Group Co Ltd
Priority to CN202010823592.2A priority Critical patent/CN113320134A/en
Publication of CN113320134A publication Critical patent/CN113320134A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C53/00Shaping by bending, folding, twisting, straightening or flattening; Apparatus therefor
    • B29C53/80Component parts, details or accessories; Auxiliary operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C53/00Shaping by bending, folding, twisting, straightening or flattening; Apparatus therefor
    • B29C53/56Winding and joining, e.g. winding spirally
    • B29C53/58Winding and joining, e.g. winding spirally helically
    • B29C53/60Winding and joining, e.g. winding spirally helically using internal forming surfaces, e.g. mandrels
    • B29C53/68Winding and joining, e.g. winding spirally helically using internal forming surfaces, e.g. mandrels with rotatable winding feed member
    • B29C53/70Winding and joining, e.g. winding spirally helically using internal forming surfaces, e.g. mandrels with rotatable winding feed member and moving axially
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C53/00Shaping by bending, folding, twisting, straightening or flattening; Apparatus therefor
    • B29C53/56Winding and joining, e.g. winding spirally
    • B29C53/58Winding and joining, e.g. winding spirally helically
    • B29C53/78Winding and joining, e.g. winding spirally helically using profiled sheets or strips
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C53/00Shaping by bending, folding, twisting, straightening or flattening; Apparatus therefor
    • B29C53/80Component parts, details or accessories; Auxiliary operations
    • B29C53/8008Component parts, details or accessories; Auxiliary operations specially adapted for winding and joining
    • B29C53/8041Measuring, controlling or regulating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29LINDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
    • B29L2023/00Tubular articles
    • B29L2023/22Tubes or pipes, i.e. rigid

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Lining Or Joining Of Plastics Or The Like (AREA)

Abstract

The invention relates to the technical field of composite plastic pipe production equipment, in particular to a double-composite-layer composite plastic pipe production system and a using method thereof. The production system comprises a control system and an extrusion mechanism, a winding mechanism, a heating mechanism, a traction mechanism and a slide rail which are arranged in sequence; the extruding mechanism is used for producing a plastic pipe, the winding mechanism is used for winding the protective belt on the plastic pipe, the heating mechanism is used for heating the joint of the protective belt and the plastic pipe, so that the protective belt and the plastic pipe are bonded together to form a composite plastic pipe, and the traction mechanism is used for drawing the composite plastic pipe to move forwards. The double-composite-layer composite plastic pipe production system can realize that the protective belt is replaced without stopping the traction device and the plastic pipe production equipment, saves time, can continuously produce the composite plastic pipe, and realizes that the production length of the composite plastic pipe is not limited.

Description

Double-composite-layer composite plastic pipe production system and application method thereof
Technical Field
The invention relates to the technical field of composite plastic pipe production equipment, in particular to a double-composite-layer composite plastic pipe production system and a using method thereof.
Background
At present, before being used, a plurality of plastic pipes need to be wound with corresponding protective layers to form composite plastic pipes, and the composite plastic pipes often have special effects, such as compression resistance, corrosion resistance, high hardness and the like.
In the existing composite plastic pipe production system, after a plastic pipe is produced, a pipeline needs to be woven through a weaving machine, the plastic pipe is driven by a traction device to advance, the weaving machine weaves on the plastic pipe, but when a protective belt reel on the weaving machine is used up and a new reel is replaced, in order to ensure the weaving effect of the protective belt on the plastic pipe, the plastic pipe production equipment and the traction device need to be stopped simultaneously to stop the production and movement of the plastic pipe, and the plastic pipe is started again after the new reel is replaced, which can cause the following problems: on one hand, the plastic pipe production equipment and the traction device are continuously stopped and started, a large amount of time is wasted, and the production efficiency is reduced, on the other hand, the plastic pipe production equipment is repeatedly stopped and started, so that the produced plastic pipe is bent or has caliber deviation at the connection part of stopping and starting.
Or in order to ensure that the plastic pipe production equipment does not stop, the plastic pipe at the end of the plastic pipe production equipment needs to be cut off, the traction mechanism still needs to stop, and the traction device is restarted to drive the pipeline to advance again after a new belt reel is replaced. This causes the following problems: on one hand, the traction device is continuously stopped and started, a large amount of time is wasted, and the production efficiency is reduced; on the other hand, it is impossible to produce a composite plastic pipe of an unlimited length, and therefore, it is necessary to provide a production system capable of continuously producing a composite plastic pipe without stopping the traction apparatus and the plastic pipe production equipment.
Disclosure of Invention
Aiming at the defects, the invention provides a double-composite-layer composite plastic pipe production system and a using method thereof.
The technical scheme adopted by the invention for solving the technical problems is as follows: a double-composite-layer composite plastic pipe production system comprises a control system, and an extrusion mechanism, a winding mechanism, a heating mechanism and a traction mechanism which are sequentially arranged; the extruding mechanism is used for producing a plastic pipe, the winding mechanism is used for winding the protective belt on the plastic pipe, the heating mechanism is used for heating the joint of the protective belt and the plastic pipe to enable the protective belt and the plastic pipe to be bonded together to form a composite plastic pipe, and the traction mechanism is used for drawing the composite plastic pipe to move forwards;
the winding mechanism comprises a first translation base and a winding frame arranged on the first translation base, the first translation base is configured to move along a sliding rail, a rotating table for winding the protective belt around the plastic pipe is arranged on the winding rack, the rotating table is provided with a plastic pipe avoiding part, the plastic pipe penetrates through the plastic pipe avoiding part, the rotating direction of the rotating table is vertical to the advancing direction of the plastic pipe, the rotating table is provided with supporting shafts for supporting the protective tape reels, one supporting shaft is provided with a first protective tape reel, the other supporting shaft is provided with a second protective tape reel, the first protective tape reel and the second protective tape reel are provided with different types of protective tapes, when the plastic pipe is wound with the protective tape, the protective tape of the first protective tape reel is positioned below the protective tape of the second protective tape reel;
the traction mechanism comprises a first traction module and a second traction module which are used for alternately drawing the composite plastic pipe and have the same structure, the first traction module and the second traction module respectively comprise a second translation base, a traction frame arranged on the second translation base and a traction ring arranged on the traction frame, the second translation base is configured to move along the slide rail, a plurality of traction cylinders are uniformly distributed in the circumferential direction of the traction ring, and the tail end of each traction cylinder is provided with an arc-shaped clamping piece used for clamping the composite plastic pipe;
the control system at least controls the motion states of the first translation base, the rotating table, the second translation base and the traction cylinder, and when the protective belt on the supporting shaft is used up, the control system controls the rotating table to stop rotating and controls the first translation base to move along the slide rail at the same speed as the composite plastic pipe, so that the rotating table and the composite plastic pipe are kept relatively static in the advancing direction of the composite plastic pipe, and a new protective belt reel is replaced for the supporting shaft; the control system controls the two second translation bases to enable the two traction racks to alternately move towards the advancing direction of the composite plastic pipe and reset, and controls the traction racks to move towards the advancing direction of the composite plastic pipe and simultaneously enables the traction cylinders on the traction racks to extend, so that the arc-shaped clamping pieces clamp the composite plastic pipe, and enables the traction cylinders on the traction racks to shorten when the traction racks reset, so that the arc-shaped clamping pieces loosen the composite plastic pipe.
Preferably, the slide rail is provided with a rack, the first translation base and the second translation base are both provided with driving motors, the driving motors are both connected with a speed reducer, and an output shaft of the speed reducer is provided with a gear meshed with the rack.
Preferably, the supporting shaft is driven by a servo motor and can be arranged on the rotating table in a swinging mode, so that an included angle between the supporting shaft and the rotating table can be adjusted, and the control system is configured to control the swinging angle of the supporting shaft.
Preferably, the width of the guard band of the second guard band tape reel is greater than that of the first guard band tape reel, and after the two guard bands are wound on the plastic tube, the guard band of the second guard band tape reel completely covers the guard band of the first guard band tape reel.
Preferably, the rotating table is provided with four supporting shafts, the four supporting shafts surround the plastic pipe avoiding part, the circumference is uniformly arranged, two adjacent supporting shafts are provided with first protective tape reels, and the other two supporting shafts are provided with second protective tape reels.
Preferably, the weight sensor on the supporting shaft transmits a detected weight signal to the control system after the protective belt reel on the supporting shaft is used up, the control system controls the rotating table to stop rotating and controls the first translation base to move along the sliding rail at the same speed as the composite plastic pipe.
Preferably, the plastic pipe is a thermoplastic plastic pipe, and the protective belt is a glass fiber belt.
Preferably, one side of the protective belt, which is attached to the plastic pipe, is provided with an adhesive layer.
The invention also discloses a using method of the double-composite-layer composite plastic pipe production system, which comprises the following steps:
s1: starting an extrusion mechanism to produce a plastic pipe through a control system, pulling the plastic pipe by a traction mechanism after the plastic pipe passes through a plastic pipe avoiding part of a rotating table, coiling a protective belt provided with the protective belt on a supporting shaft, and fixing the starting end of the protective belt on the supporting shaft on the plastic pipe;
s2, starting the traction device to pull the plastic pipe to advance through a control system, starting the rotating table to rotate, and weaving the protective belt around the circumference of the plastic pipe to form a spiral protective belt outer layer on the woven plastic pipe;
s3, when the protective tape on the tape reel of the protective tape is used up, controlling the rotating table to stop rotating through a control system, and starting the first translation base to enable the winding rack on the first translation base to move along the slide rail from the initial position at the same speed as the plastic pipe to be compounded, so that the rotating table and the compound plastic pipe are kept relatively static in the advancing direction;
s4: detaching the used protective tape reel from the supporting shaft, replacing the supporting shaft with a new protective tape reel loaded with the protective tape, and jointing the initial end of the protective tape of the new protective tape reel with the protective tape of the used protective tape reel at the tail end of the plastic pipe;
s5: and starting the rotating platform to rotate continuously through the control system, simultaneously starting the first translation base to move in the direction opposite to the direction in the step S3 and reset to the initial position, and stopping the horizontal movement after the rack is reset to the initial position.
S6: steps S3 to S5 are repeated in sequence until the tube knitting is completed.
The invention has the beneficial effects that: in the production system of the double-composite-layer composite plastic pipe, when the protective belt on the protective belt reel on the supporting shaft is used up and the protective belt reel is replaced, the rotating table stops rotating, the driving motor is started to drive the rack to move from the initial position along the base at the same speed as the composite plastic pipe, so that the rotating table and the composite plastic pipe are kept relatively static in the advancing direction; the plastic pipe production equipment and the traction mechanism do not need to be stopped, after a new protective belt disc is replaced on the supporting shaft, the starting end of the new protective belt is jointed with the tail end of the used protective belt positioned on the braided pipe, the rotating table is started to continue rotating, and the driving device is started to enable the winding rack to reset along the base. The double-composite-layer composite plastic pipe production system can realize that the protective belt is replaced without stopping the traction device and the plastic pipe production equipment, saves time, can continuously produce the composite plastic pipe, and realizes that the production length of the composite plastic pipe is not limited.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic perspective view of the present invention;
FIG. 3 is a schematic view of the winding mechanism and heating mechanism of the present invention;
fig. 4 is a schematic view of the traction mechanism of the present invention.
The plastic pipe winding machine comprises an extrusion mechanism 1, an extrusion mechanism 2, a winding mechanism 3, a heating mechanism 4, a sliding rail 5, a traction mechanism 6, a plastic pipe 7, a driving motor 8, a speed reducer 201, a winding rack 202, a rotating table 203, a protective belt reel 204, a plastic pipe avoiding part 205, a first translation base 501, a first traction module 502, a second traction module 503, a second translation base 504, a traction rack 505, a traction ring 506, a traction cylinder 507 and an arc-shaped clamping sheet.
Detailed Description
In order to make the technical means, technical features, objects and technical effects of the present invention easily understandable, the present invention is further described below with reference to the specific drawings.
As shown in fig. 1-4, the system for producing a double-composite-layer composite plastic pipe provided by the invention comprises a control system, and an extrusion mechanism 1, a winding mechanism 2, a heating mechanism 3 and a traction mechanism 5 which are sequentially arranged; the winding mechanism 2 and the traction mechanism 5 are arranged on the sliding rail 4, the extrusion mechanism 1 is used for producing a plastic pipe 6, the winding mechanism 2 is used for winding a protective belt on the plastic pipe 6, the heating mechanism 3 is used for heating the joint of the protective belt and the plastic pipe 6 so as to enable the protective belt and the plastic pipe 6 to be bonded together to form a composite plastic pipe, and the traction mechanism 5 is used for drawing the composite plastic pipe to move forwards;
the winding mechanism 2 comprises a first translation base 205 and a winding rack 201 arranged on the first translation base 205, the first translation base 205 is configured to be movable along the slide rail 4, the first translation base 205 can be driven by a motor or an air cylinder, a rotating table 202 for winding the protective belt on the plastic pipe 6 is arranged on the winding rack 201, the rotating table is driven by a motor, the rotating table 202 is provided with a plastic pipe avoiding part 204, the plastic pipe 6 passes through the plastic pipe avoiding part 204, the rotating direction of the rotating table 202 is perpendicular to the advancing direction of the plastic pipe 6, and a support shaft for supporting a belt reel of the protective belt 203 is arranged on the rotating table 202;
the first protective tape reel is arranged on one support shaft, the second protective tape reel is arranged on the other support shaft, different protective tapes are arranged on the first protective tape reel and the second protective tape reel, when the protective tapes are wound on the plastic pipe, the protective tapes of the first protective tape reel are positioned below the protective tapes of the second protective tape reel, and the two protective tapes form a double-composite layer after being wound on the plastic pipe, so that the composite plastic pipe has more beneficial effects;
the traction mechanism 5 comprises a first traction module 501 and a second traction module 502 which are used for alternately drawing the composite plastic pipe 6 and have the same structure, each of the first traction module 501 and the second traction module 502 comprises a second translation base 503, a traction frame 504 arranged on the second translation base 503, and a traction ring 505 arranged on the traction frame 504, the second translation base 503 is configured to be movable along the slide rail 4, a plurality of traction cylinders 506 are uniformly distributed in the circumferential direction of the traction ring 505, and the tail end of each traction cylinder 506 is provided with an arc-shaped clamping sheet 507 for clamping the composite plastic pipe 6;
the control system at least controls the motion states of the first translation base 205, the rotating table 202, the second translation base 503 and the traction cylinder 506, when the guard band on the supporting shaft is used up, the control system controls the rotating table 202 to stop rotating and controls the first translation base 205 to move along the slide rail, so that the winding rack on the first translation base 205 moves along the slide rail at the same speed as the composite plastic pipe, and the rotating table 202 and the composite plastic pipe 6 are kept relatively static in the advancing direction of the composite plastic pipe 6, so as to replace a new guard band tape reel 203 for the supporting shaft; the control system controls the two traction machine frames 504 to alternately move towards the advancing direction of the composite plastic pipe 6 and reset, and controls the traction machine frames 504 to move towards the advancing direction of the composite plastic pipe 6 and simultaneously enables the traction air cylinders 506 on the traction machine frames 504 to extend so as to enable the arc-shaped clamping pieces 507 to clamp the composite plastic pipe 6, and controls the traction machine frames 504 to reset and simultaneously enables the traction air cylinders 506 on the traction machine frames 504 to shorten so as to enable the arc-shaped clamping pieces 507 to loosen the composite plastic pipe 6.
In particular, the protective belts on the first protective belt reel and the second protective belt reel are preferably one of reinforced polypropylene plastic glass fiber belts, reinforced phenolic resin glass fiber belts, reinforced vinyl resin glass fiber belts and reinforced polyurethane glass fiber belts.
The slide rail 4 is provided with a rack, the first translation base 205 and the second translation base 503 are both provided with driving motors 7, the driving motors 7 are both connected with a speed reducer 8, and an output shaft of the speed reducer 8 is provided with a gear meshed with the rack.
The supporting shaft is driven by a servo motor and can be arranged on the rotating table 202 in a swinging mode, so that an included angle between the supporting shaft and the rotating table 202 can be adjusted, and the control system is configured to control the swinging angle of the supporting shaft. Specifically, one end of the supporting shaft can be hinged to the rotating table, and a servo motor or an air cylinder is arranged near the hinged position of the supporting shaft to drive the supporting shaft to swing. After the used protective tape reel 203 is detached from the supporting shaft, a new protective tape reel 203 with the protective tape is replaced for the supporting shaft, the initial end of the protective tape of the new protective tape reel 203 is jointed with the tail end of the plastic pipe 6 where the protective tape of the used protective tape reel 203 is positioned, and in the process that the first translation base 205 and the winding rack 201 are reset to the initial position, the inclination angle of the supporting shaft is adjusted through a personal wear motor, so that the winding effect of the protective tape on the plastic pipe can be kept good and consistent, and the protective tape is prevented from being over-stretched or not tightly wound.
Wherein, the openings at the two ends of the plastic pipe avoiding part 204 are respectively provided with a transverse guide roller for assisting the plastic pipe 6 to advance.
Preferably, the width of the guard band of the second guard band tape reel is greater than the guard band of the first guard band tape reel, and after the two kinds of guard bands are wound on the plastic tube, the guard band of the second guard band tape reel completely covers the guard band of the first guard band tape reel.
Preferably, the rotating table is provided with four supporting shafts, the four supporting shafts are uniformly arranged around the circumference of the plastic pipe avoiding portion, two adjacent supporting shafts are provided with first protective tape reels, and the other two supporting shafts are provided with second protective tape reels. Through setting up four back shafts, the protection tep reel of the same type is installed to per two supports, when twining the establishment to the plastic tubing, the protection tep reel of every type all has a reserve, is convenient for trade the area.
The control system may include a plurality of PLC controllers or industrial computers, and one PLC controller or industrial computer controls the motion states of the first translation base 205, the rotating table 202, the second translation base 503, and the traction cylinder 506, or one translation base, one rotating table, one second translation base, and one traction cylinder may be controlled by one PLC controller or industrial computer.
Wherein, be equipped with weight sensor on the back shaft, work as the last guard band tape dish 203 of back shaft is used up, weight sensor gives control system with the weight signal transmission that detects, and control system control the revolving stage 202 stall, and control first translation base is followed with the same speed of compound plastic tubing the slide rail motion.
The plastic pipe 6 is a thermoplastic plastic pipe 6, the protective belt is a glass fiber belt, and preferably, the protective belt is one or more of a reinforced polypropylene plastic glass fiber belt, a reinforced phenolic resin glass fiber belt, a reinforced vinyl resin glass fiber belt and a reinforced polyurethane glass fiber belt.
Wherein, the protective belt is provided with an adhesive layer towards one side of the plastic pipe 6.
Wherein, the plastic tubing dodges the position and is located the intermediate position of revolving stage, the back shaft encircles the plastic tubing dodges a circumference evenly distributed, and the plastic tubing dodges the portion for dodging the hole, should dodge the hole embedded have annular gas blowing device, and gas blowing nozzle of gas blowing device encircles gas blowing device and evenly sets up, through setting up gas blowing device, before plastic tubing and protecting band combine, blows off impurity such as the dust that probably exists on the plastic tubing, prevents that large granule material from influencing plastic tubing and protecting band combination effect.
The use method of the composite plastic pipe 6 production system comprises the following steps:
s1: the extrusion mechanism 1 is started by a control system to produce the plastic pipe 6, the plastic pipe 6 passes through a plastic pipe avoiding part 204 of the rotating table 202 and then is pulled by a traction mechanism 5, a protective belt reel 203 provided with a protective belt is arranged on a supporting shaft, and the starting end of the protective belt on the supporting shaft is fixed on the plastic pipe 6;
s2, starting the traction device to pull the plastic pipe 6 to advance through a control system, starting the rotating table 202 to rotate, weaving the protective belt around the circumference of the plastic pipe 6, and forming a spiral protective belt outer layer on the woven plastic pipe 6 to form a composite plastic pipe;
s3, when the protective tape on the tape reel 203 is used up, the control system controls the rotating table 202 to stop rotating and starts the first translation base to enable the winding rack on the first translation base to move along the slide rail from the initial position at the same speed as the composite plastic pipe, so that the rotating table 202 and the composite plastic pipe are kept relatively static in the advancing direction;
s4: detaching the used-up protective tape reel 203 from the support shaft, replacing the support shaft with a new protective tape reel 203 loaded with protective tape, and engaging the initial end of the protective tape of the new protective tape reel 203 with the protective tape of the used-up protective tape reel 203 at the end of the plastic tube 6;
s5: the control system starts the rotating table 202 to rotate continuously, and simultaneously starts the first translating base to move in the direction opposite to the direction in the step S3 to return to the initial position, and the winding frame stops moving horizontally after returning to the initial position.
S6: steps S3 to S5 are repeated in sequence until the tube knitting is completed.
The composite plastic pipe passes through a plastic pipe avoiding part of the rotating table and then passes through a traction ring of a first traction module and a second traction module of the traction mechanism, the first traction module clamps the composite plastic pipe for traction preparation, the second traction module does not clamp the composite plastic pipe, and when the first traction module 501 pulls the composite plastic pipe to advance, the second traction module 502 does not pull; when the first traction module 501 advances to the maximum distance, the second traction module 502 clamps the composite plastic pipe to traction the composite plastic pipe, the first traction module 501 releases the composite plastic pipe and does not perform traction any more, and the first traction module 501 retracts to the initial position from the maximum advancing position; after the first traction module 501 retracts to the initial position, the second traction module 502 loosens the composite plastic pipe, the composite plastic pipe is not pulled any more, the first traction module 501 clamps the composite plastic pipe at the initial position, the composite plastic pipe is pulled, and the second traction module 502 resets to the initial position.
The foregoing is merely exemplary and illustrative of the present invention and various modifications, additions and substitutions may be made by those skilled in the art to the specific embodiments described without departing from the scope of the present invention as defined in the accompanying claims.

Claims (9)

1. The utility model provides a compound plastic tubing production system of double-composite bed which characterized in that: comprises a control system, an extrusion mechanism, a winding mechanism, a heating mechanism and a traction mechanism which are arranged in sequence; the extruding mechanism is used for producing a plastic pipe, the winding mechanism is used for winding the protective belt on the plastic pipe, the heating mechanism is used for heating the joint of the protective belt and the plastic pipe to enable the protective belt and the plastic pipe to be bonded together to form a composite plastic pipe, and the traction mechanism is used for drawing the composite plastic pipe to move forwards;
the winding mechanism comprises a first translation base and a winding frame arranged on the first translation base, the first translation base is configured to move along a sliding rail, a rotating table for winding the protective belt around the plastic pipe is arranged on the winding rack, the rotating table is provided with a plastic pipe avoiding part, the plastic pipe penetrates through the plastic pipe avoiding part, the rotating direction of the rotating table is vertical to the advancing direction of the plastic pipe, the rotating table is provided with supporting shafts for supporting the protective tape reels, one supporting shaft is provided with a first protective tape reel, the other supporting shaft is provided with a second protective tape reel, the first protective tape reel and the second protective tape reel are provided with different types of protective tapes, when the plastic pipe is wound with the protective tape, the protective tape of the first protective tape reel is positioned below the protective tape of the second protective tape reel;
the traction mechanism comprises a first traction module and a second traction module which are used for alternately drawing the composite plastic pipe and have the same structure, the first traction module and the second traction module respectively comprise a second translation base, a traction frame arranged on the second translation base and a traction ring arranged on the traction frame, the second translation base is configured to move along the slide rail, a plurality of traction cylinders are uniformly distributed in the circumferential direction of the traction ring, and the tail end of each traction cylinder is provided with an arc-shaped clamping piece used for clamping the composite plastic pipe;
the control system at least controls the motion states of the first translation base, the rotating table, the second translation base and the traction cylinder, and when the protective belt on the supporting shaft is used up, the control system controls the rotating table to stop rotating and controls the first translation base to move along the slide rail at the same speed as the composite plastic pipe, so that the rotating table and the composite plastic pipe are kept relatively static in the advancing direction of the composite plastic pipe, and a new protective belt reel is replaced for the supporting shaft;
the control system controls the two second translation bases to enable the two traction racks to alternately move towards the advancing direction of the composite plastic pipe and reset, and controls the traction racks to move towards the advancing direction of the composite plastic pipe and simultaneously enables the traction cylinders on the traction racks to extend, so that the arc-shaped clamping pieces clamp the composite plastic pipe, and enables the traction cylinders on the traction racks to shorten when the traction racks reset, so that the arc-shaped clamping pieces loosen the composite plastic pipe.
2. A dual composite layer composite plastic pipe production system according to claim 1, wherein: the sliding rail is provided with a rack, the first translation base and the second translation base are both provided with driving motors, the driving motors are both connected with a speed reducer, and an output shaft of the speed reducer is provided with a gear meshed with the rack.
3. A dual composite layer composite plastic pipe production system according to claim 1, wherein: the width of the protective tape of the second protective tape reel is larger than that of the first protective tape reel, and after the two protective tapes are wound on the plastic pipe, the protective tape of the second protective tape reel completely covers the protective tape of the first protective tape reel.
4. A dual composite layer composite plastic pipe production system according to claim 1, wherein: the rotating table is provided with four supporting shafts, the four supporting shafts surround the plastic pipe avoiding portion, the circumference is evenly arranged, two adjacent supporting shafts are provided with first protective tape reels, and the other two supporting shafts are provided with second protective tape reels.
5. A dual composite layer composite plastic pipe production system according to claim 1, wherein: be equipped with weight sensor on the back shaft, work as after the protection band tape dish used up on the back shaft, weight sensor transmits the weight signal who detects for control system, control system control the revolving stage stall, and control first translation base with the same speed of compound plastic tubing is followed the slide rail motion.
6. A dual composite layer composite plastic pipe production system according to claim 1, wherein: the plastic pipe is a thermoplastic plastic pipe, and the protective belt is a glass fiber belt.
7. A dual composite layer composite plastic pipe production system according to claim 1, wherein: the protective belt is provided with a bonding layer towards one side of the plastic pipe.
8. A method for using a double-composite-layer composite plastic pipe production system, wherein the double-composite-layer composite plastic pipe production system is the double-composite-layer composite plastic pipe production system as claimed in any one of claims 1 to 7, and the method comprises the following steps:
s1: starting an extrusion mechanism to produce a plastic pipe, wherein the plastic pipe passes through a plastic pipe avoiding part of a rotating table and then is dragged by a traction mechanism, a protective belt disc provided with a protective belt is arranged on a supporting shaft, and the starting end of the protective belt on the supporting shaft is fixed on the plastic pipe;
s2, starting the traction device to pull the plastic pipe to advance, starting the rotating table to rotate, and weaving the protective belt around the circumference of the plastic pipe to form a spiral protective belt outer layer on the woven plastic pipe;
s3, when the protective tape on the tape reel is used up, controlling the rotating table to stop rotating, starting the first translation base, enabling the winding rack on the first translation base to move along the slide rail from the initial position at the same speed as the plastic pipe to be compounded, and enabling the rotating table and the compound plastic pipe to keep relatively static in the advancing direction;
s4: detaching the used protective tape reel from the supporting shaft, replacing the supporting shaft with a new protective tape reel loaded with the protective tape, and jointing the initial end of the protective tape of the new protective tape reel with the protective tape of the used protective tape reel at the tail end of the plastic pipe;
s5: and starting the rotating platform to rotate continuously, simultaneously starting the first translation base to move in the direction opposite to the direction in the step S3 to reset to the initial position, and stopping the horizontal movement after the rack is reset to the initial position.
S6: steps S3 to S5 are repeated in sequence until the tube knitting is completed.
9. The method for using the double-composite-layer composite plastic pipe production system according to claim 8, wherein in step S1, the composite plastic pipe passes through the plastic pipe avoiding portion of the rotating table and then passes through a first traction module and a second traction module of the traction mechanism, the first traction module clamps the composite plastic pipe for traction preparation, and the second traction module does not clamp the composite plastic pipe.
CN202010823592.2A 2020-08-17 2020-08-17 Double-composite-layer composite plastic pipe production system and application method thereof Pending CN113320134A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010823592.2A CN113320134A (en) 2020-08-17 2020-08-17 Double-composite-layer composite plastic pipe production system and application method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010823592.2A CN113320134A (en) 2020-08-17 2020-08-17 Double-composite-layer composite plastic pipe production system and application method thereof

Publications (1)

Publication Number Publication Date
CN113320134A true CN113320134A (en) 2021-08-31

Family

ID=77413038

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010823592.2A Pending CN113320134A (en) 2020-08-17 2020-08-17 Double-composite-layer composite plastic pipe production system and application method thereof

Country Status (1)

Country Link
CN (1) CN113320134A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104827650A (en) * 2015-04-30 2015-08-12 王庆昭 Whole combination type enhanced thermoplastic pipe composite tape winder and winding method thereof
CN206254454U (en) * 2016-12-16 2017-06-16 山东宝泰隔热材料有限公司 A kind of heat insulating strip production equipment
CN109693357A (en) * 2019-01-22 2019-04-30 中苏科技股份有限公司 A kind of uninterrupted steel wire winding device of PE reinforcement multiple tube production

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104827650A (en) * 2015-04-30 2015-08-12 王庆昭 Whole combination type enhanced thermoplastic pipe composite tape winder and winding method thereof
CN206254454U (en) * 2016-12-16 2017-06-16 山东宝泰隔热材料有限公司 A kind of heat insulating strip production equipment
CN109693357A (en) * 2019-01-22 2019-04-30 中苏科技股份有限公司 A kind of uninterrupted steel wire winding device of PE reinforcement multiple tube production

Similar Documents

Publication Publication Date Title
CN111620188B (en) Pipe winding device
JP5945606B2 (en) Apparatus and method for manufacturing an endless reinforcing belt
CN104816445A (en) Production line for machining PE (polyethylene) pipes
CN108145985B (en) Welding machine for spiral corrugated pipeline
US3037343A (en) Method and apparatus for manufacturing hose
EP3647031A1 (en) Bi-directional lamination head and method
CN212028924U (en) Automatic spiral winding device for prefabricated heat-insulation pipeline
CN108146038B (en) A kind of processing method of high-strength PVC tubing
CN113320134A (en) Double-composite-layer composite plastic pipe production system and application method thereof
CN117885370B (en) Intelligent cord cloth strip winding machine for marine hose and flexibility winding method
US4416721A (en) Apparatus for producing reinforced tubing
CN113320133A (en) Uninterrupted composite plastic pipe production system and use method thereof
CN113320132A (en) Composite plastic pipe production system and application method thereof
CN113320185A (en) Composite plastic pipe production system and application method thereof
CN113320137A (en) Pipe weaving machine for producing composite plastic pipe and using method thereof
CN113320139B (en) Quick tape changing device and tube weaving machine
CN108115926B (en) A kind of PVC pipe system of processing
CN108162444B (en) A kind of PVC pipe and its processing method
CN113320138A (en) Pipe weaving machine for continuously producing composite plastic pipes and use method thereof
US4753699A (en) Method for making hose
CN109079898A (en) Drag-line protection sleeve pipe blanking device
CN113320140A (en) Tube weaving machine and using method thereof
CN211544012U (en) Coil bundling integrated machine
CN208914249U (en) Drag-line protection sleeve pipe blanking device
CN113320131B (en) Tube braiding machine capable of rapidly replacing belt and application method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210831