CN113293797A - Method for repairing concrete cracks - Google Patents

Method for repairing concrete cracks Download PDF

Info

Publication number
CN113293797A
CN113293797A CN202110622125.8A CN202110622125A CN113293797A CN 113293797 A CN113293797 A CN 113293797A CN 202110622125 A CN202110622125 A CN 202110622125A CN 113293797 A CN113293797 A CN 113293797A
Authority
CN
China
Prior art keywords
crack
filling
parts
vibration
slurry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110622125.8A
Other languages
Chinese (zh)
Inventor
黄恒近
齐丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qianyi Construction Group Co ltd
Original Assignee
Qianyi Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qianyi Construction Group Co ltd filed Critical Qianyi Construction Group Co ltd
Priority to CN202110622125.8A priority Critical patent/CN113293797A/en
Publication of CN113293797A publication Critical patent/CN113293797A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/70Grouts, e.g. injection mixtures for cables for prestressed concrete
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/72Repairing or restoring existing buildings or building materials
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2201/00Mortars, concrete or artificial stone characterised by specific physical values
    • C04B2201/50Mortars, concrete or artificial stone characterised by specific physical values for the mechanical strength

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Inorganic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Environmental & Geological Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a method for repairing a concrete crack, which comprises the following steps: cleaning cracks: detecting the depth and the width of the crack by using equipment, cleaning the ground near the crack, when the opening at the top of the crack is less than 5 mm, cutting a groove with the width of 0.5cm-1cm along the crack, and cleaning the inner wall of the crack by using a high-pressure water gun and a high-pressure air gun; preparing slurry: mixing and preparing a filling material according to a proportion, wherein the filling material comprises 50-55 parts of cement, 25-28 parts of fly ash, 10-12 parts of quartz sand, 2-5 parts of epoxy resin glue, 1-1.2 parts of redispersible latex powder, 0.5-1.5 parts of water reducing agent and 0.2-0.6 part of retarder; the filling slurry with strong viscosity is prepared by cement, fly ash, silica fume, epoxy resin glue, redispersible latex powder, a water reducing agent, a retarder and the like, the filling slurry is filled for three times, the filling slurry is fully filled in each corner of a crack by using vibration equipment and air pressure, and a cavity is prevented from being generated in the crack.

Description

Method for repairing concrete cracks
Technical Field
The invention belongs to the technical field of building structures, and particularly relates to a method for repairing a concrete crack.
Background
Concrete cracks are common in our lives, and various methods for repairing the cracks are provided, for example, patent application No. 201711405643.4 discloses a method and a tool for repairing internal cracks of concrete.
However, the method for repairing the underground pipe gallery concrete crack has some problems, for example, the method is completed by one-time pouring, slurry enters the crack, meets a small gap at the bottom and is not ready for settlement and filling, and a plurality of small cavities are easily generated in the crack, so that the repair strength of the crack is affected.
Disclosure of Invention
Based on the technical problems in the background art, the invention provides a method for repairing concrete cracks.
The invention provides a concrete crack repairing method, which comprises the following steps:
step 1: cleaning cracks: detecting the depth and the width of the crack by using equipment, cleaning the ground near the crack, when the opening at the top of the crack is less than 5 mm, cutting a groove with the width of 0.5cm-1cm along the crack, and cleaning the inner wall of the crack by using a high-pressure water gun and a high-pressure air gun;
step 2: preparing slurry: mixing and preparing a filling material according to a proportion, wherein the filling material comprises 50-55 parts of cement, 25-28 parts of fly ash, 10-12 parts of quartz sand, 2-5 parts of epoxy resin glue, 1-1.2 parts of redispersible latex powder, 0.5-1.5 parts of water reducing agent and 0.2-0.6 part of retarder, adding the cement, the fly ash, the silica fume, the epoxy resin glue, the redispersible latex powder, the water reducing agent and the retarder into a stirring device, and then adding a proper amount of water to uniformly mix so as to obtain filling slurry;
and step 3: primary perfusion: filling slurry into the crack gradually through filling equipment, stopping filling when the slurry is filled to one third of the crack, applying vibration to the vicinity of a crack filling area by using small-sized vibration equipment, discharging air to avoid generating a cavity, and blowing and applying pressure to an air nozzle communicated with an air tank aiming at the slurry in the crack after vibration is finished;
and 4, step 4: and (3) completing the repair: and (3) performing secondary pouring by using a pouring device, stopping pouring when the filling slurry reaches the height of two thirds of the crack, applying vibration to a crack pouring area by using a small-sized vibrating device, stopping vibrating for 30 seconds, and then performing the last pouring by using the pouring device until the filling slurry fills the crack.
Preferably, in step 1, the soil, oil stains and other attachments which affect filling on the ground around the crack are cleaned, and loose concrete on the ground near the cleaning groove needs to be checked after the grooving is finished.
Preferably, in step 1, the cross section of the groove is in a V-shaped structure, and the depth of the groove is controlled to be 1 cm.
Preferably, in the step 2, the filling material comprises the following components by weight: 50 parts of cement, 28 parts of fly ash, 10 parts of quartz sand, 5 parts of epoxy resin glue, 1 part of redispersible latex powder, 1 part of water reducing agent and 0.5 part of retarder.
Preferably, in the step 2, the quartz sand is 200-mesh quartz sand, and the water reducing agent is a polycarboxyl water reducing agent.
Preferably, in step 3, the settlement of the filling slurry inside the crack is concerned in the vibration process, and when the filling slurry does not settle any more, the vibration is continued for 5 seconds.
Preferably, in step 3, the small vibration device is a small pneumatic knocking hammer, and when the small vibration device is operated, the small vibration device moves along the direction of the crack in the filling area.
Preferably, in step 3, when the air nozzle is used, the air nozzle needs to move along the crack of the filling area to blow three times, and when the filling slurry is settled, pressure is applied to the area by blowing.
Preferably, in step 4, glue is applied to the inner wall of the groove, and then the last pouring is performed.
Preferably, in step 4, after the pouring is completed, the small-sized vibration equipment is pressed to move and vibrate along the poured crack, and after the vibration is completed, the tool is used for dipping the residual filling slurry to smooth the crack area.
The invention has the beneficial effects that: firstly, a groove is formed in the top of a crack, so that slurry filling is facilitated, then filling slurry with strong viscosity is prepared by cement, fly ash, silica fume, epoxy resin glue, redispersible latex powder, a water reducing agent, a retarder and the like, filling is divided into three times during pouring and repairing, each corner of the crack is fully filled with the filling slurry by using vibration equipment and air pressure, a cavity is prevented from being formed in the crack, and the strength of a repairing position is enhanced.
Drawings
Fig. 1 is a flow chart of the present invention.
Detailed Description
The present invention will be further illustrated with reference to the following specific examples.
Referring to FIG. 1, the first embodiment
The embodiment provides a method for repairing a concrete crack, which comprises the following steps:
step 1: cleaning cracks: detecting the depth and the width of a crack by using equipment, cleaning the ground near the crack, when an opening at the top of the crack is smaller than 5 mm, cutting a groove with the width of 0.5cm-1cm along the crack, wherein the section of the groove is of a V-shaped structure, the depth of the groove is controlled to be 1cm, cleaning the inner wall of the crack by using a high-pressure water gun and a high-pressure air gun, cleaning attachments which influence filling, such as soil, oil stain and the like on the ground around the crack, and detecting and cleaning loose concrete on the ground near the groove after the grooving is finished;
step 2: preparing slurry: mixing and preparing a filling material according to a proportion, wherein the filling material is composed of 55 parts of cement, 25 parts of fly ash, 12 parts of quartz sand, 2 parts of epoxy resin glue, 1.2 parts of redispersible latex powder, 0.5 part of water reducing agent and 0.2 part of retarder, the quartz sand is 200-mesh quartz sand, the water reducing agent is a polycarboxyl water reducing agent, the cement, the fly ash, silica fume, the epoxy resin glue, the redispersible latex powder, the water reducing agent and the retarder are added into a stirring device, and then a proper amount of water is added to be uniformly mixed, so that filling slurry is obtained;
and step 3: primary perfusion: filling grout is gradually filled into the crack through filling equipment, the filling is stopped when the grout is filled to one third of the crack, small-sized vibration equipment is used for applying vibration to the position near a crack filling area, the settlement of the grout filled in the crack is concerned in the vibration process, when the grout is not settled any more, the vibration is continued for 5 seconds, cavities are avoided, the small-sized vibration equipment is a small-sized pneumatic knocking hammer, during operation, the equipment is enabled to move along the trend of the crack in the filling area, after the vibration is finished, an air nozzle communicated with an air tank is blown and applied pressure by aiming at the grout filled in the crack, when the air nozzle is used, the air nozzle needs to move and blow along the trend of the crack in the filling area for three times, and when the grout is settled, the pressure is blown and applied to the area in a key mode;
and 4, step 4: and (3) completing the repair: use filling equipment to carry out the second time and fill, when filling the thick liquid and reach the crack two-thirds height, stop filling, use small-size vibrating equipment to fill the crack and fill the regional vibration of applying, the vibration 30 seconds stops, paint the inner wall at the recess with glue, then, use filling equipment to carry out the last time and fill, fill the crack up to filling the thick liquid, fill and accomplish the back, the small-size vibrating equipment of exerting pressure removes the vibration along the crack that fills, after the vibration is accomplished, use the instrument to be stained with remaining filling thick liquid and smooth the crack region.
Referring to FIG. 1, example II
The embodiment provides a method for repairing a concrete crack, which comprises the following steps:
step 1: cleaning cracks: detecting the depth and the width of a crack by using equipment, cleaning the ground near the crack, when an opening at the top of the crack is smaller than 5 mm, cutting a groove with the width of 0.5cm-1cm along the crack, wherein the section of the groove is of a V-shaped structure, the depth of the groove is controlled to be 1cm, cleaning the inner wall of the crack by using a high-pressure water gun and a high-pressure air gun, cleaning attachments which influence filling, such as soil, oil stain and the like on the ground around the crack, and detecting and cleaning loose concrete on the ground near the groove after the grooving is finished;
step 2: preparing slurry: mixing and preparing a filling material according to a proportion, wherein the filling material is composed of 53 parts of cement, 26 parts of fly ash, 11 parts of quartz sand, 4 parts of epoxy resin glue, 1.1 parts of redispersible latex powder, 0.7 part of water reducing agent and 0.4 part of retarder, the quartz sand is 200-mesh quartz sand, the water reducing agent is a polycarboxyl water reducing agent, the cement, the fly ash, silica fume, the epoxy resin glue, the redispersible latex powder, the water reducing agent and the retarder are added into a stirring device, and then a proper amount of water is added to be uniformly mixed, so that filling slurry is obtained;
and step 3: primary perfusion: filling grout is gradually filled into the crack through filling equipment, the filling is stopped when the grout is filled to one third of the crack, small-sized vibration equipment is used for applying vibration to the position near a crack filling area, the settlement of the grout filled in the crack is concerned in the vibration process, when the grout is not settled any more, the vibration is continued for 5 seconds, cavities are avoided, the small-sized vibration equipment is a small-sized pneumatic knocking hammer, during operation, the equipment is enabled to move along the trend of the crack in the filling area, after the vibration is finished, an air nozzle communicated with an air tank is blown and applied pressure by aiming at the grout filled in the crack, when the air nozzle is used, the air nozzle needs to move and blow along the trend of the crack in the filling area for three times, and when the grout is settled, the pressure is blown and applied to the area in a key mode;
and 4, step 4: and (3) completing the repair: use filling equipment to carry out the second time and fill, when filling the thick liquid and reach the crack two-thirds height, stop filling, use small-size vibrating equipment to fill the crack and fill the regional vibration of applying, the vibration 30 seconds stops, paint the inner wall at the recess with glue, then, use filling equipment to carry out the last time and fill, fill the crack up to filling the thick liquid, fill and accomplish the back, the small-size vibrating equipment of exerting pressure removes the vibration along the crack that fills, after the vibration is accomplished, use the instrument to be stained with remaining filling thick liquid and smooth the crack region.
Referring to FIG. 1, example III
The embodiment provides a method for repairing a concrete crack, which comprises the following steps:
step 1: cleaning cracks: detecting the depth and the width of a crack by using equipment, cleaning the ground near the crack, when an opening at the top of the crack is smaller than 5 mm, cutting a groove with the width of 0.5cm-1cm along the crack, wherein the section of the groove is of a V-shaped structure, the depth of the groove is controlled to be 1cm, cleaning the inner wall of the crack by using a high-pressure water gun and a high-pressure air gun, cleaning attachments which influence filling, such as soil, oil stain and the like on the ground around the crack, and detecting and cleaning loose concrete on the ground near the groove after the grooving is finished;
step 2: preparing slurry: mixing and preparing a filling material according to a proportion, wherein the filling material is composed of 50 parts of cement, 28 parts of fly ash, 10 parts of quartz sand, 5 parts of epoxy resin glue, 1 part of redispersible latex powder, 1 part of water reducing agent and 0.5 part of retarder, the quartz sand is 200-mesh quartz sand, the water reducing agent is a polycarboxylic water reducing agent, the cement, the fly ash, silica fume, the epoxy resin glue, the redispersible latex powder, the water reducing agent and the retarder are added into a stirring device, and then a proper amount of water is added to be uniformly mixed, so that filling slurry is obtained;
and step 3: primary perfusion: filling grout is gradually filled into the crack through filling equipment, the filling is stopped when the grout is filled to one third of the crack, small-sized vibration equipment is used for applying vibration to the position near a crack filling area, the settlement of the grout filled in the crack is concerned in the vibration process, when the grout is not settled any more, the vibration is continued for 5 seconds, cavities are avoided, the small-sized vibration equipment is a small-sized pneumatic knocking hammer, during operation, the equipment is enabled to move along the trend of the crack in the filling area, after the vibration is finished, an air nozzle communicated with an air tank is blown and applied pressure by aiming at the grout filled in the crack, when the air nozzle is used, the air nozzle needs to move and blow along the trend of the crack in the filling area for three times, and when the grout is settled, the pressure is blown and applied to the area in a key mode;
and 4, step 4: and (3) completing the repair: use filling equipment to carry out the second time and fill, when filling the thick liquid and reach the crack two-thirds height, stop filling, use small-size vibrating equipment to fill the crack and fill the regional vibration of applying, the vibration 30 seconds stops, paint the inner wall at the recess with glue, then, use filling equipment to carry out the last time and fill, fill the crack up to filling the thick liquid, fill and accomplish the back, the small-size vibrating equipment of exerting pressure removes the vibration along the crack that fills, after the vibration is accomplished, use the instrument to be stained with remaining filling thick liquid and smooth the crack region.
Comparing conventional and prepared examples one to three, the following table was prepared for examples one to three:
Figure 404705DEST_PATH_IMAGE001
from the above table, it can be seen that the present invention is a significant improvement and is implemented in three preferred embodiments.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (10)

1. The method for repairing the concrete cracks is characterized by comprising the following steps:
step 1: cleaning cracks: detecting the depth and the width of the crack by using equipment, cleaning the ground near the crack, when the opening at the top of the crack is less than 5 mm, cutting a groove with the width of 0.5cm-1cm along the crack, and cleaning the inner wall of the crack by using a high-pressure water gun and a high-pressure air gun;
step 2: preparing slurry: mixing and preparing a filling material according to a proportion, wherein the filling material comprises 50-55 parts of cement, 25-28 parts of fly ash, 10-12 parts of quartz sand, 2-5 parts of epoxy resin glue, 1-1.2 parts of redispersible latex powder, 0.5-1.5 parts of water reducing agent and 0.2-0.6 part of retarder, adding the cement, the fly ash, the silica fume, the epoxy resin glue, the redispersible latex powder, the water reducing agent and the retarder into a stirring device, and then adding a proper amount of water to uniformly mix so as to obtain filling slurry;
and step 3: primary perfusion: filling slurry into the crack gradually through filling equipment, stopping filling when the slurry is filled to one third of the crack, applying vibration to the vicinity of a crack filling area by using small-sized vibration equipment, discharging air to avoid generating a cavity, and blowing and applying pressure to an air nozzle communicated with an air tank aiming at the slurry in the crack after vibration is finished;
and 4, step 4: and (3) completing the repair: and (3) performing secondary pouring by using a pouring device, stopping pouring when the filling slurry reaches the height of two thirds of the crack, applying vibration to a crack pouring area by using a small-sized vibrating device, stopping vibrating for 30 seconds, and then performing the last pouring by using the pouring device until the filling slurry fills the crack.
2. The method for repairing concrete cracks according to claim 1, wherein in step 1, soil, oil and other substances affecting filling on the ground around the cracks are cleaned, and loose concrete on the ground near the cleaning grooves needs to be checked after the grooving is finished.
3. The method for repairing concrete cracks according to claim 1, wherein in the step 1, the cross section of the groove is in a V-shaped structure, and the depth of the groove is controlled to be 1 cm.
4. The method for repairing concrete cracks according to claim 1, wherein in the step 2, the filling material comprises the following components by weight: 50 parts of cement, 28 parts of fly ash, 10 parts of quartz sand, 5 parts of epoxy resin glue, 1 part of redispersible latex powder, 1 part of water reducing agent and 0.5 part of retarder.
5. The method for repairing concrete cracks according to claim 1, wherein in the step 2, the quartz sand is 200-mesh quartz sand, and the water reducing agent is a polycarboxy water reducing agent.
6. The method for repairing concrete cracks according to claim 1, wherein in step 3, the settlement of the filling slurry inside the cracks is concerned during the vibration process, and when the filling slurry does not settle any more, the vibration process is continued for 5 seconds.
7. The method for repairing concrete cracks according to claim 1, wherein in the step 3, the small-sized vibration device is a small-sized pneumatic knocking hammer, and when the device is operated, the device moves along the crack trend of the filling area.
8. The method for repairing concrete cracks according to claim 1, wherein in the step 3, when the air nozzle is used, the air nozzle needs to move along the crack of the filling area to blow three times, and when the filling slurry is settled, the area is blown and pressed intensively.
9. The method for repairing concrete cracks according to claim 1, wherein in step 4, glue is applied to the inner wall of the groove, and then the final pouring is performed.
10. The method for repairing concrete cracks as claimed in claim 1, wherein in step 4, after the completion of the pouring, the small vibration device is pressed to move along the poured cracks for vibration, and after the vibration is completed, the residual filling slurry is applied by using a tool to smooth the crack regions.
CN202110622125.8A 2021-06-04 2021-06-04 Method for repairing concrete cracks Pending CN113293797A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110622125.8A CN113293797A (en) 2021-06-04 2021-06-04 Method for repairing concrete cracks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110622125.8A CN113293797A (en) 2021-06-04 2021-06-04 Method for repairing concrete cracks

Publications (1)

Publication Number Publication Date
CN113293797A true CN113293797A (en) 2021-08-24

Family

ID=77327155

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110622125.8A Pending CN113293797A (en) 2021-06-04 2021-06-04 Method for repairing concrete cracks

Country Status (1)

Country Link
CN (1) CN113293797A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102173661A (en) * 2010-12-22 2011-09-07 北京东方雨虹防水技术股份有限公司 Self-leveling polymer cement base repair mortar and preparation method thereof
KR101418310B1 (en) * 2014-04-22 2014-07-10 부림산업개발(주) Injecting apparatus for crack repair and crack repairing methods of concrete structure using the same
CN106321121A (en) * 2016-10-26 2017-01-11 盐城市康泰建筑灌浆技术有限公司 Vibration disturbance resistant crack leaking stoppage and reinforcement method applied to underground works
CN108797292A (en) * 2017-04-26 2018-11-13 福建省第公路工程公司 A kind of cement concrete cracks breakage raggle formula patching
CN110550918A (en) * 2019-09-12 2019-12-10 广州迪瑞夫建筑材料有限公司 Polymer modified repair mortar and construction process
CN111470835A (en) * 2020-06-03 2020-07-31 杭州市城市建设基础工程有限公司 Method and process for repairing concrete cracks in road and bridge construction
CN112079596A (en) * 2020-08-25 2020-12-15 华恒建设集团有限公司 Reinforcing and repairing method suitable for wall cracks
CN112681790A (en) * 2020-12-15 2021-04-20 国家电投集团江西中业兴达电力实业有限公司 Grouting treatment method for concrete roof cracks
CN112709228A (en) * 2020-12-22 2021-04-27 河北工程大学 Crack filling cement grouting method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102173661A (en) * 2010-12-22 2011-09-07 北京东方雨虹防水技术股份有限公司 Self-leveling polymer cement base repair mortar and preparation method thereof
KR101418310B1 (en) * 2014-04-22 2014-07-10 부림산업개발(주) Injecting apparatus for crack repair and crack repairing methods of concrete structure using the same
CN106321121A (en) * 2016-10-26 2017-01-11 盐城市康泰建筑灌浆技术有限公司 Vibration disturbance resistant crack leaking stoppage and reinforcement method applied to underground works
CN108797292A (en) * 2017-04-26 2018-11-13 福建省第公路工程公司 A kind of cement concrete cracks breakage raggle formula patching
CN110550918A (en) * 2019-09-12 2019-12-10 广州迪瑞夫建筑材料有限公司 Polymer modified repair mortar and construction process
CN111470835A (en) * 2020-06-03 2020-07-31 杭州市城市建设基础工程有限公司 Method and process for repairing concrete cracks in road and bridge construction
CN112079596A (en) * 2020-08-25 2020-12-15 华恒建设集团有限公司 Reinforcing and repairing method suitable for wall cracks
CN112681790A (en) * 2020-12-15 2021-04-20 国家电投集团江西中业兴达电力实业有限公司 Grouting treatment method for concrete roof cracks
CN112709228A (en) * 2020-12-22 2021-04-27 河北工程大学 Crack filling cement grouting method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
建筑专业《职业技能鉴定教材》编审委员会: "《混凝土工(中级)》", 30 April 1999, 中国劳动出版社 *
张明松等: "混凝土裂缝处理工艺及设备的研究", 《机床与液压》 *
李国胜: "《建筑结构裂缝及加层加固疑难问题的处理——附实例》", 31 March 2006, 中国建筑工业出版社 *

Similar Documents

Publication Publication Date Title
US5671581A (en) Water cut-off process for concrete structure
CN106930277B (en) A kind of construction of manual-excavation cast-in-place pile method
CN110439286A (en) A kind of liner is put more energy into joint steel pipe concrete column drag reduction jack-up construction method of weakening
CN108396737A (en) The Soil-cement pile material of Strengthening Wet soil base
CN109574584A (en) The preparation method of dual control cement slurry for karst foundation slip casting
CN110080550B (en) Wall surface structure
CN113293797A (en) Method for repairing concrete cracks
WO2001092180A1 (en) Resin mortar for construction and a method of plastering resin mortar
KR20090002833A (en) Sand pore fill construction apparatus
CN114150873A (en) Grouting device and grouting method for sleeve grouting
CN106365551A (en) Grouting-type hollowing ceramic tile repairing material
CN103496901B (en) Country rock wet shot concrete method inferior
CN110259127A (en) Intersect steel pipe column self-compact concrete in construction method
KR102464905B1 (en) Method of Ground Reinforcement using silica sol
CN110410106A (en) Tunnel vault band film grouting construction method
KR101860943B1 (en) Filling device for ground hole using rapid hardening and pseudo-plastic backfill material and filling method using that
CN109057343A (en) A kind of building concrete pouring procedure
CN111996923B (en) Closed type in-column concrete pouring method
JP2012087579A (en) Masonry reinforcing method
WO2005026073A1 (en) Partially hydrolyzed shaped article from hydraulic composition, method for production thereof and method for use thereof
CN112627167A (en) Roadbed underground grouting reinforcement equipment for road construction
CN106761823B (en) Exempt from wall for grouting segmentation cleaning bottom of hole retrusive controlling grouting method
JP2013036277A (en) Method for joining concrete member
JP2011214399A (en) Filler
CN208039893U (en) A kind of biliquid single system air pressure energy storage slip casting machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210824