CN113290527A - Quick assembling and disassembling device for tower barrel - Google Patents
Quick assembling and disassembling device for tower barrel Download PDFInfo
- Publication number
- CN113290527A CN113290527A CN202110793345.7A CN202110793345A CN113290527A CN 113290527 A CN113290527 A CN 113290527A CN 202110793345 A CN202110793345 A CN 202110793345A CN 113290527 A CN113290527 A CN 113290527A
- Authority
- CN
- China
- Prior art keywords
- tower
- cylinder
- cross beam
- cross
- inner tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000003921 oil Substances 0.000 claims description 12
- 238000009434 installation Methods 0.000 claims description 9
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims description 6
- 235000017491 Bambusa tulda Nutrition 0.000 claims description 6
- 241001330002 Bambuseae Species 0.000 claims description 6
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims description 6
- 239000011425 bamboo Substances 0.000 claims description 6
- 239000010720 hydraulic oil Substances 0.000 claims description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 230000002146 bilateral effect Effects 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 7
- 230000006978 adaptation Effects 0.000 abstract 1
- 238000010248 power generation Methods 0.000 description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25B—TOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
- B25B27/00—Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for
- B25B27/14—Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for for assembling objects other than by press fit or detaching same
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Wind Motors (AREA)
Abstract
The invention relates to the technical field of handling equipment, and discloses a tower cylinder rapid handling device which comprises a cross beam and a platform, wherein the top of the platform is fixedly provided with a guide outer cylinder, a lifting inner cylinder is sleeved in the guide outer cylinder, a cross beam is fixedly arranged between the two lifting inner cylinders, two ends of the cross beam are fixedly arranged at the top of the lifting inner cylinder through connecting pins, the surface of the cross beam is symmetrically provided with cross arms, the lifting inner cylinder is internally provided with a hydraulic connecting rod, the top of the hydraulic connecting rod is provided with a piston, the piston consists of four bases and two cross beams, each base consists of the platform, a rib plate, the guide outer cylinder and the lifting inner cylinder, each cross beam is provided with two movable cross arms which can fix tower cylinders with different sizes, the cross beams and the bases are connected through the connecting pins, so that the effects of convenient disassembly and convenient transportation are achieved, and the distance between the two cross arms can be adjusted at will, thereby the effect of adaptation different external diameter tower barrels has been reached.
Description
Technical Field
The invention relates to the technical field of loading and unloading equipment, in particular to a tower cylinder rapid loading and unloading device.
Background
Wind energy is increasingly gaining attention as a clean renewable energy source in all countries of the world. The wind power generation device has huge energy, the global wind power is about 2.74 multiplied by 10^9MW, the available wind power is 2 multiplied by 10^7MW and is 10 times larger than the total amount of water energy which can be developed and utilized on the earth, wind is utilized by people very early, mainly water pumping, surface grinding and the like are carried out through a windmill, at present, people are interested in how to utilize wind to generate electricity, the wind power generation is valued at home at the present stage, natural resources are fully utilized, the environment is protected, no pollution is caused, the wind power generation can not leave large-sized fans and towers, the transportation and installation of the towers in the wind power generation device mainly use cranes, the time and labor are wasted, and the cost is high.
Disclosure of Invention
The invention aims to provide a tower cylinder rapid assembling and disassembling device to solve the problems in the prior art
In order to achieve the purpose, the invention provides the following technical scheme: the utility model provides a tower section of thick bamboo fast loading and unloading device, includes crossbeam and platform, the top fixed mounting of platform has the direction urceolus, the inside cover of direction urceolus is equipped with lifts the inner tube, two lift and fixedly be provided with the crossbeam between the inner tube, the both ends of crossbeam are through connecting pin fixed mounting at the top of lifting the inner tube, the surface symmetry of crossbeam is provided with the cross arm, the inside of lifting the inner tube is provided with the hydraulic link, the piston is installed at the top of hydraulic link.
Preferably, the pneumatic cylinder is provided with four, the pneumatic cylinder passes through ball valve and leads two liang of intercommunications of oil pipe, two the pneumatic cylinder leads and connects in switching-over valve interface department through quick-operation joint between the oil pipe, switching-over valve one side is connected with the check valve through leading oil pipe, the check valve is through leading oil pipe and hydraulic pump connection, hydraulic pump and power supply intercommunication.
Preferably, the cross arm is movably sleeved on the surface of the cross beam, and a plurality of positioning holes are formed in the surface of the cross beam.
Preferably, the top of the lifting inner cylinder is fixedly provided with a mounting fork, two ends of the cross beam are arranged in the mounting fork, two sets of through holes are symmetrically formed in the two sides of the mounting fork at the top of the lifting inner cylinder, and the connecting pin penetrates through the through holes in the two sides of the mounting fork.
Preferably, rib plates are symmetrically arranged on two sides of the top of the platform, and the tops of the rib plates are welded on two sides of the guide outer cylinder.
Preferably, a barrel bottom bolt is screwed at the bottom of the hydraulic oil cylinder, and the cross beam and the cross arm are made of I-shaped steel materials.
Compared with the prior art, the invention provides a tower cylinder rapid loading and unloading device, which has the following beneficial effects:
this tower section of thick bamboo fast loading and unloading device through constituting by four bases and two crossbeams, the base comprises platform, gusset, direction urceolus, the inner tube of lifting, and has two activity cross arms on every crossbeam, can fix the tower section of thick bamboo of equidimension not, and the crossbeam is connected by the connecting pin with the base to reached convenient to detach, the effect of convenient transportation, and can adjust the interval at will between two cross arms, thereby reached the effect that adapts to different external diameter tower section of thick bamboo.
The quick loading and unloading device for the tower barrel is characterized in that two devices are hoisted to proper positions at the front end and the rear end of the tower barrel by a vehicle, a hydraulic oil cylinder is driven by a power source, a cross beam is lifted to a proper height, a cross arm and the tower barrel are connected by bolts, so that the tower barrel and the cross arm are fixed, the inner barrel is lifted through power source control to lift the tower barrel to a certain height, the transport vehicle is driven to the lower portion of the tower barrel, the crossbeam tower barrel is descended to complete loading, the loading and unloading device is placed at a proper position in a field, the crossbeam is lifted to a certain height, the wind power generation tower barrel transport vehicle is driven to the lower portion of the two crossbeams, the lifting inner barrel is controlled to descend to a proper position, the cross arm and the tower barrel are connected through bolts, a flange of the tower barrel and the cross arm are fixed through bolts, the power source drives the hydraulic cylinder, the lifting inner barrel is lifted, the tower barrel is separated from a vehicle body, the transport vehicle is driven out, the tower barrel is descended to the ground to complete stacking of the tower barrel, and therefore the effect of fast loading and unloading of the tower barrel is achieved.
Drawings
FIG. 1 is a front view of the present invention;
FIG. 2 is a cross-sectional view of the present invention;
FIG. 3 is a left side view of the present invention;
FIG. 4 is a top view of the present invention;
FIG. 5 is a hydraulic schematic of a tower of the present invention.
In the figure: 1. a cross beam; 2. a cross arm; 3. a platform; 4. a guide outer cylinder; 5. lifting the inner barrel; 6. a rib plate; 7. a connecting pin; 8. a hydraulic cylinder; 9. a barrel bottom bolt; 10. a hydraulic link; 11. a piston; 12. a hydraulic cylinder; 13. a ball valve; 14. a quick coupling; 15. a diverter valve; 16. a one-way valve; 17. a power source; 18. a hydraulic pump.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-5, a tower cylinder fast loading and unloading device includes a cross beam 1 and a platform 3, a guide outer cylinder 4 is fixedly installed on the top of the platform 3, a lifting inner cylinder 5 is sleeved inside the guide outer cylinder 4, the cross beam 1 is fixedly installed between the two lifting inner cylinders 5, two ends of the cross beam 1 are fixedly installed on the top of the lifting inner cylinder 5 through a connecting pin 7, cross arms 2 are symmetrically installed on the surface of the cross beam 1, a hydraulic connecting rod 10 is installed inside the lifting inner cylinder 5, and a piston 11 is installed on the top of the hydraulic connecting rod 10.
In order to show the working principle of the hydraulic cylinder 8 more clearly, in the embodiment, preferably, four hydraulic cylinders 12 are provided, the hydraulic cylinders 12 are communicated with two oil guide pipes through ball valves 13, the two oil guide pipes of the two hydraulic cylinders 12 are connected to a joint of a reversing valve 15 through quick connectors 14, one side of the reversing valve 15 is connected with a one-way valve 16 through the oil guide pipe, the one-way valve 16 is connected with a hydraulic pump 18 through the oil guide pipe, and the hydraulic pump 18 is communicated with a power source 17.
In order to fix 2 positions of cross arm after adjusting, prevent at the handling in-process, because rock and lead to cross arm 2 to take place the displacement, preferred in this embodiment, cross arm 2 movable sleeve establishes on the surface of crossbeam 1, and a plurality of locating holes have been seted up on the surface of crossbeam 1.
In order to conveniently install the cross beam 1 on the top of the lifting inner cylinder 5, in this embodiment, preferably, the top of the lifting inner cylinder 5 is fixedly installed with an installation fork, two ends of the cross beam 1 are placed in the installation fork, two sides of the installation fork at the top of the lifting inner cylinder 5 are symmetrically provided with two groups of through holes, and the connecting pin 7 penetrates through the through holes at two sides of the installation fork.
In order to enhance the stability of the guide outer cylinder 4 and improve the rigidity of the device, in the embodiment, it is preferable that rib plates 6 are symmetrically arranged on two sides of the top of the platform 3, and the tops of the rib plates 6 are welded on two sides of the guide outer cylinder 4.
In order to make the cross beam 1 and the cross arm 2 have stronger pressure-bearing capacity and reduce the cost in the manufacturing process, in this embodiment, it is preferable that the bottom of the hydraulic cylinder 8 is screwed with a barrel bottom bolt 9, and both the cross beam 1 and the cross arm 2 are made of i-steel materials.
The working principle is as follows: before the device is used, a user needs to check the device, check whether the connection and installation of each part of the device are normal or not, and use the device after the check is finished, firstly, a base and a beam 1 are connected by a connecting pin 7 for assembly, two devices are hoisted to proper positions at the front end and the rear end of a tower drum by using a vehicle, a power source 17 drives a hydraulic oil cylinder 8, the beam 1 is hoisted to proper height, a cross arm 2 and the tower drum are connected by using bolts, the tower drum is fixed with the cross arm 2, a hoisting inner cylinder 5 is controlled by the power source 17 to hoist to certain height, a transport vehicle is driven to the lower part of the tower, the beam 1 is descended to complete loading, the loading and unloading device is hoisted by using the vehicle to proper position in the field, the beam 1 is hoisted to certain height, the transport vehicle for the wind power generation tower is driven to hoist to certain height under the two beams 1, the hoisting inner cylinder 5 is controlled to descend to proper position, the cross arm 2 and the tower drum are connected by using bolts, the flange of the tower cylinder and the cross arm 2 are fixed by bolts, the power source 17 drives the hydraulic cylinder 12 to lift the lifting inner cylinder 5, the tower cylinder is separated from the vehicle body, the transport vehicle is driven out, and the tower cylinder is lowered to the ground to complete stacking of the tower cylinder, so that the effect of quickly loading and unloading the tower cylinder is achieved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a tower section of thick bamboo fast loading and unloading device, includes crossbeam (1) and platform (3), its characterized in that: the top fixed mounting of platform (3) has direction urceolus (4), the inside cover of direction urceolus (4) is equipped with lifts inner tube (5), two lift inner tube (5) between the fixed crossbeam (1) that is provided with, the both ends of crossbeam (1) are through connecting pin (7) fixed mounting at the top of lifting inner tube (5), the surface symmetry of crossbeam (1) is provided with cross arm (2), the inside of lifting inner tube (5) is provided with hydraulic link (10), piston (11) are installed at the top of hydraulic link (10).
2. A tower section of thick bamboo fast loading and unloading device, includes pneumatic cylinder (12) and switching-over valve (15), its characterized in that: pneumatic cylinder (12) are provided with four, pneumatic cylinder (12) are through ball valve (13) and two liang of intercommunications of oil pipe, two pneumatic cylinder (12) are led and are connected at switching-over valve (15) kneck through quick-operation joint (14) between the oil pipe, switching-over valve (15) one side is connected with check valve (16) through leading oil pipe, check valve (16) are connected with hydraulic pump (18) through leading oil pipe, hydraulic pump (18) and power supply (17) intercommunication.
3. The tower quick assembly disassembly device of claim 1, wherein: the cross arm (2) is movably sleeved on the surface of the cross beam (1), and a plurality of positioning holes are formed in the surface of the cross beam (1).
4. The tower quick assembly disassembly device of claim 1, wherein: the top fixed mounting who lifts inner tube (5) has the installation fork, the both ends of crossbeam (1) are put and are pitched in, lift inner tube (5) top installation fork bilateral symmetry and seted up two sets of through-holes, connecting pin (7) run through the installation and pitch both sides through-hole.
5. The tower quick assembly disassembly device of claim 1, wherein: rib plates (6) are symmetrically arranged on two sides of the top of the platform (3), and the tops of the rib plates (6) are welded on two sides of the guide outer cylinder (4).
6. The tower quick assembly disassembly device of claim 1, wherein: the bottom of the hydraulic oil cylinder (8) is screwed with a barrel bottom bolt (9), and the cross beam (1) and the cross arm (2) are made of I-shaped steel materials.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110793345.7A CN113290527A (en) | 2021-07-14 | 2021-07-14 | Quick assembling and disassembling device for tower barrel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110793345.7A CN113290527A (en) | 2021-07-14 | 2021-07-14 | Quick assembling and disassembling device for tower barrel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113290527A true CN113290527A (en) | 2021-08-24 |
Family
ID=77331029
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110793345.7A Pending CN113290527A (en) | 2021-07-14 | 2021-07-14 | Quick assembling and disassembling device for tower barrel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113290527A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1250630A (en) * | 1967-11-09 | 1971-10-20 | ||
DE10318675A1 (en) * | 2003-04-24 | 2004-11-18 | Greifzug Hebezeugbau Gmbh | Lifting platform for inspection installations for maintaining wind power installation rotor blades has platform elements fitted around an opening with dimensions adapted to the blades |
CN202518969U (en) * | 2012-03-27 | 2012-11-07 | 沈阳华创风能有限公司 | Tower hoisting equipment |
-
2021
- 2021-07-14 CN CN202110793345.7A patent/CN113290527A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1250630A (en) * | 1967-11-09 | 1971-10-20 | ||
DE10318675A1 (en) * | 2003-04-24 | 2004-11-18 | Greifzug Hebezeugbau Gmbh | Lifting platform for inspection installations for maintaining wind power installation rotor blades has platform elements fitted around an opening with dimensions adapted to the blades |
CN202518969U (en) * | 2012-03-27 | 2012-11-07 | 沈阳华创风能有限公司 | Tower hoisting equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203159047U (en) | Hydraulic span and height adjustable gantry crane | |
CN104477788B (en) | Spanning self-climbing type translational crane of wind power generation tower | |
CN103342296B (en) | Adhering self-elevating-type tower crane for hoisting wind power equipment | |
CN102101630B (en) | Hydraulic climbing self-hoisting device for wind driven generator | |
CN202645875U (en) | Movable type support protection device for wind driven generator blade | |
CN202240369U (en) | Slewing bearing replacement device for crane | |
CN212315372U (en) | Electromagnet adsorption device of crane for wind power generation installation and maintenance | |
CN113290527A (en) | Quick assembling and disassembling device for tower barrel | |
CN202400754U (en) | Mast crane | |
CN103195660B (en) | A kind of pylon of truss structure | |
CN204281116U (en) | Wind power generation stepped leap self-crawling type translation loop wheel machine | |
CN108439266B (en) | Jacking device for crane | |
CN102094543A (en) | Pneumatic lifting communication tower | |
CN215364450U (en) | Utility tunnel hoist and portal crane | |
CN109236211A (en) | A kind of production rig | |
CN202055507U (en) | Desulfurizing tower examination and repair platform | |
CN204281114U (en) | Wind power generation stepped from climbing arch maintenance robot | |
CN203808097U (en) | Foundation structure of offshore wind-power pipe frame | |
CN202556057U (en) | Propeller pitch changing operating platform for wheel type wind driven generator impeller | |
CN201619965U (en) | Climbing lift | |
CN111547629A (en) | Electromagnet adsorption device of crane for wind power generation installation and maintenance | |
CN204877284U (en) | Open -air resource investigation uses scalable derrick | |
CN205820706U (en) | A kind of gantry crane's supporting legs | |
CN207175356U (en) | A kind of hydraulic lift | |
CN102277957B (en) | Overhaul platform of desulfurizing tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||