CN113267710B - Power transmission line bird damage monitoring method, device, equipment and storage medium - Google Patents

Power transmission line bird damage monitoring method, device, equipment and storage medium Download PDF

Info

Publication number
CN113267710B
CN113267710B CN202110725886.6A CN202110725886A CN113267710B CN 113267710 B CN113267710 B CN 113267710B CN 202110725886 A CN202110725886 A CN 202110725886A CN 113267710 B CN113267710 B CN 113267710B
Authority
CN
China
Prior art keywords
bird damage
information
transmission line
opwg
signal acquisition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110725886.6A
Other languages
Chinese (zh)
Other versions
CN113267710A (en
Inventor
欧阳业
胡金磊
黄绍川
潘斌
王潇
黎阳羊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Qingyuan Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Qingyuan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Qingyuan Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN202110725886.6A priority Critical patent/CN113267710B/en
Publication of CN113267710A publication Critical patent/CN113267710A/en
Application granted granted Critical
Publication of CN113267710B publication Critical patent/CN113267710B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/081Locating faults in cables, transmission lines, or networks according to type of conductors
    • G01R31/085Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution lines, e.g. overhead
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/088Aspects of digital computing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • G01R31/58Testing of lines, cables or conductors

Abstract

The invention discloses a method, a device, equipment and a storage medium for monitoring bird damage of a power transmission line. The monitoring method for the bird damage of the power transmission line comprises the steps of obtaining initial information from a signal acquisition device and equipment information of the signal acquisition device; reading corresponding expert scoring data from a preset historical database based on the equipment information; and calculating the probability of the bird damage hidden danger based on the initial information and the expert scoring data. Through the initial information of the optical signal of gathering the inside transmission of OPWG optical cable and the equipment information of signal acquisition equipment, the expert's score data that combines to store in the historical database of predetermineeing again calculates the emergence probability of OPWG optical cable bird trouble hidden danger, can effectually borrow the bird trouble hidden danger control of the transmission line that realizes by OPWG optical cable, the staff can arrange maintenance maintainer to inspect and maintain the transmission line that corresponds according to the emergence probability size of bird trouble hidden danger, avoid needing to make the loss that brings when responding after the bird trouble takes place even causes certain influence.

Description

Bird damage monitoring method, device and equipment for power transmission line and storage medium
Technical Field
The embodiment of the invention relates to the technology of power equipment monitoring, in particular to a method, a device, equipment and a storage medium for monitoring bird damage of a power transmission line.
Background
With the continuous development of an electric power system, the span area length of an electric transmission line is continuously increased, the complexity of a power transmission corridor is also continuously increased, a part of the electric transmission line crosses the inhabitation environment of birds, and the normal operation of the electric power system is seriously damaged by the increasing bird activities. Specifically, in the bird damage fault of the power system, the insulator edge surface pollution flashover caused by bird droppings is a main cause of fault tripping.
At present, the monitoring means for the disasters caused by bird activities mainly depends on historical data to regularly arrange working personnel to maintain and repair the power transmission line, or the occurrence of bird damage faults can be known only after the faults of the power transmission line are caused, the loss of the bird damage monitoring means seriously reduces the stability of the power transmission line, so that the maintenance and repair arrangement of the power transmission line is unreasonable, and a large amount of manpower and material resources are consumed.
Disclosure of Invention
The invention provides a method, a device, equipment and a storage medium for monitoring bird damage of a power transmission line, which are used for monitoring and discovering the influence of bird activity on the power transmission line in time.
In a first aspect, an embodiment of the present invention provides a bird damage monitoring method for an electric transmission line, where an overhead ground wire composed of a plurality of sequentially connected OPWG optical cables is arranged on the electric transmission line, a signal acquisition device is arranged between two adjacent sections of the OPWG optical cables, and the signal acquisition device sends initial information of a received optical signal from an upper section of the OPWG optical cable to an upper computer and sends an optical signal consistent with the initial information to a lower section of the OPWG optical cable;
the method comprises the following steps:
acquiring the initial information from the signal acquisition device and the equipment information of the signal acquisition device;
reading corresponding expert scoring data from a preset historical database based on the equipment information;
and calculating the probability of the bird damage hidden danger based on the initial information and the expert scoring data.
Optionally, the reading of corresponding expert scoring data from a preset historical database based on the device information includes:
acquiring the equipment number of the signal acquisition device from the equipment information;
and reading corresponding expert scoring data from a preset historical database by taking the equipment number as a keyword.
Optionally, the calculating the probability of the bird damage risk based on the initial information and the expert scoring data includes:
normalizing the initial information to obtain transition information;
carrying out normalization processing on the expert scoring data to obtain transition scores;
splicing the transition information and the transition score into a target vector;
and inputting the target vector into a pre-trained full-connection layer classifier to obtain the probability of bird damage hidden danger.
Optionally, before the splicing the transition information and the transition score into the target vector, the method further includes:
and respectively multiplying the transition information and the transition score by preset weights to correct the transition information and the transition score.
Optionally, the normalizing the initial information to obtain transition information includes:
carrying out normalization processing on the initial information by adopting a Z-score method to obtain transition information;
the normalization processing of the expert scoring data to obtain transition scores comprises the following steps:
and carrying out normalization processing on the expert scoring data by adopting a digital normalization method to obtain a transition score.
Optionally, after the calculating the probability of the bird damage risk based on the initial information and the expert scoring data, the method further includes:
issuing an alert based on the probability and the device information.
Optionally, the issuing of the warning based on the probability and the device information includes:
comparing the probability with a preset threshold value;
if the probability is larger than or equal to the threshold value, an alarm signal is sent to an alarm device, and the initial information corresponding to the probability and the equipment information of the signal acquisition device are packaged and uploaded.
In a second aspect, an embodiment of the present invention further provides a bird damage monitoring device for an electric transmission line, where an overhead ground wire composed of a plurality of sequentially connected OPWG optical cables is disposed on the electric transmission line, a signal acquisition device is disposed between two adjacent sections of the OPWG optical cables, and the signal acquisition device sends initial information of a received optical signal from an upper section of the OPWG optical cable to an upper computer and sends an optical signal consistent with the initial information to a lower section of the OPWG optical cable;
the device comprises:
the first acquisition module is used for acquiring the initial information from the signal acquisition device and the equipment information of the signal acquisition device;
the second acquisition module is used for reading corresponding expert scoring data from a preset historical database based on the equipment information;
and the calculation module is used for calculating the probability of the bird damage hidden danger based on the initial information and the expert scoring data.
In a third aspect, an embodiment of the present invention further provides a device for monitoring bird damage of a power transmission line, where the device includes:
one or more processors;
a storage device for storing one or more programs,
when the one or more programs are executed by the one or more processors, the one or more processors are enabled to implement the method for monitoring bird damage on a power transmission line according to the first aspect.
In a fourth aspect, an embodiment of the present invention further provides a storage medium containing computer-executable instructions, which when executed by a computer processor, are configured to perform the method for monitoring bird damage on a power transmission line according to the first aspect.
According to the invention, the probability of bird damage hidden danger of the OPWG optical cable is calculated by collecting the initial information of the optical signal transmitted inside the OPWG optical cable and the equipment information of the signal acquisition equipment and combining the expert scoring data stored in the preset historical database, the bird damage hidden danger monitoring of the power transmission line can be effectively realized by the OPWG optical cable, and a worker can arrange a maintenance worker to check and maintain the corresponding power transmission line according to the bird damage hidden danger occurrence probability, so that the loss caused by response after bird damage occurs or even after a certain influence is caused is avoided.
Drawings
Fig. 1a is a flowchart of a bird damage monitoring method for a power transmission line according to an embodiment of the present invention;
FIG. 1b is a block diagram of a full link layer classifier according to an embodiment of the present invention;
fig. 2 is a structural diagram of a bird damage monitoring device for a power transmission line according to a second embodiment of the present invention;
fig. 3 is a schematic structural diagram of bird damage monitoring equipment for a power transmission line according to a third embodiment of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples. It is to be understood that the specific embodiments described herein are merely illustrative of the invention and are not limiting of the invention. It should be further noted that, for the convenience of description, only some structures related to the present invention are shown in the drawings, not all of them.
Example one
Fig. 1a is a flowchart of a bird damage monitoring method for a power transmission line according to an embodiment of the present invention, and fig. 1b is a structural diagram of a full connection layer classifier according to an embodiment of the present invention, which is applicable to a case where an OPWG optical cable is used to detect a bird damage condition of a power transmission line, where the method may be executed by a bird damage monitoring device for a power transmission line, and the bird damage monitoring device for a power transmission line may be implemented by software and/or hardware, and may be configured in computer equipment, such as a mobile phone, a tablet computer, and wearable equipment (e.g., a smart watch, smart glasses, etc.).
In the embodiment of the invention, an overhead ground wire consisting of a plurality of sections of OPWG optical cables connected in sequence is arranged on the transmission line, a signal acquisition device is arranged between two adjacent sections of OPWG optical cables, the signal acquisition device sends initial information of received optical signals from the previous section of OPWG optical cable to an upper computer, and sends optical signals consistent with the initial information to the next section of OPWG optical cable.
That is, in the embodiment of the present invention, the overhead ground wire uses the OPWG optical cable, and a signal collecting device is disposed at a certain distance to collect and forward the signal of the OPWG optical cable. The signal acquisition device acquires initial information of the optical signal transmitted by the previous section of OPWG optical cable and re-acquires the optical signal which is consistent with the optical signal transmitted by the previous section of OPWG optical cable from the next section of OPWG optical cable according to the initial information. The signal acquisition device is arranged between the two sections of OPWG optical cables, so that the optical signals transmitted by the OPWG optical cables can be acquired, the whole section of OPWG optical cables is divided into a plurality of sections, the bird damage position can be conveniently positioned in the later period, and the condition that the optical signals transmitted in the OPWG optical cables are seriously attenuated to influence the detection of the OPWG optical cables at the subsequent positions can be avoided.
An OPGW Optical cable (Optical Fiber Composite Overhead Ground Wire) is a Composite Overhead Ground Wire integrating Ground Wire and communication functions, and an Optical Fiber is placed in a Ground Wire of an Overhead high-voltage power transmission line to form an Optical Fiber communication network on a power transmission line.
In the embodiment of the invention, when the insulator is polluted and flashed by bird damage, leakage current is formed on the surface of the OPWG optical cable, and the optical signal in the OPGW optical fiber generates Faraday magneto-optical effect under the action of a magnetic field generated by the leakage current, so that the polarization state of the optical signal in the OPGW optical fiber is changed, and therefore, whether the pollution and flash caused by bird damage occur to the insulator can be monitored by detecting the change of the polarization state of the optical signal. Wherein, Faraday magneto-optical effect means: when a linearly polarized light signal propagates in the OPGW optical cable, if a strong magnetic field is applied in a direction parallel to the propagation direction of the optical signal, the vibration direction of the optical signal is deflected, the deflection angle ψ is proportional to the product of the magnetic induction B and the length l of the light passing through the medium, that is, ψ is VBl, and the proportionality coefficient V is called the verdet constant and is related to the medium property and the optical wave frequency. The direction of deflection depends on the media properties and the magnetic field direction. That is, when insulator contamination flashover occurs due to bird damage, a leakage current flowing through the OPGW optical cable forms an electromagnetic field on the surface of the OPGW optical cable, and the electromagnetic field changes the vibration direction of an optical signal propagating through the OPGW optical cable.
The method specifically comprises the following steps:
and step 110, acquiring initial information from the signal acquisition device and equipment information of the signal acquisition device.
In the specific implementation, the optical signal transmitted by the OPWG optical cable of the power transmission line is acquired through the signal acquisition device, the initial information of the optical signal of the OPWG optical cable corresponding to the acquisition position of the signal acquisition device and the equipment information corresponding to the signal acquisition device are finally obtained, the running condition of the OPWG optical cable of each part of the power transmission line can be monitored by combining the equipment information and the initial information in the later period, and the monitoring efficiency of the working condition of the OPWG optical cable is effectively improved.
In other embodiments, the number of the signal acquisition devices is not limited, and the signal acquisition devices may be one or more, and in the case of one signal, the signal attenuation rate of the OPWG optical cable and the receiving time of the optical signal may be combined to determine the position of the optical signal of the OPWG optical cable where the optical signal is deflected, so as to realize the positioning of the position where the bird damage is caused, and when a plurality of signal acquisition devices are provided, the position of the signal acquisition devices may be combined to realize more reliable positioning.
In embodiments of the present invention, the initial information may include the type, characteristic parameters, etc. of the polarized optical signal, such as the amplitude, intensity, phase, frequency, polarization, etc. parameters of the optical signal. Even further include the length of the OPGW cable, attenuation coefficient, chromatic dispersion coefficient mode field diameter, cutoff wavelength, zero dispersion slope, and the like. The equipment information may include an equipment number of the signal acquisition device, an equipment operation parameter, and the like.
And step 120, reading corresponding expert scoring data from a preset historical database based on the equipment information.
In the embodiment of the present invention, a history database containing bird damage history data is pre-established, and the history database may include the position and number of the OPWG optical cable corresponding to the position of the signal acquisition device, and may further include the frequency of occurrence of the bird damage hazard at the corresponding position, the line geographical location information, and the like, for example: distance between the line and the river, distance between the line and the lake, distance between the forest zones, distance between bird migration channels and the like. In addition, the data stored in the history database may be preprocessed, and may be directly used without additional processing after being read.
The expert scoring data is a method for scoring a certain index or scoring the relation between indexes by using the deep experts in the field, and complex data is processed. The method is applied to two places, one is that non-numerical indexes such as river conditions around lines, lake conditions, forest zone conditions and bird migration channel conditions are scored by experts according to distances between the lines and the rivers, distances between the lakes and the forest zone, distances between the birds and the bird migration channel in historical data, and bird damage reference values of different non-numerical indexes are obtained finally after normalization calculation and used for subsequent calculation. And secondly, scoring all indexes according to the importance of the indexes, and endowing different weights to different indexes according to scoring results. And the scoring result of the expert, and the non-numerical index bird damage reference value and the index weight obtained according to the scoring result are stored in a historical database.
And step 130, calculating the probability of the bird damage hidden danger based on the initial information and the expert scoring data.
In the step, whether the OPWG optical cable flows through leakage current or not can be determined according to the change of the optical signal transmitted in the OPWG optical cable, and then whether the OPWG optical cable changes caused by bird damage or not is judged, and the probability of occurrence of the hidden danger of bird damage can be effectively judged by combining the historical database. For the probability calculation, for example, a full-connection layer neural network classifier is constructed, the initial information and the expert scoring data are input into the full-connection layer neural network classifier as input for classification calculation, and the probability of occurrence of the bird damage hidden danger is finally obtained. In other embodiments, other means may be used for calculation, for example, a specific calculation formula is set, the collected initial information and expert scoring data are quantized, different weights are set according to different influences of the parameters, and the probability of the bird damage is calculated.
The technical scheme of this embodiment, through the initial information of the optical signal of gathering the inside transmission of OPWG optical cable and the equipment information of signal acquisition equipment, the expert's score data that combines to store in the historical database of predetermineeing calculates the emergence probability of OPWG optical cable bird damage hidden danger, can effectually borrow the bird damage hidden danger control of the transmission line that realizes by OPWG optical cable, the staff can arrange the maintenance maintainer to inspect and maintain corresponding transmission line according to the emergence probability size of bird damage hidden danger, avoid needing to make the loss that brings when responding to again after the bird damage takes place even causes certain influence.
In the embodiment of the present invention, after step 130, the method may further include:
and step 140, sending out an alarm based on the probability and the equipment information.
In a specific implementation, after the occurrence probability of the bird damage hidden danger is obtained through calculation, different responses can be made according to the size of the occurrence probability, for example, a warning is issued after the occurrence probability is greater than a preset value, and the content and the level of the warning issued in different preset ranges are different. Or, the warning is given out and the equipment information of the signal acquisition device corresponding to the warning is attached, so that the working personnel can make corresponding response more conveniently. The warning information and the equipment information can be combined according to a specific format form and then sent out, and the warning information and the equipment information are displayed to the staff through a display device or other means. In addition, the corresponding initial information and the corresponding equipment information can be packaged, uploaded and stored, so that the subsequent checking and rechecking of workers are facilitated.
In an embodiment of the present invention, step 120 may include:
and step 121, acquiring the equipment number of the signal acquisition device from the equipment information.
In the embodiment of the present invention, the device information of the signal acquisition device is appended with the device number corresponding to the signal acquisition device, and the number may be obtained by arranging the signal acquisition device in advance, or may be defined according to a fixed acquisition sequence in actual use, which is not limited too much here.
And step 122, reading corresponding expert scoring data from a preset historical database by taking the equipment number as a keyword.
In specific implementation, the data in the historical database are all associated with the equipment numbers, and the data in the historical database can be retrieved and read by taking the equipment numbers as keywords, so that expert scoring data corresponding to the signal acquisition device is obtained.
In an embodiment of the present invention, step 130 may include:
and 131, normalizing the initial information to obtain transition information.
And 132, carrying out normalization processing on the expert scoring data to obtain a transition score.
In the specific implementation, the initial information and the expert scoring data are respectively subjected to normalization processing, so that the initial information and the expert scoring data can be unified, and subsequent calculation is facilitated. The specific normalization methods are many, such as Z-score method, digital normalization, etc., and can be selected according to specific situations.
In an optional example, performing normalization processing on the initial information by using a Z-score method to obtain transition information; and carrying out normalization processing on the expert scoring data by adopting a digital normalization method to obtain a transition score.
In an embodiment of the present invention, the initial information may include a polarized light polarization angle, a polarized light amplitude, and a polarized light frequency of the optical signal of the OPWG optical cable collected by the signal collection apparatus.
The initial information may be normalized using the following equation (1):
Figure BDA0003138620770000101
wherein θ' represents the result after normalization, θ represents the polarization angle, the amplitude or the frequency of the polarized light in the initial information, and θ mean And σ represents a standard deviation of all sample data of the polarized light polarization angle, the polarized light amplitude or the polarized light frequency in the initial information.
The historical database can selectively comprise historical bird damage occurrence frequency f, bird damage occurrence line section number ai and line geographic position information (distance m between a line and a river) 1 Lake distance m 2 Distance m between forest zones 3 Bird migration channel distance m 4 )。
The historical bird occurrence frequency f can be normalized by the descending step model equation (2):
Figure BDA0003138620770000102
geographical location information of the line (distance m between the line and the river) 1 Lake distance m 2 Distance m between forest zones 3 Bird migration channel distance m 4 ) And carrying out normalization by using an expert evaluation mode. The specific process is that a total of P experts with different resource depths in the field are set, and the jth expert has different distances m i Two corresponding bird damage reference values m are given ij1 And m ij2 Averaging all expert results to obtain a bird damage reference value:
Figure BDA0003138620770000103
Figure BDA0003138620770000111
and the normalization results for the different distances mi are calculated using the following equation (5).
Figure BDA0003138620770000112
Wherein m' i At different distances m i Normalized result of (2),m i1 And m i2 Bird damage reference values assessed for two experts.
And step 133, splicing the transition information and the transition scores into a target vector.
In the previous steps, the polarization angle, the amplitude and the frequency of the polarized light and the distance m between the line and the river are respectively calculated 1 Lake distance m 2 Distance m between forest zones 3 Bird migration channel distance m 4 All the normalized values need to be taken as k-dimensional vectors (k is the number of the normalized parameters) in this step.
Optionally, weights may be introduced to correct the influence of each parameter, that is, each component of the k-dimensional vector is multiplied by the weight, and the specific weight is set by an expert according to an actual situation.
And 134, inputting the target vector into a pre-trained full-link classifier to obtain the probability of the bird damage hidden danger.
In specific implementation, a full-connection layer neural network classifier can be adopted to input the k-dimensional vectors in front and calculate the probability of bird damage hidden danger.
The specific setting formula of the full connection layer neural network classifier is as follows:
input layer-hidden layer:
Figure BDA0003138620770000113
in the formula, h i For hidden layer data, a hidden layer vector H ═ H is constructed 1 ,h 2 ,…,h n ]δ is the Relu nonlinear activation function, w ji For the jth input value to the ith hidden layer value, b ji Offset the ith hidden layer value for the jth input value.
Hidden layer-output layer:
Figure BDA0003138620770000121
in the formula, y i For hidden layer data, an output vector Y is formed 1 ,y 2 ,…,y n ]δ 'is Tanh nonlinear activation function, w' ji Weight, b 'of ith output value to jth hidden layer value' ji Offset the ith output value for the jth hidden layer value.
And classifying the output vector Y through a softmax function to obtain a bird damage hidden danger evaluation vector. And training the neural network by using historical data of each input quantity when the bird damage occurs in the past to obtain a weight value and a bias value in each layer. And inputting index data by using the trained neural network to obtain the probability of the occurrence of the bird damage hidden danger.
Example two
Fig. 2 is a structural diagram of a bird damage monitoring device for a power transmission line according to a second embodiment of the present invention. The device includes: a first acquisition module 21, a second acquisition module 22, and a calculation module 23. Wherein:
the transmission line is provided with a plurality of overhead ground wires consisting of OPWG optical cables which are sequentially connected, a signal acquisition device is arranged between two adjacent OPWG optical cables, the signal acquisition device sends initial information of received optical signals from the previous OPWG optical cable to an upper computer, and sends optical signals consistent with the initial information to the next OPWG optical cable;
a first obtaining module 21, configured to obtain initial information from the signal acquisition device and device information of the signal acquisition device;
the second obtaining module 22 is configured to read corresponding expert scoring data from a preset historical database based on the device information;
and the calculating module 23 is used for calculating the probability of the bird damage hidden danger based on the initial information and the expert scoring data.
Further comprising:
the second obtaining module 22 includes:
the equipment number unit is used for acquiring the equipment number of the signal acquisition device from the equipment information;
and the reading unit is used for reading corresponding expert scoring data from a preset historical database by taking the equipment number as a key word.
The calculation module 23 includes:
the initial normalization unit is used for performing normalization processing on the initial information to obtain transition information;
the expert normalization unit is used for carrying out normalization processing on the expert scoring data to obtain transition scores;
the initial normalization unit is used for normalizing initial information by adopting a Z-score method to obtain transition information; and the expert normalization unit is used for normalizing the expert scoring data by adopting a digital normalization method to obtain a transition score.
The splicing unit is used for splicing the transition information and the transition scores into a target vector;
and the computing unit is used for inputting the target vector into a pre-trained full-connected layer classifier to obtain the probability of bird damage hidden danger.
Before the splicing the transition information and the transition score into the target vector, the method may further include:
and the correcting unit is used for multiplying the transition information and the transition score by preset weights respectively to correct the transition information and the transition score.
Further comprising:
and the warning module is used for sending out a warning based on the probability and the equipment information.
The warning module includes:
the comparison unit is used for comparing the probability with a preset threshold value;
and the uploading unit is used for sending an alarm signal to the alarm device if the probability is greater than or equal to the threshold value, and packaging and uploading the initial information corresponding to the probability and the equipment information of the signal acquisition device.
The bird damage monitoring device for the power transmission line, provided by the embodiment of the invention, can execute the bird damage monitoring method for the power transmission line, provided by any embodiment of the invention, and has the corresponding functional modules and beneficial effects of the execution method.
EXAMPLE III
Fig. 3 is a schematic structural diagram of bird damage monitoring equipment for a power transmission line according to a third embodiment of the present invention. As shown in fig. 3, the electronic apparatus includes a processor 30, a memory 31, a communication module 32, an input device 33, and an output device 34; the number of the processors 30 in the electronic device may be one or more, and one processor 30 is taken as an example in fig. 3; the processor 30, the memory 31, the communication module 32, the input device 33 and the output device 34 in the electronic device may be connected by a bus or other means, and the bus connection is taken as an example in fig. 3.
The memory 31 is used as a computer-readable storage medium, and can be used to store software programs, computer-executable programs, and modules, such as modules corresponding to the monitoring method for bird damage of the power transmission line in this embodiment (for example, the first obtaining module 21, the second obtaining module 22, and the calculating module 23 in the monitoring apparatus for bird damage of power transmission line). The processor 30 executes various functional applications and data processing of the electronic device by running software programs, instructions and modules stored in the memory 31, so as to implement the above-mentioned bird damage monitoring method for the power transmission line.
The memory 31 may mainly include a storage program area and a storage data area, wherein the storage program area may store an operating system, an application program required for at least one function; the storage data area may store data created according to use of the electronic device, and the like. Further, the memory 31 may include high speed random access memory, and may also include non-volatile memory, such as at least one magnetic disk storage device, flash memory device, or other non-volatile solid state storage device. In some examples, the memory 31 may further include memory located remotely from the processor 30, which may be connected to the electronic device through a network. Examples of such networks include, but are not limited to, the internet, intranets, local area networks, mobile communication networks, and combinations thereof.
And the communication module 32 is used for establishing connection with the display screen and realizing data interaction with the display screen. The input device 33 may be used to receive input numeric or character information and generate key signal inputs related to user settings and function control of the electronic apparatus, and the output device 34 may be used to issue warning information.
The electronic device provided by this embodiment of the present invention can execute the method for monitoring bird damage of the power transmission line provided by any embodiment of the present invention, and has corresponding functions and beneficial effects.
Example four
An embodiment of the present invention further provides a storage medium containing computer-executable instructions, where the computer-executable instructions are executed by a computer processor to perform a method for monitoring bird damage to a power transmission line, where the method includes:
acquiring initial information from a signal acquisition device and equipment information of the signal acquisition device;
reading corresponding expert scoring data from a preset historical database based on the equipment information;
and calculating the probability of the bird damage hidden danger based on the initial information and the expert scoring data.
Of course, the storage medium provided in the embodiments of the present invention includes computer-executable instructions, and the computer-executable instructions are not limited to the operations of the method described above, and may also perform related operations in a method for monitoring bird damage to a power transmission line provided in any embodiment of the present invention.
From the above description of the embodiments, it is obvious for those skilled in the art that the present invention can be implemented by software and necessary general hardware, and certainly, can also be implemented by hardware, but the former is a better embodiment in many cases. Based on such understanding, the technical solutions of the present invention or portions thereof contributing to the prior art may be embodied in the form of a software product, which can be stored in a computer readable storage medium, such as a floppy disk, a Read-OnlY MemorY (ROM), a Random Access MemorY (RAM), a FLASH MemorY (FLASH), a hard disk or an optical disk of a computer, etc., and includes several instructions for enabling a computer electronic device (which may be a personal computer, a server, or a network electronic device, etc.) to execute the method according to the embodiments of the present invention.
It should be noted that, in the embodiment of the monitoring device for bird damage on the power transmission line, the units and modules included in the monitoring device are only divided according to functional logic, but are not limited to the above division, as long as the corresponding functions can be implemented; in addition, specific names of the functional units are only for convenience of distinguishing from each other, and are not used for limiting the protection scope of the present invention.
It is to be noted that the foregoing is only illustrative of the preferred embodiments of the present invention and the technical principles employed. It will be understood by those skilled in the art that the present invention is not limited to the particular embodiments described herein, but is capable of various obvious changes, rearrangements and substitutions as will now become apparent to those skilled in the art without departing from the scope of the invention. Therefore, although the present invention has been described in greater detail by the above embodiments, the present invention is not limited to the above embodiments, and may include other equivalent embodiments without departing from the spirit of the present invention, and the scope of the present invention is determined by the scope of the appended claims.

Claims (10)

1. The bird damage monitoring method for the power transmission line is characterized in that an overhead ground wire consisting of a plurality of sections of OPWG optical cables connected in sequence is arranged on the power transmission line, a signal acquisition device is arranged between two adjacent sections of the OPWG optical cables, the signal acquisition device sends initial information of received optical signals from the previous section of the OPWG optical cable to an upper computer, and sends optical signals consistent with the initial information to the next section of the OPWG optical cable;
the method comprises the following steps:
acquiring the initial information from the signal acquisition device and the equipment information of the signal acquisition device;
reading corresponding expert scoring data from a preset historical database based on the equipment information;
calculating the probability of the bird damage hidden danger based on the initial information and the expert scoring data;
the expert scoring data comprises a non-numerical index bird damage reference value and a weight corresponding to the non-numerical index bird damage reference value.
2. The method for monitoring bird damage on an electric transmission line according to claim 1, wherein the step of reading corresponding expert scoring data from a preset historical database based on the equipment information comprises the steps of:
acquiring the equipment number of the signal acquisition device from the equipment information;
and reading corresponding expert scoring data from a preset historical database by taking the equipment number as a keyword.
3. The method for monitoring bird damage to the power transmission line according to claim 1, wherein the calculating the probability of the bird damage hidden danger based on the initial information and the expert scoring data comprises:
normalizing the initial information to obtain transition information;
carrying out normalization processing on the expert scoring data to obtain transition scores;
splicing the transition information and the transition scores into a target vector;
and inputting the target vector into a pre-trained full-connection layer classifier to obtain the probability of bird damage hidden danger.
4. The method for monitoring bird damage to an electric transmission line according to claim 3, wherein before the step of splicing the transition information and the transition score into a target vector, the method further comprises the following steps:
and respectively multiplying the transition information and the transition score by preset weights to correct the transition information and the transition score.
5. The method for monitoring bird damage to the power transmission line according to claim 3, wherein the normalizing the initial information to obtain transition information comprises:
carrying out normalization processing on the initial information by adopting a Z-score method to obtain transition information;
the normalizing the expert scoring data to obtain the transition score comprises the following steps:
and carrying out normalization processing on the expert scoring data by adopting a digital normalization method to obtain a transition score.
6. The method for monitoring bird damage of the power transmission line according to claim 1, wherein after calculating the probability of the bird damage hidden danger based on the initial information and the expert scoring data, the method further comprises:
issuing an alert based on the probability and the device information.
7. The bird damage monitoring method of claim 6, wherein the issuing of the warning based on the probability and the equipment information comprises:
comparing the probability with a preset threshold value;
if the probability is larger than or equal to the threshold value, an alarm signal is sent to an alarm device, and the initial information corresponding to the probability and the equipment information of the signal acquisition device are packaged and uploaded.
8. The bird damage monitoring device for the power transmission line is characterized in that an overhead ground wire consisting of a plurality of sections of OPWG optical cables connected in sequence is arranged on the power transmission line, a signal acquisition device is arranged between two adjacent sections of the OPWG optical cables, the signal acquisition device sends initial information of received optical signals from the upper section of the OPWG optical cable to an upper computer, and sends optical signals consistent with the initial information to the lower section of the OPWG optical cable;
the device comprises:
the first acquisition module is used for acquiring the initial information from the signal acquisition device and the equipment information of the signal acquisition device;
the second acquisition module is used for reading corresponding expert scoring data from a preset historical database based on the equipment information;
the calculation module is used for calculating the probability of the bird damage hidden danger based on the initial information and the expert scoring data;
the expert scoring data comprises a non-numerical index bird damage reference value and a weight corresponding to the non-numerical index bird damage reference value.
9. The utility model provides a transmission line bird pest monitoring facilities which characterized in that, equipment includes:
one or more processors;
a storage device for storing one or more programs,
when executed by the one or more processors, cause the one or more processors to implement the method of monitoring bird damage on an electrical transmission line of any one of claims 1-7.
10. A storage medium containing computer executable instructions for performing the method of bird damage monitoring of an electric transmission line according to any one of claims 1-7 when executed by a computer processor.
CN202110725886.6A 2021-06-29 2021-06-29 Power transmission line bird damage monitoring method, device, equipment and storage medium Active CN113267710B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110725886.6A CN113267710B (en) 2021-06-29 2021-06-29 Power transmission line bird damage monitoring method, device, equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110725886.6A CN113267710B (en) 2021-06-29 2021-06-29 Power transmission line bird damage monitoring method, device, equipment and storage medium

Publications (2)

Publication Number Publication Date
CN113267710A CN113267710A (en) 2021-08-17
CN113267710B true CN113267710B (en) 2022-09-30

Family

ID=77236306

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110725886.6A Active CN113267710B (en) 2021-06-29 2021-06-29 Power transmission line bird damage monitoring method, device, equipment and storage medium

Country Status (1)

Country Link
CN (1) CN113267710B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115471796B (en) * 2022-11-14 2023-03-24 河北电力工程监理有限公司 Power grid engineering supervision system and method based on machine vision

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207201847U (en) * 2017-08-21 2018-04-10 国网新疆电力公司经济技术研究院 A kind of anti-bird pest monitoring device of transmission line of electricity
CN108197782A (en) * 2017-12-19 2018-06-22 国网江西省电力有限公司电力科学研究院 A kind of bird trouble on transmission line risk class appraisal procedure
CN108399503A (en) * 2018-03-08 2018-08-14 云南电网有限责任公司电力科学研究院 A kind of overhead transmission line bird pest fault early warning method
CN110110989A (en) * 2019-04-29 2019-08-09 国网河北省电力有限公司经济技术研究院 The evaluation method and terminal device of the anti-bird effect of overhead transmission line
CN110378549B (en) * 2019-05-31 2023-05-23 广东工业大学 Transmission tower bird damage grade assessment method based on FAHP-entropy weight method
CN110598726A (en) * 2019-07-16 2019-12-20 广东工业大学 Transmission tower bird damage risk prediction method based on random forest
CN111412947A (en) * 2020-03-25 2020-07-14 安徽继远软件有限公司 Fully-distributed OPGW optical cable icing on-line monitoring device and control method
CN111413590B (en) * 2020-04-24 2022-06-28 国家电网有限公司 Transmission line fault and non-fault flashover signal identification method based on OPGW

Also Published As

Publication number Publication date
CN113267710A (en) 2021-08-17

Similar Documents

Publication Publication Date Title
CN106529696B (en) Early warning method and early warning device for equipment in power grid
CN106017551A (en) Intelligent transmission line integrated monitoring analysis and early warning method
Xie et al. Predicting lightning outages of transmission lines using generalized regression neural network
CN105868629B (en) Security threat situation assessment method suitable for electric power information physical system
CN109474333B (en) Electric power optical cable real-time monitoring protection system based on deep learning
CN107561407B (en) Distributed transformer substation grounding grid detection and evaluation method
DE102018115155A1 (en) Method for predicting plant data and device using it
CN110648072A (en) Power communication operation and maintenance safety risk assessment method based on fuzzy analytic hierarchy process
CN113267710B (en) Power transmission line bird damage monitoring method, device, equipment and storage medium
CN114613116B (en) External damage prevention early warning method, device, equipment and storage medium
CN104750976A (en) Establishment method of transmission line state evaluation parameter system
Marie et al. Pattern recognition algorithm and software design of an optical fiber vibration signal based on Φ-optical time-domain reflectometry
CN106485333A (en) A kind of transmission line of electricity running status appraisal procedure
CN107014519A (en) BOTDR temperature, strain fast separating process in a kind of intelligent grid icing monitoring
CN114866137B (en) Detection method and device for electric power optical cable network
CN106781152A (en) A kind of fiber grating fence intrusion alarm detecting system and method
CN106530575A (en) Transmission line distributed forest fire monitoring and early warning device and method
CN106327071A (en) Power line communication risk analysis method and power line communication risk analysis system
DE112022002097T5 (en) LOCATION OF HAZARDOUS EVENTS ON UTILITY POLES
CN114684217A (en) Rail transit health monitoring system and method
CN103999316A (en) Method for generating a signal indicating an oscillation in an electrical energy supply network
CN104121945A (en) Distributed sag online monitoring system and method for optical fiber composite overhead ground wire
CN113092879A (en) Transmission line lightning stroke monitoring method, device, equipment and storage medium
CN110135645A (en) Overhead transmission line all -fiber dynamically and statically monitoring and trend predicting system and method
WO2023004180A1 (en) Identification of false transformer humming using machine learning

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant