CN113266752A - Special electric energy meter box mounting device and using method thereof - Google Patents

Special electric energy meter box mounting device and using method thereof Download PDF

Info

Publication number
CN113266752A
CN113266752A CN202110658586.0A CN202110658586A CN113266752A CN 113266752 A CN113266752 A CN 113266752A CN 202110658586 A CN202110658586 A CN 202110658586A CN 113266752 A CN113266752 A CN 113266752A
Authority
CN
China
Prior art keywords
sizing block
meter box
energy meter
ribbon
electric energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110658586.0A
Other languages
Chinese (zh)
Inventor
刘建刚
肖兰
邸浩
林涛
冯章飞
李明珏
李晓
宋修胜
杨科
成周
赵祖林
钱小倩
黄睿涵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Power Grid Co Ltd
Original Assignee
Guizhou Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Power Grid Co Ltd filed Critical Guizhou Power Grid Co Ltd
Priority to CN202110658586.0A priority Critical patent/CN113266752A/en
Publication of CN113266752A publication Critical patent/CN113266752A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M13/00Other supports for positioning apparatus or articles; Means for steadying hand-held apparatus or articles
    • F16M13/02Other supports for positioning apparatus or articles; Means for steadying hand-held apparatus or articles for supporting on, or attaching to, an object, e.g. tree, gate, window-frame, cycle
    • F16M13/022Other supports for positioning apparatus or articles; Means for steadying hand-held apparatus or articles for supporting on, or attaching to, an object, e.g. tree, gate, window-frame, cycle repositionable
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B2/00Friction-grip releasable fastenings
    • F16B2/02Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening
    • F16B2/06Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening external, i.e. with contracting action
    • F16B2/08Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening external, i.e. with contracting action using bands
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M11/00Stands or trestles as supports for apparatus or articles placed thereon ; Stands for scientific apparatus such as gravitational force meters
    • F16M11/02Heads
    • F16M11/04Means for attachment of apparatus; Means allowing adjustment of the apparatus relatively to the stand
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • G01R11/02Constructional details
    • G01R11/04Housings; Supporting racks; Arrangements of terminals

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The invention discloses a special power transformation energy meter box mounting device and a using method thereof, wherein the mounting device comprises a sizing block and a binding belt, the sizing block is sleeved on the binding belt, two ends of the binding belt are detachably and fixedly connected through a locking device, a connecting hole is formed in the sizing block, and a bolt is adopted to connect the sizing block and a special power transformation energy meter box through the connecting hole; the use method of the invention is that the sizing block and the special power transformation meter box are connected firstly, then the sizing block is sleeved on the binding belt, then the special power transformation meter box is moved to the designed installation position, and the binding belt and the electric pole are fixed. The electric pole mounting device has the advantages of less required materials and appliances in the mounting process, simplicity and rapidness in mounting, high working efficiency, no need of carrying the appliances above the electric pole, convenience for the action of workers and elimination of the potential safety hazard that the appliances fall and injure the workers below the electric pole.

Description

Special electric energy meter box mounting device and using method thereof
Technical Field
The invention relates to a special electric energy meter box installation device and a using method thereof, and belongs to the field of meter box installation.
Background
Special transformer can table case has great volume, traditional mounting means adopts the metal staple bolt to fix on the pole, the bolt of recycling is fixed the table case on the staple bolt, required material and used supporting multiplexer are more, bring inconvenience for the operation personnel, work efficiency is low, and need the staff to step on to the 2m eminence operation of pole with the help of the escalator in the installation, the below still needs another staff to stabilize the staircase, the installation is complicated hard, and simultaneously, because material and multiplexer are too much, the condition such as multiplexer inadvertently drops causes accident incident emergence such as personal injury and death easily, and it is too big to carry the table case to cause the operation personnel to bear a burden, inconvenient operation, the pole process is not only wasted time and energy from top to bottom, and there is great potential safety hazard.
Disclosure of Invention
The invention aims to provide a special power transformation energy meter box installation device and a use method thereof, and solves the problems that the existing special power transformation energy meter box is large in number of materials and matched tools required for installation, complex and labor-consuming in installation, low in working efficiency and potential safety hazards exist.
The technical scheme adopted by the invention is that the special power transformation electric energy meter box mounting device comprises: the binding belt comprises a sizing block and a binding belt, wherein the sizing block is sleeved on the binding belt, the two ends of the binding belt are detachably and fixedly connected through a locking device, a connecting hole is formed in the sizing block, and a bolt is used for connecting the sizing block and the special electric energy meter box through the connecting hole.
Further, the parallels are semi-closed rectangle box body structure, and parallels open-top sets up, and the connecting hole sets up in the parallels bottom, and the ribbon mouth is seted up respectively to the parallels left and right sides, and the ribbon passes through the parallels through the ribbon mouth.
Furthermore, the length of the sizing block is 6-8cm, the height of the sizing block is not more than 3cm, and two top edges in the length direction of the sizing block are in concave smooth transition from two ends to the middle part and are in a circular arc curve.
Furthermore, two top edges of the sizing block in the length direction are curled inwards, and a rubber pad is arranged on the curled edges.
Furthermore, a plurality of clamping grooves are formed in the position, close to the tail end, of the ribbon body along the length direction, and the head end of the ribbon is fixedly connected with the locking device.
Further, locking device is including lapping, and apron bottom face both ends are equipped with gag lever post and fixing base respectively, the gag lever post is connected with the ribbon head end, through torsional spring connection shell fragment between the fixing base, and the shell fragment bottom is contradicted and is connected the apron, presses the shell fragment top, and the shell fragment bottom breaks away from the apron.
Furthermore, two sets of sizing blocks and the ribbon are correspondingly arranged and are respectively arranged at the central positions of the upper part and the lower part of the special power transformation energy meter box.
Furthermore, the meter box further comprises a reinforcing plate, wherein the reinforcing plate is provided with a connecting hole corresponding to the sizing block and is fixed in the meter box through a bolt.
A using method of a special electric energy meter box mounting device comprises the following steps:
s1: placing a sizing block at a position connected with a special electric energy meter box, placing a reinforcing plate corresponding to the sizing block in the special electric energy meter box, and adopting bolts to fasten and connect the sizing block, the special electric energy meter box and the reinforcing plate;
s2: the tail end of the binding belt penetrates through the sizing block through the binding belt opening, and the binding belt is adjusted to enable the sizing block to be sleeved in the middle of the binding belt;
s3: support special transformer can table case to pole design mounted position, the ribbon both ends surround from the pole both sides, press the shell fragment top, and the ribbon tail end passes through between apron and the gag lever post from apron and torsional spring, taut ribbon to space, rubber pad compression between parallels and the pole, then releases the shell fragment, makes the shell fragment bottom insert the draw-in groove, fixed ribbon.
Compared with the prior art, the invention has the beneficial effects that:
1) according to the special electric energy meter box, the sizing block and the special electric energy meter box can be fixed on the ground in advance, the binding belt is connected, the special electric energy meter box is placed at a designed installation position, and the special electric energy meter box can be directly fixed by utilizing the binding belt to lock, so that fewer materials and appliances are required in the installation process, the installation is simple and rapid, the working efficiency is improved, particularly, the appliances do not need to be carried above an electric pole, the ascending operation of workers is facilitated, the safety coefficient is improved, and the potential safety hazard that the workers below are injured by falling of the appliances is eliminated;
2) the structural design of the sizing block is characterized in that the top end opening is provided with a bolt for connecting the sizing block with the special power meter box conveniently, the bottom end plane is ensured to be stably connected with the special power meter box, the sizing block is used as a connector between the binding belt and the special power meter box, the contact area with the special power meter box is increased without damaging the structure, and the sizing block has the advantages of stable and reliable connection;
3) the length of the sizing block limited by the invention not only ensures the contact area with the special power transformation energy meter box and improves the connection stability, but also avoids the existence of a gap when the binding belt is connected with the electric pole, the height of the sizing block limits the existence of a larger distance between the special power transformation energy meter box and the binding belt, so that the stress gravity center is close to the electric pole and the special power transformation energy meter box is prevented from shaking, wherein the top edge of the sizing block is in a circular arc curve and is attached to the electric pole, the binding belt is ensured to be in a circular ring shape after being connected, the binding and the binding are maximally contacted with the electric pole, the binding and the binding are facilitated, and the slippage is prevented;
4) the top edge of the sizing block is inward curled, so that the installation of a bolt is not hindered, the contact area between the top end of the sizing block and an electric pole is increased, and the curled edge is provided with the rubber pad, so that the gap between the sizing block and the electric pole is effectively filled, the sliding friction force is increased, the installation stability of the sizing block is improved, and the sizing block is prevented from shaking;
5) through the locking device, the binding belt is directly fixed without other appliances, the installation process is simplified, the inconvenience in operation on the electric pole caused by carrying the appliances is prevented, and the potential safety hazard that the lower personnel are injured by falling the appliances is eliminated;
6) two sets of sizing blocks and two sets of binding belts are arranged on the upper part and the lower part of the special power transformation energy meter box respectively, so that the whole special power transformation energy meter box can be fixed conveniently and balance can be kept;
7) through setting up the reinforcing plate, strengthen the fastness of being connected of parallels and special change electric energy meter case.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic side view of the present invention mounted to a dedicated power meter box;
FIG. 3 is a schematic view of the structure of the sizing block of the present invention;
FIG. 4 is a schematic view of a tie of the present invention;
the labels in the figure are: 1. the device comprises a sizing block, 11, a band buckle, 12, a turned edge, 2, a band, 21, a clamping groove, 3, a locking device, 31, a cover plate, 32, a limiting rod, 33, a fixing seat, 34, a torsion spring, 35, an elastic sheet, 4 and a reinforcing plate.
Detailed Description
The invention will be further explained in conjunction with the drawings attached to the specification in order to facilitate better understanding by those skilled in the art. The specific embodiments described herein are merely illustrative of the present invention and do not limit the scope of the invention.
Referring to fig. 1-4, a special electric energy meter box installation device comprises a sizing block 1, a ribbon 2 locking device 3 and a reinforcing plate 4, wherein the sizing block 1, the ribbon 2, the locking device 3 and the reinforcing plate 3 are all made of 304 stainless steel, so that the special electric energy meter box installation device is prevented from being rusted due to wind, sunshine, rain and the like in the air for a long time, is durable, can be repeatedly used, and saves materials and cost.
The sizing block 1 is sleeved on the binding belt 2, two ends of the binding belt 2 are detachably and fixedly connected through the locking device 3, and the electric pole is bound through the binding belt 2, so that the special electric energy meter box is fixed on the electric pole; set up the connecting hole on the parallels 1 simultaneously for connect special change electric energy meter case, reinforcing plate 3 corresponds parallels 1 sets up the connecting hole of parallels, arranges reinforcing plate 2 in the special change electric energy meter incasement and corresponds the mounted position of parallels 1, adopts the bolt to pass through connecting hole connection parallels 1, special change electric energy meter case and reinforcing plate 3. Adopt parallels 1 as the connector of special transformer electric energy meter case and ribbon 2, utilize ribbon 2 locking to fix special transformer electric energy meter case on the pole, the required material of installation and utensil are few, and the installation is simple swift, and can effectively improve special transformer electric energy meter case and parallels 1 firm in connection through reinforcing plate 3.
Further, the sizing block 1 is of a semi-closed rectangular box structure, the top opening of the sizing block 1 is provided, and the connecting hole is formed in the bottom of the sizing block 1, so that a special electric energy meter box can be conveniently fixed through the connecting hole by mounting a bolt at the top opening; ribbon mouth 11 is seted up respectively to the 1 left and right sides of parallels, and ribbon 2 runs through parallels 1 through ribbon mouth 11, and this mode guarantees ribbon 2 and parallels 1's connection stability, need not other materials supplementary, convenient and fast.
Specifically, the length of the sizing block 1 is 6-8cm, so that when the sizing block 1 is stably contacted with a special power transformation meter box, two ends of the sizing block 1 with overlarge length are prevented from extending out of the electric pole, a gap is formed between the binding belt 2 located at the binding belt opening 11 and the electric pole, and the connection stability of the binding belt 2 and the electric pole is reduced; the sizing block height is not more than 3cm, and the gravity center is prevented from moving outwards due to the fact that the distance between the special electric energy meter box and the binding belt 2 is too large.
In addition, two topside of parallels 1 length direction are from both ends to the concave smooth transition of middle part, are the circular arc curve, more accord with the curve trend of pole, laminate with the pole easily, are the ring shape after ribbon 2 is connected, furthest and pole contact.
Further, two topside of parallels 1 length direction inwards form turn-up 12, increase the area of contact of 1 top of parallels and pole, and be equipped with the rubber pad on turn-up 12, can reduce the clearance between pole and the parallels 1 to increase sliding friction, prevent parallels 1 slippage.
Furthermore, 2 areas of the ribbon are provided with a plurality of slots 21 along the length direction near the tail end, and the head end of the ribbon 2 is fixedly connected with the locking device 3. Locking device 3 is equipped with gag lever post 32 and fixing base 33 respectively including apron 31, 31 bottom face both ends of apron, gag lever post 32 and 2 head end fixed connection of ribbon, connect shell fragment 35 through torsional spring 34 between the fixing base 33, and shell fragment 35 bottom is contradicted and is connected apron 31, presses shell fragment 35 top, and shell fragment 35 bottom breaks away from apron 31. Gag lever post 32 and apron 31, form the ribbon socket between torsional spring 34 and the apron 31, pass through the coincidence of ribbon socket and 2 head ends of ribbon with 2 tails of ribbon, form the ring, directly insert draw-in groove 21 fixed ribbon 2 through shell fragment 35 behind the taut ribbon 2, need not with the help of other utensils, fixed mode is simple swift, solves the problem that carries the utensil and lead to the inconvenient operation on the pole and eliminates the utensil tenesmus and injures the potential safety hazard of below personnel.
As one scheme of the embodiment, the tie 2 can adopt a 304 slipknot stainless steel tie, a bolt is used as a lock head, and a screwdriver is used for fastening.
In order to improve the fixing effect of the special transformer electric energy meter box and keep the stress balance, two sets of sizing blocks 1 and two sets of binding belts 2 are correspondingly arranged and are respectively arranged at the upper part and the lower part of the special transformer electric energy meter box.
A using method of a special electric energy meter box mounting device comprises the following steps:
s1: placing the sizing block 1 at a position connected with the special power transformation energy meter box, placing the reinforcing plate 4 in the special power transformation energy meter box corresponding to the sizing block 1, and adopting bolts to fixedly connect the sizing block 1, the special power transformation energy meter box and the reinforcing plate 4;
s2: the tail end of the ribbon 2 passes through the sizing block 1 through the ribbon opening 11, and the ribbon 2 is adjusted to enable the sizing block 1 to be sleeved in the middle of the ribbon 2;
s3: support the design mounted position of pole with special electric energy meter case, 2 both ends of ribbon surround from the pole both sides, press down shell fragment 35 top, shell fragment 35 bottom breaks away from apron 31, 2 tail ends of ribbon are from apron 31 and torsional spring 34, pass through between apron 31 and the gag lever post 32, until ribbon 2 and pole in close contact with, take-up ribbon 2 to no space between parallels 1 and the pole, the rubber pad compression, then release shell fragment 35, make shell fragment 35 bottom insert draw-in groove 21, fixed ribbon 2, accomplish the installation.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes, which are made by the present specification, or directly or indirectly used in other related technical fields, are included in the scope of the present invention.

Claims (9)

1. The utility model provides a special transformer electric energy meter case installation device which characterized in that includes: sizing block (1) and ribbon (2), sizing block (1) cover is located on ribbon (2), and fixed connection can be dismantled through locking device (3) at ribbon (2) both ends, sets up the connecting hole on sizing block (1), adopts the bolt to pass through the connecting hole and connects sizing block (1) and special transformer can the case.
2. The special power meter box mounting device as claimed in claim 1,
sizing block (1) is semi-closed rectangle box body structure, and sizing block (1) open-top sets up, and the connecting hole sets up in sizing block (1) bottom, and ribbon mouth (11) are seted up respectively to sizing block (1) left and right sides, and ribbon (2) run through sizing block (1) through ribbon mouth (11).
3. The special power transformer electric energy meter box mounting device as claimed in claim 1, wherein the length of the sizing block (1) is 6-8cm, the height of the sizing block is not more than 3cm, and two top edges in the length direction of the sizing block (1) are smoothly transited from two ends to a concave middle part and are in a circular arc curve.
4. A special power transformer electric meter box mounting device according to claim 3, characterized in that two top edges of the length direction of the sizing block (1) are inwards formed with a curled edge (12), and the curled edge (12) is provided with a rubber pad.
5. The special electric energy meter box mounting device as claimed in claim 1, wherein a plurality of clamping grooves (21) are formed in the band body of the binding band (2) close to the tail end along the length direction, and the head end of the binding band (2) is fixedly connected with the locking device (3).
6. The special electric energy meter box mounting device as claimed in claim 5, wherein the locking device (3) comprises a cover plate (31), two ends of the bottom end face of the cover plate (31) are respectively provided with a limiting rod (32) and a fixing seat (33), the limiting rod (32) is connected with the head end of the binding belt (2), the fixing seats (33) are connected with each other through a torsion spring (34) to form a spring piece (35), the bottom end of the spring piece (35) abuts against the connecting cover plate (31), the top end of the spring piece (35) is pressed, and the bottom end of the spring piece (35) is separated from the cover plate (31).
7. The special power transformer electric energy meter box mounting device as claimed in claim 1, wherein two sets of the sizing blocks (1) and the tie tapes (2) are arranged correspondingly and are respectively mounted at the upper and lower central positions of the special power transformer electric energy meter box.
8. The special electric energy meter box mounting device as claimed in claim 1, further comprising a reinforcing plate (4), wherein the reinforcing plate (4) is provided with a connecting hole corresponding to the sizing block (1) and is fixed in the meter box through a bolt.
9. The use method of the special electric energy meter box mounting device according to any one of claims 1-8, characterized by comprising the following steps:
s1: placing the sizing block (1) at a position connected with the special power transformation energy meter box, placing the reinforcing plate (4) corresponding to the sizing block (1) in the special power transformation energy meter box, and adopting bolts to fasten and connect the sizing block (1), the special power transformation energy meter box and the reinforcing plate (4);
s2: the tail end of the binding belt (2) penetrates through the sizing block (1) through the binding belt opening (11), and the binding belt (2) is adjusted, so that the sizing block (1) is sleeved in the middle of the binding belt (2);
s3: support special transformer can table case to pole design mounted position, ribbon (2) both ends are surrounded from the pole both sides, press shell fragment (35) top, ribbon (2) tail end is from apron (31) and torsional spring (34), pass through between apron (31) and gag lever post (32), there is not space, the rubber pad compression between taut ribbon (2) to parallels (1) and the pole, then release shell fragment (35), make shell fragment (35) bottom insert draw-in groove (21), fixed ribbon (2).
CN202110658586.0A 2021-06-15 2021-06-15 Special electric energy meter box mounting device and using method thereof Pending CN113266752A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110658586.0A CN113266752A (en) 2021-06-15 2021-06-15 Special electric energy meter box mounting device and using method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110658586.0A CN113266752A (en) 2021-06-15 2021-06-15 Special electric energy meter box mounting device and using method thereof

Publications (1)

Publication Number Publication Date
CN113266752A true CN113266752A (en) 2021-08-17

Family

ID=77235008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110658586.0A Pending CN113266752A (en) 2021-06-15 2021-06-15 Special electric energy meter box mounting device and using method thereof

Country Status (1)

Country Link
CN (1) CN113266752A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2376649Y (en) * 1999-03-11 2000-05-03 上海亚旺机械实业有限公司 Universal label fixing clamp
JP2014121220A (en) * 2012-12-19 2014-06-30 Sanwa Tekki Corp Attachment band for abnormal heating detection device at electric wire connection part, and abnormal heating detection device using the same
CN106195579A (en) * 2015-04-30 2016-12-07 上海伊凡机电有限公司 A kind of fastening method for object is fixed on cylinder and fastening-connecting device
CN208046015U (en) * 2018-03-22 2018-11-02 温州宇杰电器有限公司 A kind of fixed structure of distribution box
CN209270701U (en) * 2019-03-15 2019-08-20 日照宏州橡塑五金有限公司 Fire-fighting fast bunding band
CN210203488U (en) * 2019-05-21 2020-03-31 潘红星 Novel durable belt
CN210299780U (en) * 2019-07-05 2020-04-14 东莞市振博皮具有限公司 Locking structure of belt buckle
CN212345588U (en) * 2020-06-12 2021-01-15 叶黎波 Belt fastener

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2376649Y (en) * 1999-03-11 2000-05-03 上海亚旺机械实业有限公司 Universal label fixing clamp
JP2014121220A (en) * 2012-12-19 2014-06-30 Sanwa Tekki Corp Attachment band for abnormal heating detection device at electric wire connection part, and abnormal heating detection device using the same
CN106195579A (en) * 2015-04-30 2016-12-07 上海伊凡机电有限公司 A kind of fastening method for object is fixed on cylinder and fastening-connecting device
CN208046015U (en) * 2018-03-22 2018-11-02 温州宇杰电器有限公司 A kind of fixed structure of distribution box
CN209270701U (en) * 2019-03-15 2019-08-20 日照宏州橡塑五金有限公司 Fire-fighting fast bunding band
CN210203488U (en) * 2019-05-21 2020-03-31 潘红星 Novel durable belt
CN210299780U (en) * 2019-07-05 2020-04-14 东莞市振博皮具有限公司 Locking structure of belt buckle
CN212345588U (en) * 2020-06-12 2021-01-15 叶黎波 Belt fastener

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李维荣: "《标准紧固件实用手册 第3版》", 30 June 2004 *

Similar Documents

Publication Publication Date Title
CN205675786U (en) A kind of collapsible glass transportation pallet
CN209174788U (en) Iron wire is straightened cutter
CN113266752A (en) Special electric energy meter box mounting device and using method thereof
CN208951222U (en) The fixation device of wire rope wedge form joint
CN203305866U (en) Elastic bus pull handle structure
CN202678549U (en) Live-wire operation irregular parallel groove clamp
CN110429543A (en) A kind of cable vibration-proof structure
CN212678548U (en) Supporting device for opening part of double-opening draw-bar box
CN209699177U (en) A kind of edge cutting machine of sealing strip
CN216634523U (en) Cut off device of fixed seat is detained to self-adhesive formula
CN213974018U (en) Handcart for construction
CN220300984U (en) Tensioning mechanism and knotting machine
CN205150332U (en) Light -duty plastics handle hand pulling device
CN214823305U (en) Flying ring convenient to disassemble and assemble for rail transit
CN214167171U (en) Adjustable automatic feeding device for magnetic material processing
CN217448750U (en) Anti-drop hook of safety belt
CN220975711U (en) Pad bar material type material placing table
CN212329296U (en) Novel hand-held type connect film anchor clamps
CN212738084U (en) Board is placed with luggage to rail transit device
CN212897452U (en) Safety protection platform
CN213367278U (en) Novel binding piece with self-locking function
CN216913945U (en) Efficient automatic cutting device for kraft paper production
CN203237329U (en) Rapid dismounting clamping rack for safe rear child's seat of bicycle
CN218537381U (en) Quick safe hair opening package device
CN115489438B (en) Integral type luggage rack mounting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210817