CN113256236A - Project management system for covering whole process of project and embedding desensitization treatment - Google Patents
Project management system for covering whole process of project and embedding desensitization treatment Download PDFInfo
- Publication number
- CN113256236A CN113256236A CN202011537957.1A CN202011537957A CN113256236A CN 113256236 A CN113256236 A CN 113256236A CN 202011537957 A CN202011537957 A CN 202011537957A CN 113256236 A CN113256236 A CN 113256236A
- Authority
- CN
- China
- Prior art keywords
- management module
- project
- information
- management
- contract
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000586 desensitisation Methods 0.000 title claims abstract description 37
- 238000000034 method Methods 0.000 title claims abstract description 27
- 238000010276 construction Methods 0.000 claims abstract description 13
- 238000013461 design Methods 0.000 claims abstract description 11
- 238000005516 engineering process Methods 0.000 claims abstract description 10
- 230000007613 environmental effect Effects 0.000 claims abstract description 4
- 238000007726 management method Methods 0.000 claims description 264
- 238000012545 processing Methods 0.000 claims description 11
- 230000000694 effects Effects 0.000 claims description 9
- 238000007689 inspection Methods 0.000 claims description 9
- 238000009430 construction management Methods 0.000 claims description 6
- 238000012937 correction Methods 0.000 claims description 3
- 238000011156 evaluation Methods 0.000 claims description 3
- 238000003908 quality control method Methods 0.000 claims description 3
- 238000012502 risk assessment Methods 0.000 claims description 3
- 230000003313 weakening effect Effects 0.000 claims description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/60—Protecting data
- G06F21/62—Protecting access to data via a platform, e.g. using keys or access control rules
- G06F21/6218—Protecting access to data via a platform, e.g. using keys or access control rules to a system of files or objects, e.g. local or distributed file system or database
- G06F21/6245—Protecting personal data, e.g. for financial or medical purposes
Abstract
The invention discloses a project management system covering the whole process of a project and embedding desensitization treatment, which comprises a project information management module, a plan operation management module, a cooperative operation management module, an item establishment management module and a contract management module, wherein the budget management module, the design and technology management module, the progress management module, the safety management module, the quality management module, the environmental protection management module, the purchase management module, the resource management module, the risk management module, a project contract construction supervision module and a CI management module are arranged on the project management system; the invention is suitable for project management processes, has complete coverage flow, and considers the embedded desensitization module in the design stage when each flow is designed, thereby having larger using and applicable crowd and accelerating the information acquisition efficiency on the basis of reducing the risk of divulgence.
Description
Technical Field
The invention belongs to the technical field of project management, and particularly relates to a project management system covering the whole process of a project and performing embedded desensitization processing.
Background
Project management refers to the application of specialized knowledge, skills, tools, and methods in a project activity to enable a project to achieve or exceed set requirements and desired processes under limited resource constraints. Project management is the overall monitoring and management of some activities that are relevant to successfully achieving a series of goals, including planning, scheduling, and maintaining the progress of the activities that make up a project;
however, the existing project management system is incomplete in coverage process, and when each process is designed, a desensitization module is not embedded in the design stage, so that the risk of disclosure still exists, and the use population is reduced to prevent the disclosure, thereby reducing the efficiency of information acquisition.
Disclosure of Invention
It is an object of the present invention to overcome the disadvantages of the prior art and to provide a project management system that covers the entire process of the project and embeds desensitization processes.
In order to achieve the purpose, the invention adopts the following technical scheme:
a project management system that covers the full course of a project and embeds desensitization processing, comprising:
the project information management module, the plan operation management module, the cooperative operation management module, the project establishment management module and the contract management module are used for establishing projects;
a budget management module, a design and technology management module, a progress management module, a safety management module, a quality management module, an environmental protection management module, a purchase management module, a resource management module, a risk management module, a performance supervision module and a CI management module which are used for the project execution stage;
the tax supervision module is used for the project ending stage;
a completion project management module and a credit construction management module used after project completion; and
desensitization modules embedded into all modules through interfaces.
Preferably, the project information management module: the system comprises a project management module, a collaborative operation management module, a project establishment management module and a contract management module, wherein the project management module is used for establishing projects and filling project information and inputting the project information into the planning operation management module, the collaborative operation management module, the project establishment management module and the contract management module;
the plan operation management module: filling and reporting an operation plan according to the information input by the project information management module;
the cooperative operation management module: compiling project subpackage bidding information according to the project information;
the project establishment management module is used for: entry of item information that is likely to be biddable based on the item information
The contract management module: and forming required contracts according to the project information.
Preferably, the budget management module: performing budget management in a project implementation phase according to the sub-projects, sub-project targets and contract price information divided by the plan operation management module, the project establishment management module and the contract management module;
the design and technology management module comprises: according to each sub-project divided by the project management module, implementing technical file management of stage application technology, construction method, workflow and the like;
the progress management module: performing progress management according to the sub-projects, sub-project targets, contract implementation time and contract price information projects divided by the plan management module, the project management module and the contract management module;
the safety management module is used for: according to sub-projects and contracts divided by the project establishment management module and the contract management module, safety related management such as safety construction plan, safety inspection, safety construction supervision, safety activities and the like in the implementation project is carried out;
the quality management module: managing information such as quality inspection, quality control, process supervision and the like in project implementation engineering according to sub-projects and contracts divided by the project management module and the contract management module;
the environment-friendly management module: according to sub-projects and contracts divided by the project establishment management module and the contract management module, environment-friendly related management such as environment-friendly plans, environment-friendly inspections, environment-friendly supervision, environment-friendly activities and the like in project implementation projects is carried out;
the purchase management module: sub-package purchase management of materials, services and the like appearing in the project is carried out according to sub-projects and contracts divided by the project management module and the contract management module;
the resource management module: according to the sub-projects and contracts divided by the project management module and the contract management module, resource management such as information, materials, instruments, facilities, equipment, public opinion and the like is carried out;
the risk management module: according to the sub-projects and contracts divided by the project management module and the contract management module, risk prediction, risk assessment, risk preplan, risk management, risk weakening measures, risk reserve management and the like related to project implementation are carried out;
the under-construction project performance supervision module: recording the performance condition of each project according to the sub-projects and contracts divided by the project management module and the contract management module;
the CI management module: and according to the sub-projects and the contracts divided by the project establishment management module and the contract management module, performing CI management according to enterprise systems and national requirements in the project implementation process.
Preferably, the tax administration module checks all the charging and paying conditions according to the sub-projects and contracts divided by the project establishment management module and the contract management module, and completes tax administration and correction.
Preferably, the as built project management module: performing subsequent ending work and supervision work according to the sub-projects and contracts divided by the project establishment management module and the contract management module;
the credit construction management module: and according to the sub-projects and contracts divided by the project establishment management module and the contract management module, counting and managing the supply and service conditions of contractors, subcontractors, suppliers and the like, finishing evaluation and scoring, and establishing a credit bank, a black list bank and the like.
Preferably, the desensitization module comprises a user name input interface, a text input interface to be displayed, an output interface and
the author information base: according to the sensitive words in the article and form filling information, establishing an author information base for each sensitive word, wherein the author has the right to know the information;
personal rights library: determining which sensitive information the user has the right to view according to the user grade;
sensitive word bank: information defining which words or phrases are contained is sensitive information.
In summary, due to the adoption of the technical scheme, the invention has the beneficial effects that:
the project management system has complete coverage flow, and when each flow is designed, the embedded desensitization module is considered in the design stage, so that the use and application crowd is large on the basis of reducing the risk of divulgence, and the efficiency of information acquisition is accelerated.
Drawings
FIG. 1 is a block diagram of a project management system that covers the entire process of a project and embeds desensitization processing in accordance with the present invention.
Detailed Description
The following describes a specific embodiment of a project management system covering the whole process of a project and embedding desensitization processing according to the present invention with reference to fig. 1. The project management system of the present invention covering the project universe and the embedded desensitization process is not limited to the description of the following embodiments.
Example 1:
this embodiment provides a specific structure of a project management system covering the whole process of a project and embedding desensitization processing, as shown in fig. 1, including:
the project information management module, the plan operation management module, the cooperative operation management module, the project establishment management module and the contract management module are used for establishing projects;
a budget management module, a design and technology management module, a progress management module, a safety management module, a quality management module, an environmental protection management module, a purchase management module, a resource management module, a risk management module, a performance supervision module and a CI management module which are used for the project execution stage;
the tax supervision module is used for the project ending stage;
a completion project management module and a credit construction management module used after project completion; and
desensitization modules embedded into all modules through interfaces.
Specifically, the project information management module: the system comprises a project management module, a collaborative operation management module, a project establishment management module and a contract management module, wherein the project management module is used for establishing projects and filling project information and inputting the project information into the planning operation management module, the collaborative operation management module, the project establishment management module and the contract management module;
the plan operation management module: filling and reporting an operation plan according to the information input by the project information management module;
the cooperative operation management module: compiling project subpackage bidding information according to the project information;
the project establishment management module is used for: entry of item information that is likely to be biddable based on the item information
The contract management module: and forming required contracts according to the project information.
Specifically, the budget management module: performing budget management in a project implementation phase according to the sub-projects, sub-project targets and contract price information divided by the plan operation management module, the project establishment management module and the contract management module;
the design and technology management module comprises: according to each sub-project divided by the project management module, implementing technical file management of stage application technology, construction method, workflow and the like;
the progress management module: performing progress management according to the sub-projects, sub-project targets, contract implementation time and contract price information projects divided by the plan management module, the project management module and the contract management module;
the safety management module is used for: according to sub-projects and contracts divided by the project establishment management module and the contract management module, safety related management such as safety construction plan, safety inspection, safety construction supervision, safety activities and the like in the implementation project is carried out;
the quality management module: managing information such as quality inspection, quality control, process supervision and the like in project implementation engineering according to sub-projects and contracts divided by the project management module and the contract management module;
the environment-friendly management module: according to sub-projects and contracts divided by the project establishment management module and the contract management module, environment-friendly related management such as environment-friendly plans, environment-friendly inspections, environment-friendly supervision, environment-friendly activities and the like in project implementation projects is carried out;
the purchase management module: sub-package purchase management of materials, services and the like appearing in the project is carried out according to sub-projects and contracts divided by the project management module and the contract management module;
the resource management module: according to the sub-projects and contracts divided by the project management module and the contract management module, resource management such as information, materials, instruments, facilities, equipment, public opinion and the like is carried out;
the risk management module: according to the sub-projects and contracts divided by the project management module and the contract management module, risk prediction, risk assessment, risk preplan, risk management, risk weakening measures, risk reserve management and the like related to project implementation are carried out;
the under-construction project performance supervision module: recording the performance condition of each project according to the sub-projects and contracts divided by the project management module and the contract management module;
the CI management module: and according to the sub-projects and the contracts divided by the project establishment management module and the contract management module, performing CI management according to enterprise systems and national requirements in the project implementation process.
Specifically, the tax administration module checks all the charging and paying conditions according to the sub-projects and contracts divided by the project establishment management module and the contract management module, and completes tax administration and correction.
Further, the completion project management module: performing subsequent ending work and supervision work according to the sub-projects and contracts divided by the project establishment management module and the contract management module;
the credit construction management module: and according to the sub-projects and contracts divided by the project establishment management module and the contract management module, counting and managing the supply and service conditions of contractors, subcontractors, suppliers and the like, finishing evaluation and scoring, and establishing a credit bank, a black list bank and the like.
Further, the desensitization module comprises a user name input interface, a text input interface to be displayed, an output interface and
the author information base: according to the sensitive words in the article and form filling information, establishing an author information base for each sensitive word, wherein the author has the right to know the information;
personal rights library: determining which sensitive information the user has the right to view according to the user grade;
sensitive word bank: information defining which words or phrases are contained is sensitive information.
The working principle is as follows: as shown in fig. 1, when a user queries information and displays information in all modules of the whole system, before the modules display the information, the desensitization module is called through a user name input interface and a character input interface to be displayed;
the desensitization module finds all sensitive words in the characters to be displayed by using a sensitive word list in a sensitive information base to obtain sensitive words 1 and 2 … of the sensitive word list;
then entering an author information base, inquiring whether the sensitive words are used in other forms or files in the system, listing all files and authors containing the sensitive words, and obtaining an author list 1 and an author list 2 … author list N, wherein each sensitive word corresponds to an author list;
the desensitization module checks whether the user name is in a certain author list or not according to the user name transmitted by the interface, if so, the corresponding sensitive word does not need desensitization in the characters to be displayed, and otherwise, the desensitization is needed;
if not, the desensitization module enters a personal permission library and inquires whether the user has the right to check the information related to the sensitive word, if so, the corresponding sensitive word does not need desensitization in the characters to be displayed, otherwise, the desensitization is needed;
the desensitization module outputs the desensitized characters to be displayed as output results, wherein 15 characters before the desensitization sensitive words to 15 characters after the desensitization sensitive words are deleted, but the reading of the front content and the reading of the back content are not influenced;
the project management system has complete coverage flow, and when each flow is designed, the embedded desensitization module is considered in the design stage, so that the use and application crowd is large on the basis of reducing the risk of divulgence, and the efficiency of information acquisition is accelerated.
The foregoing is a more detailed description of the invention in connection with specific preferred embodiments and it is not intended that the invention be limited to these specific details. For those skilled in the art to which the invention pertains, several simple deductions or substitutions can be made without departing from the spirit of the invention, and all shall be considered as belonging to the protection scope of the invention.
Claims (6)
1. A project management system that covers the entire process of a project and embeds desensitization processing, comprising: the project information management module, the plan operation management module, the cooperative operation management module, the project establishment management module and the contract management module are used for establishing projects;
a budget management module, a design and technology management module, a progress management module, a safety management module, a quality management module, an environmental protection management module, a purchase management module, a resource management module, a risk management module, a performance supervision module and a CI management module which are used for the project execution stage;
the tax supervision module is used for the project ending stage;
a completion project management module and a credit construction management module used after project completion; and
desensitization modules embedded into all modules through interfaces.
2. An item management system that covers the entire process of an item and embeds desensitization processing as recited in claim 1, wherein:
the project information management module: the system comprises a project management module, a collaborative operation management module, a project establishment management module and a contract management module, wherein the project management module is used for establishing projects and filling project information and inputting the project information into the planning operation management module, the collaborative operation management module, the project establishment management module and the contract management module;
the plan operation management module: filling and reporting an operation plan according to the information input by the project information management module;
the cooperative operation management module: compiling project subpackage bidding information according to the project information;
the project establishment management module is used for: entry of item information that is likely to be biddable based on the item information
The contract management module: and forming required contracts according to the project information.
3. An item management system that covers the entire process of an item and embeds desensitization processing as recited in claim 1, wherein:
the budget management module: performing budget management in a project implementation phase according to the sub-projects, sub-project targets and contract price information divided by the plan operation management module, the project establishment management module and the contract management module;
the design and technology management module comprises: according to each sub-project divided by the project management module, implementing technical file management of stage application technology, construction method, workflow and the like;
the progress management module: performing progress management according to the sub-projects, sub-project targets, contract implementation time and contract price information projects divided by the plan management module, the project management module and the contract management module;
the safety management module is used for: according to sub-projects and contracts divided by the project establishment management module and the contract management module, safety related management such as safety construction plan, safety inspection, safety construction supervision, safety activities and the like in the implementation project is carried out;
the quality management module: managing information such as quality inspection, quality control, process supervision and the like in project implementation engineering according to sub-projects and contracts divided by the project management module and the contract management module;
the environment-friendly management module: according to sub-projects and contracts divided by the project establishment management module and the contract management module, environment-friendly related management such as environment-friendly plans, environment-friendly inspections, environment-friendly supervision, environment-friendly activities and the like in project implementation projects is carried out;
the purchase management module: sub-package purchase management of materials, services and the like appearing in the project is carried out according to sub-projects and contracts divided by the project management module and the contract management module;
the resource management module: according to the sub-projects and contracts divided by the project management module and the contract management module, resource management such as information, materials, instruments, facilities, equipment, public opinion and the like is carried out;
the risk management module: according to the sub-projects and contracts divided by the project management module and the contract management module, risk prediction, risk assessment, risk preplan, risk management, risk weakening measures, risk reserve management and the like related to project implementation are carried out;
the under-construction project performance supervision module: recording the performance condition of each project according to the sub-projects and contracts divided by the project management module and the contract management module;
the CI management module: and according to the sub-projects and the contracts divided by the project establishment management module and the contract management module, performing CI management according to enterprise systems and national requirements in the project implementation process.
4. An item management system that covers the entire process of an item and embeds desensitization processing as recited in claim 1, wherein: the tax administration module checks all charging and paying conditions according to the sub-projects and contracts divided by the project establishment management module and the contract management module, and completes tax administration and correction.
5. An item management system that covers the entire process of an item and embeds desensitization processing as recited in claim 1, wherein:
the completion project management module: performing subsequent ending work and supervision work according to the sub-projects and contracts divided by the project establishment management module and the contract management module;
the credit construction management module: and according to the sub-projects and contracts divided by the project establishment management module and the contract management module, counting and managing the supply and service conditions of contractors, subcontractors, suppliers and the like, finishing evaluation and scoring, and establishing a credit bank, a black list bank and the like.
6. An item management system that covers the entire process of an item and embeds desensitization processing as recited in claim 1, wherein: the desensitization module comprises a user name input interface, a character input interface to be displayed, an output interface and
the author information base: according to the sensitive words in the article and form filling information, establishing an author information base for each sensitive word, wherein the author has the right to know the information;
personal rights library: determining which sensitive information the user has the right to view according to the user grade;
sensitive word bank: information defining which words or phrases are contained is sensitive information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011537957.1A CN113256236A (en) | 2020-12-23 | 2020-12-23 | Project management system for covering whole process of project and embedding desensitization treatment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011537957.1A CN113256236A (en) | 2020-12-23 | 2020-12-23 | Project management system for covering whole process of project and embedding desensitization treatment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113256236A true CN113256236A (en) | 2021-08-13 |
Family
ID=77180669
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011537957.1A Pending CN113256236A (en) | 2020-12-23 | 2020-12-23 | Project management system for covering whole process of project and embedding desensitization treatment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113256236A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7089203B1 (en) * | 1999-06-04 | 2006-08-08 | Crookshanks Rex J | Building construction bid and contract management system, internet-based method and computer program therefor |
CN108197895A (en) * | 2018-01-11 | 2018-06-22 | 韦吉楚 | A kind of enterprise information system Rights Management System |
CN109492991A (en) * | 2018-10-18 | 2019-03-19 | 华南理工大学 | Distribution engineering builds intelligent comprehensive management system |
CN111597578A (en) * | 2020-04-23 | 2020-08-28 | 国网湖北省电力有限公司信息通信公司 | Customer sensitive information desensitization system of electric power marketing system |
CN112085361A (en) * | 2020-08-28 | 2020-12-15 | 上海谊逅信息技术有限公司 | Construction engineering overall process management method |
-
2020
- 2020-12-23 CN CN202011537957.1A patent/CN113256236A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7089203B1 (en) * | 1999-06-04 | 2006-08-08 | Crookshanks Rex J | Building construction bid and contract management system, internet-based method and computer program therefor |
CN108197895A (en) * | 2018-01-11 | 2018-06-22 | 韦吉楚 | A kind of enterprise information system Rights Management System |
CN109492991A (en) * | 2018-10-18 | 2019-03-19 | 华南理工大学 | Distribution engineering builds intelligent comprehensive management system |
CN111597578A (en) * | 2020-04-23 | 2020-08-28 | 国网湖北省电力有限公司信息通信公司 | Customer sensitive information desensitization system of electric power marketing system |
CN112085361A (en) * | 2020-08-28 | 2020-12-15 | 上海谊逅信息技术有限公司 | Construction engineering overall process management method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11283840B2 (en) | Usage-tracking of information security (InfoSec) entities for security assurance | |
US20240007497A1 (en) | Automated Risk Assessment Module with Real-Time Compliance Monitoring | |
Ju | China's budding software industry | |
Pratami et al. | Designing Risk Qualitative Assessment on Fiber Optic Instalation Project in Indonesia | |
Petchenko et al. | Analysis of trends in the implementation of digitalization in accounting (Ukrainian case) | |
Garyaev | Analysis of risks arising in the implementation of BIM-technologies in construction organizations | |
KR102146545B1 (en) | Field management information system in specialty construction company based on mobile phone | |
CN113256236A (en) | Project management system for covering whole process of project and embedding desensitization treatment | |
CN115731028A (en) | Early warning method, early warning device, electronic equipment and computer readable medium | |
CN114757546A (en) | Risk early warning method, device, equipment and medium | |
CN111489101A (en) | Order auditing method, device, equipment and medium based on big data | |
Ming-Fung et al. | A data-driven approach to identify-quantify-analyse construction risk for Hong Kong NEC projects | |
Pathak et al. | Analysis of improving sales process efficiency with salesforce industries CPQ in CRM | |
Grigoryeva et al. | Implementation of Digital Technologies in the Mining and Polished of Natural Gem-Quality Diamonds | |
Idris et al. | Strategies for adoption of circular economy in the Nigeria construction industry | |
Ramsay | Know the why | |
Fil | Business processes engineering for organizing the construction objects’ design | |
Gardner | Energy management systems in buildings: The practical lessons | |
CN115829310A (en) | Dual-precontrol processing method, device, equipment and storage medium for risks and hidden dangers | |
Petersone et al. | An analysis of IT outsourcing risks in post-COVID world | |
Bedekar et al. | Robotic Process Automation: Under Promise Over Deliver | |
Clubb | Investment Appraisal for Information Technology-the Experience of the English Heritage Record of Scheduled Monuments | |
Fan et al. | Research on application of Big Data Technology in SF Express | |
CN115082221A (en) | Transaction control method and device, electronic equipment and storage medium | |
Ali et al. | Python Interactive Cost Control System for Major Contractors |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210813 |