CN113216327B - PPR water pipe dredging equipment and using method thereof - Google Patents

PPR water pipe dredging equipment and using method thereof Download PDF

Info

Publication number
CN113216327B
CN113216327B CN202110659351.3A CN202110659351A CN113216327B CN 113216327 B CN113216327 B CN 113216327B CN 202110659351 A CN202110659351 A CN 202110659351A CN 113216327 B CN113216327 B CN 113216327B
Authority
CN
China
Prior art keywords
water
pipe
side wall
outer side
injection pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110659351.3A
Other languages
Chinese (zh)
Other versions
CN113216327A (en
Inventor
邹文武
李志虎
郝建明
刘桃兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202110659351.3A priority Critical patent/CN113216327B/en
Publication of CN113216327A publication Critical patent/CN113216327A/en
Application granted granted Critical
Publication of CN113216327B publication Critical patent/CN113216327B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B7/00Water main or service pipe systems
    • E03B7/09Component parts or accessories
    • E03B7/14Devices for thawing frozen pipes

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Electromagnetic Pumps, Or The Like (AREA)

Abstract

The invention relates to the technical field of pipeline dredging equipment, in particular to PPR water pipe dredging equipment and a using method thereof. According to the invention, through the arrangement of the water pumping pipe and the water injection pipe, the other ends of the water injection pipe and the water pumping pipe penetrate through the fixed pipe and are inserted into the indoor water pipe, meanwhile, the plug block is inserted deeply along with the insertion of the water injection pipe, the water storage amount of water in the indoor pipeline is reduced, the first water pump sends hot water into the indoor water pipe, so that icicles are ablated, the water pumping pipe and the water injection pipe are pushed into the indoor water pipe and continuously penetrate deeply along with the ablation of the icicles, so that hot water flow jetted from the other end of the water injection pipe can be directly contacted with the icicles, the melting of the icicles is accelerated, and the dredging efficiency is high.

Description

PPR water pipe dredging equipment and using method thereof
Technical Field
The invention relates to the technical field of pipeline dredging equipment, in particular to PPR water pipe dredging equipment and a using method thereof.
Background
Compared with the traditional cast iron pipe, galvanized steel pipe, cement pipe and other pipelines, the PPR pipe has the advantages of energy conservation, material saving, environmental protection, light weight, high strength, corrosion resistance, smooth inner wall, no scaling, simple and convenient construction and maintenance, long service life and the like, and is widely applied to the construction industry, municipal administration, industry and agriculture fields of building water supply and drainage, urban and rural water supply and drainage, urban gas, electric power and optical cable sheaths, industrial fluid conveying agricultural irrigation and the like, and is the main force of a household water supply pipe.
In a community unit building, water for a plurality of households on one floor is communicated with a main water supply pipeline in a corridor through branch pipelines, but the branch pipelines are easy to freeze due to low temperature of the corridor when passing through the corridor in winter, so that a water pipe entering the room is easy to freeze and block, and a water pipe dredging device is needed.
Disclosure of Invention
In order to overcome the technical problems, the invention aims to provide a PPR water pipe dredging device and a using method thereof.
The purpose of the invention can be realized by the following technical scheme:
a PPR water pipe dredging device comprises a heating mechanism and a leading-in mechanism, wherein the heating mechanism comprises a heating barrel, a first water pump is installed at the upper end of the outer side wall of the heating barrel, the input end of the first water pump is communicated with the inner wall of the heating barrel, a second water pump is installed at the lower end of the outer side wall of the heating barrel, the output end of the second water pump is communicated with the inner wall of the heating barrel, a barrel cover is installed at the top end of the heating barrel, a heating rod is fixedly connected to the bottom surface of the barrel cover, the leading-in mechanism comprises a water injection pipe, one end of the water injection pipe is communicated with the output end of the first water pump, a water pumping pipe is arranged on one side of the water injection pipe, one end of the water pumping pipe is communicated with the input end of the second water pump, a plug block is fixedly sleeved on the annular outer side wall of the other end of the water pumping pipe, the other end of the water injection pipe penetrates through the plug block and extends to the outer side of the plug block, and a pushing mechanism used for pushing the water injection pipe and the water pumping pipe is arranged on the outer side of the leading-in mechanism, the other end of water injection pipe and drinking-water pipe inserts in the room water pipe, add water in the heating bucket, start the heating rod and heat the heating bucket water-logging, start water pump one and water pump two, inside water pump one sent the hot water in the heating bucket into the room water pipe through the water injection pipe, thereby melt the icicle in the room water pipe, the chock will go into room water pipe and seal, avoid going into room water pipe water-logging and spill over, water pump two will go into the cold water in the room water pipe and send back again to the heating bucket internal heating through the drinking-water pipe.
Further, the method comprises the following steps: the annular lateral wall top of heating bucket has linked firmly the water feeding fill, and one side and the inside intercommunication of heating bucket of water feeding fill, and when conveniently observing the water level in the heating bucket, the convenience is at any time to supplementing water in the heating bucket.
Further, the method comprises the following steps: the utility model discloses a water injection pipe, including water injection pipe, pumping pipe, water injection pipe, pumping pipe, fixed bolster has been linked firmly between the other end lateral wall of water injection pipe and the other end lateral wall of pumping pipe, links firmly the water injection pipe other end with the other end of pumping pipe side by side together, convenient synchronous propelling movement water injection pipe and pumping pipe.
Further, the method comprises the following steps: the other end intercommunication of water injection pipe has prevents stifled ball, prevent that the lateral wall of stifled ball sets up a plurality of through-holes with the water injection pipe other end intercommunication, makes things convenient for the other end of water injection pipe to cross the department of buckling of oral siphon through preventing stifled ball.
Further, the method comprises the following steps: the heating wire is arranged inside the anti-blocking ball and is electrically communicated with the barrel cover through a wire, so that the anti-blocking ball is heated, the cooling speed of water in the indoor water pipe is reduced, and melting of icicles is accelerated.
Further, the method comprises the following steps: the pushing mechanism comprises a fixed pipe, an internal thread sleeve is rotatably sleeved on the outer side wall of one end of the fixed pipe, a ring sleeve is fixedly sleeved on the outer side wall of the other end of the fixed pipe, an Contraband-shaped piece is fixedly connected to the outer side wall of the ring sleeve, a fixed plate is arranged between the inner side walls of the two ends of the Contraband-shaped piece, a first sleeve is fixedly connected to the top surface and the bottom surface of the fixed plate, a Contraband-shaped plate is fixedly connected between the outer side walls of one end of the first sleeve, a second sleeve is fixedly connected to the position, corresponding to the first sleeve, of the side wall of one end of the Contraband-shaped plate, a first shaft lever is rotatably connected between the annular inner side wall of the first sleeve and the annular inner side wall of the second sleeve, the two ends of the first shaft lever are respectively rotatably connected with the adjacent inner side wall of the Contraband-shaped piece, a first gear is fixedly sleeved on the annular outer side wall of one end of the first shaft lever, and a first belt pulley is fixedly sleeved on the annular outer side wall of the other end of the first sleeve corresponding to the position between the first sleeve and the second sleeve, the outer side wall of one side of the fixed plate is fixedly connected with a driving motor, the output end of the driving motor is fixedly connected with a gear II, the gear II is meshed with both the gear I and the gear II, the annular outer side wall of one end of the sleeve I, which is close to the gear II, is rotatably connected with a support arm II, a tension spring is fixedly connected between the two support arms II, the annular outer side wall of the sleeve II is rotatably connected with a support arm I, a shaft lever II is rotatably connected between one end of the support arm I and one end of the corresponding support arm II, a belt wheel II is fixedly sleeved on the annular outer side wall of one end of the shaft lever II, a belt is in transmission connection between the belt wheel II and the corresponding belt wheel I, the annular outer side wall of the shaft lever II is spirally wound and fixed with a rubber ring, the driving motor drives the two gear I to rotate through the gear II, the gear drives the shaft lever I to rotate, the shaft lever drives the belt wheel I to rotate, and the belt wheel II is driven by the belt wheel I to rotate through the belt, two drive axostylus axostyles of band pulley two rotate, the one end of two support arms of extension spring pulling is drawn close to the centre, thereby drive two axostylus axostyles two and the tight fixed bolster of rubber circle to centre extrusion clamp, two rotations of axostylus axostyles are through surperficial heliciform circle inside propelling movement fixed bolster, because the other end of drinking-water pipe and water injection pipe passes through the fixed bolster and fixes together, realize propelling movement and constantly deepening in to the entryway water pipe with drinking-water pipe, make the hot water stream of the other end ejection of water injection pipe can be direct and icicle contact, icicle melts with higher speed, replace manual propelling movement, and the portable use is realized.
Further, the method comprises the following steps: the first support arm is arched, the first support arm and the outer contour of the first support arm are the same, a lateral wall of the first support arm is connected with a connecting rod in a rotating mode, the first support arm is connected with the connecting rod in a rotating mode, the lateral wall of one end of the first connecting rod is fixedly connected with a limiting plate, the rotating connection position of the two connecting rods is stirred, one ends of the two connecting rods deflect to one side close to the first belt wheel, one end of the first support arm is driven to deflect outwards to be away from each other, the two shaft rods are driven to be away from each other, clamping of the water injection pipe is released, and the water injection pipe is convenient to operate manually.
The method is further characterized in that: the other side wall of the first supporting arm is rotatably connected with a plurality of rolling rollers, and the outer side walls of the rolling rollers are in contact with the belt, so that the belt is completely positioned under the shielding of the first supporting arm, and fingers are prevented from being in contact with the belt when the connecting rod is stirred.
A use method of PPR water pipe dredging equipment comprises the following specific use operation steps:
the method comprises the following steps: firstly, closing an outdoor water valve, then, unscrewing and disconnecting the outdoor water valve and an indoor water pipe, and then, screwing an internal thread sleeve at one end of a fixed pipe and one end of the indoor water pipe, so that the fixed pipe is butted with the indoor water pipe;
step two: the other ends of the water injection pipe and the water pumping pipe penetrate through the fixed pipe to be inserted into the indoor water pipe, water is added into the heating barrel, the heating rod is started to heat water in the heating barrel, the first water pump and the second water pump are started, hot water in the heating barrel is sent into the indoor water pipe through the water injection pipe by the first water pump, so that icicles in the indoor water pipe are melted, the indoor water pipe is sealed by the plug block, water in the indoor water pipe is prevented from overflowing, and cold water in the indoor water pipe is sent back to the heating barrel again by the second water pump through the water pumping pipe to be heated;
step three: the driving motor is started, the driving motor drives the two first gears to rotate through the second gear, the first gears drive the shaft rods to rotate, the shaft rods drive the first belt wheels to rotate, the first belt wheels drive the second belt wheels to rotate through the belt, the second belt wheels drive the second shaft rods to rotate, the extension springs pull one ends of the two support arms to approach towards the middle, so that the two shaft rods and the rubber ring are driven to extrude and clamp the fixing pad towards the middle, the second shaft rods rotate to push the fixing pad inwards through the surface spiral ring, and the water pumping pipe and the other ends of the water injection pipe are fixed together through the fixing pad, so that the water pumping pipe and the water injection pipe are pushed into the water inlet pipe and continuously go deep, hot water flow jetted from the other ends of the water injection pipe can directly contact with the icicles, and melting of the icicles is accelerated;
step four: when preventing stifled ball and removing to the department of buckling of entryway water pipe, and push mechanism can't continue to promote the water injection pipe when advancing, stir the rotation junction of two connecting rods, make the one end of two connecting rods deflect to the one side that is close to band pulley one, the one end that drives support arm one outwards deflects and keeps away from each other, thereby drive two axostylus axostyle two and keep away from each other, the centre gripping to the water injection pipe is released, through the limiting plate, the deflection angle to two connecting rods is fixed, thereby make two support arms one keep opening, manual rotation and inside propelling movement water injection pipe, make and prevent stifled ball and cross the department of buckling of entryway water pipe, then will reverse stir the junction of two connecting rods, axostylus axostyle two extrudees and the propelling movement water injection pipe again under extension spring's effect, thereby dredge the entryway pipeline.
The invention has the beneficial effects that:
1. through the arrangement of the water pumping pipe and the water injection pipe, the other ends of the water injection pipe and the water pumping pipe penetrate through the fixed pipe and are inserted into the indoor water pipe, hot water in the heating barrel is sent into the indoor water pipe through the water injection pipe by the first water pump, so that icicles in the indoor water pipe are melted, the indoor water pipe is sealed by the plug block, water in the indoor water pipe is prevented from overflowing, meanwhile, the plug block goes deep along with the insertion of the water injection pipe, the retention amount of water in the indoor pipe is reduced, cold water in the indoor water pipe is sent back to the heating barrel again through the water pumping pipe by the second water pump for heating, hot water flows in the indoor water pipe in a circulating mode, so that icicles are melted, and the dredging efficiency is high;
2. through the arrangement of the pushing mechanism, the driving motor drives the first two gears to rotate through the second gear, the first gear drives the shaft rod to rotate, the shaft rod drives the first belt wheel to rotate, the first belt wheel drives the second belt wheel to rotate through a belt, the second belt wheel drives the second shaft rod to rotate, the extension spring pulls one ends of the second two support arms to approach to the middle, thereby driving the two second shaft levers and the rubber ring to squeeze and clamp the fixing pad towards the middle, the second shaft lever rotates to push the fixing pad inwards through the spiral ring on the surface, because the other ends of the water pumping pipe and the water injection pipe are fixed together through the fixing pad, the water pumping pipe and the water injection pipe are pushed into the water inlet pipe and continuously go deep along with the melting of the icicles, so that the hot water flow ejected from the other end of the water injection pipe can be directly contacted with the icicles, thereby accelerating the melting of the icicles, simultaneously avoiding the manual continuous insertion of the water injection pipe, reducing the labor capacity and facilitating the use;
3. set up through preventing stifled ball and connecting rod and remove to the department of buckling of entrance water pipe when preventing stifled ball, and push mechanism can't continue to promote the water injection pipe when advancing, stir the rotation junction of two connecting rods for two support arms one keeps opening, and two axostylus axostyles are kept away from each other, releases the centre gripping to the water injection pipe, thereby makes things convenient for manual rotation and inside propelling movement water injection pipe, thereby makes to prevent stifled ball and cross the department of buckling of entrance water pipe, makes things convenient for manual operation.
Drawings
The invention will be further described with reference to the accompanying drawings.
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of a heating barrel according to the present invention;
FIG. 3 is a schematic view of a heating rod according to the present invention
FIG. 4 is a schematic view of the access mechanism of the present invention;
FIG. 5 is a schematic view of the pushing mechanism of the present invention;
FIG. 6 is a schematic view of the Contraband-shaped pieces of the invention;
FIG. 7 is a schematic view of a first support arm and a second support arm according to the present invention;
FIG. 8 is a schematic view of a shaft-sleeve configuration of the present invention.
In the figure: 100. a heat supply mechanism; 110. a heating barrel; 111. a first water pump; 112. a second water pump; 120. a barrel cover; 121. heating a rod; 130. a water adding hopper; 200. a feeding mechanism; 210. a water injection pipe; 220. a water pumping pipe; 230. a fixing pad; 240. a chock block; 250. anti-blocking balls; 300. a pushing mechanism; 310. a fixed tube; 311. an internal thread sleeve; 320. sleeving a ring; 321. contraband-shaped pieces; 330. a fixing plate; 331. a first sleeve; 332. contraband shaped plates; 333. a second sleeve; 334. a first shaft lever; 335. a first gear; 336. a first belt wheel; 340. a drive motor; 341. a second gear; 350. a first supporting arm; 351. rolling a roller; 352. a connecting rod; 353. a limiting plate; 360. a second supporting arm; 361. an extension spring; 370. a second shaft lever; 371. and a second belt wheel.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-8, a PPR water pipe dredging apparatus includes a heat supply mechanism 100 and an introducing mechanism 200, the heat supply mechanism 100 includes a heating barrel 110, a first water pump 111 is installed at an upper end of an outer side wall of the heating barrel 110, an input end of the first water pump 111 is communicated with an inner wall of the heating barrel 110, a second water pump 112 is installed at a lower end of the outer side wall of the heating barrel 110, an output end of the second water pump 112 is communicated with the inner wall of the heating barrel 110, a barrel cover 120 is installed at a top end of the heating barrel 110, a heating rod 121 is fixedly connected to a bottom surface of the barrel cover 120, the introducing mechanism 200 includes a water injection pipe 210, one end of the water injection pipe 210 is communicated with an output end of the first water pump 111, a water pumping pipe 220 is installed at one side of the water injection pipe 210, one end of the water pumping pipe 220 is communicated with the input end of the second water pump 112, a plug 240 fixedly sleeved on an annular outer side wall of the other end of the water pumping pipe 220, and the other end of the water injection pipe 210 penetrates through the plug 240 and extends to an outer side of the plug 240, the outside that lets in mechanism 200 is provided with push mechanism 300 that is used for propelling movement water injection pipe 210 and drinking-water pipe 220, the other end of water injection pipe 210 and drinking-water pipe 220 inserts into the room water pipe, add water in heating bucket 110, start heating rod 121 and heat the heating bucket 110 water-logging, start first water pump 111 and second water pump 112, inside water pump 111 sent into the room water pipe through water injection pipe 210 with the hot water in the heating bucket 110, thereby melt the icicle in the room water pipe, chock 240 will go into room water pipe and seal, avoid going into room water pipe water-logging to spill over, second water pump 112 will go into the interior cold water of room water pipe and send back again to heating bucket 110 internal heating through drinking-water pipe 220.
The top end of the annular outer side wall of the heating barrel 110 is fixedly connected with the water adding bucket 130, one side of the water adding bucket 130 is communicated with the inside of the heating barrel 110, the water level in the heating barrel 110 can be observed conveniently, water can be supplemented into the heating barrel 110 conveniently at any time, a fixing pad 230 is fixedly connected between the outer side wall of the other end of the water injection pipe 210 and the outer side wall of the other end of the water pumping pipe 220, the other end of the water injection pipe 210 and the other end of the water pumping pipe 220 are fixedly connected in parallel, the water injection pipe 210 and the water pumping pipe 220 can be pushed conveniently and synchronously, the other end of the water injection pipe 210 is communicated with the anti-blocking ball 250, the outer side wall of the anti-blocking ball 250 is provided with a plurality of through holes communicated with the other end of the water injection pipe 210, the other end of the water injection pipe 210 can conveniently cross the bending part of the indoor water pipe through the anti-blocking ball 250, a heating wire is arranged in the anti-blocking ball 250, the heating wire is electrically communicated with the anti-blocking barrel cover 120 through a wire, the heating of the ball 250 is realized, and the cooling speed of the water in the indoor water pipe is slowed down, the melting of icicles is accelerated.
The pushing mechanism 300 comprises a fixed pipe 310, an inner thread sleeve 311 is rotatably sleeved on the outer side wall of one end of the fixed pipe 310, a ring sleeve 320 is fixedly sleeved on the outer side wall of the other end of the fixed pipe 310, an Contraband-shaped piece 321 and an 21274are fixedly connected to the outer side wall of the ring sleeve 320, a fixing plate 330 is arranged between the inner side walls of the two ends of the shape piece 321, a first sleeve 331 is fixedly connected to the top surface and the bottom surface of the fixing plate 330, a Contraband-shaped plate 332 is fixedly connected between the outer side walls of the one end of the first sleeve 331, a second sleeve 333 is fixedly connected to the position, corresponding to the first sleeve 331, of the side wall of the one end of the 21274332, a first shaft lever 334 is rotatably connected between the annular inner side walls of the first sleeve 331, two ends of the first shaft lever 334 are respectively rotatably connected with the 21274, a first gear 335 is rotatably connected to the adjacent inner side wall of the first shaft 334, and a belt wheel is fixedly sleeved on the annular outer side wall of the other end of the first sleeve 334, and a belt wheel 336 is positioned corresponding to the position between the first sleeve 331 and the second sleeve 333, the outer side wall of one side of the fixing plate 330 is fixedly connected with a driving motor 340, the output end of the driving motor 340 is fixedly connected with a second gear 341, the second gear 341 is meshed with both first gears 335, the annular outer side wall of one end of the first sleeve 331 close to the second gear 341 is rotatably connected with a second support arm 360, a tension spring 361 is fixedly connected between the two support arms 360, the annular outer side wall of the second sleeve 333 is rotatably connected with a first support arm 350, a second shaft lever 370 is rotatably connected between one end of the first support arm 350 and one end of the corresponding second support arm 360, a second belt pulley 371 is fixedly sleeved on the annular outer side wall of one end of the second shaft lever 370, a belt is in transmission connection between the second belt pulley 371 and the corresponding first belt pulley 336, a rubber ring is spirally wound and fixed on the annular outer side wall of the second shaft lever 370, the driving the two first gears 335 to rotate through the second gear 341, the first gear 335 drives the first gear 334 to rotate, the first shaft 334 drives the first belt pulley 336 to rotate, band pulley 336 drives two 371 rotations of band pulley through the belt, two 371 drive two 370 rotations of axostylus axostyle, extension spring 361 pulls two 360 one ends of support arm and draws close to the centre, thereby drive two 370 and rubber circles of axostylus axostyle and press from both sides tight fixed bolster 230 to centre extrusion, two 370 rotations of axostylus axostyle are through surperficial heliciform circle inside propelling movement fixed bolster 230, because the other end of drinking-water pipe 220 and water injection pipe 210 passes through fixed bolster 230 together, the realization is with drinking-water pipe 220 and water injection pipe 210 to the intraductal propelling movement of income room water and constantly deepening, make the hot water stream that the other end of water injection pipe 210 jetted out can directly contact with the icicle, melt with higher speed the icicle, replace manual propelling movement, and convenience is used.
Support arm 350 is the arch, and support arm 350 is the same with two 360 outlines of support arm, an lateral wall of support arm 350 rotates and is connected with connecting rod 352, the one end of two connecting rods 352 rotates to be connected, and the one end lateral wall of one of them connecting rod 352 has linked firmly limiting plate 353, stir the rotation junction of two connecting rods 352, make the one end of two connecting rods 352 to deflecting to the one side that is close to band pulley 336, the one end that drives support arm 350 outwards deflects and keeps away from each other, thereby drive two axostylus axostyles two 370 and keep away from each other, relieve the centre gripping to water injection pipe 210, make things convenient for manual operation water injection pipe 210, another lateral wall of support arm 350 rotates and is connected with a plurality of roller 351, and roller 351, the lateral wall and the belt contact, make the belt be located support arm 350 shield down completely, when avoiding stirring connecting rod 352, the finger contacts with the belt.
A use method of PPR water pipe dredging equipment comprises the following specific use operation steps:
the method comprises the following steps: firstly, closing the outdoor water valve, then loosening and disconnecting the outdoor water valve and the indoor water pipe, and then screwing the internal thread sleeve 311 at one end of the fixing pipe 310 and one end of the indoor water pipe, so that the fixing pipe 310 is in butt joint with the indoor water pipe;
step two: the other ends of the water injection pipe 210 and the water pumping pipe 220 penetrate through the fixing pipe 310 and are inserted into the indoor water pipe, water is added into the heating barrel 110, the heating rod 121 is started to heat water in the heating barrel 110, the first water pump 111 and the second water pump 112 are started, hot water in the heating barrel 110 is sent into the indoor water pipe through the water injection pipe 210 by the first water pump 111, so that ice columns in the indoor water pipe are melted, the indoor water pipe is sealed by the plug 240 to prevent water in the indoor water pipe from overflowing, and cold water in the indoor water pipe is sent back to the heating barrel 110 by the second water pump 112 through the water pumping pipe 220 to be heated again;
step three: the driving motor 340 is started, the driving motor 340 drives the two first gears 335 to rotate through the second gears 341, the first gears 335 drive the first shafts 334 to rotate, the first shafts 334 drive the first belt wheels 336 to rotate, the first belt wheels 336 drive the second belt wheels 371 to rotate through the belt, the second belt wheels 371 drive the second shafts 370 to rotate, the extension spring 361 pulls one ends of the two support arms two 360 to draw close to the middle, so that the two second shafts 370 and the rubber rings are driven to squeeze and clamp the fixing pads 230 towards the middle, the second shafts 370 rotate to push the fixing pads 230 inwards through the spiral surface rings, and as the water pumping pipe 220 and the other end of the water injection pipe 210 are fixed together through the fixing pads 230, the water pumping pipe 220 and the water injection pipe 210 are pushed into the indoor water pipe and continuously go deep, so that hot water ejected from the other end of the water injection pipe 210 can directly contact with the icicles to accelerate melting of the icicles;
step four: when anti-blocking ball 250 moves to the indoor water pipe bending part, and push mechanism 300 can not continue to push water injection pipe 210 to advance, stir the rotation junction of two connecting rods 352, make the one end of two connecting rods 352 deflect to the side close to belt wheel 336, the one end that drives supporting arm 350 deflects outwards and keeps away from each other, thereby drive two axostylus axostyles 370 and keep away from each other, relieve the centre gripping to water injection pipe 210, through limiting plate 353, fix the deflection angle of two connecting rods 352, thereby make two supporting arms 350 keep opening, manual rotation and inwards push water injection pipe 210, make anti-blocking ball 250 cross the bending part of indoor water pipe, then will reverse the junction of two connecting rods 352, two axostylus axostyles 370 extrude and push water injection pipe 210 again under extension spring 361's effect, thereby dredge the indoor pipeline.
The working principle is as follows: when the water heater is used, the outdoor water valve is closed, the outdoor water valve is unscrewed from the indoor water pipe, the internal thread sleeve 311 at one end of the fixing pipe 310 is screwed with one end of the indoor water pipe, so that the fixing pipe 310 is in butt joint with the indoor water pipe, the other ends of the water injection pipe 210 and the water pumping pipe 220 penetrate through the fixing pipe 310 and are inserted into the indoor water pipe, water is added into the heating barrel 110, the heating rod 121 is started to heat the water in the heating barrel 110, the water pump I111 and the water pump II 112 are started, the water pump I111 sends hot water in the heating barrel 110 into the indoor water pipe through the water injection pipe 210, so that icicles in the indoor water pipe are melted, the water inlet pipe is sealed by the plug 240 to prevent the water in the indoor water pipe from overflowing, meanwhile, the plug 240 penetrates deeply along with the insertion of the water injection pipe 210 to reduce the storage amount of the indoor water, the water pumping pipe 220 returns cold water in the indoor water pipe to the heating barrel 110 through the water pumping pipe 220 by the water pump II, the driving motor 340 is started, the driving motor 340 drives the two first gears 335 to rotate through the second gears 341, the first gears 335 drive the first shafts 334 to rotate, the first shafts 334 drive the first belt wheels 336 to rotate, the first belt wheels 336 drive the second belt wheels 371 to rotate through a belt, the second belt wheels 371 drive the second shafts 370 to rotate, the extension springs 361 pull one ends of the two support arms 360 to draw close to the middle, so that the two second shafts 370 and the rubber rings are driven to squeeze and clamp the fixing pads 230 towards the middle, the second shafts 370 rotate to push the fixing pads 230 inwards through the surface spiral rings, and the water pumping pipe 220 and the other ends of the water injection pipes 210 are fixed together through the fixing pads 230, so that the water pumping pipe 220 and the water injection pipes 210 are pushed into the water pipe of the chamber and continuously go deep, hot water flow jetted from the other ends of the water injection pipes 210 can directly contact with icicles, and melting of the icicles is accelerated;
when anti-blocking ball 250 moves to the indoor water pipe bending part, and push mechanism 300 can not continue to push water injection pipe 210 to advance, stir the rotation junction of two connecting rods 352, make the one end of two connecting rods 352 deflect to the side close to belt wheel 336, the one end that drives supporting arm 350 deflects outwards and keeps away from each other, thereby drive two axostylus axostyles 370 and keep away from each other, relieve the centre gripping to water injection pipe 210, through limiting plate 353, fix the deflection angle of two connecting rods 352, thereby make two supporting arms 350 keep opening, manual rotation and inwards push water injection pipe 210, make anti-blocking ball 250 cross the bending part of indoor water pipe, then will reverse the junction of two connecting rods 352, two axostylus axostyles 370 extrude and push water injection pipe 210 again under extension spring 361's effect, thereby dredge the indoor pipeline.
In the description herein, references to the description of "one embodiment," "an example," "a specific example" or the like are intended to mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The foregoing is illustrative and explanatory only, and it will be appreciated by those skilled in the art that various modifications, additions and substitutions can be made to the embodiments described without departing from the scope of the invention as defined in the appended claims.

Claims (4)

1. The utility model provides a PPR water pipe dredging device, its characterized in that, includes heat supply mechanism (100) and lets in mechanism (200), heat supply mechanism (100) is including heating bucket (110), water pump (111) are installed to the lateral wall upper end of heating bucket (110), and the input of water pump (111) and the inner wall intercommunication of heating bucket (110), water pump two (112) are installed to the lateral wall low side of heating bucket (110), and the output of water pump two (112) and the inner wall intercommunication of heating bucket (110), bung (120) are installed on the top of heating bucket (110), and the bottom surface of bung (120) has linked firmly heating rod (121), it includes water injection pipe (210) to let in mechanism (200), the one end of water injection pipe (210) and the output intercommunication of water pump one (111), one side of water injection pipe (210) is provided with pumping pipe (220), the one end of pumping pipe (220) and the input intercommunication of water pump two (112), the annular outer side wall at the other end of the water pumping pipe (220) is fixedly sleeved with a plug block (240), the other end of the water injection pipe (210) penetrates through the plug block (240) and extends to the outer side of the plug block (240), and a pushing mechanism (300) for pushing the water injection pipe (210) and the water pumping pipe (220) is arranged on the outer side of the introducing mechanism (200);
the top end of the annular outer side wall of the heating barrel (110) is fixedly connected with a water adding hopper (130), one side of the water adding hopper (130) is communicated with the interior of the heating barrel (110), a fixing pad (230) is fixedly connected between the outer side wall of the other end of the water injection pipe (210) and the outer side wall of the other end of the water pumping pipe (220), the other end of the water injection pipe (210) is communicated with an anti-blocking ball (250), the outer side wall of the anti-blocking ball (250) is provided with a plurality of through holes communicated with the other end of the water injection pipe (210), a heating wire is installed in the anti-blocking ball (250), and the heating wire is electrically communicated with the barrel cover (120) through a wire;
the pushing mechanism (300) comprises a fixed pipe (310), an internal thread sleeve (311) is rotatably sleeved on the outer side wall of one end of the fixed pipe (310), a ring sleeve (320) is fixedly sleeved on the outer side wall of the other end of the fixed pipe (310), an Contraband-shaped piece (321) is fixedly connected to the outer side wall of the ring sleeve (320), a fixing plate (330) is arranged between the inner side walls of two ends of a Contraband-shaped piece (321), the top surface and the bottom surface of the fixing plate (330) are fixedly connected with a first sleeve (331), a Contraband-shaped plate (332) is fixedly connected between the outer side walls of one ends of the two first sleeve (331), a second sleeve (333) is fixedly connected to the position of one end side wall of the Contraband-shaped plate (332) corresponding to the two first sleeve (331), a first shaft lever (334) is rotatably connected between the inner side wall of the annular inner side of the first sleeve (331) and the inner side wall of the annular inner side of the second sleeve (333), and two ends of the first shaft lever (334) are rotatably connected with the adjacent inner side walls of the Contraband-shaped piece (321) respectively, a first gear (335) is fixedly sleeved on the annular outer side wall at one end of the first shaft lever (334), a first belt wheel (336) is fixedly sleeved on the annular outer side wall at the position, corresponding to the position between the first sleeve (331) and the second sleeve (333), at the other end of the first shaft lever (334), a driving motor (340) is fixedly connected on the outer side wall at one side of the fixing plate (330), a second gear (341) is fixedly connected on the output end of the driving motor (340), the second gear (341) is meshed with the first two gears (335), a second support arm (360) is rotatably connected on the annular outer side wall at one end, close to the second gear (341), of the first sleeve (331), a stretching spring (361) is fixedly connected between the second support arm (360), a first support arm (350) is rotatably connected on the annular outer side wall of the second sleeve (333), and a second shaft lever (370) is rotatably connected between one end of the first support arm (350) and one end of the corresponding second support arm (360), the annular outer side wall of one end of the second shaft rod (370) is fixedly sleeved with a second belt wheel (371), a belt is in transmission connection between the second belt wheel (371) and the corresponding first belt wheel (336), and the annular outer side wall of the second shaft rod (370) is spirally wound and fixed with a rubber ring.
2. The PPR water pipe dredging device according to claim 1, wherein the first supporting arm (350) is arched, the first supporting arm (350) and the second supporting arm (360) have the same outer contour, a connecting rod (352) is rotatably connected to an outer side wall of the first supporting arm (350), one end of each of the two connecting rods (352) is rotatably connected, and a limiting plate (353) is fixedly connected to an outer side wall of one end of one of the connecting rods (352).
3. The PPR water pipe dredging device of claim 2, wherein a plurality of rollers (351) are rotatably connected to the other side wall of the first supporting arm (350), and the outer side wall of the roller (351) is in contact with a belt.
4. The use method of the PPR water pipe dredging device, as claimed in claim 3, wherein the specific use operation steps of the PPR water pipe dredging device are as follows:
the method comprises the following steps: firstly, closing an outdoor water valve, then, unscrewing and disconnecting the outdoor water valve and a water inlet pipe, and then, screwing an internal thread sleeve (311) at one end of a fixed pipe (310) and one end of the water inlet pipe, so that the fixed pipe (310) is butted with the water inlet pipe;
step two: the other ends of a water injection pipe (210) and a water pumping pipe (220) penetrate through a fixed pipe (310) and are inserted into a room water pipe, water is added into a heating barrel (110), a heating rod (121) is started to heat the water in the heating barrel (110), a first water pump (111) and a second water pump (112) are started, the first water pump (111) sends hot water in the heating barrel (110) into the room water pipe through the water injection pipe (210), so that icicles in the room water pipe are melted, the room water pipe is sealed by a plug block (240) to avoid overflow of the water in the room water pipe, and the second water pump (112) sends cold water in the room water pipe back into the heating barrel (110) through the water pumping pipe (220) again for heating;
step three: starting a driving motor (340), wherein the driving motor (340) drives two first gears (335) to rotate through a second gear (341), the first gear (335) drives a first shaft lever (334) to rotate, the first shaft lever (334) drives a first belt wheel (336) to rotate, the first belt wheel (336) drives a second belt wheel (371) to rotate through a belt, the second belt wheel (371) drives a second shaft lever (370) to rotate, a tension spring (361) pulls one ends of the two support arms (360) to approach towards the middle, so that the two second shaft levers (370) and a rubber ring are driven to squeeze and clamp a fixing pad (230) towards the middle, the second shaft lever (370) rotates to push the fixing pad (230) inwards through a surface spiral ring, and the pumping pipe (220) and the water injection pipe (210) are pushed into the water pipe of the entry chamber and continuously deepen the pumping pipe (220) and the water injection pipe (210) because the other ends of the pumping pipe (220) and the water injection pipe (210) are fixed together through the fixing pad (230), hot water flow jetted from the other end of the water injection pipe (210) can directly contact with the icicles to accelerate melting of the icicles;
step four: when the anti-blocking ball (250) moves to the bending part of the water inlet pipe and the pushing mechanism (300) cannot continuously push the water injection pipe (210) to advance, the rotating joint of the two connecting rods (352) is shifted to enable one ends of the two connecting rods (352) to deflect to one side close to the belt wheel I (336), one ends of the supporting arms I (350) are driven to deflect outwards and away from each other, so that the two shaft rods II (370) are driven to separate from each other, the water injection pipe (210) is released from being clamped, the deflection angles of the two connecting rods (352) are fixed through the limiting plate (353), so that the two supporting arms I (350) are kept open, the water injection pipe (210) is manually rotated and pushed inwards, the anti-blocking ball (250) crosses the bending part of the water inlet pipe, then the joint of the two connecting rods (352) is shifted reversely, the shaft rods II (370) are squeezed again under the action of the stretching spring (361) and push the water injection pipe (210), thereby dredging the chamber-entering pipeline.
CN202110659351.3A 2021-06-15 2021-06-15 PPR water pipe dredging equipment and using method thereof Active CN113216327B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110659351.3A CN113216327B (en) 2021-06-15 2021-06-15 PPR water pipe dredging equipment and using method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110659351.3A CN113216327B (en) 2021-06-15 2021-06-15 PPR water pipe dredging equipment and using method thereof

Publications (2)

Publication Number Publication Date
CN113216327A CN113216327A (en) 2021-08-06
CN113216327B true CN113216327B (en) 2022-09-02

Family

ID=77080329

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110659351.3A Active CN113216327B (en) 2021-06-15 2021-06-15 PPR water pipe dredging equipment and using method thereof

Country Status (1)

Country Link
CN (1) CN113216327B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2337295A1 (en) * 2001-02-16 2002-08-16 Floyd Keays Method and apparatus for thawing and warming pipelines
CN203080597U (en) * 2012-12-31 2013-07-24 周子逍 Device for dredging frozen sewer pipe
CN203222849U (en) * 2013-04-18 2013-10-02 陈杰 Water heat conduction type pipeline de-icing device
CN107419776A (en) * 2017-09-03 2017-12-01 广州市恒策科技服务有限公司 A kind of anti-freeze anti-rupture device of water pipe
CN207794199U (en) * 2018-01-22 2018-08-31 刘婷婷 A kind of running water antifreezing device
CN209495077U (en) * 2018-12-27 2019-10-15 中国铁建电气化局集团北方工程有限公司 A kind of water supply and sewerage pipeline defroster

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2337295A1 (en) * 2001-02-16 2002-08-16 Floyd Keays Method and apparatus for thawing and warming pipelines
CN203080597U (en) * 2012-12-31 2013-07-24 周子逍 Device for dredging frozen sewer pipe
CN203222849U (en) * 2013-04-18 2013-10-02 陈杰 Water heat conduction type pipeline de-icing device
CN107419776A (en) * 2017-09-03 2017-12-01 广州市恒策科技服务有限公司 A kind of anti-freeze anti-rupture device of water pipe
CN207794199U (en) * 2018-01-22 2018-08-31 刘婷婷 A kind of running water antifreezing device
CN209495077U (en) * 2018-12-27 2019-10-15 中国铁建电气化局集团北方工程有限公司 A kind of water supply and sewerage pipeline defroster

Also Published As

Publication number Publication date
CN113216327A (en) 2021-08-06

Similar Documents

Publication Publication Date Title
CN207154315U (en) A kind of petroleum pipeline dredger
CN113216327B (en) PPR water pipe dredging equipment and using method thereof
CN107014229A (en) A kind of sewage heat exchanger
CN211289018U (en) Connecting mechanism convenient to install for pipeline connection
CN206019039U (en) A kind of high solar water heater of utilization rate
CN107560491A (en) Earth source heat pump heating plant
CN208431963U (en) A kind of solar water heater with descaling function
CN206814798U (en) A kind of pipe lining device of blast furnace cooling stave bad water pipe
CN214087831U (en) Automatic dross scraper blade system of clearing up of biochemical pond
CN213512526U (en) Water supply and drainage pipeline joint for building capable of being disassembled and connected quickly
CN210980398U (en) Rotation type hanging solar panel
CN212069808U (en) A belt cleaning device for PVC tubular product
CN203529995U (en) Dross remover for transition section between flocculation basin and settling pond
CN214008375U (en) Flexible interface full-sealing quick connection structure for drainage pipeline
CN206787352U (en) A kind of sewage heat exchanger
CN215463961U (en) Raw material mixing device for polyolefin drainage and sewage pipeline production
CN219473995U (en) Pipeline for extracting middle-deep geothermal energy
CN221034488U (en) Municipal administration is connection structure for water supply and drainage pipeline
CN213541637U (en) PPR (polypropylene random) anti-freezing pipe
CN220329514U (en) Anti-blocking device for blocking pipe by crystallization of high-salt wastewater
CN108935120A (en) A kind of coprodaecum cleaning machine
CN216225948U (en) Electric power calandria pull throughs
CN219585900U (en) Sewage treatment pond of quick clearance filler
CN216920241U (en) Discharge mechanism that hydraulic engineering used
CN215745265U (en) Water supply plant is with conduit that has pretreatment function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant