CN113202027A CN202110371696.9A CN202110371696A CN113202027A CN 113202027 A CN113202027 A CN 113202027A CN 202110371696 A CN202110371696 A CN 202110371696A CN 113202027 A CN113202027 A CN 113202027A
Authority
CN
China
Prior art keywords
support
steel pipe
pipe pile
hanging rod
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110371696.9A
Other languages
Chinese (zh)
Inventor
王安文
吴曼
王佳
张曼
薛飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN202110371696.9A priority Critical patent/CN113202027A/en
Publication of CN113202027A publication Critical patent/CN113202027A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a method for quickly dismantling a cast-in-place beam steel pipe pile support, wherein preformed holes are arranged at positions, which are opposite to two ends of a bearing beam of a lower steel pipe pile support, of two sides of a beam body, when the support is dismantled, a cross beam is erected at the tops of two opposite preformed holes of a cross bridge on the top surface of the beam body, a pad beam is arranged on the cross beam corresponding to each preformed hole, two through jacks are erected at the tops of two ends of the pad beam, and a shoulder pole beam is erected at the tops of the two jacks; a hanging rod penetrates through each preformed hole, the lower end of the hanging rod is anchored with a support bearing beam, the upper end of the hanging rod penetrates through the cross beam, the pad beam, the space between the two jacks and the shoulder pole beam, a lower nut is screwed on the top surface of the pad beam on the hanging rod, and an upper nut is screwed on the top surface of the shoulder pole beam; firstly, dismantling the steel pipe pile of the support, and then controlling the jack to integrally drop the upper structure of the support to the ground. The invention has the advantages of extremely high construction speed, low cost and high safety.

Description

Method for quickly dismantling cast-in-place beam steel pipe pile support
Technical Field
The invention belongs to the technical field of bridge construction, and relates to a method for dismantling a steel pipe pile support after cast-in-place beam construction is carried out by adopting the steel pipe pile support.
Background
The cast-in-place beam of the bridge is usually constructed by adopting a full support or a steel pipe pile support. When the steel pipe pile support is used for construction, a sand unloading cylinder is usually arranged at the top of the steel pipe pile, a bearing beam is erected on the sand unloading cylinder, a Bailey beam is erected on the bearing beam, a distribution beam is erected on the Bailey beam, and a cast-in-place beam construction template is installed on the distribution beam. And when the support is dismantled after the cast-in-place beam is constructed, the height of the support is reduced by discharging sand from the sand discharging barrel, then the upper structure of the support is dismantled from top to bottom in sequence by adopting hoisting equipment, and finally the steel pipe pile is dismantled. The existing support dismantling method is slow in construction, and when the sand discharging barrel descends, the sand discharging amount of each sand barrel needs to be synchronously controlled to be consistent, so that the inclination of the upper structure of the platform is avoided, and the construction difficulty is high; constructors need to operate at high altitude, and risks are high.
Disclosure of Invention
The invention aims to provide a support dismantling method with high construction speed and low construction risk aiming at the problems of the existing steel pipe pile support dismantling method.
The technical scheme of the invention is as follows:
a method for quickly dismantling a cast-in-place beam steel pipe pile support is characterized by comprising the following steps:
(1) when the cast-in-place beam is constructed, preformed holes are arranged at the positions of two sides of the beam body, which are opposite to two ends of each bearing beam of the lower steel pipe pile support;
(2) after the beam body concrete reaches the form removal strength, erecting double-spliced I-shaped steel cross beams at the tops of two opposite preformed holes in the transverse bridge direction of the top surface of the beam body, erecting double-spliced I-shaped steel backing beams on the cross beams corresponding to each preformed hole in the bridge direction, erecting two penetrating jacks at the tops of two ends of each backing beam, and erecting a shoulder pole beam at the tops of the two jacks;
(3) a hanging rod penetrates through each preformed hole, the lower end of the hanging rod is anchored with a support bearing beam, the upper end of the hanging rod sequentially penetrates through the cross beam, the pad beam, the space between the two jacks and the shoulder pole beam from bottom to top, a lower nut is screwed on the top surface of the pad beam on the hanging rod, and an upper nut is screwed on the top surface of the shoulder pole beam;
(4) dismantling the steel pipe pile of the support to suspend the lower part of the bearing beam of the support in the air, and completely lifting the upper structure of the support by a lifting rod;
(5) the upper nuts are rotated upwards on the hanging rod by the height of one stroke of the jack, and then the shoulder pole beam is jacked upwards by the jack by one stroke; the lower nuts are rotated upwards by the height of one stroke of the jack, then the jack returns oil, the height of the suspender is reduced by one jack stroke, and the upper structure of the support lifted by the suspender is reduced along with the height of the lower nuts;
(6) and (5) repeatedly repeating the step until the support superstructure is descended to the ground.
According to the invention, the upper structure of the support is lifted by fully utilizing the supporting force provided by the constructed cast-in-place beam, and after the steel pipe pile is removed, the upper structure of the support can be integrally lowered to the ground without dismantling rod pieces one by one or hoisting equipment, so that the construction speed is extremely high and the investment is low; the risk that the component was demolishd to reducible personnel on the support brings, and the security is high.
Drawings
FIG. 1 is a schematic cross-bridging view of a support beam being lifted by a boom;
FIG. 2 is a schematic representation of the forward direction of the carrier beam through the boom hoist;
fig. 3 is a partially enlarged view of fig. 2.
Detailed Description
As shown in fig. 1, the lower structure of the cast-in-place beam construction support is a steel pipe pile 1, and the upper structure of the support comprises a bearing beam 2 erected at the top of the steel pipe pile, a bailey beam 3 erected at the top of the bearing beam, a distribution beam 4 erected at the top of the bailey beam, a template installed on the distribution beam, and the like.
The method for quickly dismantling the steel pipe pile support comprises the following steps:
(1) when the cast-in-place beam 5 is constructed, preformed holes are arranged at the positions of two sides of the beam body, which are opposite to two ends of each bearing beam of the lower steel pipe pile support;
(2) as shown in fig. 1, 2 and 3, after the beam concrete reaches the form removal strength, double-spliced I-shaped steel cross beams 6 are erected at the tops of two opposite preformed holes on the top surface of the beam in the transverse bridge direction, double-spliced I-shaped steel backing beams 7 are erected on the cross beams corresponding to each preformed hole in the bridge direction, two penetrating jacks 8 are erected at the tops of two ends of each backing beam, and a shoulder pole beam 9 is erected at the tops of the two jacks;
(3) a hanging rod 10 penetrates through each preformed hole, the lower end of the hanging rod is anchored with a support bearing beam 2, the upper end of the hanging rod sequentially penetrates through a cross beam 6, a pad beam 7, two jacks 8 and a shoulder pole beam 9 from bottom to top, a lower nut 11 is screwed on the top surface of the pad beam on the hanging rod, and an upper nut 12 is screwed on the top surface of the shoulder pole beam;
(4) dismantling the support steel pipe pile 1, reducing the height of a unloading device such as a sand cylinder and the like under the condition that the unloading device such as the sand cylinder is installed at the top of the steel pipe pile, taking down the unloading device, and then separating and moving away the bottom of the steel pipe pile from a support foundation; and directly cutting off the steel pipe pile under the condition that the bearing beam is directly installed at the top of the steel pipe pile. After the steel pipe pile is dismantled, the lower part of a bearing beam of the support is suspended, and the upper structure of the support is completely lifted by a suspender 10;
(5) the upper nuts 12 are rotated upwards on the suspension rod by the height of one stroke of the jack, and then the carrying pole beam 9 is lifted upwards by the jack 8 by one stroke; each lower nut 11 is rotated upwards by the height of one stroke of the jack, then the jack returns oil, the height of the suspender 10 is reduced by one jack stroke, and the upper structure of the bracket is reduced by the corresponding height;
(6) and (5) repeating the step until the support superstructure is descended to the ground.

Claims (2)

1. A method for quickly dismantling a cast-in-place beam steel pipe pile support is characterized by comprising the following steps:
(1) when the cast-in-place beam is constructed, preformed holes are arranged at the positions of two sides of the beam body, which are opposite to two ends of each bearing beam of the lower steel pipe pile support;
(2) after the beam body concrete reaches the form removal strength, erecting double-spliced I-shaped steel cross beams at the tops of two opposite preformed holes in the transverse bridge direction of the top surface of the beam body, erecting double-spliced I-shaped steel backing beams on the cross beams corresponding to each preformed hole in the bridge direction, erecting two penetrating jacks at the tops of two ends of each backing beam, and erecting a shoulder pole beam at the tops of the two jacks;
(3) a hanging rod penetrates through each preformed hole, the lower end of the hanging rod is anchored with a support bearing beam, the upper end of the hanging rod sequentially penetrates through the cross beam, the pad beam, the space between the two jacks and the shoulder pole beam from bottom to top, a lower nut is screwed on the top surface of the pad beam on the hanging rod, and an upper nut is screwed on the top surface of the shoulder pole beam;
(4) dismantling the steel pipe pile of the support to suspend the lower part of the bearing beam of the support in the air, and completely lifting the upper structure of the support by a lifting rod;
(5) the upper nuts are rotated upwards on the hanging rod by the height of one stroke of the jack, and then the shoulder pole beam is jacked upwards by the jack by one stroke; the lower nuts are rotated upwards by the height of one stroke of the jack, then the jack returns oil, the height of the suspender is reduced by one jack stroke, and the upper structure of the support lifted by the suspender is reduced along with the height of the lower nuts;
(6) and (5) repeatedly repeating the step until the support superstructure is descended to the ground.
2. The method for quickly dismantling the cast-in-place beam steel pipe pile support according to claim 1, characterized in that: when the support steel pipe pile is dismantled in the step (4), under the condition that the unloading device is installed at the top of the steel pipe pile, the height of the unloading device is reduced, the unloading device is taken down, and then the bottom of the steel pipe pile is separated from the supporting foundation and moved away; and cutting off the steel pipe pile under the condition that the bearing beam is directly installed at the top of the steel pipe pile.
CN202110371696.9A 2021-04-07 2021-04-07 Method for quickly dismantling cast-in-place beam steel pipe pile support Pending CN113202027A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110371696.9A CN113202027A (en) 2021-04-07 2021-04-07 Method for quickly dismantling cast-in-place beam steel pipe pile support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110371696.9A CN113202027A (en) 2021-04-07 2021-04-07 Method for quickly dismantling cast-in-place beam steel pipe pile support

Publications (1)

Publication Number Publication Date
CN113202027A true CN113202027A (en) 2021-08-03

Family

ID=77026250

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110371696.9A Pending CN113202027A (en) 2021-04-07 2021-04-07 Method for quickly dismantling cast-in-place beam steel pipe pile support

Country Status (1)

Country Link
CN (1) CN113202027A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114134812A (en) * 2021-10-26 2022-03-04 山东高速工程建设集团有限公司 Construction method of in-water support dismantling system for cast-in-place bridge steel pipe pile

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06136722A (en) * 1992-10-23 1994-05-17 Sho Bond Constr Co Ltd Bridge floor plate disassembly method and device therefor
CN103669902A (en) * 2013-12-31 2014-03-26 中建铁路建设有限公司 Cast-in-place beam support truss integral dropping and dismounting tool and construction method thereof
CN203669407U (en) * 2013-12-31 2014-06-25 中建铁路建设有限公司 Cast-in-place beam supporting truss overall-falling dismantling tool
WO2017088117A1 (en) * 2015-11-25 2017-06-01 陈修缘 Lift-type construction system for use in constructing structure of upper portion of bridge and construction method thereof
CN107892238A (en) * 2017-11-11 2018-04-10 中铁三局集团华东建设有限公司 A kind of lowering equipment and method for Bailey beam
CN112482232A (en) * 2020-11-30 2021-03-12 中交第一航务工程局有限公司 Beam falling system for dismantling box girder Bailey beam support of urban railway and construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06136722A (en) * 1992-10-23 1994-05-17 Sho Bond Constr Co Ltd Bridge floor plate disassembly method and device therefor
CN103669902A (en) * 2013-12-31 2014-03-26 中建铁路建设有限公司 Cast-in-place beam support truss integral dropping and dismounting tool and construction method thereof
CN203669407U (en) * 2013-12-31 2014-06-25 中建铁路建设有限公司 Cast-in-place beam supporting truss overall-falling dismantling tool
WO2017088117A1 (en) * 2015-11-25 2017-06-01 陈修缘 Lift-type construction system for use in constructing structure of upper portion of bridge and construction method thereof
CN107892238A (en) * 2017-11-11 2018-04-10 中铁三局集团华东建设有限公司 A kind of lowering equipment and method for Bailey beam
CN112482232A (en) * 2020-11-30 2021-03-12 中交第一航务工程局有限公司 Beam falling system for dismantling box girder Bailey beam support of urban railway and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114134812A (en) * 2021-10-26 2022-03-04 山东高速工程建设集团有限公司 Construction method of in-water support dismantling system for cast-in-place bridge steel pipe pile

Similar Documents

Publication Publication Date Title
CN104963301B (en) The dilatory translation downward putting device and method removed for pier top beam section and bridge pier
CN102080357B (en) Integrated beam-falling device and method for steel pipe pier bailey beam cast-in-place bracket
CN103630416B (en) The test platform of hoisting mechanism
CN103669902B (en) Cast-in-place beam support truss integral dropping and dismounting tool and construction method thereof
CN109972621B (en) Pile pulling device for steel pipe pile in small-clearance shallow water area and construction method of pile pulling device
CN104632088A (en) Petroleum drilling machine tower-shaped derrick sleeving mounting method
CN113202027A (en) Method for quickly dismantling cast-in-place beam steel pipe pile support
CN215164726U (en) A wholly unload structure that is used for cast-in-place beam steel pipe pile support to demolish fast
CN105781210B (en) A kind of conical tower and its tool section assist punching construction method for lifting whole
CN101109028A (en) Method of upside-down mounting hydraulic pressure lifting of converter shell
CN110467113B (en) Large-tonnage tunnel anchor cable saddle hoisting device and method
CN108545629B (en) Utilize the construction method of tower crane lifting girder truss
CN115233730B (en) Top plate jacking device for V-shaped column and jacking construction method
CN202482862U (en) Steel tube pile driving construction location adjuster
CN111519545A (en) Pier and capping beam integrated construction platform and construction method thereof
CN111335172A (en) Movable pier column cross beam prestress tensioning hanging frame construction platform and construction method
CN111157211A (en) Large-scale hydraulic pile hammer test bench
CN203715115U (en) Supporting point structure for self-hoisting system of portal crane
CN213738414U (en) Multi-upright-column synchronous jacking joint adding system
CN209923780U (en) Suspended support of segment prefabricated bent cap
CN210368963U (en) Pile pulling device for small-clearance shallow water area steel pipe pile
CN103922231A (en) Climbing method of inside-climbing tower crane for super high-rise building
CN102493367A (en) Non-blasting construction method for dismantling pier to land bridge
CN106564814B (en) Lifting platform support dynamical system lifting method for dismounting under truss covering operating mode
KR20130117171A (en) Cone mounting method of top side deck

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20210803

WD01 Invention patent application deemed withdrawn after publication