CN113188511A - Settlement observation pile for roadbed backfill and observation method using settlement observation pile - Google Patents

Settlement observation pile for roadbed backfill and observation method using settlement observation pile Download PDF

Info

Publication number
CN113188511A
CN113188511A CN202110481475.7A CN202110481475A CN113188511A CN 113188511 A CN113188511 A CN 113188511A CN 202110481475 A CN202110481475 A CN 202110481475A CN 113188511 A CN113188511 A CN 113188511A
Authority
CN
China
Prior art keywords
pile
anchoring
driving rod
observation
settlement observation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110481475.7A
Other languages
Chinese (zh)
Inventor
蒋凯
郑峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN202110481475.7A priority Critical patent/CN113188511A/en
Publication of CN113188511A publication Critical patent/CN113188511A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C5/00Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a settlement observation pile for roadbed backfilling and an observation method using the settlement observation pile, wherein the observation pile comprises: the anchoring pile is internally provided with a plurality of sleeves, and anchoring nails are correspondingly arranged in the sleeves; and the driving rod is arranged on the anchoring pile and can rotate around the axis of the driving rod and drive the anchoring nail to penetrate out of or retreat into the anchoring pile. The driving rod drives the anchoring nail to extend out/retract so as to facilitate the anchoring/recovering operation of the anchoring pile.

Description

Settlement observation pile for roadbed backfill and observation method using settlement observation pile
Technical Field
The invention relates to an observation pile, in particular to a settlement observation pile for roadbed backfilling and an observation method using the settlement observation pile.
Background
In road construction, the original ground surface fluctuation usually relates to roadbed filling construction, but the current construction process level can not completely eliminate the continuous settlement after roadbed refilling, so that settlement observation is often required in certain predicted large settlement sections (such as high filling sections and sections filled with improved fillers made of poor materials such as high liquid limit soil) in order to reasonably estimate whether the subsequent settlement can meet the design requirements.
At present, a commonly adopted observation mode is to take a larger chassis, insert an observation pile on the chassis, and bury the chassis deeply inside a roadbed, so as to judge the settlement height by observing the observation pile. The observation mode requires strict protection of the observation pile in the backfilling process, but each layer of roadbed needs to be rolled for many times in the backfilling process, so that the observation pile is inevitably damaged; moreover, protecting the observation pile by one step can also cause the subgrade around the observation pile to be not rolled tightly, thereby causing quality hidden danger; meanwhile, due to the existence of the chassis, the observation pile buried in the soil body cannot be pulled out for recycling, and great waste is caused.
Disclosure of Invention
In view of the above problems, a settlement observation pile for roadbed backfill and an observation method used by the settlement observation pile are provided, which aim to effectively overcome various defects existing in the existing observation mode.
The specific technical scheme is as follows:
a first aspect of the invention provides a settlement observation pile for use in subgrade backfill, characterised by comprising:
the anchoring pile is internally provided with a plurality of sleeves, and anchoring nails are correspondingly arranged in the sleeves; and
and the driving rod is arranged on the anchoring pile and can rotate around the axis of the driving rod and drive the anchoring nail to penetrate out of or retreat into the anchoring pile.
The settlement observation pile for the roadbed backfill is further characterized in that the driving rod is further provided with an operating handle.
The settlement observation pile for the roadbed backfill is further characterized in that the anchoring nail is provided with a first spiral sheet, the driving rod is provided with a second spiral sheet, and the second spiral sheet can penetrate through the sleeve and is in transmission connection with the first spiral sheet.
The settlement observation pile for the roadbed backfilling is also characterized in that the bottom of the anchoring pile is conical.
A second aspect of the present invention is to provide an observation method using the above settlement observation pile for roadbed backfilling, having the characteristics that it comprises the steps of:
1) backfilling the roadbed to the top layer in a layered manner;
2) and lofting the observation pile point positions.
3) Driving the anchoring pile into a preset position, and rotating the driving rod to enable the anchoring nail to penetrate out of the anchoring pile and be anchored in the soil body;
4) carrying out construction backfill and rolling operation, and carrying out settlement observation operation by using the driving rod in the operation process;
5) and after the construction is finished, the driving rod is rotated reversely to enable the anchoring nail to retreat into the sleeve, and the observation pile is pulled out for recycling.
The beneficial effect of above-mentioned scheme is:
the driving rod drives the anchoring nail to extend out/retract so as to facilitate the anchoring/recovering operation of the anchoring pile.
Drawings
Fig. 1 is a schematic structural view of a settlement observation pile provided in an embodiment of the present invention;
fig. 2 is a schematic view of a partially exploded structure of a settlement observation pile provided in an embodiment of the present invention;
in the drawings: 1. anchoring piles; 2. anchoring nails; 3. a drive rod; 4. an operating handle; 5. a first helical flight; 6. a second spiral sheet.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that the embodiments and features of the embodiments may be combined with each other without conflict.
The invention is further described with reference to the following drawings and specific examples, which are not intended to be limiting.
As shown in fig. 1 and 2, the settlement observation pile provided in the embodiment of the present invention includes an anchor pile 1, a plurality of sleeves are installed in the anchor pile 1, and anchor nails 2 are correspondingly installed in the sleeves; and the driving rod 3 is arranged on the anchoring pile 1, and the driving rod 3 can rotate around the axis line of the driving rod 3 and drive the anchoring nail 2 to penetrate out of or retreat into the anchoring pile 1.
According to the invention, the anchoring nail 2 is provided with the first spiral sheet 5, the driving rod 3 is provided with the second spiral sheet 6, and the second spiral sheet 6 can penetrate through the sleeve (the sleeve is correspondingly provided with the through groove) and is attached to the first spiral sheet 5, so that the second spiral sheet 6 can continuously stir the first spiral sheet 5 when the driving rod 3 is rotated, so that the anchoring nail 2 rotates and penetrates out of the anchoring pile 1, and then the anchoring nail is drilled into and anchored in foundation soil; correspondingly, can reverse rotation second flight 6 after the operation is accomplished to the settlement observation to stir first flight 5 and make anchor nail 2 withdraw into the sleeve from the foundation soil, lose anchor nail 2 anchor effect anchor pile 1 this moment and extract from the foundation soil very conveniently.
The first spiral slice 5 on the anchoring nail 2 has both the transmission function and the anchoring function of anchoring the anchoring pile 1 in foundation soil.
In the invention, in order to rotate the driving rod 3, an operating handle 4 can be arranged on the driving rod 3.
It should be noted that in the present invention, the driving rod 3 can be rotatably connected to the anchoring pile 1 by means of a ball bearing, so that the driving rod 3 can be rotated in the forward/reverse direction to extend/retract the anchoring nail 2.
It should be noted that, in the present invention, the driving rod 3 can also be screwed onto the anchoring pile 1, so that when the driving rod 3 is rotated upwards, the driving rod 3 can gradually extend out of the anchoring pile 1 and drive the anchoring nail 2 to extend out of the anchoring cylinder 1; correspondingly, only need reverse rotation actuating lever 3 downwards after the operation is accomplished in the settlement observation to also can drive anchor nail 2 from top to bottom one by one when withdrawing actuating lever 3 into anchor pile 1, so that anchor nail 2 withdraws into in the sleeve 1. In the invention, the lower driving rod 3 is positioned in the anchoring cylinder 1 when initially positioned, so that the integral transition and reuse of the pile can be observed conveniently.
The observation method using the settlement observation pile comprises the following steps:
1) backfilling the roadbed to the top layer in a layered manner;
2) and lofting the observation pile point positions.
3) Driving the anchoring pile 1 into a preset position, and rotating the driving rod 3 to enable the anchoring nail 2 to penetrate out of the anchoring pile 1 and be anchored in the soil body;
4) carrying out construction backfill and rolling operation, and carrying out settlement observation operation by using the driving rod 3 in the operation process;
5) and after the construction is finished, the driving rod 3 is rotated reversely to enable the anchoring nail 2 to retreat into the sleeve, and the observation pile is pulled out for recycling.
Compared with the conventional observation method, the observation method disclosed by the invention has the advantage that all parts of the observation pile can be completely recycled.
While the invention has been described with reference to a preferred embodiment, it will be understood by those skilled in the art that various changes in form and detail may be made therein without departing from the spirit and scope of the invention.

Claims (7)

1. A subside observation pile for road bed backfill, comprising:
the anchoring pile comprises an anchoring pile (1), wherein a plurality of sleeves are installed in the anchoring pile (1), and anchoring nails (2) are correspondingly installed in the sleeves; and
the driving rod (3), the driving rod (3) install in on the anchor stake (1), the driving rod (3) can be rotatory and drive around self axial lead anchor nail (2) wear out/retreat in anchor stake (1).
2. The settlement observation pile for subgrade backfill according to claim 1, characterized in that an operating handle (4) is also mounted on the driving rod (3).
3. The settlement observation pile for road foundation backfill according to claim 1 or 2, characterized in that a first spiral sheet (5) is installed on the anchoring nail (2), a second spiral sheet (6) is installed on the driving rod (3), and the second spiral sheet (6) can pass through the sleeve and is in transmission connection with the first spiral sheet (5).
4. The settlement observation pile for subgrade backfill according to claim 3, characterized in that the bottom of the anchor pile (1) is conical.
5. The settlement observation pile for road foundation backfill according to claim 4, characterized in that the driving rod (3) is rotationally connected to the anchoring pile (1) through a ball bearing.
6. The settlement observation pile for road foundation backfill according to claim 4, characterized in that the driving rod (3) is screwed onto the anchoring pile (1).
7. An observation method using the settlement observation pile for roadbed backfilling according to any one of claims 1 to 6, characterized by comprising the steps of:
1) backfilling the roadbed to the top layer in a layered manner;
2) and lofting the observation pile point positions.
3) Driving the anchoring pile (1) into a preset position, and rotating the driving rod (3) to enable the anchoring nail (2) to penetrate out of the anchoring pile (1) and be anchored in the soil body;
4) carrying out construction backfill and rolling operation, and carrying out settlement observation operation by using the driving rod (3) in the operation process;
5) and after the construction is finished, the driving rod (3) is rotated reversely to enable the anchoring nail (2) to retreat into the sleeve, and the observation pile is pulled out for recycling.
CN202110481475.7A 2021-04-30 2021-04-30 Settlement observation pile for roadbed backfill and observation method using settlement observation pile Pending CN113188511A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110481475.7A CN113188511A (en) 2021-04-30 2021-04-30 Settlement observation pile for roadbed backfill and observation method using settlement observation pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110481475.7A CN113188511A (en) 2021-04-30 2021-04-30 Settlement observation pile for roadbed backfill and observation method using settlement observation pile

Publications (1)

Publication Number Publication Date
CN113188511A true CN113188511A (en) 2021-07-30

Family

ID=76983266

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110481475.7A Pending CN113188511A (en) 2021-04-30 2021-04-30 Settlement observation pile for roadbed backfill and observation method using settlement observation pile

Country Status (1)

Country Link
CN (1) CN113188511A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335932A (en) * 2020-03-06 2020-06-26 中南林业科技大学 Recoverable stock device of multiple spot anchor mechanical type
CN211547743U (en) * 2019-12-02 2020-09-22 广州粤嘉工程技术有限公司 Foundation pit supporting pile easy to disassemble
CN212153401U (en) * 2020-04-03 2020-12-15 中建筑港集团有限公司 Foundation pit support anchor rod

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN211547743U (en) * 2019-12-02 2020-09-22 广州粤嘉工程技术有限公司 Foundation pit supporting pile easy to disassemble
CN111335932A (en) * 2020-03-06 2020-06-26 中南林业科技大学 Recoverable stock device of multiple spot anchor mechanical type
CN212153401U (en) * 2020-04-03 2020-12-15 中建筑港集团有限公司 Foundation pit support anchor rod

Similar Documents

Publication Publication Date Title
US20190234036A1 (en) Screw pile substructure support system
JP5520347B2 (en) Pile digging method
JP5102187B2 (en) Pile construction method combined with ground improvement
WO1994002687A1 (en) Apparatus and method for forming piles
CN112761139A (en) Cast-in-place pile with diameter-expanding conical pile section, drill bit for pile forming and pile forming construction method
CN103321222B (en) Recoverable type anchor rod, pressure-bearing plate type anchor pile and anchoring method
CN113188511A (en) Settlement observation pile for roadbed backfill and observation method using settlement observation pile
CN107700508A (en) A kind of shaped steel stirs the construction method of water spray soil curtain support pile
JP2007247189A (en) Method of forming improved body, and screw shaft for use in the method
CN208023566U (en) A kind of screw thread rammed bulb pile
JP2001140251A (en) Composite pile and execution method therefor
CN112049104A (en) Extensible soft soil area pile foundation structure and construction method thereof
CN111519620A (en) Special device for pile head of stone-crushing pile machine and using method thereof
CN104863123B (en) Drilling bearing pile and forming method thereof
CN102966091A (en) Rotary embedded steel pipe pile and construction method thereof
CN218439233U (en) SCP spiral soil-displacement drilling tool
CN116066154B (en) Active regulation and control method for deformation of shield tunnel
CN111997040B (en) Long spiral drilling thin-wall pipe pile composite pile foundation construction device and construction method thereof
CN212506360U (en) High pile cap foundation based on pile screwing
CN102561341A (en) Dry-soil-removed reinforced concrete screw pile forming device and method
JP4481662B2 (en) Pile setting method and blade plate
CN111364490A (en) High pile cap foundation based on driven and rotated piles and construction method thereof
JPS6115210B2 (en)
CN113373916A (en) Pipe pile end bottom expanding grouting construction method
CN116856434A (en) Slope reinforcement device and reinforcement method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210730