CN113163419A - Resource scheduling system of high-speed coverage network of power system - Google Patents

Resource scheduling system of high-speed coverage network of power system Download PDF

Info

Publication number
CN113163419A
CN113163419A CN202110197768.2A CN202110197768A CN113163419A CN 113163419 A CN113163419 A CN 113163419A CN 202110197768 A CN202110197768 A CN 202110197768A CN 113163419 A CN113163419 A CN 113163419A
Authority
CN
China
Prior art keywords
carrier
module
radio frequency
scheduling
terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110197768.2A
Other languages
Chinese (zh)
Other versions
CN113163419B (en
Inventor
宁晓军
刘宏
张振香
王迪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pingyi Power Supply Co Of State Grid Shandong Electric Power Co
Original Assignee
Pingyi Power Supply Co Of State Grid Shandong Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pingyi Power Supply Co Of State Grid Shandong Electric Power Co filed Critical Pingyi Power Supply Co Of State Grid Shandong Electric Power Co
Priority to CN202110197768.2A priority Critical patent/CN113163419B/en
Publication of CN113163419A publication Critical patent/CN113163419A/en
Application granted granted Critical
Publication of CN113163419B publication Critical patent/CN113163419B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/02Arrangements for optimising operational condition
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • H04W72/044Wireless resource allocation based on the type of the allocated resource
    • H04W72/0453Resources in frequency domain, e.g. a carrier in FDMA
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/30Resource management for broadcast services
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/54Allocation or scheduling criteria for wireless resources based on quality criteria
    • H04W72/542Allocation or scheduling criteria for wireless resources based on quality criteria using measured or perceived quality

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Quality & Reliability (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention relates to a resource scheduling system of a high-speed coverage network of a power system, which comprises: the system comprises a configuration module, a broadcast module, a measurement module and a scheduling module, wherein the configuration module is responsible for configuring the number of baseband carriers, the number of radio frequency carriers and radio frequency carrier configuration information and outputting the carrier configuration information to the broadcast module, the measurement module and the scheduling module; the broadcasting module is responsible for broadcasting carrier configuration information related to the base station; the measurement module is responsible for acquiring the quality values of the terminal side and the base station side on each carrier, calculating the comprehensive quality value and outputting the comprehensive quality value to the scheduling module; the scheduling module realizes the optimal mapping from the baseband carrier to the radio frequency carrier based on the spectrum optimal principle, and ensures the effectiveness of transmission; according to the invention, the limitation of the baseband carrier capacity is broken, and the optimal radio frequency carrier resource is selected in the range of the maximum radio frequency capacity working bandwidth in real time to bear the baseband carrier data based on the radio cognitive technology, so that the transmission rate is increased, and the application requirement of high throughput of the power system fusion network is met.

Description

Resource scheduling system of high-speed coverage network of power system
Technical Field
The invention relates to the field of high-speed communication scheduling of an electric power system, in particular to a resource scheduling system of a high-speed coverage network of the electric power system.
Background
With the advancement of social informatization, the requirements of interconnection of everything and immediate sharing of information spread in various industries, taking an electric power system as an example, various application requirements such as various sensing data acquisition and feedback, high-definition video monitoring and feedback, visual scheduling management communication, video conference communication, remote operation assistance communication, office mutual sharing communication, data collection communication, robot interconnection communication and the like exist, and the related application requirements have a fusion concurrency characteristic, so that an overlay network is required to provide a higher-speed access capability to meet the application requirement of high bandwidth under fusion communication.
Obviously, how to effectively and fully utilize spectrum resources is the most critical ring for providing an overlay network with high-rate service capability, however, in the prior art, the management of spectrum resources is mainly completed by using a method of static allocation or semi-static allocation (dynamic selection is performed during power-on initialization, and then spectrum resources are kept unchanged until next power-on initialization is changed), so that the optimal spectrum resources cannot be selected for communication in real time according to the surrounding environment, and finally the rate of the overlay system is not changed. Therefore, it is a problem to be solved in the industry to provide a spectrum resource scheduling system that can adapt to the surrounding environment and select the optimal spectrum for communication in real time.
Disclosure of Invention
The technical problem to be solved by the invention is as follows: the invention overcomes the defects of the prior art and provides a resource scheduling system of a high-speed coverage network of a power system.
The technical scheme adopted by the invention for solving the problems in the prior art is as follows:
the invention provides a resource scheduling system of a high-speed coverage network of a power system, which comprises: the system comprises a configuration module, a broadcast module, a measurement module and a scheduling module, wherein the functions of the modules are as follows:
a configuration module: the module is responsible for configuring the number of baseband carriers, the number of radio frequency carriers and radio frequency carrier configuration information and outputting the carrier configuration information to the broadcasting module, the measuring module and the scheduling module;
a broadcasting module: the module is responsible for broadcasting carrier configuration information related to the base station;
a measurement module: the module is responsible for acquiring the quality values of the terminal side and the base station side on each carrier, calculating the comprehensive quality value and outputting the comprehensive quality value to the scheduling module;
a scheduling module: the module realizes the optimal mapping from the baseband carrier to the radio frequency carrier based on the spectrum optimal principle, and ensures the effectiveness of transmission;
the method for scheduling resources by the mutual cooperation of the configuration module, the broadcast module, the measurement module and the scheduling module comprises the following steps:
step 1: the configuration module configures the baseband carrier number P of the scheduling module, determines the radio frequency carrier number K and the radio frequency carrier configuration according to the radio frequency working bandwidth and the carrier bandwidth, sends carrier configuration information to the measurement module, and sends the carrier configuration information to a terminal residing in the base station through the broadcast module;
step 2: the measuring module generates the quality coefficient Q of each terminal on each radio frequency carrier wave on each TTI according to the measuring resultt,m,nThe TTI is a transmission interval;
and step 3: the scheduling module determines a terminal set A scheduled by the current TTI according to a scheduling algorithm;
and 4, step 4: the scheduling module is according to Qt,m,nAnd scheduling the terminal set A to P radio frequency carrier resources for data transmission.
Preferably, in step 1, the method for determining the number K of radio frequency carriers and the configuration of the radio frequency carriers includes:
step 1.1, reading information from a database, and determining the group number G of carriers and the frequency offset value FreqOffset _ G of each group of carriers in a radio frequency working bandwidth, wherein G takes the values of 1,.
Step 1.2, selecting a carrier group j which is not configured, and completing the radio frequency carrier number K and the radio frequency carrier configuration: in the radio frequency working bandwidth, taking FreqOffset _ j as a starting point, taking the carrier bandwidth as a stepping, intercepting the maximum number of radio frequency carriers not exceeding the maximum frequency of the radio frequency working bandwidth as the carrier number K of the carrier group, and determining the configuration information of each radio frequency carrier in the carrier group, wherein the configuration information at least comprises an initial frequency point and bandwidth information;
and 1.3, judging whether all carrier wave groups are configured or not, if so, ending, and otherwise, skipping to the step 1.2.
Preferably, in the step 2, Q ist,m,nThe method is obtained by weighting the downlink quality value of a plurality of TTIs before the time t of the radio frequency carrier n measured by the terminal m and the uplink quality value of a plurality of TTIs before the time t of the radio frequency carrier n measured by the base station by the measuring module.
Preferably, in step 3, the scheduling algorithm includes any one or a combination of Qos service level scheduling, RR polling scheduling, and PF proportional-average scheduling algorithm.
Preferably, in step 3, the scheduled terminal set a is a sum of terminals scheduled in total in the current TTI in all carriers managed by the scheduling module.
Preferably, in step 4, the scheduling of the terminal set a to P radio frequency carrier resources for data transmission includes:
step 4.1, selecting one carrier set s which is not subjected to transmission efficiency evaluation;
4.2, sequencing the terminal according to the quality coefficients from high to low corresponding to each carrier in the carrier group to obtain a terminal quality coefficient list of each carrier;
4.3, sequentially selecting the carrier with the highest quality coefficient for each terminal in the terminal set A;
step 4.4, adding the quality coefficients in the terminal quality coefficient list of each carrier in the carrier group to obtain the sum of the quality coefficients C _ SumQuality, and selecting the P carriers with the highest C _ SumQuality;
step 4.5, distributing each terminal in the terminal set A to the P carriers determined in the step 4.4 according to the Quality optimal matching principle, when the number of terminals distributed by a certain carrier exceeds the preset number, not distributing the carrier, and adding the Quality coefficients of the terminal A under the P carriers to obtain the comprehensive Quality value Quality _ g of the carrier group;
step 4.6, judging whether all carrier groups finish transmission efficiency evaluation, if so, skipping to step 4.7, and if not, skipping to step 4.1;
and 4.7, selecting the carrier group with the largest value in the Quality _ g, and finishing the carrier scheduling operation of the terminal according to the P carriers distributed by the terminal set A corresponding to the Quality _ g of the carrier group and the terminal distributed on each carrier as a scheduling result.
Compared with the prior art, the invention has the following beneficial effects:
according to the invention, the limitation of baseband carrier capacity is broken through, and based on a radio cognitive technology, the optimal radio frequency carrier resource is selected in real time within the working bandwidth range of the maximum radio frequency capacity to carry baseband carrier data, so that the transmission rate is improved, the application requirement of high throughput of a power system fusion network is met, and the aim of multi-dimensional fusion communication of the power system is fulfilled.
Drawings
The invention is further illustrated with reference to the following figures and examples.
Figure 1 is a flow chart of the method of the present invention,
FIG. 2 is a schematic diagram of the system of the present invention.
Detailed Description
In order to make the technical solution and the advantages of the present invention clearer, the following explains embodiments of the present invention in further detail.
As shown in fig. 1 and fig. 2, the present invention provides a resource scheduling system for a high-rate coverage network of an electric power system, including: the system comprises a configuration module, a broadcast module, a measurement module and a scheduling module, wherein the functions of the modules are as follows:
a configuration module: the module is responsible for configuring the number of baseband carriers, the number of radio frequency carriers and radio frequency carrier configuration information and outputting the carrier configuration information to the broadcasting module, the measuring module and the scheduling module;
a broadcasting module: the module is responsible for broadcasting carrier configuration information related to the base station;
a measurement module: the module is responsible for acquiring the quality values of the terminal side and the base station side on each carrier, calculating the comprehensive quality value and outputting the comprehensive quality value to the scheduling module;
a scheduling module: the module realizes the optimal mapping from the baseband carrier to the radio frequency carrier based on the spectrum optimal principle, and ensures the effectiveness of transmission;
the method for scheduling resources by the mutual cooperation of the configuration module, the broadcast module, the measurement module and the scheduling module comprises the following steps:
step 1: the configuration module configures the baseband carrier number P of the scheduling module, determines the radio frequency carrier number K and the radio frequency carrier configuration according to the radio frequency working bandwidth and the carrier bandwidth, sends carrier configuration information to the measurement module, and sends the carrier configuration information to a terminal residing in the base station through the broadcast module;
step 2: the measuring module generates the quality coefficient Q of each terminal on each radio frequency carrier wave on each TTI according to the measuring resultt,m,nThe TTI is a transmission interval;
and step 3: the scheduling module determines a terminal set A scheduled by the current TTI according to a scheduling algorithm;
and 4, step 4: the scheduling module is according to Qt,m,nAnd scheduling the terminal set A to P radio frequency carrier resources for data transmission.
The invention also provides a resource scheduling method of the high-speed coverage network of the power system, and the steps of the method are consistent with the steps 1 to 4.
The number of baseband carriers in step 1 describes the processing capacity of the baseband.
Preferably, in step 1, the method for determining the number K of radio frequency carriers and the configuration of the radio frequency carriers includes:
step 1.1, reading information from a database, and determining the group number G of carriers and the frequency offset value FreqOffset _ G of each group of carriers in a radio frequency working bandwidth, wherein G takes the values of 1,.
Step 1.2, selecting a carrier group j which is not configured, and completing the radio frequency carrier number K and the radio frequency carrier configuration: in the radio frequency working bandwidth, taking FreqOffset _ j as a starting point, taking the carrier bandwidth as a stepping, intercepting the maximum number of radio frequency carriers not exceeding the maximum frequency of the radio frequency working bandwidth as the carrier number K of the carrier group, and determining the configuration information of each radio frequency carrier in the carrier group, wherein the configuration information at least comprises an initial frequency point and bandwidth information; for example, the rf operating bandwidth is 500Mhz, the frequency offset of the current carrier group is 50Mhz, and the carrier bandwidth is 100Mhz, then 50Mhz-150Mhz is the first rf carrier of the carrier group, 150Mhz-250Mhz is the second rf carrier of the carrier group, 250Mhz-350Mhz is the third rf carrier of the carrier group, and 350Mhz-450Mhz is the fourth rf carrier of the carrier group, since the bandwidth of 450Mhz plus 100Mhz already exceeds the maximum frequency of the rf operating bandwidth, which is 500Mhz, the carrier group can only be divided into four rf carriers.
And 1.3, judging whether all carrier wave groups are configured or not, if so, ending, and otherwise, skipping to the step 1.2.
The carrier group describes the total number of carriers supported by a fixed frequency offset in the working frequency band of the radio frequency end.
In the step 2, the Qt,m,nThe method is obtained by weighting the downlink quality value of a plurality of TTIs before the time t of the radio frequency carrier n measured by the terminal m and the uplink quality value of a plurality of TTIs before the time t of the radio frequency carrier n measured by the base station by the measuring module.
The signal quality is determined by comprehensively determining RSRP, SINR, RSSI, RSRQ, and the like, where RSRP is reference signal received power, SINR is signal-to-interference-plus-noise ratio, RSSI is signal received strength indication, and RSRQ is reference signal received quality.
The downlink quality value is Q1, the uplink quality value is Q2, and the Q ist,m,nEqual to Q1P 1+ Q2P 2, P1 and P2 are weighted proportions.
In step 3, the scheduling algorithm includes any one or a combination of Qos service level scheduling, RR polling scheduling, and PF proportional average scheduling algorithm.
The Qos service level scheduling enables different data streams to obtain different levels of service by controlling the use of different types of packets on a link broadband. The basic idea of RR polling scheduling is to consider that the scheduling priorities of all terminals are equal, and all terminals are scheduled periodically, so as to ensure that the scheduling probability of each terminal user is the same. The idea of the PF proportional-average scheduling algorithm is to satisfy the high-speed data service requirement of a terminal with good channel quality as much as possible, and also consider the use experience of a terminal with poor channel quality. The basic idea of the algorithm is that the ratio of the instantaneous rate to the long-term average rate is considered when selecting the terminal, and meanwhile, different terminals are adjusted by utilizing the weight value, so that the purpose of simultaneously considering the system performance and the user experience is achieved.
In step 3, the scheduled terminal set a is a total number of terminals scheduled in the current TTI under all carriers managed by the scheduling module.
In step 4, the method of scheduling the terminal set a to P radio frequency carrier resources for data transmission includes:
step 4.1, selecting one carrier set s which is not subjected to transmission efficiency evaluation;
4.2, sequencing the terminal according to the quality coefficients from high to low corresponding to each carrier in the carrier group to obtain a terminal quality coefficient list of each carrier;
4.3, sequentially selecting the carrier with the highest quality coefficient for each terminal in the terminal set A;
step 4.4, adding the quality coefficients in the terminal quality coefficient list of each carrier in the carrier group to obtain the sum of the quality coefficients C _ SumQuality, and selecting the P carriers with the highest C _ SumQuality;
step 4.5, distributing each terminal in the terminal set A to the P carriers determined in the step 4.4 according to the Quality optimal matching principle, when the number of terminals distributed by a certain carrier exceeds the preset number, not distributing the carrier, and adding the Quality coefficients of the terminal A under the P carriers to obtain the comprehensive Quality value Quality _ g of the carrier group;
step 4.6, judging whether all carrier groups finish transmission efficiency evaluation, if so, skipping to step 4.7, and if not, skipping to step 4.1;
and 4.7, selecting the carrier group with the largest value in the Quality _ g, and finishing the carrier scheduling operation of the terminal according to the P carriers distributed by the terminal set A corresponding to the Quality _ g of the carrier group and the terminal distributed on each carrier as a scheduling result.
The following describes a specific embodiment of a resource scheduling system of a high-rate coverage network of an electric power system with specific embodiments:
example (b): in this embodiment, the value of the baseband carrier number P is 2, the radio frequency operating bandwidth is 2000Mhz-2500Mhz, the carrier bandwidth is 100Mhz, the number G of carrier group is equal to 2, wherein the frequency offset value FreqOffset _1 of the 1 st group of carriers in the radio frequency operating bandwidth is equal to 0 Mhz; the frequency offset value FreqOffset _2 of the 2 nd group carrier within the radio frequency operating bandwidth is equal to 50Mhz, so from step 1.1 to step 1.3, it can be obtained:
for the carrier group 1, five carriers are included, that is, the first carrier (corresponding to G1_ C1 in table 1) in the carrier group 1 has an initial frequency point of 2000Mhz and a bandwidth of 100Mhz, the second carrier has an initial frequency point of 2100Mhz and a bandwidth of 100Mhz (corresponding to G1_ C2 in table 1), the third carrier has an initial frequency point of 2200Mhz and a bandwidth of 100Mhz (corresponding to G1_ C3 in table 1), the fourth carrier has an initial frequency point of 2300Mhz and a bandwidth of 100Mhz (corresponding to G1_ C4 in table 1), and the fifth carrier has an initial frequency point of 2400Mhz and a bandwidth of 100Mhz (corresponding to G1_ C5 in table 1);
for the carrier group 2, since FreqOffset _2 is equal to 50Mhz, carriers are taken from 2050Mhz, and since the carrier bandwidth is 100Mhz, the maximum number of carriers taken is four (because the fifth carrier already exceeds the maximum frequency 2500 Mhz), that is, the carrier group 2 includes four carriers, that is, the first carrier in the carrier group 2 (corresponding to G2_ C1 in table 1) has an initial frequency point of 2050Mhz and a bandwidth of 100Mhz, the second carrier has an initial frequency point of 2150Mhz and a bandwidth of 100Mhz (corresponding to G2_ C2 in table 1), the third carrier has an initial frequency point of 2250Mhz and a bandwidth of 100Mhz (corresponding to G2_ C3 in table 1), and the fourth carrier has an initial frequency point of 2350Mhz and a bandwidth of 100Mhz (corresponding to G2_ C4 in table 1).
If the current TTI exists, the measurement module obtains the quality value of each terminal under each carrier according to the uplink and downlink measurement results, such as Q in Table 1t,m,nAs shown in the column, in this embodiment, the scheduling algorithm uses Qos, three terminals are scheduled per carrier in each TTI, that is, the total number of terminals scheduled in the current TTI of two carriers is six, and it is assumed that six terminals (corresponding to the terminal set a) scheduled in the current TTI are: terminal 1, terminal 2, terminal 3, terminal 4, terminal 5, terminal 6;
then, the scheduling of the terminal is completed according to the steps 4.1 to 4.7:
taking carrier group 1 as an example, first, in each carrier in the carrier group, the terminals are sorted according to the quality coefficients from high to low to obtain a terminal quality coefficient list of each carrier, and Q in table 1 is obtainedt,m,nThe results of the columns; then, selecting the carrier with the highest quality coefficient for each terminal in the terminal set A in sequence to obtain a result of selecting the carrier with the highest quality coefficient for each terminal in the terminal set A in the list 1; then, P carriers with the highest sum of quality coefficients in the carriers and C _ SumQuality are selected from the carrier group, and the C _ SumQuality column in table 1 is a recovery background frame part, namely, two carriers G1_ C1 and G1_ C3; then, each terminal in terminal set a is allocated to P carriers according to the quality optimal matching principle, wherein, when the carrier allocation of terminal 4 is performed after the carrier allocation of terminal 1, terminal 2, and terminal 3 is completed, although the quality of terminal 4 on carrier G1_ C1 is better than that of carrier G1_ C3, at most 3 terminals can be scheduled by one carrier, therefore, terminal 4 can only be allocated to carrier G1_ C3, and so on, the carrier allocation of terminal 5 and terminal 6 is completed, and the allocation result is detailed in "each terminal in terminal set a is according to the quality optimal matching principle" in table 1,allocating to P carriers to remove columns; next, calculating the sum of the Quality values of the carriers where the terminals are located to obtain a comprehensive Quality value Quality _1 of the carrier group 1, wherein the value is 127;
the operation process of the carrier 2 is the same as that of the carrier 1, the relevant data in the operation process is shown in table 1, and finally the comprehensive Quality value Quality _2 of the carrier group 2 is obtained, and the value is 148;
finally, the sizes of Quality _2 and Quality _1 are compared, and since Quality _2 is greater than Quality _1, two carriers (i.e., G2_ C1 and G2_ C2) allocated to terminal set a in carrier group 2 are used as scheduling results, i.e., terminal 1, terminal 2 and terminal 3 are scheduled to carrier G2_ C1 in the current TTI, and terminal 4, terminal 5 and terminal 6 are scheduled to carrier G2_ C2. It can be seen from this embodiment that, by using the method of the present invention, the optimal spectrum can be selected in real time for data transmission, thereby effectively increasing the transmission rate. Compared with the prior art, if after power-on initialization and according to initial frequency point self-optimization, the base station selects G2_ C3 and G2_ C4 as working carriers, and as time goes on, the surrounding interference environment changes, taking TTI shown in table 1 as an example, then in G2_ C3 and G2_ C4, according to the optimal adaptation principle, terminal 1, terminal 2 and terminal 3 are allocated to carrier G2_ C4, and terminal 4, terminal 5 and terminal 6 are allocated to carrier G2_ C3, then Quality _2 is: 12+12+10+2+2 equals 40, and the quality value obtained by the invention is 148, compared with the prior art, the rate of the invention is improved by times, obviously, the method of the invention has obvious advantages compared with the prior art, and the method can effectively meet the requirements of high bandwidth and high throughput of converged communication.
It can be seen from the above embodiments that, by using the method of the present invention, the limitation of baseband carrier capability is broken, and based on the radio cognitive technology, the optimal radio frequency carrier resource is selected in real time within the range of the radio frequency maximum capability working bandwidth to carry baseband carrier data, thereby increasing the transmission rate, satisfying the application requirement of high throughput of the power system converged network, and achieving the goal of multidimensional converged communication of the power system.
Table 1 example process data schematic
Figure BDA0002946401230000081
Figure BDA0002946401230000091
Figure BDA0002946401230000101
Figure BDA0002946401230000111
The embodiments of the present invention have been described in detail with reference to the drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge of those skilled in the art without departing from the gist of the present invention.

Claims (6)

1. A resource scheduling system for a high-rate coverage network of an electrical power system, comprising: the system comprises a configuration module, a broadcast module, a measurement module and a scheduling module, wherein the functions of the modules are as follows:
a configuration module: the module is responsible for configuring the number of baseband carriers, the number of radio frequency carriers and radio frequency carrier configuration information and outputting the carrier configuration information to the broadcasting module, the measuring module and the scheduling module;
a broadcasting module: the module is responsible for broadcasting carrier configuration information related to the base station;
a measurement module: the module is responsible for acquiring the quality values of the terminal side and the base station side on each carrier, calculating the comprehensive quality value and outputting the comprehensive quality value to the scheduling module;
a scheduling module: the module realizes the optimal mapping from the baseband carrier to the radio frequency carrier based on the spectrum optimal principle, and ensures the effectiveness of transmission;
the method for scheduling resources by the mutual cooperation of the configuration module, the broadcast module, the measurement module and the scheduling module comprises the following steps:
step 1: the configuration module configures the baseband carrier number P of the scheduling module, determines the radio frequency carrier number K and the radio frequency carrier configuration according to the radio frequency working bandwidth and the carrier bandwidth, sends carrier configuration information to the measurement module, and sends the carrier configuration information to a terminal residing in the base station through the broadcast module;
step 2: the measuring module generates the quality coefficient Q of each terminal on each radio frequency carrier wave on each TTI according to the measuring resultt,m,nThe TTI is a transmission interval;
and step 3: the scheduling module determines a terminal set A scheduled by the current TTI according to a scheduling algorithm;
and 4, step 4: the scheduling module is according to Qt,m,nAnd scheduling the terminal set A to P radio frequency carrier resources for data transmission.
2. The system according to claim 1, wherein the system comprises:
in step 1, the method for determining the number K of radio frequency carriers and the configuration of the radio frequency carriers includes:
step 1.1, reading information from a database, and determining the group number G of carriers and the frequency offset value FreqOffset _ G of each group of carriers in a radio frequency working bandwidth, wherein G takes the values of 1,.
Step 1.2, selecting a carrier group j which is not configured, and completing the radio frequency carrier number K and the radio frequency carrier configuration: in the radio frequency working bandwidth, taking FreqOffset _ j as a starting point, taking the carrier bandwidth as a stepping, intercepting the maximum number of radio frequency carriers not exceeding the maximum frequency of the radio frequency working bandwidth as the carrier number K of the carrier group, and determining the configuration information of each radio frequency carrier in the carrier group, wherein the configuration information at least comprises an initial frequency point and bandwidth information;
and 1.3, judging whether all carrier wave groups are configured or not, if so, ending, and otherwise, skipping to the step 1.2.
3. The system according to claim 1, wherein the system comprises:
in the step 2, the Qt,m,nThe method is obtained by weighting the downlink quality value of a plurality of TTIs before the time t of the radio frequency carrier n measured by the terminal m and the uplink quality value of a plurality of TTIs before the time t of the radio frequency carrier n measured by the base station by the measuring module.
4. The system according to claim 1, wherein the system comprises:
in step 3, the scheduling algorithm includes any one or a combination of Qos service level scheduling, RR polling scheduling, and PF proportional average scheduling algorithm.
5. The system according to claim 4, wherein the system comprises:
in step 3, the scheduled terminal set a is a total number of terminals scheduled in the current TTI under all carriers managed by the scheduling module.
6. The system according to claim 1, wherein the system comprises:
in step 4, the method of scheduling the terminal set a to P radio frequency carrier resources for data transmission includes:
step 4.1, selecting one carrier set s which is not subjected to transmission efficiency evaluation;
4.2, sequencing the terminal according to the quality coefficients from high to low corresponding to each carrier in the carrier group to obtain a terminal quality coefficient list of each carrier;
4.3, sequentially selecting the carrier with the highest quality coefficient for each terminal in the terminal set A;
step 4.4, adding the quality coefficients in the terminal quality coefficient list of each carrier in the carrier group to obtain the sum of the quality coefficients C _ SumQuality, and selecting the P carriers with the highest C _ SumQuality;
step 4.5, distributing each terminal in the terminal set A to the P carriers determined in the step 4.4 according to the Quality optimal matching principle, when the number of terminals distributed by a certain carrier exceeds the preset number, not distributing the carrier, and adding the Quality coefficients of the terminal A under the P carriers to obtain the comprehensive Quality value Quality _ g of the carrier group;
step 4.6, judging whether all carrier groups finish transmission efficiency evaluation, if so, skipping to step 4.7, and if not, skipping to step 4.1;
and 4.7, selecting the carrier group with the largest value in the Quality _ g, and finishing the carrier scheduling operation of the terminal according to the P carriers distributed by the terminal set A corresponding to the Quality _ g of the carrier group and the terminal distributed on each carrier as a scheduling result.
CN202110197768.2A 2021-02-22 2021-02-22 Resource scheduling system of high-speed coverage network of power system Active CN113163419B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110197768.2A CN113163419B (en) 2021-02-22 2021-02-22 Resource scheduling system of high-speed coverage network of power system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110197768.2A CN113163419B (en) 2021-02-22 2021-02-22 Resource scheduling system of high-speed coverage network of power system

Publications (2)

Publication Number Publication Date
CN113163419A true CN113163419A (en) 2021-07-23
CN113163419B CN113163419B (en) 2022-07-22

Family

ID=76883386

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110197768.2A Active CN113163419B (en) 2021-02-22 2021-02-22 Resource scheduling system of high-speed coverage network of power system

Country Status (1)

Country Link
CN (1) CN113163419B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114173345A (en) * 2021-12-06 2022-03-11 国网山东省电力公司平邑县供电公司 Scheduling device for improving safety communication efficiency of electric power system
CN115209551A (en) * 2022-09-14 2022-10-18 国网信息通信产业集团有限公司 Method for standard adaptation of public network cellular technology to 230MHz power private network

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1414255A1 (en) * 2002-10-24 2004-04-28 Siemens Aktiengesellschaft Method for managing radio resources
WO2007058270A1 (en) * 2005-11-17 2007-05-24 Matsushita Electric Industrial Co., Ltd. Carrier allocation method in multi cell orthogonal frequency division multiple access system
US20080253336A1 (en) * 2007-04-13 2008-10-16 Stefan Parkvall Multi-Carrier CQI Feedback Method and Apparatus
US20090110087A1 (en) * 2007-10-30 2009-04-30 Yin Liu Channel-Dependent Frequency-Domain Scheduling in an Orthogonal Frequency Division Multiplexing Communications System
WO2010102456A1 (en) * 2009-03-13 2010-09-16 华为技术有限公司 Method of resource distribution, method of data transmission, base station and terminal
WO2010106951A1 (en) * 2009-03-16 2010-09-23 株式会社エヌ・ティ・ティ・ドコモ Base station apparatus and information transmission method
US20110267996A1 (en) * 2009-01-04 2011-11-03 Zte Corporation System information transmission method
JP2012257331A (en) * 2012-09-20 2012-12-27 Kyocera Corp Radio base station and radio communication method
CN103874073A (en) * 2014-03-19 2014-06-18 中国联合网络通信集团有限公司 Communication system carrier selection method, base stations and terminal devices
WO2014125928A1 (en) * 2013-02-13 2014-08-21 株式会社Nttドコモ Radio base station, user terminal, and radio communication method
US20160057732A1 (en) * 2014-08-19 2016-02-25 Telefonaktiebolaget L M Ericsson (Publ) Dynamic Resource Allocation By Base Station Providing Both Broadcast and Unicast Services
WO2016184166A1 (en) * 2015-10-16 2016-11-24 中兴通讯股份有限公司 Method and apparatus for allocating carrier aggregation bandwidth
US20180103479A1 (en) * 2015-07-21 2018-04-12 South University Of Science And Technology Of China Resource allocation optimization method for simultaneous information and energy transfer system

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1414255A1 (en) * 2002-10-24 2004-04-28 Siemens Aktiengesellschaft Method for managing radio resources
WO2007058270A1 (en) * 2005-11-17 2007-05-24 Matsushita Electric Industrial Co., Ltd. Carrier allocation method in multi cell orthogonal frequency division multiple access system
US20080253336A1 (en) * 2007-04-13 2008-10-16 Stefan Parkvall Multi-Carrier CQI Feedback Method and Apparatus
US20090110087A1 (en) * 2007-10-30 2009-04-30 Yin Liu Channel-Dependent Frequency-Domain Scheduling in an Orthogonal Frequency Division Multiplexing Communications System
US20110267996A1 (en) * 2009-01-04 2011-11-03 Zte Corporation System information transmission method
WO2010102456A1 (en) * 2009-03-13 2010-09-16 华为技术有限公司 Method of resource distribution, method of data transmission, base station and terminal
WO2010106951A1 (en) * 2009-03-16 2010-09-23 株式会社エヌ・ティ・ティ・ドコモ Base station apparatus and information transmission method
JP2012257331A (en) * 2012-09-20 2012-12-27 Kyocera Corp Radio base station and radio communication method
WO2014125928A1 (en) * 2013-02-13 2014-08-21 株式会社Nttドコモ Radio base station, user terminal, and radio communication method
CN103874073A (en) * 2014-03-19 2014-06-18 中国联合网络通信集团有限公司 Communication system carrier selection method, base stations and terminal devices
US20160057732A1 (en) * 2014-08-19 2016-02-25 Telefonaktiebolaget L M Ericsson (Publ) Dynamic Resource Allocation By Base Station Providing Both Broadcast and Unicast Services
US20180103479A1 (en) * 2015-07-21 2018-04-12 South University Of Science And Technology Of China Resource allocation optimization method for simultaneous information and energy transfer system
WO2016184166A1 (en) * 2015-10-16 2016-11-24 中兴通讯股份有限公司 Method and apparatus for allocating carrier aggregation bandwidth

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114173345A (en) * 2021-12-06 2022-03-11 国网山东省电力公司平邑县供电公司 Scheduling device for improving safety communication efficiency of electric power system
CN114173345B (en) * 2021-12-06 2023-06-30 国网山东省电力公司平邑县供电公司 Scheduling device for improving safety communication efficiency of power system
CN115209551A (en) * 2022-09-14 2022-10-18 国网信息通信产业集团有限公司 Method for standard adaptation of public network cellular technology to 230MHz power private network
CN115209551B (en) * 2022-09-14 2022-12-13 国网信息通信产业集团有限公司 Method for standard adaptation of public network cellular technology to 230MHz power private network

Also Published As

Publication number Publication date
CN113163419B (en) 2022-07-22

Similar Documents

Publication Publication Date Title
US9185687B2 (en) Transmission and reception bandwidth setting method, mobile terminal and base station in radio communication system that defines a plurality of signal bandwidths
US7573851B2 (en) Method and system for switching antenna and channel assignments in broadband wireless networks
RU2382501C2 (en) Method, transmission/reception device and system for configuring and controlling channels in wireless communication system using amc channels and diversity channels
CN111769918B (en) DMRS port indication method and device
CN101242623B (en) Wireless resource managing method, wireless network controller and base station
CN113163419B (en) Resource scheduling system of high-speed coverage network of power system
US8774022B2 (en) Wireless communication system, base station, resource block allocation method, and program
CN105340333B (en) A kind of method and device of power and channel the joint configuration of WLAN
EP2815619B1 (en) Downlink multicarrier mobile communication network configuration
EP2091165B1 (en) Method for reducing interference between adjacent sectors, and base station apparatus
US10972963B2 (en) Determination and transmission of BSS load metrics for MU WLAN systems
EP2469949A1 (en) Dynamic multiple input and multiple output cell cluster
US8611286B2 (en) Methods for channel-dependent time-and-frequency-domain scheduling and related communication nodes
CN103634799A (en) Cognitive radio system-based spectrum allocation method and equipment
US20120170526A1 (en) Carrier aggregation method and device for LTE system
CN107079472A (en) Method and apparatus for determining access node cluster
EP3220701B1 (en) Multi-transceiver configuration method, multi-transceiver channel reuse method and apparatuses
US8483167B2 (en) Apparatus and method of dynamic downlink permutation assignment for use in a wireless communication system
Hwang et al. On the effects of resource usage ratio on data rate in LTE systems
CN112689308B (en) Multi-user wireless data transmission method, system, device and storage medium
WO2009135745A1 (en) Method for allocating frequency subchannels on an air interface of a wireless communication system and corresponding radio resource allocation module
CN108271209B (en) A kind of resource selection method, terminal and base station
Wei et al. Dynamic system level frequency spectrum allocation scheme based on cognitive radio technology
WO2014047873A1 (en) SIGNALLING METHOD AND APPARATUSES SUPPORTING QoE-AWARE RADIO RESOURCE ALLOCATION
CN106060945B (en) A kind of LTE resource scheduling algorithm based on RB feedback

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant