CN113107211A - Temporary reinforcing method for replacing equipment anchorage device in tensioning and lifting construction - Google Patents

Temporary reinforcing method for replacing equipment anchorage device in tensioning and lifting construction Download PDF

Info

Publication number
CN113107211A
CN113107211A CN202110352419.3A CN202110352419A CN113107211A CN 113107211 A CN113107211 A CN 113107211A CN 202110352419 A CN202110352419 A CN 202110352419A CN 113107211 A CN113107211 A CN 113107211A
Authority
CN
China
Prior art keywords
lifting
tensioning
anchorage device
steel strand
temporary reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110352419.3A
Other languages
Chinese (zh)
Inventor
蒋国明
金平
郭建鹏
唐飞虎
邱顶宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Shanghai Steel Structure Technology Co Ltd
Original Assignee
MCC Shanghai Steel Structure Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Shanghai Steel Structure Technology Co Ltd filed Critical MCC Shanghai Steel Structure Technology Co Ltd
Priority to CN202110352419.3A priority Critical patent/CN113107211A/en
Publication of CN113107211A publication Critical patent/CN113107211A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • E04G21/121Construction of stressing jacks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention particularly relates to a temporary reinforcing method for replacing an anchorage device in tensioning and lifting construction, which comprises a temporary reinforcing component and is characterized in that: when the cable structure (1) is in a tensioning and lifting construction process, the lifting equipment anchorage device fails and needs to be replaced or the lifting steel strand is outgoing and broken, the following steps are implemented: step 1, determining the model of a temporary reinforcing component according to the sizes of an anchorage device and a steel strand; step 2, arranging temporary reinforcing components on the periphery of the cable structure (1); and 3, after the step 2 is implemented, the four dowel bars (5) unload the load of the lifting mechanism step by step in a synchronous step loading mode. The load conversion device for replacing the anchorage device (or the steel strand) of the hydraulic tensioning and lifting equipment when the distance between the inclined cable head and the anchoring joint is close converts the load on the tensioning and lifting mechanism with problems to the temporary reinforcing device safely and reliably, and ensures the safe and smooth completion of equipment replacement and load conversion.

Description

Temporary reinforcing method for replacing equipment anchorage device in tensioning and lifting construction
Technical Field
The invention relates to the technical field of tensioning and lifting construction of cable structure engineering, in particular to a temporary reinforcing method for replacing an anchorage device in tensioning and lifting construction.
Background
Usually, in the cable net stretch-draw lifting work progress, if lifting means ground tackle when breaking down unable maintenance, this problem of unable fine solution of prior art can only move back the anchor with the cable body and put on the bed-jig, changes ground tackle and stretch-draw again, not only influences the efficiency of construction but also influences overall structure safety.
Disclosure of Invention
The invention aims to overcome the defects and provides a reinforcing method which is simple in structure, large in bearing capacity and good in stability and can effectively solve the problem that the anchor of the lifting equipment is difficult to replace.
In order to achieve the above object, the present invention is realized by:
a temporary reinforcing method for replacing an anchorage device in tensioning and lifting construction comprises a tooling lug plate (2), a first steel plate (3), a dowel bar (5), a lengthened sleeve connecting piece (7), a second steel plate (9) and a spigot nut (10); when the cable structure (1) is in a tensioning and lifting construction process, the lifting equipment anchorage device fails and needs to be replaced or the lifting steel strand is outgoing and broken, the following steps are implemented:
step 1, determining the specifications and sizes of an ear installing plate (2), a first steel plate (3), a dowel bar (5), a lengthened sleeve connecting piece (7), a second steel plate (9) and a spigot nut (10) and the model of a hydraulic jack (8) according to the sizes of an anchorage device and a steel strand;
step 2, placing two first thick steel plates (3) in the middle of an inclined cable tensioning tool lug plate (2) at the periphery of a cable structure (1), additionally arranging two first thick steel plates (3) on the ground anchor side of a reaction frame (4) and additionally arranging four force transfer rods (5), and when the length of a standard transmission vertical rod is insufficient, adopting a lengthened sleeve connecting piece (7) for butt joint and lengthening; a second steel plate (9) is additionally arranged at two ends of the dowel bar (5), and the outer side of the second steel plate (9) is fixed by a spigot nut (10) of a hydraulic jack (8);
and 3, after the step 2 is finished, the load of the lifting mechanism is unloaded step by the four dowel bars (5) in a synchronous step loading mode, and when the load of the lifting mechanism is not large, the steel strand (11) is cut off, and the anchorage device of the tensioning lifting mechanism or the steel strand for lifting is replaced.
The load conversion device for replacing the anchorage device (or the steel strand) of the hydraulic tensioning and lifting equipment when the distance between the inclined cable head and the anchoring joint is close converts the load on the tensioning and lifting mechanism with problems to the temporary reinforcing device safely and reliably, and ensures the safe and smooth completion of equipment replacement and load conversion.
Drawings
Fig. 1 is a top view of a load conversion device used for replacing an anchorage device or a steel strand of hydraulic tensioning and lifting equipment.
Fig. 2 is a sectional view of the load conversion device used for replacing an anchorage device or a steel strand of hydraulic tensioning lifting equipment.
Fig. 3 is a node diagram of a load conversion device when the anchor or the steel strand is replaced by hydraulic tensioning lifting equipment.
Detailed Description
The invention is further illustrated by the following specific examples.
A temporary reinforcing method for replacing an anchorage device in tensioning and lifting construction comprises a tooling lug plate (2), a first steel plate (3), a dowel bar (5), a lengthened sleeve connecting piece (7), a second steel plate (9) and a spigot nut (10); when the cable structure (1) is in a tensioning and lifting construction process, the lifting equipment anchorage device fails and needs to be replaced or the lifting steel strand is outgoing and broken, the following steps are implemented:
step 1, determining the specifications and sizes of an ear installing plate (2), a first steel plate (3), a dowel bar (5), a lengthened sleeve connecting piece (7), a second steel plate (9) and a spigot nut (10) and the model of a hydraulic jack (8) according to the sizes of an anchorage device and a steel strand;
step 2, placing two first thick steel plates (3) in the middle of an inclined cable tensioning tool lug plate (2) at the periphery of a cable structure (1), additionally arranging two first thick steel plates (3) on the ground anchor side of a reaction frame (4) and additionally arranging four force transfer rods (5), and when the length of a standard transmission vertical rod is insufficient, adopting a lengthened sleeve connecting piece (7) for butt joint and lengthening; a second steel plate (9) is additionally arranged at two ends of the dowel bar (5), and the outer side of the second steel plate (9) is fixed by a spigot nut (10) of a hydraulic jack (8);
and 3, after the step 2 is finished, the load of the lifting mechanism is unloaded step by the four dowel bars (5) in a synchronous step loading mode, and when the load of the lifting mechanism is not large, the steel strand (11) is cut off, and the anchorage device of the tensioning lifting mechanism or the steel strand for lifting is replaced.
The load conversion device for replacing the anchorage device (or the steel strand) of the hydraulic tensioning and lifting equipment when the distance between the inclined cable head and the anchoring joint is close converts the load on the tensioning and lifting mechanism with problems to the temporary reinforcing device safely and reliably, and ensures the safe and smooth completion of equipment replacement and load conversion.

Claims (1)

1. A temporary reinforcing method for replacing an anchorage device in tensioning and lifting construction comprises a tooling lug plate (2), a first steel plate (3), a dowel bar (5), a lengthened sleeve connecting piece (7), a second steel plate (9) and a spigot nut (10); the method is characterized in that: when the cable structure (1) is in a tensioning and lifting construction process, the lifting equipment anchorage device fails and needs to be replaced or the lifting steel strand is outgoing and broken, the following steps are implemented:
step 1, determining the specifications and sizes of an ear installing plate (2), a first steel plate (3), a dowel bar (5), a lengthened sleeve connecting piece (7), a second steel plate (9) and a spigot nut (10) and the model of a hydraulic jack (8) according to the sizes of an anchorage device and a steel strand;
step 2, placing two first thick steel plates (3) in the middle of an inclined cable tensioning tool lug plate (2) at the periphery of a cable structure (1), additionally arranging two first thick steel plates (3) on the ground anchor side of a reaction frame (4) and additionally arranging four force transfer rods (5), and when the length of a standard transmission vertical rod is insufficient, adopting a lengthened sleeve connecting piece (7) for butt joint and lengthening; a second steel plate (9) is additionally arranged at two ends of the dowel bar (5), and the outer side of the second steel plate (9) is fixed by a spigot nut (10) of a hydraulic jack (8);
and 3, after the step 2 is finished, the load of the lifting mechanism is unloaded step by the four dowel bars (5) in a synchronous step loading mode, and when the load of the lifting mechanism is not large, the steel strand (11) is cut off, and the anchorage device of the tensioning lifting mechanism or the steel strand for lifting is replaced.
CN202110352419.3A 2021-03-31 2021-03-31 Temporary reinforcing method for replacing equipment anchorage device in tensioning and lifting construction Pending CN113107211A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110352419.3A CN113107211A (en) 2021-03-31 2021-03-31 Temporary reinforcing method for replacing equipment anchorage device in tensioning and lifting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110352419.3A CN113107211A (en) 2021-03-31 2021-03-31 Temporary reinforcing method for replacing equipment anchorage device in tensioning and lifting construction

Publications (1)

Publication Number Publication Date
CN113107211A true CN113107211A (en) 2021-07-13

Family

ID=76713446

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110352419.3A Pending CN113107211A (en) 2021-03-31 2021-03-31 Temporary reinforcing method for replacing equipment anchorage device in tensioning and lifting construction

Country Status (1)

Country Link
CN (1) CN113107211A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100948895B1 (en) * 2009-06-01 2010-03-24 주식회사 오케이컨설턴트 Temporary bridge adjustable in length and its construction method
CN101748898A (en) * 2010-01-21 2010-06-23 武汉二航路桥特种工程有限责任公司 Method for implementing the middle connection tensioning of cables and device thereof
CN206495138U (en) * 2016-11-28 2017-09-15 柳州欧维姆工程有限公司 A kind of engineering tensioning system of two halves formula with thread
CN108412207A (en) * 2018-04-16 2018-08-17 北京市建筑工程研究院有限责任公司 A kind of tooling and application method suitable for the double rope synchronous tensions of beam-string structure
CN109137763A (en) * 2018-10-29 2019-01-04 招商局重庆交通科研设计院有限公司 Drag-line cutter device and drag-line Demolition Construction method
CN109162209A (en) * 2018-09-04 2019-01-08 广东和立土木工程有限公司 Quick replacement construction method for half-through type and through type arch bridge suspenders

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100948895B1 (en) * 2009-06-01 2010-03-24 주식회사 오케이컨설턴트 Temporary bridge adjustable in length and its construction method
CN101748898A (en) * 2010-01-21 2010-06-23 武汉二航路桥特种工程有限责任公司 Method for implementing the middle connection tensioning of cables and device thereof
CN206495138U (en) * 2016-11-28 2017-09-15 柳州欧维姆工程有限公司 A kind of engineering tensioning system of two halves formula with thread
CN108412207A (en) * 2018-04-16 2018-08-17 北京市建筑工程研究院有限责任公司 A kind of tooling and application method suitable for the double rope synchronous tensions of beam-string structure
CN109162209A (en) * 2018-09-04 2019-01-08 广东和立土木工程有限公司 Quick replacement construction method for half-through type and through type arch bridge suspenders
CN109137763A (en) * 2018-10-29 2019-01-04 招商局重庆交通科研设计院有限公司 Drag-line cutter device and drag-line Demolition Construction method

Similar Documents

Publication Publication Date Title
CN110205940A (en) 0# block construction bracket and its reverse drawing preloading method
CN110318342B (en) Construction equipment is assembled to prefabricated bent cap cantilever of festival section
CN117105088B (en) Lifting anti-shaking equipment
CN113107211A (en) Temporary reinforcing method for replacing equipment anchorage device in tensioning and lifting construction
CN112479052B (en) High-altitude cantilever lifting beam hoisting mechanism
CN219906710U (en) Adjustable lifting balance beam frame suitable for multiple machine stations
CN212096869U (en) Precast beam processingequipment
CN211397503U (en) Device capable of realizing efficient drill rod adding and connecting
CN211421883U (en) Prestressed tensioning jack lifting device
CN214401403U (en) Anchoring device for bridge expansion joint
CN209837123U (en) Pile foundation static load test device
CN110820518B (en) Machining and hoisting method for steel arch bridge suspender
CN2486597Y (en) Construction hanging basket for building
CN220165606U (en) Anti-falling safety hoisting machine
CN2509324Y (en) Easy-to-disassembling support with adjustable length
CN219451606U (en) Device for preventing prestressed beam from being subjected to inverted arch after unloading
CN108910729B (en) Device and method for improving stress of prestressed crane boom tower crane
CN219860068U (en) Special lifting appliance applied to lifting of steel structure modules
CN115676621B (en) Prefabricated member efficient installation device for foundation construction
CN218786459U (en) Steel reinforcement cage lifting device
CN111809531B (en) Pushing type bridge girder erection machine and girder erection method thereof
CN221546414U (en) External prestressing force structure of building roof beam
CN209794147U (en) Special fixture for cement component
CN213114327U (en) Combined beam structure of bridge girder erection machine
CN217480618U (en) Coupling beam for supporting floor beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210713