CN113088812A - High-strength-toughness ultralow-temperature impact-resistant tubing head forging blank and manufacturing method thereof - Google Patents

High-strength-toughness ultralow-temperature impact-resistant tubing head forging blank and manufacturing method thereof Download PDF

Info

Publication number
CN113088812A
CN113088812A CN202110274878.4A CN202110274878A CN113088812A CN 113088812 A CN113088812 A CN 113088812A CN 202110274878 A CN202110274878 A CN 202110274878A CN 113088812 A CN113088812 A CN 113088812A
Authority
CN
China
Prior art keywords
equal
percent
less
temperature
furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110274878.4A
Other languages
Chinese (zh)
Other versions
CN113088812B (en
Inventor
李金浩
韩蕾蕾
李成浩
欧阳峥容
刘珊珊
郑桂芸
张海霞
马传庆
张利平
李月
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Iron and Steel Co Ltd
Original Assignee
Shandong Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Iron and Steel Co Ltd filed Critical Shandong Iron and Steel Co Ltd
Priority to CN202110274878.4A priority Critical patent/CN113088812B/en
Publication of CN113088812A publication Critical patent/CN113088812A/en
Priority to PCT/CN2021/118763 priority patent/WO2022193587A1/en
Application granted granted Critical
Publication of CN113088812B publication Critical patent/CN113088812B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/02Ferrous alloys, e.g. steel alloys containing silicon
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/002Hybrid process, e.g. forging following casting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/06Methods for forging, hammering, or pressing; Special equipment or accessories therefor for performing particular operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/06Methods for forging, hammering, or pressing; Special equipment or accessories therefor for performing particular operations
    • B21J5/08Upsetting
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/18Hardening; Quenching with or without subsequent tempering
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/26Methods of annealing
    • C21D1/28Normalising
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D6/00Heat treatment of ferrous alloys
    • C21D6/004Heat treatment of ferrous alloys containing Cr and Ni
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D6/00Heat treatment of ferrous alloys
    • C21D6/005Heat treatment of ferrous alloys containing Mn
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D6/00Heat treatment of ferrous alloys
    • C21D6/008Heat treatment of ferrous alloys containing Si
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/0068Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for particular articles not mentioned below
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C33/00Making ferrous alloys
    • C22C33/04Making ferrous alloys by melting
    • C22C33/06Making ferrous alloys by melting using master alloys
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/001Ferrous alloys, e.g. steel alloys containing N
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/002Ferrous alloys, e.g. steel alloys containing In, Mg, or other elements not provided for in one single group C22C38/001 - C22C38/60
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/008Ferrous alloys, e.g. steel alloys containing tin
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/04Ferrous alloys, e.g. steel alloys containing manganese
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/06Ferrous alloys, e.g. steel alloys containing aluminium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/40Ferrous alloys, e.g. steel alloys containing chromium with nickel
    • C22C38/44Ferrous alloys, e.g. steel alloys containing chromium with nickel with molybdenum or tungsten
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/40Ferrous alloys, e.g. steel alloys containing chromium with nickel
    • C22C38/46Ferrous alloys, e.g. steel alloys containing chromium with nickel with vanadium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/60Ferrous alloys, e.g. steel alloys containing lead, selenium, tellurium, or antimony, or more than 0.04% by weight of sulfur
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Abstract

The invention discloses a high-strength-toughness ultralow-temperature impact-resistant tubing head forging blank and a manufacturing method thereof, wherein the high-strength-toughness ultralow-temperature impact-resistant tubing head forging blank contains the following chemical components in percentage by mass: c: 0.30-0.40%, Si: 0.20 to 0.50%, Mn: 0.70-1.00%, Cr: 1.00-1.30%, Ni: 0.20 to 0.50%, Mo: 0.20-0.30%, V: 0.02-0.05%, Al: 0.02 to 0.05 percent of P, less than or equal to 0.012 percent of S, less than or equal to 0.005 percent of S, less than or equal to 0.015 percent of five-harmful element Sn, less than or equal to 0.015 percent of As, less than or equal to 0.015 percent of Pb, less than or equal to 0.015 percent of Sb, less than or equal to 0.015 percent of Bi, less than or equal to 1.5ppm of gas [ H ], [ 15ppm of O ], and less than or equal to 60ppm of [ N; the balance of Fe and other inevitable impurities; the component design of the invention has obvious superiority and high purity of steel, the structural uniformity of the forging can be obviously improved by forging under high pressure, and the strength, the toughness and the low-temperature impact resistance at minus 60 ℃ of the blank of the oil pipe head forging can be obviously improved.

Description

High-strength-toughness ultralow-temperature impact-resistant tubing head forging blank and manufacturing method thereof
Technical Field
The invention relates to the technical field of steel materials, in particular to a high-strength-toughness ultralow-temperature impact-resistant tubing head forging blank and a manufacturing method thereof.
Background
The tubing head is mounted on top of the casing head cross-piece, and after the final casing is installed, the tubing head is mounted to provide a load step to support the tubing string and to provide a sealed bore for tubing hanger or production casing/tubing annulus sealing. After completion, the tree is reinstalled onto the top flange of the tubing head cross-piece by connecting the tubing head reducing nipple. The tubing head made of the common CrMo steel material has low strength and poor toughness, can resist low-temperature impact of less than-60 ℃, and is brittle-broken in some extreme environments, thereby causing major accidents of oil wells and causing well blowout to be scrapped seriously.
Disclosure of Invention
The invention aims to provide a high-strength-toughness ultralow-temperature impact-resistant tubing head forging blank and a manufacturing method thereof aiming at the defects in the prior art, wherein the production process flow is as follows: electric furnace smelting, LF refining, VD vacuum treatment, continuous casting process, heating, forging and heat treatment.
In order to achieve the purpose, the invention adopts the following technical scheme:
a high-strength-toughness ultralow-temperature impact-resistant tubing head forging blank comprises the following chemical components in percentage by mass: c: 0.30-0.40%, Si: 0.20 to 0.50%, Mn: 0.70-1.00%, Cr: 1.00-1.30%, Ni: 0.20 to 0.50%, Mo: 0.20-0.30%, V: 0.02-0.05%, Al: 0.02 to 0.05 percent of P, less than or equal to 0.012 percent of S, less than or equal to 0.005 percent of S, less than or equal to 0.015 percent of five-harmful element Sn, less than or equal to 0.015 percent of As, less than or equal to 0.015 percent of Pb, less than or equal to 0.015 percent of Sb, less than or equal to 0.015 percent of Bi, less than or equal to 1.5ppm of gas [ H ], [ 15ppm of O ], and less than or equal to 60ppm of [ N; the balance of Fe and other inevitable impurities.
The invention relates to a method for manufacturing a blank of a high-strength-toughness ultralow-temperature impact-resistant tubing head forging, which comprises the following steps of:
(1) electric furnace smelting: smelting in an electric arc furnace, adopting scrap steel and hot molten iron, wherein the proportion of the hot molten iron is more than or equal to 60 percent, and the total charging amount is 120 tons. The end point C is more than or equal to 0.07 percent, the P is less than or equal to 0.015 percent, and the residual elements meet the internal control requirement; the tapping temperature is 1640-1680 ℃. The tapping time of the electric furnace is more than or equal to 2.0 min; the residual steel amount of the electric furnace is more than or equal to 10 tons. Aluminum ingots, medium manganese, ferrosilicon and ferrochromium are adopted for deoxidation alloying, and silicon-manganese alloy is strictly forbidden to be added. Tapping and feeding sequence: aluminum ingot → medium manganese → ferrosilicon → ferrochrome → nickel plate → ferromolybdenum → ferrovanadium → active lime → premelting slag, the alloy is added according to the target components of C, Mn, Cr, Ni and Mo by 0.06 percent, the adding amount of the aluminum ingot is 1.2-1.6 kg/t, the adding amount of the lime is 6-8 kg/t, and the adding amount of the premelting slag is 6-8 kg/t. The addition amount of the alloy is properly adjusted according to the actual content of the alloy elements and the content of the residual elements in the molten steel of the electric furnace.
(2) LF refining: after the refining is in place, slag charge is added according to the slag condition, and the Al of the refined final slag is controlled2O320-31 percent and less than or equal to 0.5 percent of (FeO + MnO), and deoxidizing by using high-purity silicon carbide, wherein the adding amount is more than 1.0kg/t steel. Under the condition of good slagging, an appropriate amount of aluminum wires can be fed according to the deoxidation condition, and after fully stirring for 2min at the argon flow of 300-700 NL/min, a sample is taken for full analysis after soft blowing for 1 min. According to the analysis result of the primary sample, the contents of components such as C, Si, Mn, Cr, Ni, Mo, V and the like are adjusted according to the requirements of target components, the mixture is fully stirred for 1.5min by argon flow of 300-700 NL/min, and then the secondary sample is taken for analysis after soft blowing for 2 min. Before LF tapping, calcium wires are fed according to the length of 1.0-1.5 m/ton of steel, and then soft blowing is carried out for more than or equal to 2 min.
(3) Vacuum treatment in a VD furnace: and slagging off before entering a VD furnace. The vacuum degree is less than 67Pa, and the holding time is more than or equal to 12 minutes. The soft argon blowing time after VD treatment is not less than 15 minutes, and the stirring and cooling of the bare molten steel and the large argon amount are strictly forbidden during the soft argon blowing. Controlling the steel feeding temperature after soft argon blowing: a first furnace for continuous casting: 1579-1589 ℃, starting the second furnace: 1549-1569 ℃.
(4) Continuous casting protection pouring: the tundish is well baked and kept clean, and the baking temperature is more than or equal to 1100 ℃. The crystallizer meets the requirements of arc alignment and water gap alignment, and the nozzle atomization effect is good. The large ladle long nozzle is hermetically cast by using a graphite sealing gasket and argon blowing, the tundish is fully sealed, and argon is blown into the tundish before casting; the liquid level of the tundish is not less than 700mm, and the fluctuation of the liquid level of the crystallizer is less than or equal to +/-3 mm. The medium carbon alloy continuous casting covering slag is adopted, and a double-layer tundish covering agent is used. The superheat degree of the tundish in the normal heat is controlled according to a target of 15-30 ℃, and the temperature of the first tundish is as follows: 1534-1544 deg.C (heat exchange heat times minus 5 deg.C), and 1519-1529 deg.C for normal heat times. The temperature of the casting blank entering the tension leveler is more than or equal to 900 ℃. The electromagnetic stirring current of the crystallizer is controlled to be 250-300A, the frequency is controlled to be 1.0-2.0Hz, the electromagnetic stirring current at the tail end is controlled to be 100-150A, and the frequency is controlled to be 5.0-8.0 Hz. The temperature of the round billet with the diameter of 700mm entering a slow cooling pit is more than or equal to 750 ℃, and the pit discharging temperature is less than or equal to 100 ℃.
(5) Heating by a heating furnace: and (3) heating the round billet with the diameter of 700mm in a heating furnace to 1200-1230 ℃, wherein the heat preservation time is more than or equal to 1 hour.
(6) Free forging in a 5000-ton hydraulic press: and (3) freely forging the round billet with the diameter of 700mm in a hydraulic machine, adopting a three-pier and three-drawing process, and carrying out small reduction on the pier thickness of the first pass by 30mm, drawing length of the second pass by 30mm, drawing thickness of the third pass by 40mm, drawing length of the fourth pass by 45mm, drawing thickness of the fifth pass by 65mm, and drawing length of the sixth pass by 70 mm.
(7) And (3) heat treatment: and (3) carrying out integral heat treatment on the forged round billet, wherein the heat treatment process comprises normalizing, quenching (heating to 843-885 ℃ for heat preservation and then quenching with water or polymer), tempering (heating to 649-704 ℃ for heat preservation and then air cooling).
Compared with the prior art, the invention adopts the technical scheme to produce the beneficial effects that:
the component design of the invention has obvious superiority and high purity of steel, the structural uniformity of the forging can be obviously improved by forging under high pressure, the strength, the toughness and the low-temperature impact resistance at minus 60 ℃ of the blank of the oil pipe head forging can be obviously improved, the invention is used in various extreme environments, and the service life and the safety coefficient are greatly improved.
Detailed Description
The present invention will be further described with reference to the following examples.
Example 1
The chemical components and the mass percentage content of the high-strength-toughness ultralow-temperature impact-resistant tubing head forging blank in the embodiment are shown in table 1, and the balance of the components are Fe and inevitable impurities. Table 2 shows the mechanical properties of the examples. Table 3 shows the non-metallic inclusion grades of the examples.
The production process comprises electric furnace smelting, LF refining, VD vacuum treatment, continuous casting process, heating, forging and heat treatment, and the specific process steps are as follows:
(1) electric furnace smelting: smelting in an electric arc furnace, and adopting scrap steel and hot charging molten iron, wherein the proportion of the hot charging molten iron is 62 percent, and the total charging amount is 118 tons. The end point C is 0.08 percent, the P is 0.010 percent, and the residual elements meet the internal control requirement; the tapping temperature was 1650 ℃. Tapping time of the electric furnace is 3 min; the residual steel amount of the electric furnace is 10.5 tons. Aluminum ingots, medium manganese, ferrosilicon and ferrochromium are adopted for deoxidation alloying, and silicon-manganese alloy is strictly forbidden to be added. Tapping and feeding sequence: aluminum ingot → medium manganese → ferrosilicon → ferrochrome → nickel plate → ferromolybdenum → ferrovanadium → active lime → premelting slag, the alloy is added according to the target component of C, Mn, Cr, Ni and Mo by 0.06 percent, the adding amount of the aluminum ingot is 1.3kg/t, the adding amount of the lime is 6kg/t and the adding amount of the premelting slag is 7 kg/t. The addition amount of the alloy is properly adjusted according to the actual content of the alloy elements and the content of the residual elements in the molten steel of the electric furnace.
(2) LF refining: after the refining is in place, slag charge is added according to the slag condition, and the Al of the refined final slag is controlled2O322% and 0.3% of (FeO + MnO), and deoxidizing with high purity silicon carbide, and the addition amount is more than 1.0kg/t steel. Under the condition of good slagging, an appropriate amount of aluminum wires can be fed according to the deoxidation condition, and after fully stirring for 2min at the argon flow rate of 360NL/min, a sample is taken for full analysis after soft blowing for 1 min. According to the analysis result of the primary sample, the contents of components such as C, Si, Mn, Cr, Ni, Mo, V and the like are adjusted according to the requirements of target components, the mixture is fully stirred for 1.5min by argon flow 400NL/min, and then the secondary sample is taken for analysis after soft blowing for 2 min. Before LF tapping, calcium wires are fed according to the proportion of 1.2 m/ton steel, and then soft blowing is carried out for 3 min.
(3) Vacuum treatment in a VD furnace: and slagging off before entering a VD furnace. The vacuum was less than 67Pa hold time 15 minutes. And after VD treatment, soft argon blowing time is 16 minutes, and bare molten steel and large argon amount are strictly forbidden to be stirred and cooled during soft argon blowing. Controlling the temperature of steel feeding to 1559 ℃ after soft argon blowing.
(4) Continuous casting protection pouring: the tundish was baked well and kept clean, baking temperature 1120 ℃. The crystallizer meets the requirements of arc alignment and water gap alignment, and the nozzle atomization effect is good. The large ladle long nozzle is hermetically cast by using a graphite sealing gasket and argon blowing, the tundish is fully sealed, and argon is blown into the tundish before casting; the liquid level of the tundish is 720mm, and the fluctuation of the liquid level of the crystallizer is less than or equal to +/-3 mm. The medium carbon alloy continuous casting covering slag is adopted, and a double-layer tundish covering agent is used. The degree of superheat of the tundish is controlled according to a target of 20 ℃. The temperature of the casting blank entering the withdrawal and straightening unit is 915 ℃. The electromagnetic stirring current of the crystallizer is controlled at 280A, the frequency is controlled at 1.6Hz, the electromagnetic stirring current at the tail end is controlled at 130A, and the frequency is controlled at 5.0 Hz. The temperature of the round billet with the diameter of 700mm entering a slow cooling pit is 762 ℃, and the pit outlet temperature is less than 100 ℃.
(5) Heating by a heating furnace: the round billet with the diameter of 700mm enters a heating furnace to be heated to 1210 ℃, and the heat preservation time is 1.5 hours.
(6) Free forging in a 5000-ton hydraulic press: and (3) freely forging the round billet with the diameter of 700mm in a hydraulic machine, adopting a three-pier and three-drawing process, and carrying out small reduction on the pier thickness of the first pass by 30mm, drawing length of the second pass by 30mm, drawing thickness of the third pass by 40mm, drawing length of the fourth pass by 45mm, drawing thickness of the fifth pass by 65mm, and drawing length of the sixth pass by 70 mm.
(7) And (3) heat treatment: and (3) carrying out integral heat treatment on the forged round billet, wherein the heat treatment process comprises normalizing, quenching (heating to 855 ℃, keeping the temperature, quenching the polymer) and tempering (heating to 660 ℃, keeping the temperature, and then air cooling).
Example 2
The chemical components and the mass percentage content of the high-strength-toughness ultralow-temperature impact-resistant tubing head forging blank in the embodiment are shown in table 1, and the balance of the components are Fe and inevitable impurities. Table 2 shows the results of mechanical properties of the examples. Table 3 shows the non-metallic inclusion grades of the examples.
The production process comprises electric furnace smelting, LF refining, VD vacuum treatment, continuous casting process, heating, forging and heat treatment, and the specific process steps are as follows:
(1) electric furnace smelting: smelting in an electric arc furnace, and adopting scrap steel and hot charging molten iron, wherein the proportion of the hot charging molten iron is 60.6 percent, and the total charging amount is 119.3 tons. The end point C is 0.08 percent, the P is 0.011 percent, and the residual elements meet the internal control requirement; the tapping temperature was 1652 ℃. Tapping time of the electric furnace is 3.5 min; the residual steel amount of the electric furnace is 10.6 tons. Aluminum ingots, medium manganese, ferrosilicon and ferrochromium are adopted for deoxidation alloying, and silicon-manganese alloy is strictly forbidden to be added. Tapping and feeding sequence: aluminum ingot → medium manganese → ferrosilicon → ferrochrome → nickel plate → ferromolybdenum → ferrovanadium → active lime → premelting slag, the alloy is added according to the target component of C, Mn, Cr, Ni and Mo by 0.06 percent, the adding amount of the aluminum ingot is 1.5kg/t, the adding amount of the lime is 7.6kg/t and the adding amount of the premelting slag is 7.2 kg/t. The addition amount of the alloy is properly adjusted according to the actual content of the alloy elements and the content of the residual elements in the molten steel of the electric furnace.
(2) LF refining: after the refining is in place, slag charge is added according to the slag condition, and the Al of the refined final slag is controlled2O325%, (FeO + MnO) ═ 0.2%, and deoxygenation was performed using high purity silicon carbide, added at a level greater than 1.0kg/t steel. Under the condition of good slagging, an appropriate amount of aluminum wires can be fed according to the deoxidation condition, and after fully stirring for 2min at the argon flow of 380NL/min, a sample is taken for full analysis after soft blowing for 1 min. According to the analysis result of the primary sample, the contents of components such as C, Si, Mn, Cr, Ni, Mo, V and the like are adjusted according to the requirements of target components, the mixture is fully stirred for 1.5min by argon flow 410NL/min, and then the secondary sample is taken for analysis after soft blowing for 2 min. Before LF tapping, calcium wires are fed according to the proportion of 1.3 m/ton steel, and then soft blowing is carried out for 3.5 min.
(3) Vacuum treatment in a VD furnace: and slagging off before entering a VD furnace. The vacuum was less than 67Pa hold time 13 minutes. After VD treatment, the soft argon blowing time is 17 minutes, and the stirring and cooling of the bare molten steel and the large argon amount are strictly forbidden during the soft argon blowing. Controlling the temperature of steel feeding to 1555 ℃ after soft argon blowing.
(4) Continuous casting protection pouring: the tundish was baked well and kept clean at a baking temperature of 1125 ℃. The crystallizer meets the requirements of arc alignment and water gap alignment, and the nozzle atomization effect is good. The large ladle long nozzle is hermetically cast by using a graphite sealing gasket and argon blowing, the tundish is fully sealed, and argon is blown into the tundish before casting; the liquid level of the tundish is 730mm, and the fluctuation of the liquid level of the crystallizer is less than or equal to +/-3 mm. The medium carbon alloy continuous casting covering slag is adopted, and a double-layer tundish covering agent is used. The degree of superheat of the tundish is controlled according to a target of 21 ℃. The temperature of the casting blank entering the tension leveler is 920 ℃. The electromagnetic stirring current of the crystallizer is controlled to be 282A, the frequency is controlled to be 1.6Hz, the electromagnetic stirring current at the tail end is controlled to be 120A, and the frequency is controlled to be 5.0 Hz. The temperature of the round billet with the diameter of 700mm entering a slow cooling pit is 775 ℃, and the pit discharging temperature is less than 100 ℃.
(5) Heating by a heating furnace: the round billet with the diameter of 700mm enters a heating furnace to be heated to 1223 ℃, and the heat preservation time is 1.6 hours.
(6) Free forging in a 5000-ton hydraulic press: and (3) freely forging the round billet with the diameter of 700mm in a hydraulic machine, adopting a three-pier and three-drawing process, and carrying out small reduction on the pier thickness of the first pass by 30mm, drawing length of the second pass by 30mm, drawing thickness of the third pass by 40mm, drawing length of the fourth pass by 45mm, drawing thickness of the fifth pass by 65mm, and drawing length of the sixth pass by 70 mm.
(7) And (3) heat treatment: and (3) carrying out integral heat treatment on the forged round billet, wherein the heat treatment process comprises normalizing, quenching (heating to 860 ℃ for heat preservation and then polymer quenching), tempering (heating to 662 ℃ for heat preservation and then air cooling).
Example 3
The chemical components and the mass percentage content of the high-strength-toughness ultralow-temperature impact-resistant tubing head forging blank in the embodiment are shown in table 1, and the balance of the components are Fe and inevitable impurities. Table 2 shows the results of mechanical properties of the examples. Table 3 shows the non-metallic inclusion grades of the examples.
The production process comprises electric furnace smelting, LF refining, VD vacuum treatment, continuous casting process, heating, forging and heat treatment, and the specific process steps are as follows:
(1) electric furnace smelting: smelting in an electric arc furnace, and adopting scrap steel and hot charging molten iron, wherein the proportion of the hot charging molten iron is 61 percent, and the total charging amount is 120.3 tons. The end point C is 0.09 percent, the P is 0.013 percent, and residual elements meet the internal control requirement; the tapping temperature was 1646 ℃. Tapping time of the electric furnace is 4 min; the residual steel amount of the electric furnace is 10.8 tons. Aluminum ingots, medium manganese, ferrosilicon and ferrochromium are adopted for deoxidation alloying, and silicon-manganese alloy is strictly forbidden to be added. Tapping and feeding sequence: aluminum ingot → medium manganese → ferrosilicon → ferrochrome → nickel plate → ferromolybdenum → ferrovanadium → active lime → premelting slag, the alloy is added according to the target component of C, Mn, Cr, Ni and Mo by 0.06 percent, the adding amount of the aluminum ingot is 1.3kg/t, the adding amount of the lime is 7.2kg/t and the adding amount of the premelting slag is 7.3 kg/t. The addition amount of the alloy is properly adjusted according to the actual content of the alloy elements and the content of the residual elements in the molten steel of the electric furnace.
(2) LF refining: after the refining is in place, slag charge is added according to the slag condition, and the Al of the refined final slag is controlled2O324.5% and 0.4% of (FeO + MnO), and deoxidizing with high purity silicon carbide, the addition amount is more than 1.0kg/t steel. Under the condition of good slagging, an appropriate amount of aluminum wires can be fed according to the deoxidation condition, and after fully stirring for 2min by using the argon flow 410NL/min, a sample is taken for full analysis after soft blowing for 1 min. According to the analysis result of the primary sample, according to the target componentAdjusting the contents of C, Si, Mn, Cr, Ni, Mo, V and other components, fully stirring for 1.5min by argon flow of 420NL/min, soft blowing for 2min, and sampling for analysis. Before LF tapping, calcium wires are fed according to the proportion of 1.4 m/ton steel, and then soft blowing is carried out for 4 min.
(3) Vacuum treatment in a VD furnace: and slagging off before entering a VD furnace. The vacuum was less than 67Pa hold time 14 minutes. And after VD treatment, the soft argon blowing time is 18 minutes, and the stirring and cooling of the bare molten steel and the large argon amount are strictly forbidden during the soft argon blowing. After the soft argon blowing, the temperature of the upper steel is controlled to be 1560 ℃.
(4) Continuous casting protection pouring: the tundish was baked well and kept clean, baking temperature 1120 ℃. The crystallizer meets the requirements of arc alignment and water gap alignment, and the nozzle atomization effect is good. The large ladle long nozzle is hermetically cast by using a graphite sealing gasket and argon blowing, the tundish is fully sealed, and argon is blown into the tundish before casting; the liquid level of the tundish is 728mm, and the fluctuation of the liquid level of the crystallizer is less than or equal to +/-3 mm. The medium carbon alloy continuous casting covering slag is adopted, and a double-layer tundish covering agent is used. The degree of superheat of the tundish is controlled according to a target of 22 ℃. The temperature of the casting blank entering the tension leveler is 921 ℃. The electromagnetic stirring current of the crystallizer is controlled at 279A, the frequency is controlled at 1.5Hz, the electromagnetic stirring current at the tail end is controlled at 118A, and the frequency is controlled at 5.3 Hz. The temperature of the round billet with the diameter of 700mm entering a slow cooling pit is 763 ℃, and the pit outlet temperature is less than 100 ℃.
(5) Heating by a heating furnace: the round billet with the diameter of 700mm enters a heating furnace to be heated to 1213 ℃, and the heat preservation time is 1.4 hours.
(6) Free forging in a 5000-ton hydraulic press: and (3) freely forging the round billet with the diameter of 700mm in a hydraulic machine, adopting a three-pier and three-drawing process, and carrying out small reduction on the pier thickness of the first pass by 30mm, drawing length of the second pass by 30mm, drawing thickness of the third pass by 40mm, drawing length of the fourth pass by 45mm, drawing thickness of the fifth pass by 65mm, and drawing length of the sixth pass by 70 mm.
(7) And (3) heat treatment: and (3) carrying out integral heat treatment on the forged round billet, wherein the heat treatment process comprises normalizing, quenching (heating to 862 ℃ for heat preservation and then polymer quenching), tempering (heating to 658 ℃ for heat preservation and then air cooling).
Table 1 shows the chemical compositions of steels of examples of the present invention
Chemical composition Example 1 Example 2 Example 3
C 0.33% 0.34% 0.35%
Si 0.35% 0.38% 0.31%
Mn 0.84% 0.88% 0.90%
P 0.010% 0.011% 0.009%
S 0.003% 0.002% 0.003%
Cr 1.20% 1.22% 1.25%
Ni 0.30% 0.28% 0.23%
Mo 0.25% 0.22% 0.21%
V 0.035% 0.030% 0.040%
Sn 0.005% 0.006% 0.004%
As 0.004% 0.005% 0.003%
Pb 0.003% 0.003% 0.002%
Sb 0.004% 0.001% 0.002%
Bi 0.005% 0.002% 0.003%
[H] 1.2ppm 1.1ppm 1.0ppm
[O] 10ppm 11ppm 9ppm
[N] 55ppm 50ppm 48ppm
Table 2 shows the mechanical properties
Tensile strength Yield strength Elongation percentage Shrinkage rate Impact at-60 ℃
Example 1 872 663 32.5 51 56
Example 2 901 656 28 56 59
Example 3 895 687 27 52 57
Technical requirements ≥675MPa ≥530MPa ≥20% ≥41% ≥30J
TABLE 3 grades of non-metallic inclusions
Figure BDA0002976205180000071
Figure BDA0002976205180000081
As can be seen from the tables 2-3, the tensile strength of the obtained forging blank can be about 900MPa, the yield strength is increased by more than 200MPa compared with the technical requirement, the yield strength is increased by more than 650MPa, the yield strength is increased by more than 120MPa compared with the similar forging, other performance parameters are far higher than the technical requirement, and the remarkable technical effect is achieved.
The method can be realized by upper and lower limit values and interval values of intervals of process parameters (such as temperature, time and the like), and embodiments are not listed.
Conventional technical knowledge in the art can be used for the details which are not described in the present invention.
Finally, it should be noted that the above embodiments are only used for illustrating the technical solutions of the present invention and are not limited. Although the present invention has been described in detail with reference to the embodiments, it will be understood by those skilled in the art that various changes may be made and equivalents may be substituted without departing from the spirit and scope of the invention as defined in the appended claims.

Claims (6)

1. A high-strength and high-toughness ultralow-temperature impact-resistant tubing head forging blank is characterized in that: the forging blank comprises the following chemical components in percentage by mass: c: 0.30-0.40%, Si: 0.20 to 0.50%, Mn: 0.70-1.00%, Cr: 1.00-1.30%, Ni: 0.20 to 0.50%, Mo: 0.20-0.30%, V: 0.02-0.05%, Al: 0.02 to 0.05 percent of P, less than or equal to 0.012 percent of S, less than or equal to 0.005 percent of S, less than or equal to 0.015 percent of five-harmful element Sn, less than or equal to 0.015 percent of As, less than or equal to 0.015 percent of Pb, less than or equal to 0.015 percent of Sb, less than or equal to 0.015 percent of Bi, less than or equal to 1.5ppm of gas [ H ], [ 15ppm of O ], and less than or equal to 60ppm of [ N; the balance of Fe and other inevitable impurities.
2. A manufacturing method of a high-strength-toughness ultralow-temperature impact-resistant tubing head forging blank comprises the following steps:
(1) electric furnace smelting:
smelting in an electric arc furnace, wherein scrap steel and hot molten iron are adopted, the proportion of the hot molten iron is more than or equal to 60 percent, and the total charging amount is 120 tons; the end point C is more than or equal to 0.07 percent, the P is less than or equal to 0.015 percent, and the residual elements meet the internal control requirement; the tapping temperature is 1640-1680 ℃. The tapping time of the electric furnace is more than or equal to 2.0 min; the residual steel amount of the electric furnace is more than or equal to 10 tons;
(2) LF refining:
after the refining is in place, slag charge is added according to the slag condition, and the Al of the refined final slag is controlled2O320 to 31 percent of (FeO + MnO) and less than or equal to 0.5 percent of the total amount of the steel, and deoxidizing by using high-purity silicon carbide, wherein the adding amount of the silicon carbide is more than 1.0kg/t of steel; under the condition of good slagging, an appropriate amount of aluminum wires can be fed according to the deoxidation condition, and after fully stirring for 2min at the argon flow rate of 300-700 NL/min, a sample is taken for full analysis after soft blowing for 1 min; according to the analysis result of the primary sample, the contents of components such as C, Si, Mn, Cr, Ni, Mo, V and the like are adjusted according to the requirements of target components, after the argon flow is 300-700 NL/min and fully stirred for 1.5min, the secondary sample is taken for analysis after the soft blowing is carried out for 2 min; before LF tapping, feeding a calcium line according to the thickness of 1.0-1.5 m/ton steel, and then soft blowing for more than or equal to 2 min;
(3) vacuum treatment in a VD furnace:
slagging off before entering a VD furnace; the vacuum degree is less than 67Pa, and the holding time is more than or equal to 12 minutes; the soft argon blowing time after VD treatment is not less than 15 minutes, and the stirring and cooling of the bare molten steel and the large argon amount are strictly forbidden during the soft argon blowing; controlling the steel feeding temperature after soft argon blowing: a first furnace for continuous casting: 1579-1589 ℃, starting the second furnace: 1549-1569 ℃;
(4) continuous casting protection pouring:
the tundish is well baked and kept clean, and the baking temperature is more than or equal to 1100 ℃; the large ladle long nozzle is hermetically cast by using a graphite sealing gasket and argon blowing, the tundish is fully sealed, and argon is blown into the tundish before casting; the liquid level of the tundish is not lower than 700mm, and the fluctuation of the liquid level of the crystallizer is +/-3 mm; adopting medium carbon alloy continuous casting covering slag and using a double-layer tundish covering agent; the superheat degree of the tundish in the normal heat is controlled according to a target of 15-30 ℃, and the temperature of the first tundish is as follows: 1534-1544 ℃ and 1519-1529 ℃ of normal heat; the temperature of the casting blank entering a tension leveler is more than or equal to 900 ℃; the temperature of the round billet with the diameter of 700mm entering a slow cooling pit is more than or equal to 750 ℃, and the pit outlet temperature is less than or equal to 100 ℃;
(5) heating by a heating furnace:
heating the round billet with the diameter of 700mm in a heating furnace to 1200-1230 ℃, wherein the heat preservation time is more than or equal to 1 hour;
(6) hydraulic free forging:
the round billet with the diameter of 700mm enters a hydraulic machine for free forging, a three-pier and three-drawing process is adopted, the pier thickness of the first pass is reduced by 30mm, the drawing length of the second pass is reduced by 30mm, the pier thickness of the third pass is reduced by 40mm, the drawing length of the fourth pass is reduced by 45mm, the pier thickness of the fifth pass is reduced by 65mm, and the drawing length of the sixth pass is reduced by 70 mm;
(7) and (3) heat treatment:
and carrying out integral heat treatment on the forged round billet, wherein the heat treatment process comprises normalizing, quenching and tempering.
3. The manufacturing method according to claim 2, wherein in the step (2), aluminum ingots, medium manganese, ferrosilicon and ferrochrome are adopted for deoxidation alloying, and silicon-manganese alloy is strictly prohibited; tapping and feeding sequence: aluminum ingot → medium manganese → ferrosilicon → ferrochrome → nickel plate → ferromolybdenum → ferrovanadium → active lime → premelting slag, the alloy is added according to the target components of C, Mn, Cr, Ni and Mo by 0.06 percent, the adding amount of the aluminum ingot is 1.2-1.6 kg/t, the adding amount of the lime is 6-8 kg/t, and the adding amount of the premelting slag is 6-8 kg/t.
4. The manufacturing method as claimed in claim 2, wherein in the step (4), the electromagnetic stirring current of the crystallizer is controlled at 250-300A, the frequency is controlled at 1.0-2.0Hz, the electromagnetic stirring current at the end is controlled at 100-150A, and the frequency is controlled at 5.0-8.0 Hz.
5. The manufacturing method according to claim 2, wherein in the heat treatment of the step (7), the quenching is: heating to 843-885 ℃, keeping the temperature, quenching with water or polymer, and tempering: heating to 649-704 deg.C, keeping the temp. and air cooling.
6. The manufacturing method according to claim 2, wherein the forging blank manufactured by the above manufacturing method has mechanical properties of: the tensile strength is more than or equal to 675MPa, the yield strength is more than or equal to 530MPa, the elongation is more than or equal to 20 percent, and the shrinkage is more than or equal to 41 percent; the low-temperature impact energy at minus 60 ℃ is more than or equal to 30J; the impurity A is not more than 1.0 grade in fineness, the A is not more than 1.0 grade in thickness, the B is not more than 1.5 grade in fineness, the B is not more than 1.0 grade in thickness, the C is not more than 1.0 grade in fineness, the C is not more than 1.0 grade in thickness, the D is not more than 1.0 grade in fineness and the D is not more than 1.0 grade in thickness.
CN202110274878.4A 2021-03-15 2021-03-15 High-strength-toughness ultralow-temperature impact-resistant tubing head forging blank and manufacturing method thereof Active CN113088812B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202110274878.4A CN113088812B (en) 2021-03-15 2021-03-15 High-strength-toughness ultralow-temperature impact-resistant tubing head forging blank and manufacturing method thereof
PCT/CN2021/118763 WO2022193587A1 (en) 2021-03-15 2021-09-16 High-strength and high-toughness ultralow temperature impact resistant tubing head forge piece blank and manufacturing method therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110274878.4A CN113088812B (en) 2021-03-15 2021-03-15 High-strength-toughness ultralow-temperature impact-resistant tubing head forging blank and manufacturing method thereof

Publications (2)

Publication Number Publication Date
CN113088812A true CN113088812A (en) 2021-07-09
CN113088812B CN113088812B (en) 2022-12-06

Family

ID=76667200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110274878.4A Active CN113088812B (en) 2021-03-15 2021-03-15 High-strength-toughness ultralow-temperature impact-resistant tubing head forging blank and manufacturing method thereof

Country Status (2)

Country Link
CN (1) CN113088812B (en)
WO (1) WO2022193587A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113699448A (en) * 2021-08-27 2021-11-26 中冶陕压重工设备有限公司 Low-alloy structural steel SY41CrMnMoNbVTi and preparation method thereof
CN114686770A (en) * 2022-04-18 2022-07-01 营口中车型钢新材料有限公司 Steel for railway brake beam mold
WO2022193587A1 (en) * 2021-03-15 2022-09-22 山东钢铁股份有限公司 High-strength and high-toughness ultralow temperature impact resistant tubing head forge piece blank and manufacturing method therefor
CN116949353A (en) * 2023-06-02 2023-10-27 江阴兴澄特种钢铁有限公司 Bi-containing free-cutting non-quenched and tempered steel for automobile engine crankshaft and manufacturing method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103131956A (en) * 2013-03-15 2013-06-05 济钢集团有限公司 High-strength steel plate with tensile strength of 800 MPa above and manufacturing method thereof
CN104894487A (en) * 2015-06-25 2015-09-09 江苏沙钢集团淮钢特钢股份有限公司 High-strength high-toughness steel for valves of oil drilling platforms and technology for manufacturing high-strength high-toughness steel
CN105385948A (en) * 2015-11-06 2016-03-09 天津钢管集团股份有限公司 Manufacturing method for seamless pipe with yield strength higher than 690 MPa of self-elevating drilling platform
CN110230005A (en) * 2019-05-22 2019-09-13 山东钢铁股份有限公司 A kind of high carbon chromium cold roll blank steel and preparation method thereof

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110257692A (en) * 2019-06-12 2019-09-20 山东钢铁股份有限公司 A kind of surface layer oil casing pipe steel and its manufacturing method
CN113088812B (en) * 2021-03-15 2022-12-06 山东钢铁股份有限公司 High-strength-toughness ultralow-temperature impact-resistant tubing head forging blank and manufacturing method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103131956A (en) * 2013-03-15 2013-06-05 济钢集团有限公司 High-strength steel plate with tensile strength of 800 MPa above and manufacturing method thereof
CN104894487A (en) * 2015-06-25 2015-09-09 江苏沙钢集团淮钢特钢股份有限公司 High-strength high-toughness steel for valves of oil drilling platforms and technology for manufacturing high-strength high-toughness steel
CN105385948A (en) * 2015-11-06 2016-03-09 天津钢管集团股份有限公司 Manufacturing method for seamless pipe with yield strength higher than 690 MPa of self-elevating drilling platform
CN110230005A (en) * 2019-05-22 2019-09-13 山东钢铁股份有限公司 A kind of high carbon chromium cold roll blank steel and preparation method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022193587A1 (en) * 2021-03-15 2022-09-22 山东钢铁股份有限公司 High-strength and high-toughness ultralow temperature impact resistant tubing head forge piece blank and manufacturing method therefor
CN113699448A (en) * 2021-08-27 2021-11-26 中冶陕压重工设备有限公司 Low-alloy structural steel SY41CrMnMoNbVTi and preparation method thereof
CN114686770A (en) * 2022-04-18 2022-07-01 营口中车型钢新材料有限公司 Steel for railway brake beam mold
CN116949353A (en) * 2023-06-02 2023-10-27 江阴兴澄特种钢铁有限公司 Bi-containing free-cutting non-quenched and tempered steel for automobile engine crankshaft and manufacturing method thereof

Also Published As

Publication number Publication date
WO2022193587A1 (en) 2022-09-22
CN113088812B (en) 2022-12-06

Similar Documents

Publication Publication Date Title
CN113088812B (en) High-strength-toughness ultralow-temperature impact-resistant tubing head forging blank and manufacturing method thereof
CN103160729B (en) Medium-carbon microalloyed steel for engineering machinery caterpillar chain piece and production process thereof
CN104651754B (en) Low alloy steel for high-pressure boiler tube and preparation method thereof
CN108950432B (en) Manufacturing method of high-strength and high-toughness low-alloy wear-resistant steel
CN108660377A (en) The preparation method of seamless steel pipe and seamless steel pipe
CN102268615B (en) Engineering steel material with excellent core low-temperature impact toughness and lamellar tearing resisting performance and production method thereof
CN109280743A (en) A kind of roll high-strength abrasion-proof steel and its production method
CN113528976B (en) Non-quenched and tempered bar without surface cracks and preparation method thereof
CN108977612B (en) Smelting method of high-strength atmospheric corrosion resistant bolt steel
CN117230360B (en) Preparation method of single-vacuum 300M steel
CN112779468A (en) High-performance steel for automobile gear and production method thereof
CN109097665B (en) Smelting method of high-strength atmospheric corrosion resistant bolt steel
CN105543646A (en) Production process for medium-high carbon steel through thin slabs
CN106555118B (en) Micro-alloy high-strength high-toughness steel containing Cu and production method thereof
CN114635094B (en) Martensitic stainless steel for valve body and preparation method thereof
CN115386790A (en) Niobium-containing high-temperature carburized gear steel and production process thereof
CN110284056B (en) Corrosion-resistant steel plate for ocean platform and production method thereof
CN115094307A (en) Hot work die steel continuous casting round billet for electroslag remelting and production process thereof
CN114855060A (en) Pipeline steel X80 and production method thereof
CN110468329B (en) ZG-SY09MnCrNiMo RE steel and casting preparation method
CN115094321B (en) Steel for long-service-life injection molding machine screw and preparation method thereof
CN114196877B (en) High-strength and high-toughness high-iron frame steel and smelting method thereof
CN117248167B (en) Corrosion-resistant I-steel and production method thereof
CN110257718B (en) Wear-resistant stainless steel structural alloy and preparation method thereof
CN113604748B (en) Thick-specification weather-resistant corrosion-resistant Cr alloy steel plate and production method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant