CN113074026B CN202110362601.7A CN202110362601A CN113074026B CN 113074026 B CN113074026 B CN 113074026B CN 202110362601 A CN202110362601 A CN 202110362601A CN 113074026 B CN113074026 B CN 113074026B
Authority
CN
China
Prior art keywords
steam
valve
pipeline
pressure
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110362601.7A
Other languages
Chinese (zh)
Other versions
CN113074026A (en
Inventor
潘小丰
庞向阳
李国源
方军
奚凌峰
丁勇能
邵宁
朱子勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Huadian Banshan Power Generation Co ltd
Original Assignee
Hangzhou Huadian Banshan Power Generation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Huadian Banshan Power Generation Co ltd filed Critical Hangzhou Huadian Banshan Power Generation Co ltd
Priority to CN202110362601.7A priority Critical patent/CN113074026B/en
Publication of CN113074026A publication Critical patent/CN113074026A/en
Application granted granted Critical
Publication of CN113074026B publication Critical patent/CN113074026B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D25/00Component parts, details, or accessories, not provided for in, or of interest apart from, other groups
    • F01D25/32Collecting of condensation water; Drainage ; Removing solid particles
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D17/00Regulating or controlling by varying flow
    • F01D17/10Final actuators
    • F01D17/105Final actuators by passing part of the fluid
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D19/00Starting of machines or engines; Regulating, controlling, or safety means in connection therewith

Abstract

The invention discloses a control method of a steam turbine high-pressure cylinder steam inlet pipeline drain valve, which comprises the following steps: setting automatic switching logic of a front pipeline drain valve of the high-pressure main steam combined valve, and if the following conditions are met simultaneously, opening the front pipeline drain valve of the high-pressure main steam combined valve: the degree of superheat of pipeline steam is less than 13.9 ℃, an FDX ignition signal is continuously on, and two optional conditions are adopted; setting automatic closing logic of a front pipeline drain valve of the high-pressure main steam combined valve, and closing the front pipeline drain valve of the high-pressure main steam combined valve if the following conditions are met simultaneously: pipeline steam superheat is >27.8 ℃, the FDX ignition signal is on continuously, and four selectable conditions. The invention fully utilizes the high-pressure steam drum pressure of the shutdown clearance of the unit, ensures the smooth thermal start of the unit and realizes the self supply of auxiliary steam; the automation level of the unit is further improved, and misoperation of operators is effectively avoided; further improving the steam inlet speed of the high-pressure cylinder of the steam turbine and effectively reducing the hot-start gas consumption of the unit.

Description

Control method of steam turbine high-pressure cylinder steam inlet pipeline drainage valve
Technical Field
The invention relates to the technical field of steam turbines, in particular to a control method of a drain valve of a steam inlet pipeline of a high-pressure cylinder of a steam turbine.
Background
When the 9FA gas-steam combined cycle unit normally operates, the unit load consists of a gas turbine load and a steam turbine load. After the unit is started in a hot state and connected to the grid, the unit load is the gas turbine load, the unit keeps the exhaust temperature of the gas turbine lower than a certain value (566 ℃) by controlling the gas turbine load, and high-pressure main steam is slowly heated, so that a high-pressure steam cylinder of the steam turbine meets the steam inlet condition (the pressure of the main steam is higher than 39kg/cm & lt 2 & gt, and the temperature of the main steam is higher than the temperature of the upper wall of the high-pressure steam inlet cylinder), and the steam turbine load is added. Before steam admission of the steam turbine, the working medium quantity of a reheater system is limited, and in order to prevent damage to metal components caused by dry burning of the reheater system due to overhigh exhaust temperature of fuel gas, the load of a combustion engine is controlled to be a lower value in a stage of waiting for steam admission of a high-pressure cylinder of the steam turbine, so that the waiting time of the stage is shortened, and reduction of hot start gas consumption of a unit is facilitated.
Because the measuring point of the steam inlet working medium parameter of the high-pressure cylinder of the steam turbine is positioned between the inlet of the high-pressure bypass pipeline and the high-pressure main steam combined valve, a circulation dead zone is easily formed on the section of the pipeline before the steam inlet of the high-pressure cylinder of the steam turbine, and the quality of the working medium is not qualified. Therefore on the basis of setting up the high pressure bypass and carrying out working medium quality promotion, the preceding pipeline trap before through opening high pressure main vapour combination valve in good time increases the main vapour circulation for steam turbine high pressure jar admission: after the unit is ignited, when the superheat degree of main steam is lower than 13.9 ℃, a drain valve of a main steam pipeline in front of the high-pressure main steam combination valve is automatically opened, and an operator changes the valve into a manual state; the operator changes the valve into automatic state after high pressure steam inlet, when the superheat degree of the main steam is higher than 27.8 ℃, the drain valve of the main steam pipeline in front of the high pressure main steam combination valve is automatically closed.
The original switching logic of the drain valve of the front pipeline of the high-pressure main steam combined valve has obvious effect on accelerating the steam admission of the high-pressure cylinder of the steam turbine. There are still certain disadvantages: 1. in order to further respond to the policy of energy conservation and consumption reduction, the unit completes the self-supply transformation of the hot-state starting auxiliary steam in 2019, namely, high-pressure steam drum steam and medium-pressure steam drum steam are adopted to provide the hot-state starting steam for the unit, and the use of the natural gas for starting the boiler is reduced. The existing hot-state starting is mostly carried out by adopting the mode, so that the steam trap of the main steam pipeline in front of the high-pressure main steam combination valve is started after ignition, the pressure of the high-pressure steam drum is too quickly lost, and the auxiliary steam self-supply is not favorably and smoothly completed. Under the condition that the mode is not adopted for hot starting, the valve is started after ignition, unnecessary loss of the pressure of a high-pressure steam pocket can exist, and the effect of accelerating steam admission is reduced; 2. the automatic and manual modes of the valve need to be manually switched and adjusted to control the opening and closing of the valve, so that the possibility of improper operation exists, and the concept of high automation of a digital power plant is contradicted.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provides a control method of a steam inlet pipeline drainage valve of a high-pressure cylinder of a steam turbine.
The purpose of the invention is realized by the following technical scheme:
a control method for a steam trap valve of a steam inlet pipeline of a high-pressure cylinder of a steam turbine comprises the following steps:
setting automatic switching logic of a front pipeline drain valve of the high-pressure main steam combined valve, and if the following conditions are met simultaneously, opening the front pipeline drain valve of the high-pressure main steam combined valve:
the degree of superheat of pipeline steam is less than 13.9 ℃, an FDX ignition signal is continuously generated, and two optional conditions are provided;
setting automatic closing logic of a front pipeline drain valve of the high-pressure main steam combined valve, and closing the front pipeline drain valve of the high-pressure main steam combined valve if the following conditions are met simultaneously:
the tube steam superheat was >27.8 ℃, the FDX ignition signal persisted, and four selectable conditions.
The two selectable conditions are logical or relations, and specifically include: the first is the unit rotating speed >2000rpm, and the second is the continuous existence of the L94X shutdown signal.
The four selectable conditions are logical or relations, which specifically include: the method comprises the steps that firstly, a unit hot-state starting mode signal is continuous, the CV opening degree of a control valve in a high-pressure main steam combined valve is larger than 5%, secondly, an L94X shutdown signal is continuous, thirdly, a unit cold-state starting mode signal is continuous, and fourthly, a unit warm-state starting mode signal is continuous.
The high-pressure main steam combined valve is sequentially a control valve and a stop valve.
And the pipeline steam superheat measuring point is positioned between the inlet of the high-pressure bypass pipeline and the high-pressure main steam combined valve.
The invention has the beneficial effects that:
the invention fully utilizes the high-pressure steam drum pressure of the shutdown clearance of the unit, ensures the smooth thermal start of the unit and realizes the self supply of auxiliary steam; the automation level of the unit is further improved, and misoperation of operators is effectively avoided; the steam inlet speed of the high-pressure cylinder of the steam turbine is further increased, and the hot-state starting gas consumption of the unit is effectively reduced.
Drawings
FIG. 1 is a diagram illustrating the automatic valve opening logic of the present invention;
FIG. 2 is a schematic diagram of the automatic valve shut-off logic of the present invention;
fig. 3 is an explanatory view of the layout of the apparatus of the present invention.
Detailed Description
In order to more clearly understand the technical features, objects, and effects of the present invention, embodiments of the present invention will now be described with reference to the accompanying drawings.
In this embodiment, as shown in fig. 1 and 2, a control method for a drain valve of a steam inlet pipe of a high-pressure cylinder of a steam turbine includes the following steps:
setting automatic switching logic of a front pipeline drain valve of the high-pressure main steam combined valve, and if the following conditions are met simultaneously, opening the front pipeline drain valve of the high-pressure main steam combined valve:
the degree of superheat of pipeline steam is less than 13.9 ℃, an FDX ignition signal is continuously on, and two optional conditions are adopted;
setting automatic closing logic of a front pipeline drain valve of the high-pressure main steam combined valve, and closing the front pipeline drain valve of the high-pressure main steam combined valve if the following conditions are met simultaneously:
pipeline steam superheat is >27.8 ℃, the FDX ignition signal is on continuously, and four selectable conditions.
The two selectable conditions are logical or relations, and specifically include: the first is the unit rotating speed >2000rpm, and the second is the continuous existence of the L94X shutdown signal.
The four selectable conditions are logical or relations, which specifically include: the method comprises the steps that firstly, a unit hot-state starting mode signal is continuous, the CV opening degree of a control valve in a high-pressure main steam combined valve is larger than 5%, secondly, an L94X shutdown signal is continuous, thirdly, a unit cold-state starting mode signal is continuous, and fourthly, a unit warm-state starting mode signal is continuous.
As shown in fig. 3, the high-pressure main steam combination valve is a control valve and a stop valve in sequence; and the pipeline steam superheat measuring point is positioned between the inlet of the high-pressure bypass pipeline and the high-pressure main steam combined valve.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are given by way of illustration of the principles of the present invention, but that various changes and modifications may be made without departing from the spirit and scope of the invention, and such changes and modifications are within the scope of the invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (3)

1. A control method for a steam trap valve of a steam inlet pipeline of a high-pressure cylinder of a steam turbine is characterized by comprising the following steps:
setting automatic switching logic of a front pipeline drain valve of the high-pressure main steam combined valve, and if the following conditions are met simultaneously, opening the front pipeline drain valve of the high-pressure main steam combined valve:
the degree of superheat of pipeline steam is less than 13.9 ℃, an FDX ignition signal is continuously generated, and two optional conditions are provided; the two selectable conditions are logical or relations, and specifically include: the first is that the rotating speed of the unit is more than 2000rpm, and the second is that the L94X stop signal continuously exists;
setting automatic closing logic of a front pipeline drain valve of the high-pressure main steam combined valve, and closing the front pipeline drain valve of the high-pressure main steam combined valve if the following conditions are met simultaneously:
the degree of superheat of pipeline steam is greater than 27.8 ℃, an FDX ignition signal is continuously on, and four optional conditions are met; the four selectable conditions are logical or relations, which specifically include: the control valve CV opening degree in the high-pressure main steam combined valve is larger than 5% when the unit hot-state starting mode signal is continuous, the L94X stop signal is continuous, the unit cold-state starting mode signal is continuous, and the unit warm-state starting mode signal is continuous.
2. The method for controlling the steam trap valve of the steam turbine high pressure cylinder steam inlet pipeline according to claim 1, wherein the high pressure main steam combination valve is a control valve and a stop valve in sequence.
3. The method for controlling the steam trap valve of the steam inlet pipeline of the high-pressure cylinder of the steam turbine as claimed in claim 1, wherein the pipeline steam superheat measuring point is located between the inlet of the high-pressure bypass pipeline and the high-pressure main steam combination valve.
CN202110362601.7A 2021-04-02 2021-04-02 Control method of steam turbine high-pressure cylinder steam inlet pipeline drainage valve Active CN113074026B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110362601.7A CN113074026B (en) 2021-04-02 2021-04-02 Control method of steam turbine high-pressure cylinder steam inlet pipeline drainage valve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110362601.7A CN113074026B (en) 2021-04-02 2021-04-02 Control method of steam turbine high-pressure cylinder steam inlet pipeline drainage valve

Publications (2)

Publication Number Publication Date
CN113074026A CN113074026A (en) 2021-07-06
CN113074026B true CN113074026B (en) 2023-02-21

Family

ID=76615061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110362601.7A Active CN113074026B (en) 2021-04-02 2021-04-02 Control method of steam turbine high-pressure cylinder steam inlet pipeline drainage valve

Country Status (1)

Country Link
CN (1) CN113074026B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1410320A (en) * 1973-06-12 1975-10-15 Westinghouse Electric Corp Arrangement for controlling the loading of a turbine system
JPS5937208A (en) * 1982-04-16 1984-02-29 Hitachi Ltd Protection for steam turbine
CN103573303A (en) * 2013-11-12 2014-02-12 中国电力工程顾问集团西南电力设计院 Thermal power plant generator set adopting superheat to control drain valve on main steam pipeline
CN103573304A (en) * 2013-11-12 2014-02-12 中国电力工程顾问集团西南电力设计院 Thermal power plant generator set adopting superheat to control drain valve on reheat steam pipeline
JP2016070554A (en) * 2014-09-29 2016-05-09 三浦工業株式会社 Steam superheating system
CN105781629A (en) * 2016-03-30 2016-07-20 国核电力规划设计研究院 Control method of steam turbine steam pipeline drain valve of power station
CN108678814A (en) * 2018-05-14 2018-10-19 哈尔滨汽轮机厂有限责任公司 Steam turbine sequence starts method
CN110159365A (en) * 2019-06-12 2019-08-23 中国能源建设集团广东省电力设计研究院有限公司 A kind of sequence starting method of the small steam turbine of two-shipper backheat

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1410320A (en) * 1973-06-12 1975-10-15 Westinghouse Electric Corp Arrangement for controlling the loading of a turbine system
JPS5937208A (en) * 1982-04-16 1984-02-29 Hitachi Ltd Protection for steam turbine
CN103573303A (en) * 2013-11-12 2014-02-12 中国电力工程顾问集团西南电力设计院 Thermal power plant generator set adopting superheat to control drain valve on main steam pipeline
CN103573304A (en) * 2013-11-12 2014-02-12 中国电力工程顾问集团西南电力设计院 Thermal power plant generator set adopting superheat to control drain valve on reheat steam pipeline
JP2016070554A (en) * 2014-09-29 2016-05-09 三浦工業株式会社 Steam superheating system
CN105781629A (en) * 2016-03-30 2016-07-20 国核电力规划设计研究院 Control method of steam turbine steam pipeline drain valve of power station
CN108678814A (en) * 2018-05-14 2018-10-19 哈尔滨汽轮机厂有限责任公司 Steam turbine sequence starts method
CN110159365A (en) * 2019-06-12 2019-08-23 中国能源建设集团广东省电力设计研究院有限公司 A kind of sequence starting method of the small steam turbine of two-shipper backheat

Also Published As

Publication number Publication date
CN113074026A (en) 2021-07-06

Similar Documents

Publication Publication Date Title
CN109441575B (en) Method for operating heat supply network system of steam combined cycle generator set in heat supply period
CN109442368B (en) Bypass system comprehensive control method for improving regulating capacity of heat supply unit
CN100557306C (en) The startup method of band circulating-stove-water pump monotube boiler near steam heating boilers
CN204552839U (en) A kind of steam by-pass device of Combined cycle gas-steam turbine unit
CN100557304C (en) Dewatering capacity-enlarging starts the startup method of monotube boiler near steam heating boilers
CN111042881A (en) Wide-load high-efficiency steam turbine generator unit with part of cylinders capable of being cut off
CN104033196B (en) Method for quickly heating steam engine of gas engine combined cycle unit in cold state
JP5840559B2 (en) Exhaust gas recirculation type gas turbine power plant operating method and exhaust gas recirculation type gas turbine power plant
CN113074026B (en) Control method of steam turbine high-pressure cylinder steam inlet pipeline drainage valve
CN114719191A (en) Pipeline pre-warming method, system and controller
CN210069816U (en) Power plant boiler high temperature steam pipeline cinder sweeps structure
CN101096918A (en) Electric generating set small side road system and control method thereof
CN111042879B (en) High-load high-efficiency turbine unit with high and medium pressure cylinders cut off by separate cylinders
CN210564782U (en) Gas turbine gas heating system that admits air
CN203395585U (en) Steam main pipeline structure for ultra supercritical unit
CN112879890B (en) Automatic starting control method for whole process of coal-fired unit based on electric water feeding pump
CN114483235B (en) Heat supply system switched from extraction and condensation to zero output of low-pressure cylinder and working method thereof
CN206377647U (en) A kind of heating system as the occasion requires
CN110986067A (en) Blow pipe system for combined cycle power plant boiler and operation method thereof
CN113007692A (en) Coal-fired unit whole-process automatic starting control method based on steam-driven water feeding pump
CN107023338B (en) A kind of combustion engine of combined cycle generating unit load up method synchronous with steam turbine
CN218971278U (en) System for assisting steam turbine
CN113803284B (en) Thermal state starting method and equipment for steam induced draft fan of power plant boiler
CN114941552B (en) Large supercritical reheating type double-pumping back pressure unit-based rapid switching control method for heat supply without stopping furnace when shutdown
CN113091038B (en) Method for coordinately controlling steam pressure and steam drum water level of waste heat boiler

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant