CN113065798A - Safety production risk early warning method and system - Google Patents

Safety production risk early warning method and system Download PDF

Info

Publication number
CN113065798A
CN113065798A CN202110440025.3A CN202110440025A CN113065798A CN 113065798 A CN113065798 A CN 113065798A CN 202110440025 A CN202110440025 A CN 202110440025A CN 113065798 A CN113065798 A CN 113065798A
Authority
CN
China
Prior art keywords
risk
early warning
module
electrically connected
safety production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110440025.3A
Other languages
Chinese (zh)
Inventor
程明仁
庄丽君
肖静东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Junhong Safety And Environmental Protection Technology Co ltd
Original Assignee
Hubei Junhong Safety And Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Junhong Safety And Environmental Protection Technology Co ltd filed Critical Hubei Junhong Safety And Environmental Protection Technology Co ltd
Priority to CN202110440025.3A priority Critical patent/CN113065798A/en
Publication of CN113065798A publication Critical patent/CN113065798A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

The invention discloses a safety production risk early warning method and a system, which comprises an early warning device body, a system classification module, a safety production early warning system, a safety information management system, a risk model establishing system, a model information interaction system and a data acquisition module, wherein the system classification module is arranged in the early warning device body, a risk model database in the safety production process can be established through the risk model establishing system through the arranged risk model establishing system, more common risk factors in the safety production are set in the system in advance through a risk factor setting module, results caused by different risk factors are counted into the risk model database through a risk result simulation system, so that the risk factors generated in the actual safety production can be conveniently predicted, and the risk prediction preparation can be made in advance through the mode, the cost budget can be reduced, and compared with a traditional risk early warning system, the method is advanced.

Description

Safety production risk early warning method and system
Technical Field
The invention belongs to the technical field of production risk early warning, and particularly relates to a safety production risk early warning method and system.
Background
The risk early warning system is a system which monitors the change trend of risk factors by collecting related data information according to the characteristics of a researched object, evaluates the strength of deviation of various risk states from an early warning line, sends out early warning signals to a decision layer and takes early pre-control countermeasures in advance. Therefore, an evaluation index system must be constructed first and the index types are analyzed and processed to construct an early warning system; and secondly, carrying out comprehensive evaluation on the evaluation index system according to the early warning model, and finally, setting an early warning interval according to the evaluation result and taking corresponding measures. The risk prediction needs to comprehensively analyze a large amount of information, backward manual management means cannot adapt to the risk prediction, and the accuracy and timeliness of the risk prediction can be gradually improved only by means of high-tech means and combination of manual management and improvement of the automation level and the processing capacity of analysis. Therefore, a highly automated and intelligent risk early warning system is urgently needed to be established.
Disclosure of Invention
The invention aims to overcome the defects in the prior art and provides a safety production risk early warning method and a safety production risk early warning system so as to solve the problem that the early warning system technology provided in the background technology is relatively lagged behind.
In order to achieve the purpose, the invention provides the following technical scheme: the safety production risk early warning method and the system comprise an early warning device body, a system classification module, a safety production early warning system, a safety information management system, a risk model establishing system, a model information interaction system and a data acquisition module, wherein the system classification module is arranged in the early warning device body, the system classification module comprises the safety production early warning system, the safety information management system, the risk model establishing system and the model information interaction system, the risk model establishing system is electrically connected with a risk factor setting module, the risk factor setting module is electrically connected with a risk result simulation system, the risk result simulation system is electrically connected with a data statistics module, the data acquisition module is electrically connected with a data identification module, and the data identification module is electrically connected with a risk model database, the risk model database is electrically connected with the data comparison module, the data comparison module is electrically connected with the risk assessment module, and the risk assessment module is electrically connected with the safety production early warning system.
Preferably, the safety production early warning system and the risk identification system are electrically connected, and the risk identification system and the risk identification analysis module are electrically connected.
Preferably, the safety production early warning system and the risk evaluation system are electrically connected, and the risk evaluation system and the risk factor quantification module are electrically connected.
Preferably, the safety production early warning system and the risk early warning system are electrically connected, and the risk early warning system and the risk alarm control module are electrically connected.
Preferably, the safety information management system is electrically connected with the production equipment information feedback module, the staff duty information counting module, the product quality detection module and the equipment circuit detection module respectively.
Preferably, the model information interaction system and the risk information interaction module are electrically connected, the risk information interaction module and the risk score calculation module are electrically connected, and the risk score calculation module and the cost information prediction module are electrically connected.
Preferably, the safety production early warning system is electrically connected with the network communication system, and the network communication system is electrically connected with the risk monitoring platform.
Preferably, the upper end of one side of the early warning device body is fixedly connected with a display, and the lower end of the display is provided with a keyboard.
Preferably, both ends of one side of the early warning device body are provided with connecting sockets, and the connecting sockets are respectively a power socket and a network cable socket.
The safety production risk early warning method and the safety production risk early warning system comprise the following steps:
the method comprises the following steps: analyzing risk factors according to the overall production flow of the enterprise, classifying various risk factors, and uploading classification information results to a risk model database;
step two: monitoring production equipment, staff duty, product quality and equipment circuit conditions through a safety information management system;
step three: collecting monitoring data of a safety information management system through a data collection module, and comparing the collected data with data information in a risk model database;
step four: performing risk evaluation calculation on the information after the risk data comparison, and dividing the calculation result into a plurality of risk standard ranges;
step five: and the risk standard carries out cost information consumption calculation and uploads a calculation result to a risk monitoring platform.
Compared with the prior art, the invention provides a safety production risk early warning method and a safety production risk early warning system, which have the following beneficial effects:
1. according to the risk model establishing system, the risk model database in the safety production process can be established through the risk model establishing system, the common risk factors in the safety production are set in the system in advance through the risk factor setting module, and the results caused by different risk factors are counted into the risk model database through the risk result simulation system, so that the risk factors generated in the actual safety production can be conveniently predicted, the risk prediction preparation can be made in advance through the mode, the cost budget can be reduced, and the mode is advanced compared with the traditional risk early warning system;
2. according to the invention, through the arranged safety production early warning system, the risk factors in the actual safety production process can be respectively identified, analyzed, quantified and prompted by a risk alarm through the safety production early warning system, and the actual risk factors can be identified in type and quantified in grade through the mode, so that the risk data in the follow-up and risk model database can be conveniently compared;
3. according to the invention, through the set network communication system, the cost information prediction result can be uploaded into the risk monitoring platform through the network communication system, so that the risk monitoring platform can know the risk factor information condition and the risk cost prediction result condition, and through the set model information interaction system, the data interaction between the actual risk factor information condition and the data in the risk model data can be realized through the risk model interaction system, so that the comparison between the actual risk factor and the data in the risk model database is realized.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention without limiting the invention in which:
fig. 1 is a schematic structural diagram of a safety production risk early warning method and system provided by the invention;
FIG. 2 is a schematic flow chart of a method and a system for risk early warning in safety production according to the present invention;
FIG. 3 is a system framework diagram of a system classification module in the safety production risk early warning method and system according to the present invention;
FIG. 4 is a system framework diagram of a data acquisition module in the safety production risk early warning method and system according to the present invention;
fig. 5 is a system framework diagram of a safety production early warning system in the safety production risk early warning method and system according to the present invention;
fig. 6 is a system framework diagram of a safety information management system in the safety production risk early warning method and system according to the present invention;
FIG. 7 is a system framework diagram of a risk modeling system in the safety production risk early warning method and system of the present invention;
FIG. 8 is a system framework diagram of a model information interaction system in the safety production risk early warning method and system of the present invention;
in the figure: 1. a pre-warning device body; 2. a display; 3. a keyboard; 4. a connecting socket; 5. a system classification module; 6. a safety production early warning system; 7. a security information management system; 8. a risk model building system; 9. a model information interaction system; 10. a data acquisition module; 11. a data identification module; 12. a risk model database; 13. a data comparison module; 14. a risk assessment module; 15. a network communication system; 16. a risk monitoring platform; 17. a risk identification system; 18. a risk identification analysis module; 19. a risk evaluation system; 20. a risk factor quantification module; 21. a risk early warning system; 22. a risk alert control module; 23. a production equipment information feedback module; 24. the staff duty information counting module; 25. a product quality detection module; 26. a device circuit detection module; 27. a risk factor setting module; 28. a risk result simulation system; 29. a data statistics module; 30. a risk information interaction module; 31. a risk score calculation module; 32. and a cost information prediction module.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-8, the present invention provides the following technical solutions: the safety production risk early warning method and the system comprise an early warning device body 1, a system classification module 5, a safety production early warning system 6, a safety information management system 7, a risk model establishing system 8, a model information interaction system 9 and a data acquisition module 10, wherein the system classification module 5 is arranged in the early warning device body 1, the safety production early warning system 6, the safety information management system 7, the risk model establishing system 8 and the model information interaction system 9 are contained in the system classification module 5, the risk model establishing system 8 is electrically connected with a risk factor setting module 27, the risk factor setting module 27 is electrically connected with a risk result simulation system 28, the risk result simulation system 28 is electrically connected with a data statistics module 29, and the data acquisition module 10 is electrically connected with a data identification module 11, the data identification module 11 is electrically connected with the risk model database 12, the risk model database 12 is electrically connected with the data comparison module 13, the data comparison module 13 is electrically connected with the risk assessment module 14, the risk assessment module 14 is electrically connected with the safety production early warning system 6, the risk model database 12 in the safety production process is established through the risk model establishing system 8, common risk factors in the safety production are set in the system in advance through the risk factor setting module 27, results caused by different risk factors are counted in the risk model database 12 through the risk result simulation system 28, therefore, the risk budget factors generated in the actual safety production can be conveniently predicted, risk prediction preparation can be made in advance through the method, and the cost can be reduced.
In the invention, preferably, the safety production early warning system 6 is electrically connected with the risk identification system 17, the risk identification system 17 is electrically connected with the risk identification analysis module 18, and the safety production early warning system 6 is used for respectively carrying out identification analysis, risk quantification and risk alarm prompting on the risk factors in the actual safety production process in the risk factor prediction process, so that the actual risk factors are subjected to type identification and grade quantification, and the subsequent comparison with the risk data in the risk model database 12 is facilitated.
In the invention, preferably, the safety production early warning system 6 is electrically connected with the risk evaluation system 19, the risk evaluation system 19 is electrically connected with the risk factor quantification module 20, the actual risk factors can be quantified and measured by the risk factor quantification module 20, and the actual risk factors can be classified differently according to the risk grade standard.
In the present invention, preferably, the safety production early warning system 6 is electrically connected to the risk early warning system 21, and the risk early warning system 21 is electrically connected to the risk alarm control module 22.
In the present invention, preferably, the safety information management system 7 is electrically connected to the production equipment information feedback module 23, the employee attendance information statistics module 24, the product quality detection module 25, and the equipment circuit detection module 26, respectively.
In the present invention, preferably, the model information interaction system 9 is electrically connected to the risk information interaction module 30, the risk information interaction module 30 is electrically connected to the risk score calculation module 31, and the risk score calculation module 31 is electrically connected to the cost information prediction module 32.
In the invention, preferably, the safety production early warning system 6 is electrically connected with the network communication system 15, the network communication system 15 is electrically connected with the risk monitoring platform 16, and the cost information prediction result is uploaded into the risk monitoring platform 16 through the network communication system 15, so that the risk monitoring platform 16 can know the risk factor information condition and the risk cost prediction result condition.
In the invention, preferably, the upper end of one side of the early warning device body 1 is fixedly connected with a display 2, and the lower end of the display 2 is provided with a keyboard 3.
In the invention, preferably, the two ends of one side of the early warning device body 1 are both provided with the connecting sockets 4, and the two connecting sockets 4 are respectively a power socket and a network cable socket.
The safety production risk early warning method and the safety production risk early warning system comprise the following steps:
the method comprises the following steps: analyzing risk factors according to the overall production flow of the enterprise, classifying various risk factors, and uploading classification information results to a risk model database 12;
step two: monitoring production equipment, staff duty, product quality and equipment circuit conditions through a safety information management system 7;
step three: collecting the monitoring data of the safety information management system 7 through a data collecting module 10, and comparing the collected data with the data information in a risk model database 12;
step four: performing risk evaluation calculation on the information after the risk data comparison, and dividing the calculation result into a plurality of risk standard ranges;
step five: the risk standard performs cost information consumption calculation and uploads the calculation result to the risk monitoring platform 16.
The first embodiment is as follows:
the safety production risk early warning method and the system comprise an early warning device body 1, a system classification module 5, a safety production early warning system 6, a safety information management system 7, a risk model establishing system 8, a model information interaction system 9 and a data acquisition module 10, wherein the system classification module 5 is arranged in the early warning device body 1, the safety production early warning system 6, the safety information management system 7, the risk model establishing system 8 and the model information interaction system 9 are contained in the system classification module 5, the risk model establishing system 8 is electrically connected with a risk factor setting module 27, the risk factor setting module 27 is electrically connected with a risk result simulation system 28, the risk result simulation system 28 is electrically connected with a data statistics module 29, and the data acquisition module 10 is electrically connected with a data identification module 11, the data identification module 11 is electrically connected with the risk model database 12, the risk model database 12 is electrically connected with the data comparison module 13, the data comparison module 13 is electrically connected with the risk assessment module 14, the risk assessment module 14 is electrically connected with the safety production early warning system 6, the risk model database 12 in the safety production process is established through the risk model establishing system 8, common risk factors in the safety production are set in the system in advance through the risk factor setting module 27, results caused by different risk factors are counted in the risk model database 12 through the risk result simulation system 28, therefore, the risk budget factors generated in the actual safety production can be conveniently predicted, risk prediction preparation can be made in advance through the method, and the cost can be reduced.
Example two:
the safety production risk early warning method and the system comprise an early warning device body 1, a system classification module 5, a safety production early warning system 6, a safety information management system 7, a risk model establishing system 8, a model information interaction system 9 and a data acquisition module 10, wherein the system classification module 5 is arranged in the early warning device body 1, the safety production early warning system 6, the safety information management system 7, the risk model establishing system 8 and the model information interaction system 9 are contained in the system classification module 5, the risk model establishing system 8 is electrically connected with a risk factor setting module 27, the risk factor setting module 27 is electrically connected with a risk result simulation system 28, the risk result simulation system 28 is electrically connected with a data statistics module 29, and the data acquisition module 10 is electrically connected with a data identification module 11, the data identification module 11 is electrically connected with the risk model database 12, the risk model database 12 is electrically connected with the data comparison module 13, the data comparison module 13 is electrically connected with the risk assessment module 14, the risk assessment module 14 is electrically connected with the safety production early warning system 6, the risk model database 12 in the safety production process is established through the risk model establishing system 8, common risk factors in the safety production are set in the system in advance through the risk factor setting module 27, results caused by different risk factors are counted in the risk model database 12 through the risk result simulation system 28, therefore, the risk budget factors generated in the actual safety production can be conveniently predicted, risk prediction preparation can be made in advance through the method, and the cost can be reduced.
In the invention, preferably, the safety production early warning system 6 is electrically connected with the risk identification system 17, the risk identification system 17 is electrically connected with the risk identification analysis module 18, and the safety production early warning system 6 is used for respectively carrying out identification analysis, risk quantification and risk alarm prompting on the risk factors in the actual safety production process in the risk factor prediction process, so that the actual risk factors are subjected to type identification and grade quantification, and the subsequent comparison with the risk data in the risk model database 12 is facilitated.
In the invention, preferably, the safety production early warning system 6 is electrically connected with the risk evaluation system 19, the risk evaluation system 19 is electrically connected with the risk factor quantification module 20, the actual risk factors can be quantified and measured by the risk factor quantification module 20, and the actual risk factors can be classified differently according to the risk grade standard.
The working principle and the using process of the invention are as follows: when in use, the connecting socket 4 at one side of the early warning device body 1 is respectively inserted into a power line and a network cable, risk factors are analyzed according to the total production flow of an enterprise, a plurality of risk factors are classified, classified information results are uploaded to a risk model database 12, production equipment, staff duty, product quality and equipment circuit conditions are monitored through a safety information management system 7, monitoring data of the safety information management system 7 are collected through a data acquisition module 10, the collected data are compared with data information in the risk model database 12, risk evaluation calculation is carried out on the information after risk data comparison, the calculation results are divided into a plurality of risk standard ranges, cost information consumption calculation is carried out on the risk standards, the calculation results are uploaded to a risk monitoring platform 16, the risk model database 12 in the safety production process is established through a risk model establishing system 8, common risk factors in safety production are set in advance in the system through the risk factor setting module 27, results caused by different risk factors are counted into the risk model database 12 through the risk result simulation system 28, so that the risk factors generated in actual safety production can be conveniently predicted, risk prediction preparation can be made in advance through the method, cost budget can be reduced, the risk factors in the actual safety production process are respectively identified and analyzed, risk quantification and risk alarm prompting are carried out through the safety production early warning system 6 in the risk factor prediction process, type identification and grade quantification processing on the actual risk factors are realized, the follow-up comparison with risk data in the risk model database 12 is convenient, and cost information prediction results are uploaded into the risk monitoring platform 16 through the network communication system 15, the risk monitoring platform 16 can know the risk factor information condition and the risk cost prediction result condition, the actual risk factor information condition and the data in the risk model database 12 can be subjected to data interaction through the risk model information interaction system 9, and the actual risk factor and the data in the risk model database 12 can be compared.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (10)

1. Safety production risk early warning method and system, including early warning device body (1), systematic classification module (5), safety production early warning system (6), safety information management system (7), risk model establishment system (8), model information interactive system (9) and data acquisition module (10), its characterized in that: the early warning device comprises an early warning device body (1), wherein a system classification module (5) is arranged in the early warning device body (1), the system classification module (5) comprises a safety production early warning system (6), a safety information management system (7), a risk model establishing system (8) and a model information interaction system (9), the risk model establishing system (8) is electrically connected with a risk factor setting module (27), the risk factor setting module (27) is electrically connected with a risk result simulation system (28), the risk result simulation system (28) is electrically connected with a data statistics module (29), a data acquisition module (10) is electrically connected with a data identification module (11), the data identification module (11) is electrically connected with a risk model database (12), and the risk model database (12) is electrically connected with a data comparison module (13), the data comparison module (13) is electrically connected with the risk assessment module (14), and the risk assessment module (14) is electrically connected with the safety production early warning system (6).
2. The safety production risk early warning method and system according to claim 1, characterized in that: the safety production early warning system (6) is electrically connected with the risk identification system (17), and the risk identification system (17) is electrically connected with the risk identification analysis module (18).
3. The safety production risk early warning method and system according to claim 1, characterized in that: the safety production early warning system (6) is electrically connected with the risk evaluation system (19), and the risk evaluation system (19) is electrically connected with the risk factor quantification module (20).
4. The safety production risk early warning method and system according to claim 1, characterized in that: the safety production early warning system (6) is electrically connected with the risk early warning system (21), and the risk early warning system (21) is electrically connected with the risk alarm control module (22).
5. The safety production risk early warning method and system according to claim 1, characterized in that: the safety information management system (7) is electrically connected with the production equipment information feedback module (23), the staff duty information counting module (24), the product quality detection module (25) and the equipment circuit detection module (26) respectively.
6. The safety production risk early warning method and system according to claim 1, characterized in that: the model information interaction system (9) is electrically connected with the risk information interaction module (30), the risk information interaction module (30) is electrically connected with the risk score calculation module (31), and the risk score calculation module (31) is electrically connected with the cost information prediction module (32).
7. The safety production risk early warning method and system according to claim 1, characterized in that: the safety production early warning system (6) is electrically connected with the network communication system (15), and the network communication system (15) is electrically connected with the risk monitoring platform (16).
8. The safety production risk early warning method and system according to claim 1, characterized in that: the early warning device is characterized in that a display (2) is fixedly connected to the upper end of one side of the early warning device body (1), and a keyboard (3) is arranged at the lower end of the display (2).
9. The safety production risk early warning method and system according to claim 1, characterized in that: the early warning device is characterized in that connecting sockets (4) are arranged at two ends of one side of the early warning device body (1), and the two connecting sockets (4) are respectively a power socket and a network cable socket.
10. The safety production risk early warning method and system according to claim 1, characterized in that: the method comprises the following steps:
the method comprises the following steps: analyzing risk factors according to the overall production flow of the enterprise, classifying various risk factors, and uploading classification information results to a risk model database (12);
step two: monitoring production equipment, staff duty, product quality and equipment circuit conditions through a safety information management system (7);
step three: monitoring data of the safety information management system (7) is collected through a data collection module (10), and the collected data is compared with data information in a risk model database (12);
step four: performing risk evaluation calculation on the information after the risk data comparison, and dividing the calculation result into a plurality of risk standard ranges;
step five: and the risk standard calculates cost information consumption and uploads a calculation result to a risk monitoring platform (16).
CN202110440025.3A 2021-04-23 2021-04-23 Safety production risk early warning method and system Pending CN113065798A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110440025.3A CN113065798A (en) 2021-04-23 2021-04-23 Safety production risk early warning method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110440025.3A CN113065798A (en) 2021-04-23 2021-04-23 Safety production risk early warning method and system

Publications (1)

Publication Number Publication Date
CN113065798A true CN113065798A (en) 2021-07-02

Family

ID=76567633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110440025.3A Pending CN113065798A (en) 2021-04-23 2021-04-23 Safety production risk early warning method and system

Country Status (1)

Country Link
CN (1) CN113065798A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114419837A (en) * 2021-12-07 2022-04-29 攀枝花钢城集团米易瑞地矿业有限公司 Safety production early warning system and method thereof
CN116227849A (en) * 2023-01-18 2023-06-06 北京图安世纪科技股份有限公司 Standardized management and early warning system for enterprise dangerous operation

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102339415A (en) * 2010-07-22 2012-02-01 北京市药品监督管理局药品认证管理中心 Risk evaluation system for medicine production and management enterprises
CN102521672A (en) * 2011-12-01 2012-06-27 嘉兴电力局 Safety risk automatic recognition method based on network-distribution production operation plan
CN102737287A (en) * 2012-04-23 2012-10-17 中国电力科学研究院 Regional power grid on-line power supply risk assessment system
CN109887542A (en) * 2019-02-12 2019-06-14 嘉兴海云惠智医疗科技有限公司 A kind of tumour individuation genetic test intelligence solution read apparatus based on cloud computing
CN111047169A (en) * 2019-12-03 2020-04-21 深圳供电局有限公司 Fault analysis and detection system for power grid dispatching
CN112070400A (en) * 2020-09-09 2020-12-11 广东电力信息科技有限公司 Method and device for evaluating security situation of power grid database

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102339415A (en) * 2010-07-22 2012-02-01 北京市药品监督管理局药品认证管理中心 Risk evaluation system for medicine production and management enterprises
CN102521672A (en) * 2011-12-01 2012-06-27 嘉兴电力局 Safety risk automatic recognition method based on network-distribution production operation plan
CN102737287A (en) * 2012-04-23 2012-10-17 中国电力科学研究院 Regional power grid on-line power supply risk assessment system
CN109887542A (en) * 2019-02-12 2019-06-14 嘉兴海云惠智医疗科技有限公司 A kind of tumour individuation genetic test intelligence solution read apparatus based on cloud computing
CN111047169A (en) * 2019-12-03 2020-04-21 深圳供电局有限公司 Fault analysis and detection system for power grid dispatching
CN112070400A (en) * 2020-09-09 2020-12-11 广东电力信息科技有限公司 Method and device for evaluating security situation of power grid database

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114419837A (en) * 2021-12-07 2022-04-29 攀枝花钢城集团米易瑞地矿业有限公司 Safety production early warning system and method thereof
CN114419837B (en) * 2021-12-07 2023-09-26 攀枝花钢城集团米易瑞地矿业有限公司 Safety production early warning system and early warning method thereof
CN116227849A (en) * 2023-01-18 2023-06-06 北京图安世纪科技股份有限公司 Standardized management and early warning system for enterprise dangerous operation
CN116227849B (en) * 2023-01-18 2023-09-15 北京图安世纪科技股份有限公司 Standardized management and early warning system for enterprise dangerous operation

Similar Documents

Publication Publication Date Title
CN111047082B (en) Early warning method and device of equipment, storage medium and electronic device
CN110674189B (en) Method for monitoring secondary state and positioning fault of intelligent substation
CN103198147B (en) The differentiation of automatic monitoring abnormal data and processing method
CN113065798A (en) Safety production risk early warning method and system
CN104751285B (en) Power network schedule automation front-collection data accuracy differentiates and warning system
CN108197817A (en) A kind of method of the non-intrusion type load transient state monitoring based on big data
CN111444169A (en) Transformer substation electrical equipment state monitoring and diagnosis system and method
CN110633901A (en) Intelligent substation relay protection device operation situation perception and remote maintenance system
CN115358155A (en) Power big data abnormity early warning method, device, equipment and readable storage medium
CN115345568A (en) Monitoring and early warning method and system based on drainage pipe network GIS
CN115049326A (en) Production management system and management method
CN115511367A (en) Intelligent quality management system of production line
CN116244765A (en) Equipment maintenance management method based on industrial Internet
CN105743220A (en) Dispatching automation monitoring information analyzing and processing system and method
CN116611953A (en) Electric energy meter production and manufacturing real-time data management method and system based on Internet of things
CN112365186A (en) Health degree evaluation method and system for electric power information system
CN117113135A (en) Carbon emission anomaly monitoring and analyzing system capable of sorting and classifying anomaly data
CN113837672B (en) Equipment maintenance management method based on industrial Internet
CN115760024A (en) Intelligent building management and control platform based on BIM
CN115659832B (en) Enterprise operation analysis and early warning monitoring method and system based on big data analysis
CN111959281A (en) Electric bicycle battery safety management system based on thing networking
CN114520543B (en) Operation and maintenance system for secondary equipment
US20240054427A1 (en) An instrument scrap evaluation method based on cloud platform big data management
CN211718760U (en) Industrial real-time data processing system
CN114118479A (en) Bidirectional RNN-based power project abnormity early warning processing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210702