CN113062626A - 5G intelligent disassembly building construction auxiliary system - Google Patents

5G intelligent disassembly building construction auxiliary system Download PDF

Info

Publication number
CN113062626A
CN113062626A CN202110273958.8A CN202110273958A CN113062626A CN 113062626 A CN113062626 A CN 113062626A CN 202110273958 A CN202110273958 A CN 202110273958A CN 113062626 A CN113062626 A CN 113062626A
Authority
CN
China
Prior art keywords
monitoring
display
instrument panel
transmission system
counting sensing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110273958.8A
Other languages
Chinese (zh)
Inventor
孙易路
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tanggu Technology Development Tianjin Co ltd
Original Assignee
Tanggu Technology Development Tianjin Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tanggu Technology Development Tianjin Co ltd filed Critical Tanggu Technology Development Tianjin Co ltd
Priority to CN202110273958.8A priority Critical patent/CN113062626A/en
Publication of CN113062626A publication Critical patent/CN113062626A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/08Wrecking of buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/08Wrecking of buildings
    • E04G23/082Wrecking of buildings using shears, breakers, jaws and the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a 5G intelligent dismantling building construction auxiliary system which is characterized by comprising a monitoring structure, a display structure, a counting sensing structure, a meter panel monitoring structure, a transmission system and a main control terminal structure, wherein the monitoring structure, the counting sensing structure and the meter panel monitoring structure are respectively connected with the display structure, and the display structure is connected with the main control terminal through the transmission system; the monitoring structures are respectively arranged on the outer side of the demolition equipment and the position of a manipulator of the demolition equipment, so that all-dimensional information acquisition, processing and control can be performed on a building needing demolition, workers can conveniently monitor the demolition equipment in real time, and accidents are avoided.

Description

5G intelligent disassembly building construction auxiliary system
Technical Field
The invention relates to the field of building construction, in particular to a 5G intelligent disassembly building construction auxiliary system.
Background
With the development of society, various buildings appear like bamboo shoots in spring after rain, with the acceleration of the updating speed, many old buildings need to be reformed and dismantled, a large amount of dismantling and modifying work exists in the building reformation, and part of dismantling operation is high in danger.
However, some buildings cannot inquire original design data due to the early construction time, only field measurement can be performed, the traditional measurement method is not accurate and consumes too much time, the obtained analysis conclusion is deviated from the actual result, certain safety risk exists, and the cost is difficult to control.
And the steel net rack is a spatial three-dimensional structure, the structure is complex, important contents such as bed-jig erection, dismantling sequence, construction requirements and safety precautions are important, and the intuition is not strong if the traditional scheme bottom-crossing mode or even construction animation bottom-crossing is adopted. Potential safety hazards exist in the dismantling process, and safety accidents are easy to happen.
Disclosure of Invention
According to the technical problem, the invention provides a 5G intelligent dismantling building construction auxiliary system which is characterized by comprising a monitoring structure, a display structure, a counting sensing structure, a meter panel monitoring structure, a transmission system and a main control terminal structure, wherein the monitoring structure, the counting sensing structure and the meter panel monitoring structure are respectively connected with the display structure, and the display structure is connected with the main control terminal through the transmission system;
the hydraulic shears are arranged on the upper side of the dismantling device, and a counting sensing structure is arranged on the hydraulic shears;
the monitoring structure is a monitoring facility;
the display structure consists of a display and a receiving module, the receiving module receives data transmitted by the monitoring structure, the counting sensing structure and the instrument panel monitoring structure, and the receiving module transmits the received information to the display and displays the information by the display;
the instrument panel monitoring structure is connected with a removed equipment instrument panel, and displays and stores data transmitted from the instrument panel;
the transmission system is a 5G transmission optical network.
The monitoring facilities are multiple, the monitoring facilities are cameras, and the cameras are respectively installed on the outer side of the dismantling device and the positions of mechanical hands of the dismantling device.
The invention has the beneficial effects that: the monitoring structures are respectively arranged on the outer side of the demolition equipment and the position of a manipulator of the demolition equipment, so that all-dimensional information acquisition, processing and control can be performed on a building needing demolition, workers can conveniently monitor the demolition equipment in real time, and accidents are avoided.
According to the invention, the hydraulic shears are arranged on the upper side of the dismantling equipment, the counting sensing structure is arranged on the hydraulic shears, the opening and closing times of the hydraulic shears can be recorded in real time, the hydraulic shears can be used for dismantling buildings, concrete beams and the like are sheared, and a small amount of steel bars can be sheared. Count sensing structure and demonstration structural connection show structural installation in the driver's cabin, and driver's cabin and main control terminal structure can monitor the front end hydraulic pressure and cut, make things convenient for the staff to monitor the building condition of demolising.
The invention applies 5G intelligent construction to the building dismantling construction process, carries out overall monitoring on the working state of the equipment through multi-angle and omnibearing information acquisition, processing and control, and processes in time when abnormity is found.
Drawings
FIG. 1 is a schematic block diagram of the invention;
Detailed Description
Example 1
The invention provides a 5G intelligent dismantling building construction auxiliary system which is characterized by comprising a monitoring structure, a display structure, a counting sensing structure, a meter panel monitoring structure, a transmission system and a main control terminal structure, wherein the monitoring structure, the counting sensing structure and the meter panel monitoring structure are respectively connected with the display structure, and the display structure is connected with the main control terminal through the transmission system; the hydraulic shears are arranged on the upper side of the dismantling device, and a counting sensing structure is arranged on the hydraulic shears; the display structure consists of a display and a receiving module, the receiving module receives data transmitted by the monitoring structure, the counting sensing structure and the instrument panel monitoring structure, and the receiving module transmits the received information to the display and displays the information by the display; the instrument panel monitoring structure is connected with a removed equipment instrument panel, and displays and stores data transmitted from the instrument panel; the transmission system is a 5G transmission optical network. The monitoring structure is a plurality of, the monitoring structure is the camera, the camera is installed respectively and is demolishd the equipment outside and demolish equipment manipulator position.
Example 2
When the device is used, monitoring facilities are arranged at suitable positions of the whole vehicle, such as the outside of a cab, an excavator operating arm and the like, all-dimensional monitoring is implemented through angle control, and the working state of the device, such as the size of crushed materials, can be seen in the cab. A counting sensor mechanism is arranged on the hydraulic shears, so that the opening and closing times of the hydraulic shears can be recorded in real time; the instrument panel monitoring mechanism is arranged in the cab, so that parameters such as pressure, flow and the like on the instrument panel can be played back; the display structure consists of a display and a receiving module, the receiving module receives data transmitted by the monitoring structure, the counting sensing structure and the instrument panel monitoring structure, and the receiving module transmits the received information to the display and displays the information by the display; the demolition information acquisition of the demolition site can be transmitted to the display structure in real time through the 5G transmission system, and the receiver controls the working state in real time.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. While the invention has been described with respect to the above embodiments, it will be understood by those skilled in the art that the invention is not limited to the above embodiments, which are described in the specification and illustrated only to illustrate the principles of the invention, but that various changes and modifications may be made without departing from the spirit and scope of the invention as defined by the appended claims. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (2)

1. A5G intelligent dismantling building construction auxiliary system is characterized by comprising a monitoring structure, a display structure, a counting sensing structure, a dashboard monitoring structure, a transmission system and a main control terminal structure, wherein the monitoring structure, the counting sensing structure and the dashboard monitoring structure are respectively connected with the display structure, and the display structure is connected with the main control terminal through the transmission system;
the hydraulic shears are arranged on the upper side of the dismantling device, and a counting sensing structure is arranged on the hydraulic shears;
the monitoring structure is a monitoring facility;
the display structure consists of a display and a receiving module, the receiving module receives data transmitted by the monitoring structure, the counting sensing structure and the instrument panel monitoring structure, and the receiving module transmits the received information to the display and displays the information by the display;
the instrument panel monitoring structure is connected with a removed equipment instrument panel, and displays and stores data transmitted from the instrument panel;
the transmission system is a 5G transmission optical network.
2. The 5G intelligent dismantling building construction auxiliary system as claimed in claim 1, wherein said monitoring means is a plurality of said monitoring means, said monitoring means is a camera, said camera is installed outside the dismantling device and at the position of the dismantling device manipulator respectively.
CN202110273958.8A 2021-03-15 2021-03-15 5G intelligent disassembly building construction auxiliary system Pending CN113062626A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110273958.8A CN113062626A (en) 2021-03-15 2021-03-15 5G intelligent disassembly building construction auxiliary system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110273958.8A CN113062626A (en) 2021-03-15 2021-03-15 5G intelligent disassembly building construction auxiliary system

Publications (1)

Publication Number Publication Date
CN113062626A true CN113062626A (en) 2021-07-02

Family

ID=76560586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110273958.8A Pending CN113062626A (en) 2021-03-15 2021-03-15 5G intelligent disassembly building construction auxiliary system

Country Status (1)

Country Link
CN (1) CN113062626A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115110798A (en) * 2022-08-02 2022-09-27 中建二局第三建筑工程有限公司 Hydraulic shearing and dismantling method for light steel pipe frame system structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105780842A (en) * 2016-04-26 2016-07-20 汤谷科技发展(天津)股份有限公司 Hydraulic accessory working condition monitoring system with positioning function
CN110987057A (en) * 2019-09-30 2020-04-10 中交天津港湾工程研究院有限公司 Hydraulic pressure is automatic monitoring system in high in clouds for creeping formwork
CN112034314A (en) * 2020-08-26 2020-12-04 刘情 Monitoring system
CN112308510A (en) * 2020-10-22 2021-02-02 河南正兴工程管理有限公司 Green and environment-friendly building construction management system and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105780842A (en) * 2016-04-26 2016-07-20 汤谷科技发展(天津)股份有限公司 Hydraulic accessory working condition monitoring system with positioning function
CN110987057A (en) * 2019-09-30 2020-04-10 中交天津港湾工程研究院有限公司 Hydraulic pressure is automatic monitoring system in high in clouds for creeping formwork
CN112034314A (en) * 2020-08-26 2020-12-04 刘情 Monitoring system
CN112308510A (en) * 2020-10-22 2021-02-02 河南正兴工程管理有限公司 Green and environment-friendly building construction management system and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115110798A (en) * 2022-08-02 2022-09-27 中建二局第三建筑工程有限公司 Hydraulic shearing and dismantling method for light steel pipe frame system structure

Similar Documents

Publication Publication Date Title
CN106593534B (en) A kind of intelligent tunnel construction safety monitoring system
CN111324923B (en) Real-time monitoring method, device and system for bridge pushing structure
CN204515511U (en) Cultivating one monitoring system built by bridge
CN100465999C (en) Caisson 3D scene rebuilding and excavator collision avoidance system based on laser scanning
CN112650115B (en) Bridge girder erection machine active safety monitoring system
CN113062626A (en) 5G intelligent disassembly building construction auxiliary system
CN111220117A (en) Dynamic monitoring method and device for deformation of formwork support
CN203606651U (en) An intelligent remote control device for engineering machinery
CN115563683A (en) Hydraulic engineering automatic safety monitoring management system based on digital twins
CN204569242U (en) A kind of remote control security tower crane based on position coordinate
CN115171337A (en) Real-time intelligent monitoring method and system for high and large formwork safety construction
CN104264589A (en) Real-time monitoring method for hanging basket states
CN208183704U (en) The safety pre-warning system in tunnel portal slope construction stage
CN111668935A (en) Substation operation preparation management method and system based on EIM
CN209244608U (en) A kind of big cross section labyrinth deep drilled shaft concrete Sliding Mode Attitude monitoring system
CN106441690A (en) Real-time automatic monitoring method for wireless torsional force wrench
CN115935637A (en) GIS digital twin-based transformer substation visual operation and maintenance system
CN212007339U (en) Structure stress and strain monitoring and early warning system based on BIM technology
CN210952784U (en) High mound pump sending concrete pump pipe detecting system
CN114266099A (en) Intelligent guiding and safety early warning method for road surface excavation operation by coupling underground pipe network BIM model
CN220729328U (en) Bridge rotation structure monitoring system
CN109505656B (en) Karst tunnel water inrush early warning system and early warning method
CN113391605A (en) Automatic mining method based on digital mining technology
Zhang et al. Large-scale machinery monitoring system based on the visual reality
CN111447363A (en) Tunnel wireless panoramic video monitoring system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210702