CN113008507A - High-flow high-stability Mach number wind tunnel rapid adjusting system and method based on temporary flushing gas source - Google Patents

High-flow high-stability Mach number wind tunnel rapid adjusting system and method based on temporary flushing gas source Download PDF

Info

Publication number
CN113008507A
CN113008507A CN202110293279.7A CN202110293279A CN113008507A CN 113008507 A CN113008507 A CN 113008507A CN 202110293279 A CN202110293279 A CN 202110293279A CN 113008507 A CN113008507 A CN 113008507A
Authority
CN
China
Prior art keywords
mach number
main valve
wind tunnel
valve
gas source
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110293279.7A
Other languages
Chinese (zh)
Inventor
李凌蔚
张兴龙
吴宋伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing University of Aeronautics and Astronautics
Original Assignee
Nanjing University of Aeronautics and Astronautics
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing University of Aeronautics and Astronautics filed Critical Nanjing University of Aeronautics and Astronautics
Priority to CN202110293279.7A priority Critical patent/CN113008507A/en
Publication of CN113008507A publication Critical patent/CN113008507A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M9/00Aerodynamic testing; Arrangements in or on wind tunnels
    • G01M9/02Wind tunnels
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M9/00Aerodynamic testing; Arrangements in or on wind tunnels
    • G01M9/02Wind tunnels
    • G01M9/04Details

Landscapes

  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • General Physics & Mathematics (AREA)
  • Aerodynamic Tests, Hydrodynamic Tests, Wind Tunnels, And Water Tanks (AREA)

Abstract

The invention provides a high-flow high-stability Mach number wind tunnel rapid adjusting system and method based on a temporary flushing gas source. The structure of the device comprises a temporary flushing air source, a main valve, an auxiliary valve, a spray pipe, a pressure sensor, a Mach number sensor and a control unit, wherein the auxiliary valve has faster small flow regulation capacity and is connected with the main valve in parallel. The method comprises the following steps: (1) on the basis of 50% opening of the auxiliary valve, manually adjusting a main valve at a characteristic Mach number point within the wind tunnel capacity range to obtain a curve cluster of the relation between the main valve opening and the air source pressure under the corresponding Mach number; (2) obtaining the opening of a main valve through two-dimensional linear interpolation according to the instruction Mach number and the current air source pressure; (3) and closed-loop PID adjustment of the instruction Mach number is carried out by utilizing the auxiliary valve, and the outlet Mach number is maintained. The invention adopts a composite control strategy of main valve feedforward and auxiliary valve closed loop PID, and solves the problem that the outlet Mach number is not easy to be stable caused by continuous reduction of air source pressure, poor main valve repeatability, strong nonlinearity and slow regulation speed in a wind tunnel test.

Description

High-flow high-stability Mach number wind tunnel rapid adjusting system and method based on temporary flushing gas source
Technical Field
The invention relates to a high-flow high-stability Mach number wind tunnel rapid adjusting system and method based on a temporary flushing gas source, and belongs to the field of aerospace industrial wind tunnel test measurement and control.
Background
The wind tunnel is one of the most commonly used aerodynamic experimental equipments in the aerospace industry, and is a pipe-shaped experimental equipment which is used for generating and controlling airflow in an artificial mode, simulating the flowing condition of the air around an aircraft or a solid body, measuring the effect of the airflow on the solid body and observing physical phenomena. The wind tunnel test is an important means for acquiring aerodynamic data of the aircraft, measuring the appearance design layout of the aircraft and evaluating the flight performance. For a jet-type wind tunnel commonly used in the aerospace industry, wind tunnel test data are obviously influenced by the accuracy of the outlet Mach number, so that the outlet Mach number is one of the pneumatic parameters which need to be controlled accurately most.
The wind tunnel based on the temporary flushing air source is called a temporary flushing wind tunnel, and a high-pressure air storage tank is mostly used as a temporary flushing air source system. Compared with a continuous wind tunnel, the temporary air-charging source can provide larger flow and larger Mach number, the air source pressure in the air storage tank is rapidly reduced due to the rapid consumption of the air source during the operation, and the operation time of the temporary air-charging wind tunnel is usually several seconds to dozens of seconds according to the difference of the initial air source pressure of the temporary air-charging source and the volume of the air storage tank. The rapid reduction of the air source pressure enables the Mach number of the wind tunnel outlet to be reduced, in order to provide stable and accurate Mach number of the outlet in the test process, an adjusting valve is usually arranged between a temporary air source and the outlet of a wind tunnel spray pipe in the current engineering, and the air flow entering the wind tunnel is controlled through the opening of a PID closed-loop adjusting valve, so that the purpose of controlling the Mach number of the outlet is achieved.
The patent with publication number CN110161841A discloses a feedforward-fuzzy PID control method suitable for a transient transonic wind tunnel, which sets PID parameters in real time through fuzzy reasoning, and when an attack angle changes, a feedforward control part sets a feedforward control quantity according to the attack angle feedback, so as to suppress disturbance caused by the change of the attack angle and improve the transient quality of a controller. The patent with publication number CN110702361A discloses a flow field accurate control system and a control method for a direct current temporary impulse type transonic wind tunnel, which solves the control accuracy problem of mach 1.0-1.2 by adopting a control mode of PID control and static feedforward control on grid fingers at two throats of the wind tunnel and optimal control on the flow field. The patent with publication number CN101887267B discloses a wind tunnel mach number controller, which adopts a fuzzy control method with self-adjusting factors at the wind tunnel starting stage, and uses PID control after the mach number is basically stable.
The situations of too fast pressure drop and pressure fluctuation of the air source are not considered in the methods, and whether the Mach number can be quickly adjusted stably for a long time is not considered. The method for adjusting the Mach number of the outlet of the large-flow wind tunnel based on the temporary flushing gas source has the following defects: (1) due to the rapid consumption of the air source in the air storage tank, the phenomenon of air source pressure pulsation can be generated, so that the fluctuation of the outlet Mach number is caused, and the stable and high-precision outlet Mach number cannot be provided; (2) the Mach number fluctuation of an outlet is caused by the overshoot brought by the strong adjusting capacity of the adjusting valve; (3) the dead zone, nonlinearity, hysteresis, poor repeatability, slow regulation speed and other characteristics of the regulating valve can reduce the real-time performance and reliability of the control system. In addition, the method increases the complexity of the control algorithm, and the situation that the characteristics of the regulating valve are not ideal in practical engineering application is not considered, so that the method has certain limitation.
Disclosure of Invention
The invention provides a high-flow high-stability Mach number wind tunnel rapid regulation system and a method based on a temporary flushing gas source, and aims to design a low-cost and easily-realized temporary flushing wind tunnel system, realize rapid regulation of outlet Mach number through low-complexity control logic, stably keep for a long time, and overcome the problems of slow and unstable outlet Mach number regulation caused by continuous pressure reduction of the temporary flushing gas source and poor repeatability, strong nonlinearity and slow regulation speed of a main valve in the temporary flushing wind tunnel system.
The technical solution of the invention is as follows:
a high-flow high-stability Mach number wind tunnel rapid regulation system and a method based on a temporary flushing gas source structurally comprise the temporary flushing gas source, a main valve, an auxiliary valve, a spray pipe, a pressure sensor, a Mach number sensor and a control unit, and are shown in figure 1. The temporary flushing gas source comprises an air compressor set and a high-pressure spherical tank, and the gas source outputs large-flow airflow which is adjusted by a main valve and an auxiliary valve and then is ejected through a spray pipe; the main valve is a large-flow regulating valve, the auxiliary valve is a small-flow regulating valve, and the auxiliary valve has higher regulating speed and higher regulating precision; the spray pipe is a contraction spray pipe with a certain outlet area.
Further, the air compressor unit inputs compressed high-pressure gas into a high-pressure spherical tank for storage, so as to form a temporary flushing gas source capable of outputting large flow;
furthermore, the main valve is a wind tunnel large-flow regulating valve, the large-flow regulating capacity is strong, and the characteristics of dead zones, hysteresis, poor repeatability and the like which are not beneficial to precise regulation exist in the low regulating speed;
furthermore, the auxiliary valve is a mechanism additionally arranged in the invention, is a small-flow high-precision quick adjusting valve, has strong small-flow adjusting capacity, is connected with the main valve in parallel, and improves the rapidity and stability of the Mach number adjustment of the wind tunnel outlet;
further, the pressure sensor is positioned at the outlet of the spherical tank and used for measuring the pressure of the temporary charging air source;
furthermore, the Mach number sensor is positioned at the outlet of the spray pipe, and the Mach number of the outlet is calculated according to the total static pressure difference of the outlet of the spray pipe;
further, the control unit calculates a control command to control the opening of the main valve and the auxiliary valve according to the Mach number command, the actual Mach number measured by the Mach number sensor and the current temporary charging source pressure measured by the pressure sensor;
a high-flow high-stability Mach number wind tunnel rapid regulation system and method based on temporary flushing gas source, the regulation method thereof integrates the characteristics of main and auxiliary valves, and forms a composite control strategy adopting main valve feedforward and auxiliary valve closed loop PID, as shown in figure 2, the method comprises the following concrete steps:
(1) through experiments, the regulation rules of the main valve under different Mach numbers and air source pressures are mastered, and an air source pressure curve cluster of the opening of the main valve under different Mach numbers is obtained;
(2) according to instruction Mach number MrAnd the current source pressure PasObtaining the current main valve opening through two-dimensional linear interpolation, and using the current main valve opening as open-loop feedforward regulation of a large-flow wind tunnel stable Mach number regulation strategy based on a temporary flushing gas source;
(3) and performing equal Mach number closed-loop regulation by using the auxiliary valve, and regulating the opening of the auxiliary valve by adopting a PID algorithm commonly used in engineering to accurately correct the Mach number of the wind tunnel outlet.
Further, the step (1) of manually debugging to master the regulation rules of the main valve under different Mach numbers and air source pressures to obtain the main valve opening-air source pressure curve cluster under different Mach numbers specifically comprises the following steps:
step 1-1, opening the auxiliary valve to 50% of opening degree, so that bidirectional adjustment can be conveniently carried out during closed-loop control;
step 1-2, adjusting the main valve to make the Mach number M of the outlet close to the Mach number M of the set valuer. Record the air supply pressure P at this timeasAnd main valve opening Am
And 1-3, due to the characteristic of temporary flushing of the gas source, the pressure of the gas source can be continuously reduced along with the rapid consumption of the gas in the high-pressure tank, so that the Mach number of the outlet can be continuously reduced after being stabilized for a short time. When the Mach number M of the outlet cannot be stabilized in a short time, repeating the step 1-2;
step 1-4, repeating step 1-3 until the set Mach number M can not be maintainedrUntil it is transiently stable. So far, a set of corresponding relations of the main valve opening and the air source pressure are obtained, wherein the set Mach number is maintained within the deviation allowable range;
step 1-5, modifying the set Mach number MrRepeating the steps 1-4 until all the key Mach number points are covered;
and step 1-6, obtaining a main valve opening-air source pressure relation curve cluster based on the steps 1-2 to 1-5.
Further, the open-loop feedforward regulation in step (2) means that the main valve is opened to a reference opening and kept before the closed-loop PID regulation is performed on the auxiliary valve. Specifically, the current set mach number and the temporary charging source pressure are obtained, and then the main valve opening required under the current set mach number and the gas source pressure is obtained through two-dimensional linear interpolation according to the main valve opening and gas source pressure curve cluster obtained in the step (2).
And (3) after the main valve is opened to a certain reference opening according to the main valve opening-air source pressure curve cluster, performing closed-loop PID (proportion integration differentiation) adjustment through the fast-reading high-precision auxiliary valve, performing small-range accurate correction on the actual Mach number, and keeping the stability for a certain time.
Further, the step (3) isThe PID control algorithm is based on the deviation between the command value and the actual value, and the deviation is based on the deviation, and the deviation is based onPE(k)+KI∑E(k)+KDEC(k) Control and adjust parameter K according to actual working conditionP、KIAnd KD. Wherein E (k) is a deviation between the control quantity command value and the actual feedback value, EC(k) Is the variation rate of the deviation, which is the variation rate of the deviation of the controlled variable per unit time, KPIs a proportional gain factor, KIIs an integral gain coefficient, KDIs a differential gain factor.
Compared with the prior art, the invention has the following beneficial effects:
the invention provides a high-flow high-stability Mach number wind tunnel rapid regulation system and a method based on a temporary flushing gas source.
According to the invention, the large-range flow and Mach number are regulated through the open-loop feedforward regulation of the main valve, the small-range flow and Mach number are accurately corrected through the closed-loop PID regulation of the auxiliary valve, the accuracy of the wind tunnel outlet Mach number is higher and the regulation speed is higher due to the combination of coarse regulation and fine regulation, and the instability of the outlet Mach number caused by the rapid reduction of the air source pressure due to the excessively slow regulation speed is avoided.
The invention adjusts the main valve in an open-loop feedforward adjustment mode, each adjustment of the main valve is one-way one-time adjustment, and bidirectional multiple adjustment and correction are not needed, thereby effectively avoiding the problems possibly caused by dead zone, hysteresis, nonlinearity and poor repeatability of the main valve in the existing system and improving the reliability and repeatability of the system.
The invention only needs to be simply transformed on the basis of the common system in the prior art, namely an auxiliary valve is additionally arranged.
Drawings
FIG. 1 is a gas path structure and control signal diagram of a large-flow high-stability Mach number wind tunnel rapid regulation system based on a temporary flushing gas source;
FIG. 2 is a control logic diagram of a high-flow high-stability Mach number wind tunnel rapid adjustment method based on a temporary flushing gas source;
FIG. 3 is a flow chart of the operation of a high flow and high stable Mach number wind tunnel rapid regulation system and method based on a temporary flushing gas source;
FIG. 4 is a main valve opening-air source pressure curve cluster under different Mach numbers;
FIG. 5 is a graph of Mach 0.8 experiment;
Detailed Description
The technical solution of the present invention is further explained with reference to the drawings and the specific embodiments.
A flow chart of a high-flow high-stability mach number wind tunnel rapid regulation system and method based on a temporary flushing gas source is shown in fig. 3. The original temporary-impulse type wind tunnel system is provided with a main valve which is a large-flow butterfly valve and has strong large-flow adjusting capacity, the adjusting precision of the main valve is 0.1%, the Mach number changes by 0.02-0.05 due to the fact that the opening degree is adjusted by 0.1%, 30s is needed when the main valve is fully closed to be fully opened, dead zones exist between 0-10% of the opening degree, the problems of hysteresis and poor up-down repetition degree exist, and the precise adjustment of the Mach number at the outlet of the wind tunnel cannot be well realized. Meanwhile, the adjustment speed is low, so that the Mach number of the wind tunnel outlet cannot be stabilized for the required time due to the fact that the air source pressure is rapidly reduced. Therefore, a small-flow high-precision quick auxiliary valve is additionally arranged on the basis, the valve adjusting precision is 0.01%, the opening degree is adjusted by 0.01% so that the Mach number is changed by 0.01-0.02, 10s is needed from full opening to full closing, no dead zone or hysteresis exists, the repeatability is good, and the flow can be accurately adjusted in a small range.
The air-cooled screw type air compressor unit is adopted to pump air to the high-pressure spherical tank, so that the pressure of an air source in the spherical tank reaches 750kPa, and the volume of the spherical tank is 500m3The area of the outlet of the spray pipe is 450mm multiplied by 400mm, and the quick adjustment method for stabilizing the Mach number is as follows:
(1) based on the system, the main valve is manually debugged, the regulation rule of the main valve under the Mach number of 0.4-0.8 is mastered, and the opening-air source pressure curve cluster of the main valve under different Mach numbers is obtained, and the method specifically comprises the following steps:
step 1-1, opening the auxiliary valve to 50% of opening degree, and performing regular exploration on the main valve on the basis, so that the auxiliary valve can be adjusted in two directions when closed-loop control is added;
step 1-2, manually adjusting the main valve to make the outlet Mach number close to 0.4. Specifically, the auxiliary valve is kept unchanged at 50% opening, and the main valve is manually adjusted so that the outlet Mach number is equal to or greater than 0.35 and equal to or less than 0.45. Record the air supply pressure at this time
Figure BSA0000236481700000051
And main valve opening
Figure BSA0000236481700000052
And 1-3, due to the characteristic of temporary flushing of the gas source, the pressure of the gas source can be continuously reduced along with the rapid consumption of the gas in the high-pressure tank, so that the Mach number of the outlet can be continuously reduced after being stabilized for a short time. When the Mach number of the outlet is reduced to be less than 0.35, repeating the step 1-2 to ensure that the Mach number of the outlet meets the condition that M is more than or equal to 0.35 and less than or equal to 0.45 again, and recording the air source pressure at the moment
Figure BSA0000236481700000061
And main valve opening
Figure BSA0000236481700000062
And 1-4, repeating the steps 1-3 until the transient stability of the outlet Mach number of which M is more than or equal to 0.35 and less than or equal to 0.45 cannot be maintained. So far, a set of corresponding relations of the main valve opening and the air source pressure for maintaining the set Mach number within the deviation +/-0.05 is obtained
Figure BSA0000236481700000063
Step 1-5, changing the set Mach number to 0.5, repeating the step 1-4, and obtaining the corresponding relation between the main valve opening and the air source pressure when the outlet Mach number is 0.5
Figure BSA0000236481700000064
Repeating the steps in this manner1-5, until covering 0.4-0.8 Mach number.
And 1-6, obtaining a main valve opening-air source pressure relation curve cluster based on the steps 1-2 to 1-5, as shown in FIG. 4.
(2) On the curve cluster obtained in the step (1), according to the instruction Mach number MrAnd the current source pressure PasObtaining the current main valve opening A by two-dimensional linear interpolationmAs an open-loop feedforward regulation of a high-flow wind tunnel stable Mach number regulation strategy based on a temporary flushing gas source, when a system is started, a main valve is directly opened to the current opening A according to an interpolation resultmThe problems of hysteresis, poor repeatability and the like caused by the reciprocating adjustment of the main valve are avoided;
(3) keeping the main valve still, the auxiliary valve according to U (K) ═ KPE(k)+KI∑E(k)+KDEC(k) Performing equal Mach number closed-loop PID regulation, and selecting proper PID parameter KP、KIAnd KDAnd accurately correcting the Mach number of the wind tunnel outlet.
Taking Mach number of 0.8 as an example, the initial air source pressure is 750kPa, and the volume of the spherical tank is 500m3The area of the outlet of the spray pipe is 450mm multiplied by 400mm, the adjustment result shown in figure 5 is obtained through main valve open-loop feedforward adjustment and auxiliary valve closed-loop PID correction, and the invention can realize the stable Mach number rapid adjustment within a long-time temporary air source capacity range within 40s, the Mach number error is within +/-0.001, and the Mach number error can be maintained about 60 s.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (5)

1. A high-flow high-stability Mach number wind tunnel rapid regulation system and method based on a temporary flushing gas source are characterized in that the structure comprises a temporary flushing gas source, a main valve, an auxiliary valve, a spray pipe, a pressure sensor, a Mach number sensor and a control unit; the temporary flushing gas source comprises an air compressor set and a high-pressure spherical tank, and the gas source outputs large-flow airflow which is adjusted by a main valve and an auxiliary valve and then is ejected through a spray pipe; the main valve is a large-flow regulating valve, the auxiliary valve is a small-flow regulating valve, and the auxiliary valve has higher regulating speed and higher regulating precision; the spray pipe is a contraction spray pipe with a certain outlet area; and the control unit calculates a control command to control the opening of the main valve and the auxiliary valve according to the Mach number command, the actual Mach number measured by the Mach number sensor and the current temporary charging source pressure measured by the pressure sensor.
2. The high-flow high-stability Mach number wind tunnel rapid regulation system and method based on the temporary flushing gas source of claim 1, characterized in that the main valve is a high-flow regulating valve, the high-flow regulating capability is strong, the regulating speed is slow, and there are usually dead zones, hysteresis loops, poor repeatability and other characteristics which are not conducive to precise regulation; the auxiliary valve is a mechanism additionally arranged in the invention, adopts a small-flow high-precision quick adjusting valve, has strong small-flow adjusting capability and high adjusting speed, is connected with the main valve in parallel, and improves the quick adjusting capability of the Mach number at the outlet of the wind tunnel.
3. The system and the method for quickly adjusting the high-flow and high-stability Mach number wind tunnel based on the temporary flushing gas source according to claim 1, wherein the adjusting method comprises the following steps:
(1) on the basis of 50% opening of the auxiliary valve, carrying out main valve manual adjustment on a plurality of characteristic Mach number points within the wind tunnel capacity range to obtain a main valve opening and temporary charging source pressure relation curve cluster under corresponding Mach numbers;
(2) according to instruction Mach number MrThe current air source pressure is obtained through two-dimensional linear interpolation, and the current main valve opening is used as open-loop feedforward regulation of a large-flow wind tunnel stable Mach number regulation strategy based on a temporary flushing air source;
(3) and closed-loop PID adjustment of the instruction Mach number is carried out by utilizing the auxiliary valve, and the Mach number of the wind tunnel outlet is maintained.
4. The system and the method for quickly adjusting the large-flow high-stability Mach number wind tunnel based on the temporary flushing gas source as claimed in claim 3, wherein the step (1) is implemented by manually debugging and mastering the adjustment rules of the main valve under different Mach numbers and gas source pressures to obtain a main valve opening-gas source pressure curve cluster under different Mach numbers, and specifically comprises the following steps:
(1) the auxiliary valve is opened to 50 percent of opening degree, so that the bidirectional adjustment can be conveniently realized during closed-loop control;
(2) adjusting the main valve so that the outlet Mach number M approaches the set Mach number Mr. Record the air supply pressure P at this timeasAnd main valve opening Am
(3) Due to the characteristic of the temporary flushing air source, along with the rapid consumption of air in the high-pressure tank, the pressure of the air source can be continuously reduced, so that the Mach number of the outlet can be continuously reduced after being stabilized for a short time. When the Mach number M of the outlet cannot be stabilized in a short time, repeating the step (2);
(4) repeating the step (3) until the set Mach number M cannot be maintainedrUntil it is transiently stable. So far, a set of corresponding relations of the main valve opening and the air source pressure are obtained, wherein the set Mach number is maintained within the deviation allowable range;
(5) modifying the set Mach number MrRepeating the step (4) until all the key Mach number points are covered;
(6) and (5) obtaining a main valve opening-air source pressure relation curve cluster based on the steps (2) to (5).
5. The system and the method for fast adjusting the large-flow high-stability Mach number wind tunnel based on the temporary flushing gas source as claimed in claim 4, characterized in that a composite control strategy of main valve feedforward and auxiliary valve closed loop PID is adopted, thereby solving the problem that the Mach number at the outlet is not easy to be stable due to continuous pressure drop of the temporary flushing gas source, poor main valve repeatability, strong nonlinearity and slow adjusting speed in the wind tunnel test.
CN202110293279.7A 2021-03-18 2021-03-18 High-flow high-stability Mach number wind tunnel rapid adjusting system and method based on temporary flushing gas source Pending CN113008507A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110293279.7A CN113008507A (en) 2021-03-18 2021-03-18 High-flow high-stability Mach number wind tunnel rapid adjusting system and method based on temporary flushing gas source

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110293279.7A CN113008507A (en) 2021-03-18 2021-03-18 High-flow high-stability Mach number wind tunnel rapid adjusting system and method based on temporary flushing gas source

Publications (1)

Publication Number Publication Date
CN113008507A true CN113008507A (en) 2021-06-22

Family

ID=76402713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110293279.7A Pending CN113008507A (en) 2021-03-18 2021-03-18 High-flow high-stability Mach number wind tunnel rapid adjusting system and method based on temporary flushing gas source

Country Status (1)

Country Link
CN (1) CN113008507A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114185266A (en) * 2022-02-15 2022-03-15 中国空气动力研究与发展中心高速空气动力研究所 Total pressure composite control method suitable for temporary impulse type wind tunnel
CN114185265A (en) * 2022-02-15 2022-03-15 中国空气动力研究与发展中心高速空气动力研究所 Large-scale opening jet flow wind tunnel ultrasonic speed constant total pressure continuous variable Mach number control method
CN114326849A (en) * 2021-12-30 2022-04-12 中国汽车工程研究院股份有限公司 Temperature control method for automobile environment wind tunnel
CN114967474A (en) * 2022-07-26 2022-08-30 中国空气动力研究与发展中心高速空气动力研究所 General wind tunnel flow field control method based on neural network
CN115420456A (en) * 2022-11-07 2022-12-02 中国空气动力研究与发展中心高速空气动力研究所 Annular slit valve characteristic sectional correction method based on different pressure ratio conditions
CN116754176A (en) * 2023-08-22 2023-09-15 中国空气动力研究与发展中心高速空气动力研究所 Online accurate estimation method for air source pressure of temporary flushing type high-speed wind tunnel
CN117075481A (en) * 2023-10-13 2023-11-17 中国空气动力研究与发展中心高速空气动力研究所 Mach number composite control method for wind tunnel transonic ladder variable attack angle test

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101887267A (en) * 2010-07-16 2010-11-17 江苏技术师范学院 Mach number controller in wind tunnel
CN104833476A (en) * 2015-06-01 2015-08-12 中国航天空气动力技术研究院 Low Mach number system of trisonics wind tunnel
CN105353650A (en) * 2015-12-22 2016-02-24 中国航天空气动力技术研究院 Method for establishing pressure regulating valve preset opening model for sub-transonic flow field of intermittent sub-transonic and supersonic wind tunnel
CN110161841A (en) * 2019-06-05 2019-08-23 中国空气动力研究与发展中心高速空气动力研究所 A kind of feedforward-fuzzy PID control method suitable for temporarily rushing formula transonic wind tunnel
CN112304554A (en) * 2020-12-02 2021-02-02 中国空气动力研究与发展中心高速空气动力研究所 Method for improving practicability of characteristic curve of air-vent valve of annular gap of wind tunnel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101887267A (en) * 2010-07-16 2010-11-17 江苏技术师范学院 Mach number controller in wind tunnel
CN104833476A (en) * 2015-06-01 2015-08-12 中国航天空气动力技术研究院 Low Mach number system of trisonics wind tunnel
CN105353650A (en) * 2015-12-22 2016-02-24 中国航天空气动力技术研究院 Method for establishing pressure regulating valve preset opening model for sub-transonic flow field of intermittent sub-transonic and supersonic wind tunnel
CN110161841A (en) * 2019-06-05 2019-08-23 中国空气动力研究与发展中心高速空气动力研究所 A kind of feedforward-fuzzy PID control method suitable for temporarily rushing formula transonic wind tunnel
CN112304554A (en) * 2020-12-02 2021-02-02 中国空气动力研究与发展中心高速空气动力研究所 Method for improving practicability of characteristic curve of air-vent valve of annular gap of wind tunnel

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114326849A (en) * 2021-12-30 2022-04-12 中国汽车工程研究院股份有限公司 Temperature control method for automobile environment wind tunnel
CN114326849B (en) * 2021-12-30 2022-07-08 中国汽车工程研究院股份有限公司 Temperature control method for automobile environment wind tunnel
CN114185266A (en) * 2022-02-15 2022-03-15 中国空气动力研究与发展中心高速空气动力研究所 Total pressure composite control method suitable for temporary impulse type wind tunnel
CN114185265A (en) * 2022-02-15 2022-03-15 中国空气动力研究与发展中心高速空气动力研究所 Large-scale opening jet flow wind tunnel ultrasonic speed constant total pressure continuous variable Mach number control method
CN114185266B (en) * 2022-02-15 2022-04-22 中国空气动力研究与发展中心高速空气动力研究所 Total pressure composite control method suitable for temporary impulse type wind tunnel
CN114967474B (en) * 2022-07-26 2022-11-04 中国空气动力研究与发展中心高速空气动力研究所 General wind tunnel flow field control method based on neural network
CN114967474A (en) * 2022-07-26 2022-08-30 中国空气动力研究与发展中心高速空气动力研究所 General wind tunnel flow field control method based on neural network
CN115420456A (en) * 2022-11-07 2022-12-02 中国空气动力研究与发展中心高速空气动力研究所 Annular slit valve characteristic sectional correction method based on different pressure ratio conditions
CN115420456B (en) * 2022-11-07 2023-02-03 中国空气动力研究与发展中心高速空气动力研究所 Annular slit valve characteristic sectional correction method based on different pressure ratio conditions
CN116754176A (en) * 2023-08-22 2023-09-15 中国空气动力研究与发展中心高速空气动力研究所 Online accurate estimation method for air source pressure of temporary flushing type high-speed wind tunnel
CN116754176B (en) * 2023-08-22 2023-10-24 中国空气动力研究与发展中心高速空气动力研究所 Online accurate estimation method for air source pressure of temporary flushing type high-speed wind tunnel
CN117075481A (en) * 2023-10-13 2023-11-17 中国空气动力研究与发展中心高速空气动力研究所 Mach number composite control method for wind tunnel transonic ladder variable attack angle test
CN117075481B (en) * 2023-10-13 2023-12-19 中国空气动力研究与发展中心高速空气动力研究所 Mach number composite control method for wind tunnel transonic ladder variable attack angle test

Similar Documents

Publication Publication Date Title
CN113008507A (en) High-flow high-stability Mach number wind tunnel rapid adjusting system and method based on temporary flushing gas source
CN114185265B (en) Large-scale opening jet flow wind tunnel ultrasonic speed constant total pressure continuous variable Mach number control method
CN110702361A (en) Flow field accurate control system and control method of direct-current temporary-impulse type transonic wind tunnel
CN106774468A (en) Flow rate controlling method
CN101887267B (en) Mach number controller in wind tunnel
CN114185266B (en) Total pressure composite control method suitable for temporary impulse type wind tunnel
CN107152551B (en) A kind of Regulation Control method and Regulation Control device
CN111006843B (en) Continuous variable speed pressure method of temporary impulse type supersonic wind tunnel
CN114967474B (en) General wind tunnel flow field control method based on neural network
CN114061890B (en) Downward blowing type static pressure matching control method for large-size opening jet flow wind tunnel
CN116499700B (en) Wind tunnel main injection pressure sectional control method and system
CN113251192B (en) Digital valve control system and control method by considering valve response time
CN113157010B (en) Method and device for regulating and controlling thrust of deep variable thrust engine and electronic equipment
WO2022105356A1 (en) Method and system, having incremental adjustment function, for adjusting control rod of nuclear power unit
CN114061891A (en) Downward-blowing injection type static pressure matching control method for large-size open jet wind tunnel
CN111413865B (en) Disturbance compensation single-loop superheated steam temperature active disturbance rejection control method
CN114941587B (en) Flow closed-loop control method and device based on adjustable venturi
CN103021489B (en) Nuclear power station chemistry and the control device of earial drainage temperature under volume control system and method
CN113236443B (en) Self-tuning method for pressure feedback control parameter of variable thrust engine
CN112764437A (en) Automatic control method for air flow regulation of test bed based on pneumatic regulating valve
RU2587526C1 (en) Air pressure regulator in antechamber of wind tunnel
CN117666331B (en) High-speed wind tunnel flow field composite adjusting method
CN110442155A (en) A kind of no-load voltage ratio heating device liquid oxygen flow process for accurately
CN118170192B (en) Control method and system for gas pressure and flow of two-stage pressure regulating pipeline
CN112148056B (en) Power adjusting method, device and system for thermal power generating unit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Li Lingwei

Inventor after: Zhang Xinglong

Inventor after: Wu Songwei

Inventor after: Zhang Tianhong

Inventor before: Li Lingwei

Inventor before: Zhang Xinglong

Inventor before: Wu Songwei