CN112987589A CN202110319316.7A CN202110319316A CN112987589A CN 112987589 A CN112987589 A CN 112987589A CN 202110319316 A CN202110319316 A CN 202110319316A CN 112987589 A CN112987589 A CN 112987589A
Authority
CN
China
Prior art keywords
station
target
power utilization
terminal
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110319316.7A
Other languages
Chinese (zh)
Inventor
查剑
苏鹏飞
曾祥钊
唐建华
高斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Konka Electronic Technology Co Ltd
Original Assignee
Shenzhen Konka Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Konka Electronic Technology Co Ltd filed Critical Shenzhen Konka Electronic Technology Co Ltd
Priority to CN202110319316.7A priority Critical patent/CN112987589A/en
Publication of CN112987589A publication Critical patent/CN112987589A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B15/00Systems controlled by a computer
    • G05B15/02Systems controlled by a computer electric
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/26Pc applications
    • G05B2219/2642Domotique, domestic, home control, automation, smart house
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a station power utilization control method, a server, a system and a computer readable storage medium. The method is applied to a server side and comprises the following steps: configuring station electricity utilization control authority of a target station for a target account according to pre-stored station configuration information; receiving a station power utilization control request aiming at a target station and sent by a first terminal, and when a login account corresponding to the first terminal is the target account, performing power utilization control on the target station according to the station power utilization control request; receiving a station power utilization information query request sent by a second terminal, acquiring power utilization information of each station according to the station power utilization information query request, and sending the power utilization information of each station to the second terminal. The invention can realize remote power utilization control of the stations and is convenient for management personnel to manage.

Description

Station electricity utilization control method, server, system and computer readable storage medium
Technical Field
The invention relates to the technical field of power utilization control, in particular to a station power utilization control method, a server, a system and a computer readable storage medium.
Background
On each station of office, connect various consumer including the computer of office personnel, these consumer also can consume a lot of electric quantities even in standby state, many enterprises require staff to cut off the power supply to the station after work in the management, in prior art, it cuts off the power supply to the station to ensure that staff is after work, rely on the manual work to inspect all stations, not only the cost of labor is high, low efficiency, the staff condition of every station is different from work, the manual work is examined all stations and is cut off the power supply and also have a lot of limitations, station power consumption management is inconvenient.
Thus, there is a need for improvements and enhancements in the art.
Disclosure of Invention
The invention provides a station power utilization control method, a server, a system and a computer readable storage medium, and aims to solve the problem that station power utilization management is inconvenient in the prior art.
The invention provides a station power utilization control method, which is applied to a server side and comprises the following steps:
configuring station electricity utilization control authority of a target station for a target account according to pre-stored station configuration information;
receiving a station power utilization control request aiming at a target station and sent by a first terminal, and when a login account corresponding to the first terminal is the target account, performing power utilization control on the target station according to the station power utilization control request;
receiving a station power utilization information query request sent by a second terminal, acquiring power utilization information of each station according to the station power utilization information query request, and sending the power utilization information of each station to the second terminal.
The station power utilization control method, wherein the power utilization control of the target station according to the station power utilization control request, comprises:
and powering on or powering off the target station through the intelligent socket corresponding to the target station according to the station power utilization control request.
The station power utilization control method, wherein the station power utilization control request includes a target time for powering on and off the target station, and the target station is powered on and off by an intelligent socket corresponding to the target station, includes:
controlling the intelligent socket corresponding to the target station to be powered on or off at the target moment;
and before the target time is reached, locking the target station until the target time is reached or receiving an unlocking command.
The station power utilization control method comprises the following steps that before power utilization information of each station is acquired according to the station power utilization information inquiry request, the method further comprises the following steps:
and polling each station at a preset moment, acquiring the power on/off condition of each station at the preset moment, recording the power on/off condition into the power consumption information of each station, and sending prompt information to the first terminal.
The station power utilization control method comprises the following steps of:
and when the power on-off condition of the target station is inconsistent with the target power utilization state corresponding to the target preset time at the target preset time, controlling the target station to be switched to the target power utilization state.
The station power utilization control method comprises the following steps of, before configuring station power utilization control authority of a target station for a target account according to pre-stored station configuration information:
receiving a station configuration command of the second terminal;
generating the station configuration information according to the station configuration command request;
the station configuration information comprises grouping information of each station and an account bound to each station.
The station power utilization control method comprises the following steps that after station power utilization control authority of a target station is configured for a target account according to pre-stored station configuration information, the method further comprises the following steps:
receiving attendance card punching time corresponding to the target station;
switching on or off the target station according to the attendance checking time;
and powering on or off an illuminating lamp in the area where the target station is located according to the attendance checking time.
In a second aspect of the present invention, there is provided a server comprising: the system comprises a processor and a storage medium which is in communication connection with the processor, wherein the storage medium is suitable for storing a plurality of signals, and the processor is suitable for calling the signals in the storage medium to execute the steps of realizing the station electricity utilization control method.
In a third aspect of the present invention, there is provided an electric control system for stations, comprising:
a first terminal, a second terminal and a server as provided by the second aspect of the invention;
the first terminal is used for sending a station electricity utilization control request aiming at a target station to the server;
the second terminal is used for sending a station power utilization information query request to the server;
the server is used for configuring station electricity utilization control authority of a target station for a target account according to pre-stored station configuration information, and when a login account corresponding to the first terminal is the target account, electricity utilization control is carried out on the target station according to the station electricity utilization control request; and
and acquiring the power utilization information of each station according to the station power utilization information inquiry request, and sending the power utilization information of each station to the second terminal.
In a fourth aspect of the present invention, a computer-readable storage medium is provided, wherein the computer storage medium stores one or more programs, which are executable by one or more processors to implement the steps of any of the above-described methods for controlling the station power consumption.
Has the advantages that: compared with the prior art, the station power utilization control method, the station power utilization control device, the terminal and the storage medium are provided, station power utilization control authority of a target station is configured for a target account, when a station power utilization control request sent by a first terminal for logging in the target account is received, power utilization control is carried out on the target station according to the station power utilization control request, remote power utilization control over the stations can be achieved, and when a station power utilization information query request sent by a second terminal is received, power utilization information of each station is sent to the second terminal, automatic statistics on the power utilization information of each station can be achieved, and management of managers is facilitated.
Drawings
FIG. 1 is a flow chart of an embodiment of a method for controlling station power consumption provided by the present invention;
FIG. 2 is a schematic view of an application scenario of an embodiment of a station power utilization control method provided by the invention;
FIG. 3 is a schematic diagram of interaction at each end of an embodiment of a station power utilization control method provided by the invention;
FIG. 4 is a schematic diagram of a server according to an embodiment of the present invention;
fig. 5 is a schematic structural diagram of an embodiment of the station electric control system provided by the invention.
Detailed Description
In order to make the objects, technical solutions and effects of the present invention clearer and clearer, the present invention is further described in detail below with reference to the accompanying drawings and examples. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Example one
As shown in fig. 1, the method for controlling station power consumption provided by this embodiment includes the steps of:
and S100, configuring station electricity utilization control authority of the target station for the target account according to the pre-stored station configuration information.
The station power utilization control method provided by this embodiment may be applied to a station power utilization control system, where the station power utilization control system includes a first terminal, a second terminal, and a server, and the station power utilization control method is executed by the server. As shown in fig. 2, intelligent sockets are correspondingly arranged at each station in an office, the intelligent sockets supply power to each piece of electric equipment at the station, and the intelligent sockets are controlled to realize power utilization control of each station. Specifically, before configuring the station electricity utilization control authority of the target station for the target account according to the pre-stored station configuration information, the method comprises the following steps:
receiving a station configuration command of the second terminal;
and generating the station configuration information according to the station configuration setting command.
The station configuration information includes group information of each station and an account bound to each station, the second terminal is a management end used by a manager, the first terminal is a management end used by an employee, as shown in fig. 2, the second terminal may be a PC end, a mobile end or a large screen end, and the first terminal may be a PC section or a mobile end. As shown in fig. 3, the server may be an IOT cloud platform, the first terminal and the second terminal may interact with the server through an http protocol or an MQTT protocol, the manager may send a station configuration command to the server through the second terminal, the server generates the station configuration information after receiving the station configuration command, and the station configuration information includes group information of each station and an account bound to each station. Specifically, a manager can divide and group each station to realize station partition management, the division and grouping can be based on a belonging department or attendance time, the manager can also bind each station with a corresponding employee, the station configuration command comprises station grouping information and station bound employee information, the server receives the station configuration command, generates an account for each employee correspondingly, generates the station configuration information, configures station power utilization control authority of a station (target station) corresponding to the account for a target account according to the station configuration information, and the employee can log in the target account through the first terminal to realize power utilization control of the target station.
Referring to fig. 1 again, the method for controlling power consumption of the workstation further includes:
s200, receiving a station electricity utilization control request aiming at a target station sent by a first terminal, and carrying out electricity utilization control on the target station according to the station electricity utilization control request when a login account corresponding to the first terminal is the target account.
The method comprises the steps that an employee can log in a target account through a first terminal, a station electricity utilization control request aiming at a target station is sent through the first terminal, the server determines whether the station aimed at by the station electricity utilization control request is consistent with a login account of the first terminal after receiving the station electricity utilization control request, and if the login account corresponding to the first terminal is the target account, electricity utilization control is conducted on the target station according to the station electricity utilization control request.
Specifically, the performing power utilization control on the target workstation according to the workstation power utilization control request includes:
and powering on or powering off the target station through the intelligent socket corresponding to the target station according to the station power utilization control request.
As shown in fig. 3, the smart socket may access an overlay smart gateway through a wireless communication technology (e.g., zigbee), and the gateway is connected to the server through ethernet, wifi, 4G, etc., and implements real-time information feedback and control with the server through MQTT protocol. The station power utilization control request comprises a target moment for powering on and off the target station, and the powering on and off the target station through the intelligent socket corresponding to the target station comprises the following steps:
and S210, controlling the intelligent socket corresponding to the target station to be powered on or off at the target moment.
And S220, before the target time is reached, locking the target station until the target time is reached or receiving an unlocking command.
The user can send the station power utilization control request through the first terminal to control the target station, the station power utilization control request comprises a target moment for powering on or powering off the target station, and the target moment can be a real-time moment, namely when the server receives the station power utilization control request, the server immediately sends information to the intelligent socket of the target station to power on or power off, so that the user can power on or power off the station through the mobile terminal even if the user is not in an office. The employee can also perform reservation control on the target station through the first terminal, and then, the station power utilization control request including the target time of powering on and powering off the target station can be sent out, wherein the target time can be the time set by the employee.
The employee may also lock the target station through the first terminal, specifically, when the employee requires no power off (for example, power on overnight) during non-attendance time based on a test or other requirements, the employee may lock the target station, the power consumption state of the target station is not changed before the target time is reached (for example, the power consumption state of the target station is not changed at a preset time of polling each station, which is specifically described later), the server automatically releases the station locking state until the target time is reached, and the smart socket may be controlled to be powered on or powered off through the first terminal; when a user sends the station power utilization control request, the locking reason can be remarked, the server stores the locking reason of the target station after receiving the station power utilization control request, and the locking reason of the target station can be displayed when receiving station information inquiry requests sent by other terminals; meanwhile, the target station can be unlocked by the staff through the first terminal (the station can be powered on or powered off).
Referring to fig. 1 again, the method for controlling power consumption of the workstation further includes:
s300, receiving a station power utilization information query request sent by a second terminal, acquiring power utilization information of each station according to the station power utilization information query request, and sending the power utilization information of each station to the second terminal.
Specifically, the power utilization information of the stations comprises the power on/off condition of the stations at a preset moment, the second terminal can send a station power utilization information query request to the server, and the server acquires the power utilization information of each station and sends the power utilization information to the second terminal after receiving the station power utilization information query request.
Before the power utilization information of each station is acquired according to the station power utilization information inquiry request, the method comprises the following steps:
and polling each station at a preset moment, acquiring the power on-off condition of each station at the preset moment and recording the power on-off condition into the power consumption information of each station.
The preset time can be determined according to attendance time, power failure can be carried out on the stations after work for saving electricity, the preset time can be the time after the attendance time, the time before the attendance time and the like, the server acquires the information of each intelligent socket to realize inspection of the stations, acquires the power on-off condition and record of each station at the preset time, and can record information such as locking reasons into the power utilization information when the stations are locked. Further, after the power on/off condition of each station at the preset time is obtained and recorded in the power consumption information of each station, prompt information can be sent to the first terminal to prompt that the current power on state of the target station of the staff corresponding to the target station is reminded.
Specifically, when the inspection is performed on each station at a preset time, the following steps are further performed:
and when the power on-off condition of the target station is inconsistent with the target power utilization state corresponding to the target preset time at the target preset time, controlling the target station to be switched to the target power utilization state.
And setting a corresponding target power utilization state (a power-on state or a power-off state) for each preset time, and when the power-on and power-off conditions of the target station at the target preset time are inconsistent with the target power utilization state corresponding to the target preset time, controlling the target station to be switched to the target power utilization state by the server, for example, when the target power utilization state corresponding to the target preset time is the power-off state, and the target station is the power-on state, the target station is powered off, so that the situation that the station of a worker forgetting to power off the station is automatically powered off after work can be realized, and the effect of saving power is realized. It is worth noting that when the target station is in the locking state, even if the power on/off condition of the target station is inconsistent with the target power utilization state, the power utilization state of the target station is not changed.
It is worth mentioning that, because sudden power failure in the working process of the electric equipment may damage the electric equipment and lose data, before the target station is controlled to be switched from the power-on state to the power-off state, prompt information may be sent to the first terminal, so that the staff may perform operations such as data storage in time, and loss caused by sudden power failure is prevented. Specifically, the corresponding prompt information may be sent to the employee WeChat, the telephone number, and the like corresponding to the target workstation, or the prompt information may be displayed on the display screen of the electric equipment of the target workstation.
In a possible implementation manner, after configuring the station power utilization control authority of the target station for the target account according to the pre-stored station configuration information, the station power utilization control method provided in this embodiment further includes the steps of:
s410, receiving corresponding attendance card punching time of the target station;
s420, powering on and powering off the target station according to the attendance card punching time;
and S430, powering on and powering off an illuminating lamp in the area where the target station is located according to the attendance checking time.
As shown in fig. 2, the server can also acquire the data of the attendance machine and control the station power consumption according to the data of the attendance machine, the attendance opening time corresponding to the target station is the attendance card punching time of the employee corresponding to the target station, specifically, after the employee corresponding to the target station punches the card during work-on or work-off, the attendance machine sends the card punching time to the server, the server automatically energizes the target station after the card punching time during work-on, the target station is automatically powered off after the off-duty time of the work, so that the trouble of manual power on and off of the staff is avoided, the unified power off of the stations can be realized without waiting for the preset off-duty time under the condition that the staff goes off the work in advance, and the station power-off can be automatically carried out in time according to the actual working condition of the staff, so that the power consumption is further saved.
Further, the server may obtain data of the attendance machine and control the illumination lamp according to the data of the attendance machine, specifically, after the employee corresponding to the target station punches the card at work or during work, the server automatically energizes the illumination lamp in the area where the target station is located after the time of punching the card at work, and the server automatically de-energizes the illumination lamp in the area where the target station is located after the time of punching the card at work.
In summary, this embodiment provides a station power consumption control method, where a station power consumption control authority of a target station is configured for a target account, when a station power consumption control request sent by a first terminal that logs in the target account is received, power consumption control is performed on the target station according to the station power consumption control request, so that remote power consumption control on the station can be realized, and when a station power consumption information query request sent by a second terminal is received, power consumption information of each station is sent to the second terminal, so that automatic statistics on the power consumption information of each station can be realized, and management by a manager is facilitated.
It should be understood that, although the steps in the flowcharts shown in the figures of the present specification are shown in order as indicated by the arrows, the steps are not necessarily performed in order as indicated by the arrows. The steps of the present invention are not limited to being performed in the exact order disclosed, and may be performed in other orders, unless explicitly stated otherwise. Moreover, at least a portion of the steps of the present invention may include multiple sub-steps or multiple stages, which are not necessarily performed at the same time, but may be performed at different times, and the order of performing the sub-steps or stages is not necessarily sequential, but may be performed alternately or alternately with other steps or at least a portion of the sub-steps or stages of other steps.
It will be understood by those skilled in the art that all or part of the processes of the methods of the embodiments described above can be implemented by hardware related to a computer program, which can be stored in a non-volatile computer readable storage medium, and when executed, can include the processes of the embodiments of the methods described above. Any reference to memory, storage, databases, or other media used in embodiments provided herein may include non-volatile and/or volatile memory. Non-volatile memory can include read-only memory (ROM), Programmable ROM (PROM), Electrically Programmable ROM (EPROM), Electrically Erasable Programmable ROM (EEPROM), or flash memory. Volatile memory can include Random Access Memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in a variety of forms such as Static RAM (SRAM), Dynamic RAM (DRAM), Synchronous DRAM (SDRAM), Double Data Rate SDRAM (DDRSDRAM), Enhanced SDRAM (ESDRAM), Synchronous Link DRAM (SLDRAM), Rambus Direct RAM (RDRAM), direct bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
Example two
Based on the above embodiments, the present invention further provides a server, and a schematic block diagram thereof may be as shown in fig. 4. The server comprises a processor 10 and a memory 20, wherein the memory 20 stores a computer program, and the processor 10 executes the computer program to realize at least the following steps:
configuring station electricity utilization control authority of a target station for a target account according to pre-stored station configuration information;
receiving a station power utilization control request aiming at a target station and sent by a first terminal, and when a login account corresponding to the first terminal is the target account, performing power utilization control on the target station according to the station power utilization control request;
receiving a station power utilization information query request sent by a second terminal, acquiring power utilization information of each station according to the station power utilization information query request, and sending the power utilization information of each station to the second terminal.
Wherein, the power utilization control of the target station according to the station power utilization control request comprises the following steps:
and powering on or powering off the target station through the intelligent socket corresponding to the target station according to the station power utilization control request.
Wherein, the station power consumption control request includes the target moment of switching on or off the target station, and the intelligent socket corresponding to the target station switches on or off the target station, including:
controlling the intelligent socket corresponding to the target station to be powered on or off at the target moment;
and before the target time is reached, locking the target station until the target time is reached or receiving an unlocking command.
Before the power consumption information of each station is acquired according to the station power consumption information inquiry request, the method further comprises the following steps:
and polling each station at a preset moment, acquiring the power on/off condition of each station at the preset moment, recording the power on/off condition into the power consumption information of each station, and sending prompt information to the first terminal.
Wherein, to in the preset moment each station patrol and examine including:
and when the power on-off condition of the target station is inconsistent with the target power utilization state corresponding to the target preset time at the target preset time, controlling the target station to be switched to the target power utilization state.
Before configuring the station electricity utilization control authority of the target station for the target account according to the pre-stored station configuration information, the method comprises the following steps:
receiving a station configuration command of the second terminal;
generating the station configuration information according to the station configuration command request;
the station configuration information comprises grouping information of each station and an account bound to each station.
After configuring the station power utilization control authority of the target station for the target account according to the pre-stored station configuration information, the method further comprises the following steps:
receiving attendance card punching time corresponding to the target station;
switching on or off the target station according to the attendance checking time;
and powering on or off an illuminating lamp in the area where the target station is located according to the attendance checking time.
EXAMPLE III
The invention also provides a station power utilization control system, as shown in fig. 5, the station power utilization control system comprises a first terminal, a second terminal and the server according to the second embodiment;
the first terminal is used for sending a station electricity utilization control request aiming at a target station to the server;
the second terminal is used for sending a station power utilization information query request to the server;
the server is used for configuring station electricity utilization control authority of a target station for a target account according to pre-stored station configuration information, and when a login account corresponding to the first terminal is the target account, electricity utilization control is carried out on the target station according to the station electricity utilization control request; and
and acquiring the power utilization information of each station according to the station power utilization information inquiry request, and sending the power utilization information of each station to the second terminal.
Example four
The present invention also provides a computer readable storage medium having one or more programs stored thereon, the one or more programs being executable by one or more processors to implement the steps of the method for controlling station utilization as described in the above embodiments.
Finally, it should be noted that: the above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.

Claims (10)

1. A station power utilization control method is applied to a server side and comprises the following steps:
configuring station electricity utilization control authority of a target station for a target account according to pre-stored station configuration information;
receiving a station power utilization control request aiming at a target station and sent by a first terminal, and when a login account corresponding to the first terminal is the target account, performing power utilization control on the target station according to the station power utilization control request;
receiving a station power utilization information query request sent by a second terminal, acquiring power utilization information of each station according to the station power utilization information query request, and sending the power utilization information of each station to the second terminal.
2. The station power utilization control method according to claim 1, wherein the power utilization control of the target station according to the station power utilization control request includes:
and powering on or powering off the target station through the intelligent socket corresponding to the target station according to the station power utilization control request.
3. The station power utilization control method according to claim 2, wherein the station power utilization control request includes a target time for powering on and off the target station, and the powering on and off of the target station is performed through a smart socket corresponding to the target station, and the method includes:
controlling the intelligent socket corresponding to the target station to be powered on or off at the target moment;
and before the target time is reached, locking the target station until the target time is reached or receiving an unlocking command.
4. The station power utilization control method according to claim 1, wherein before the power utilization information of each station is acquired according to the station power utilization information query request, the method further comprises:
and polling each station at a preset moment, acquiring the power on/off condition of each station at the preset moment, recording the power on/off condition into the power consumption information of each station, and sending prompt information to the first terminal.
5. The method for electrically controlling the stations according to claim 4, wherein the routing inspection of the stations at the preset time comprises:
and when the power on-off condition of the target station is inconsistent with the target power utilization state corresponding to the target preset time at the target preset time, controlling the target station to be switched to the target power utilization state.
6. The method for controlling the station electricity consumption according to claim 1, wherein before configuring the station electricity consumption control authority of the target station for the target account according to the pre-stored station configuration information, the method comprises the following steps:
receiving a station configuration command of the second terminal;
generating the station configuration information according to the station configuration command request;
the station configuration information comprises grouping information of each station and an account bound to each station.
7. The station power utilization control method according to claim 1, wherein after configuring station power utilization control authority of a target station for a target account according to pre-stored station configuration information, the method further comprises:
receiving attendance card punching time corresponding to the target station;
switching on or off the target station according to the attendance checking time;
and powering on or off an illuminating lamp in the area where the target station is located according to the attendance checking time.
8. A server, characterized in that the server comprises: the workstation power consumption control system comprises a processor and a storage medium which is in communication connection with the processor, wherein the storage medium is suitable for storing a plurality of signals, and the processor is suitable for calling the signals in the storage medium to execute the steps of implementing the workstation power consumption control method of any one of the claims 1-7.
9. An electrical station control system, comprising: a first terminal, a second terminal and a server according to claim 8;
the first terminal is used for sending a station electricity utilization control request aiming at a target station to the server;
the second terminal is used for sending a station power utilization information query request to the server;
the server is used for configuring station electricity utilization control authority of a target station for a target account according to pre-stored station configuration information, and when a login account corresponding to the first terminal is the target account, electricity utilization control is carried out on the target station according to the station electricity utilization control request; and
and acquiring the power utilization information of each station according to the station power utilization information inquiry request, and sending the power utilization information of each station to the second terminal.
10. A computer-readable storage medium storing one or more programs, the one or more programs being executable by one or more processors to perform the steps of the method for controlling the power usage of workstations according to any of claims 1-7.
CN202110319316.7A 2021-03-25 2021-03-25 Station electricity utilization control method, server, system and computer readable storage medium Pending CN112987589A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110319316.7A CN112987589A (en) 2021-03-25 2021-03-25 Station electricity utilization control method, server, system and computer readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110319316.7A CN112987589A (en) 2021-03-25 2021-03-25 Station electricity utilization control method, server, system and computer readable storage medium

Publications (1)

Publication Number Publication Date
CN112987589A true CN112987589A (en) 2021-06-18

Family

ID=76333644

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110319316.7A Pending CN112987589A (en) 2021-03-25 2021-03-25 Station electricity utilization control method, server, system and computer readable storage medium

Country Status (1)

Country Link
CN (1) CN112987589A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107580132A (en) * 2017-09-05 2018-01-12 广东欧珀移动通信有限公司 Method for sending information, device, storage medium and electronic equipment
CN109903414A (en) * 2018-12-27 2019-06-18 北京智慧云行科技有限责任公司 One kind is based on Internet of Things monitoring office attendance control system and method
CN110111437A (en) * 2019-02-15 2019-08-09 北京车和家信息技术有限公司 Staffing System and method, computer readable storage medium
CN110351296A (en) * 2019-07-22 2019-10-18 深圳市口袋网络科技有限公司 A kind of application login method, device and its relevant device
CN112399140A (en) * 2020-09-27 2021-02-23 平安信托有限责任公司 Office terminal monitoring processing method, office terminal monitoring processing device, office terminal monitoring processing equipment and storage medium

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107580132A (en) * 2017-09-05 2018-01-12 广东欧珀移动通信有限公司 Method for sending information, device, storage medium and electronic equipment
CN109903414A (en) * 2018-12-27 2019-06-18 北京智慧云行科技有限责任公司 One kind is based on Internet of Things monitoring office attendance control system and method
CN110111437A (en) * 2019-02-15 2019-08-09 北京车和家信息技术有限公司 Staffing System and method, computer readable storage medium
CN110351296A (en) * 2019-07-22 2019-10-18 深圳市口袋网络科技有限公司 A kind of application login method, device and its relevant device
CN112399140A (en) * 2020-09-27 2021-02-23 平安信托有限责任公司 Office terminal monitoring processing method, office terminal monitoring processing device, office terminal monitoring processing equipment and storage medium

Similar Documents

Publication Publication Date Title
EP3010114B1 (en) Method for controlling automatic identification of application network topology by power distribution network
CN106844645B (en) Power communication equipment information inquiry system
US20070033284A1 (en) System server for data processing with multiple clients and a data processing method
CN112073265A (en) Internet of things monitoring method and system based on distributed edge computing
CN107179977B (en) Database Full-automatic monitoring system based on mpm models
CN112987589A (en) Station electricity utilization control method, server, system and computer readable storage medium
CN107425994B (en) Method, terminal and server for realizing remote parameter management
CN113259425A (en) 61850 standard-based data conversion method, transformer substation gateway and storage medium
CN113703363A (en) Plug-and-play method of intelligent edge computing gateway in power dispatching cloud
CN109039427B (en) Ship monitoring management device
CN103870931A (en) Intelligent management serving system and serving method for special vehicle
CN114089711B (en) Industrial equipment control management method, electronic equipment and storage medium
CN116319670A (en) Method and system for automatically switching multi-domain name IP in charging and battery-changing cabinet
CN102457873A (en) Method and system for maintaining base transceiver station
CN114495311A (en) Automatic inspection method for network equipment
CN110099208B (en) Method and device for cross-level and cross-domain upgrading of camera in video monitoring system
CN113325746A (en) Unified management control method and system for laboratory equipment
CN105471928A (en) Internet-of-things service scheduling and processing system, and Internet-of-things service scheduling and processing method
CN111147589B (en) Method, device and system for monitoring integrated power supply cabinet and storage medium
CN117246673B (en) Intelligent warehouse control management system and method for chip test factory
CN110971454B (en) Management method, system and device of integrated power supply cabinet and computer equipment
CN111555925B (en) Automatic identification and configuration method and system for power automation terminal
CN116261159A (en) Method for realizing performance management based on NETCONF protocol in 5G open access network
CN116996495B (en) System and method for supporting automatic access to multiple types of single lamp controls
CN113489154B (en) Power grid monitoring system data loss prevention method based on main and standby channel switching technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination