CN112982830A - Assembled frame column and construction method - Google Patents

Assembled frame column and construction method Download PDF

Info

Publication number
CN112982830A
CN112982830A CN202110297097.7A CN202110297097A CN112982830A CN 112982830 A CN112982830 A CN 112982830A CN 202110297097 A CN202110297097 A CN 202110297097A CN 112982830 A CN112982830 A CN 112982830A
Authority
CN
China
Prior art keywords
column
frame
layer
cylinder
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110297097.7A
Other languages
Chinese (zh)
Inventor
安瑞刚
张永煜
段晓东
岳庭
刘玲
韩毅
褚文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Sixth Group Co Ltd
Original Assignee
China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Sixth Group Co Ltd filed Critical China Railway Sixth Group Co Ltd
Priority to CN202110297097.7A priority Critical patent/CN112982830A/en
Publication of CN112982830A publication Critical patent/CN112982830A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Abstract

The invention provides an assembled frame column and a construction method, and relates to the technical field of constructional engineering. The utility model provides an assembled frame post, includes a plurality of cylinders, and the cylinder is the cavity structure, is provided with the reinforcing bar net post in the cavity structure, is provided with the adapter sleeve between two adjacent cylinders, and adapter sleeve one end stretches into in the cylinder, and in the other end stretched into rather than adjacent cylinder, even spaced apart is equipped with a plurality of through-holes on the cylinder, and two liang of correspondences of through-hole are provided with the dead lever in the through-hole that corresponds, and the dead lever runs through the adapter sleeve. The assembled frame column has the characteristics of simple structure, convenience in installation, stable structure, low price and the like. In addition, the invention also provides a construction method of the assembled frame column, the assembled frame column can be quickly installed by using the construction method, and the installed frame column is stable in structure and extremely high in quality.

Description

Assembled frame column and construction method
Technical Field
The invention relates to the technical field of constructional engineering, in particular to an assembled frame column and a construction method.
Background
The fabricated structure is a short for fabricated concrete structure, and is a concrete structure formed by assembling and connecting prefabricated components serving as main stressed components. The assembled reinforced concrete structure is one of the important directions for the development of building structures in China, is beneficial to the development of industrialization of buildings in China, improves the production efficiency, saves energy, develops green and environment-friendly buildings, and is beneficial to improving and ensuring the quality of building engineering. Compared with a cast-in-place construction method, the assembly type PC structure is beneficial to green construction, because the assembly type construction can better meet the requirements of land saving, energy saving, material saving, water saving, environmental protection and the like of the green construction, the negative effects on the environment are reduced, including noise reduction, dust prevention, environmental pollution reduction, clean transportation, field interference reduction, water, electricity, material and other resources and energy sources, and the principle of sustainable development is followed.
At present, the connecting structure between the existing assembly type frame columns is complex, the installation is extremely inconvenient, and the price is high.
Disclosure of Invention
The invention aims to provide an assembled frame column which has the characteristics of simple structure, convenience in installation, stable structure, low price and the like.
Another object of the present invention is to provide a construction method of an assembled frame column, by which the assembled frame column can be quickly installed, and the installed frame column has a stable structure and an extremely high quality.
The embodiment of the invention is realized by the following steps:
in a first aspect, the embodiment of the application provides an assembled frame column, including a plurality of cylinders, the cylinder is the cavity structure, is provided with reinforcing bar net post in the cavity structure, is provided with the adapter sleeve between two adjacent cylinders, and adapter sleeve one end is stretched into in the cylinder, and in the other end stretched into rather than adjacent cylinder, evenly spaced apart is equipped with a plurality of through-holes on the cylinder, and two liang of correspondences of through-hole are provided with the dead lever in the through-hole that corresponds, and the dead lever runs through the adapter sleeve.
In some embodiments of the present invention, the steel bar net post includes a plurality of transverse bars and a plurality of vertical bars, the transverse bars and the vertical bars are arranged in a crossed manner to form a net post structure, the vertical bars extend out of the tail end of the net post structure, and the extended vertical bars pass through the connecting sleeve and extend into the adjacent post bodies.
In some embodiments of the present invention, a stopper is disposed in the cavity structure, a terminal of the net post structure contacts with the stopper, and the stopper is used for limiting the net post structure.
In some embodiments of the present invention, a concrete layer is poured into the cavity structure, and the steel mesh column is wrapped and sandwiched in the concrete layer.
In some embodiments of the present invention, the cylinder includes a rectangular structure, the connecting sleeve is a rectangular frame corresponding to the rectangular structure, a first reinforcing plate is disposed in the rectangular frame, and two ends of the first reinforcing plate are respectively connected to two side walls of the rectangular frame.
In some embodiments of the present invention, the cylinder includes a cylindrical structure, the connecting sleeve is a cylindrical sleeve corresponding to the cylindrical structure, and the second reinforcing plate is disposed in the cylindrical sleeve.
In some embodiments of the present invention, a pouring opening is formed on a side wall of the column body, the pouring opening is communicated with the cavity structure, a pouring frame is disposed at the pouring opening, and the pouring frame is detachably connected to the column body.
In some embodiments of the present invention, the sidewall of the column body is provided with a baffle, and the baffle is slidably disposed along the sidewall and can slide along the sidewall to the pouring opening to shield the pouring opening.
In some embodiments of the present invention, the column body is provided with a bracket hoop, the bracket hoop is provided with connecting pieces, and a connecting rod is arranged between the connecting pieces.
In a second aspect, an embodiment of the present application provides a construction method of a fabricated frame column, including the following steps:
1) positioning the position of a frame column to be installed;
2) transporting the assembly of assembled frame columns to the site;
3) arranging the steel bar net post in the cavity structure along the lower part of the post body, enabling the blocking piece to block the steel bar net post, arranging the first layer of post body at the position for installing the frame post, hooping the bracket hoop at the middle part of the post body, and connecting the connecting rod between the adjacent bracket hoops through the connecting piece;
4) one end of the connecting sleeve extends into the column body of the first layer to enable the connecting sleeve to reach the stopper, the stopper blocks the connecting sleeve, and a fixing rod is inserted into the through hole corresponding to the column body of the first layer to enable the fixing rod to penetrate through the connecting sleeve and the column body of the first layer;
5) arranging a steel bar net column in the cylinder body of the second layer, wherein the steel bar net column is contacted with the stopper, limiting through the stopper, hoisting the cylinder body of the second layer, butting the cylinder body of the second layer with the connecting sleeve to enable the connecting sleeve to extend into the cylinder body of the second layer, and limiting through the connecting sleeve contacted with the stopper;
6) inserting a fixing rod into the through hole of the cylinder of the second layer, and enabling the fixing rod to penetrate through the connecting sleeve and the cylinder of the second layer;
7) arranging bracket hoops on the column body of the second layer, arranging connecting rods between adjacent bracket hoops through connecting pieces, and repeating the steps 3) -7) in sequence;
8) and installing a pouring frame at the pouring opening of each column body, pouring concrete into the cavity structure through the pouring frame, moving the baffle plate after pouring is finished, covering the pouring opening with the baffle plate, and removing the pouring frame after the concrete is dried to form a concrete layer.
Compared with the prior art, the embodiment of the invention has at least the following advantages or beneficial effects:
the invention provides an assembled frame column, which comprises a plurality of columns, wherein the columns are the columns of the assembled frame column and are main bearing parts of an assembled frame. The column body is of a cavity structure, and a steel bar net column is arranged in the cavity structure. Above-mentioned cylinder is the cavity structure, and the cylinder chooses for use the weight that the cavity structure can alleviate the cylinder, convenient transport and quick hoist and mount. The reinforcing mesh column in the cavity structure can enhance the strength of the column body and improve the bearing capacity of the column body. The connecting sleeve is arranged between the two adjacent cylinders, one end of the connecting sleeve extends into the cylinders, the other end of the connecting sleeve extends into the adjacent cylinders, a plurality of through holes are uniformly arranged on the cylinders at intervals, the through holes correspond to each other in pairs, fixing rods are arranged in the corresponding through holes, and the fixing rods penetrate through the connecting sleeve. The connecting sleeve is used for connecting two adjacent cylinders, and the connecting sleeve can be connected with the two adjacent cylinders by inserting the fixing rods into the corresponding through holes in pairs. The connecting sleeve can be quickly and conveniently connected with the two adjacent columns by using the hole type connecting mode, and the fixed rod bears the shear stress, so that the fixed rod can stably connect the two adjacent columns to the connecting sleeve. The structure is relatively simple, convenient to install, relatively stable and low in price.
Therefore, the assembled frame column has the characteristics of simple structure, convenience in installation, stable structure, low price and the like.
The invention also provides a construction method of the assembled frame column, which comprises the following steps: 1) positioning the position of a frame column to be installed; 2) transporting the assembly of assembled frame columns to the site; 3) arranging the steel bar net post in the cavity structure along the lower part of the post body, enabling the blocking piece to block the steel bar net post, arranging the first layer of post body at the position for installing the frame post, hooping the bracket hoop at the middle part of the post body, and connecting the connecting rod between the adjacent bracket hoops through the connecting piece; 4) one end of the connecting sleeve extends into the column body of the first layer to enable the connecting sleeve to reach the stopper, the stopper blocks the connecting sleeve, and a fixing rod is inserted into the through hole corresponding to the column body of the first layer to enable the fixing rod to penetrate through the connecting sleeve and the column body of the first layer; 5) arranging a steel bar net column in the cylinder body of the second layer, wherein the steel bar net column is contacted with the stopper, limiting through the stopper, hoisting the cylinder body of the second layer, butting the cylinder body of the second layer with the connecting sleeve to enable the connecting sleeve to extend into the cylinder body of the second layer, and limiting through the connecting sleeve contacted with the stopper; 6) inserting a fixing rod into the through hole of the cylinder of the second layer, and enabling the fixing rod to penetrate through the connecting sleeve and the cylinder of the second layer; 7) arranging bracket hoops on the column body of the second layer, arranging connecting rods between adjacent bracket hoops through connecting pieces, and repeating the steps 3) -7) in sequence; 8) and installing a pouring frame at the pouring opening of each column body, pouring concrete into the cavity structure through the pouring frame, moving the baffle plate after pouring is finished, covering the pouring opening with the baffle plate, and removing the pouring frame after the concrete is dried to form a concrete layer. The construction method of the assembly type frame column can be used for rapidly installing the assembly type frame column, and the installed frame column is stable in structure and high in quality.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings needed to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
FIG. 1 is a schematic structural diagram of an embodiment of the present invention;
FIG. 2 is an enlarged view taken at A in FIG. 1;
FIG. 3 is a schematic three-dimensional structure of an embodiment of the present invention;
FIG. 4 is a schematic structural diagram of a rectangular frame according to an embodiment of the present invention;
fig. 5 is a schematic structural diagram of a cylindrical sleeve in an embodiment of the invention.
Icon: 1-column body, 2-concrete layer, 3-blocking piece, 4-positioning rod, 5-connecting sleeve, 6-reinforcing structure, 601-first reinforcing plate, 602-second reinforcing plate, 7-pouring frame, 8-baffle, 9-pouring opening, 10-connecting piece, 11-connecting rod, 12-transverse rib, 13-vertical rib, 14-through hole and 15-bracket hoop.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. The components of embodiments of the present invention generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations.
Thus, the following detailed description of the embodiments of the present invention, presented in the figures, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined and explained in subsequent figures.
In the description of the embodiments of the present invention, it should be noted that, if the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings or the orientations or positional relationships that the products of the present invention are usually placed in when used, the orientations or positional relationships are only used for convenience of describing the present invention and simplifying the description, but the terms do not indicate or imply that the devices or elements indicated must have specific orientations, be constructed in specific orientations, and operate, and therefore, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," "third," and the like are used solely to distinguish one from another and are not to be construed as indicating or implying relative importance.
Furthermore, the terms "horizontal", "vertical", "overhang" and the like do not require that the components be absolutely horizontal or overhang, but may be slightly inclined. For example, "horizontal" merely means that the direction is more horizontal than "vertical" and does not mean that the structure must be perfectly horizontal, but may be slightly inclined.
In the description of the embodiments of the present invention, "a plurality" represents at least 2.
In the description of the embodiments of the present invention, it should be further noted that unless otherwise explicitly stated or limited, the terms "disposed," "mounted," "connected," and "connected" should be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
Examples
Referring to fig. 1, fig. 1 is a schematic structural diagram of an embodiment of the present invention, and the embodiment provides an assembled frame column, which includes a plurality of columns 1, where the columns 1 are columns 1 of the assembled frame column, and are main load-bearing components of an assembled frame. The column body 1 is of a cavity structure, and a steel bar net column is arranged in the cavity structure. Above-mentioned cylinder 1 is the cavity structure, and cylinder 1 chooses for use the cavity structure can alleviate the weight of cylinder 1, convenient transport and quick hoist and mount. The reinforcing mesh column in the cavity structure can enhance the strength of the column body 1 and improve the bearing capacity of the column body 1.
In this embodiment, a connecting sleeve 5 is arranged between the two adjacent columns 1, one end of the connecting sleeve 5 extends into the column 1, the other end of the connecting sleeve 5 extends into the column 1 adjacent to the connecting sleeve, a plurality of through holes 14 are uniformly arranged on the column 1 at intervals, the through holes 14 correspond to each other in pairs, fixing rods are arranged in the corresponding through holes 14, and the fixing rods penetrate through the connecting sleeve 5. The connecting sleeve 5 is used for connecting two adjacent columns 1, and the connecting sleeve 5 can be connected with the two adjacent columns 1 by inserting the fixing rods into the corresponding two through holes 14.
In this embodiment, the connection sleeve 5 can be quickly and conveniently connected with two adjacent columns 1 by using the hole type connection mode of the through hole 14 corresponding to the fixing rod, and the fixing rod can bear shear stress to stably connect the two adjacent columns 1 to the connection sleeve. The structure is relatively simple, convenient to install, relatively stable and low in price.
Therefore, the assembled frame column has the characteristics of simple structure, convenience in installation, stable structure, low price and the like.
Referring to fig. 2, in some embodiments of the present invention, the rebar grid includes a plurality of transverse ribs 12 and a plurality of vertical ribs 13, the transverse ribs 12 and the vertical ribs 13 are arranged in a crossed manner to form a grid structure, the vertical ribs 13 extend from the ends of the grid structure, and the extended vertical ribs 13 pass through the connecting sleeve 5 and extend into the adjacent column 1.
In this embodiment, the steel mesh columns are alternately connected through the horizontal ribs 12 and the vertical ribs 13, and the horizontal ribs 12 and the vertical ribs 13 can bear larger load after being connected by glue, so that the stability of the column body 1 is further enhanced. The cross joint of the transverse ribs 12 and the vertical ribs 13 is bound by thin steel wires, so that the transverse ribs 12 and the vertical ribs 13 can be stably connected together.
Referring to fig. 1, in some embodiments of the present invention, a stopper 3 is disposed in the cavity structure, a terminal of the net post structure contacts the stopper 3, and the stopper 3 is used for limiting the net post structure.
In this embodiment, the stopper 3 is a limiting structure, and the stopper 3 can block the steel bar net column to prevent the steel bar net column from moving into the connecting sleeve 5. Meanwhile, the blocking piece 3 can block the connecting sleeve 5 extending into the cavity structure to play a limiting role. The fixed connecting sleeve 5 extends into the cavity structure to a depth which prevents the connecting sleeve 5 from extending into the cavity structure of the same column body 1.
Referring to fig. 1 and 2, in some embodiments of the present invention, a concrete layer 2 is poured into the cavity structure, and the steel mesh column is wrapped and sandwiched in the concrete layer 2.
In this embodiment, above-mentioned concrete layer 2 can further strengthen the stability and the intensity of cylinder 1, can pour concrete layer 2 after having installed cylinder 1, the installation of the concrete layer 2 of being convenient for. The combination of the mixed soil layer and the reinforced net column can form a reinforced concrete structure, and the strength and the stability are extremely strong.
In this embodiment, the connecting sleeve 5 is provided with a reinforcing structure 6 inside for reinforcing the stability of the connecting sleeve 5.
Referring to fig. 4, in some embodiments of the present invention, the column 1 includes a rectangular structure, the connecting sleeve 5 is a rectangular frame corresponding to the rectangular structure, a first reinforcing plate 601 is disposed in the rectangular frame, two ends of the first reinforcing plate 601 are respectively connected to two sidewalls of the rectangular frame, and the first reinforcing plate 601 is the reinforcing structure 6.
In this embodiment, above-mentioned cylinder 1 is the rectangle structure, chooses for use the cylinder 1 of cuboid structure to decide according to engineering actual need, and adapter sleeve 5 be the rectangle frame, can correspond with the cuboid structure, and the adapter sleeve 5 of being convenient for closely laminates with the rectangle frame, guarantees to pour the in-process at above-mentioned concrete layer 2, can not appear leaking the problem between adapter sleeve 5 and the cylinder 1. The first reinforcing plate 601 is used to reinforce the stability of the rectangular frame and prevent the rectangular frame from deforming.
Referring to fig. 5, in another embodiment, the cylinder 1 may also be a cylinder 1, the connection sleeve 5 is a cylinder sleeve corresponding to the cylinder 1, and a second reinforcement plate 602 is disposed in the cylinder sleeve. Above-mentioned cylinder 1 chooses for use 1 structure of cylinder can material saving, and cylinder 1 structure is according to stable simultaneously. The connecting sleeve 5 is a cylindrical sleeve corresponding to the structure of the cylinder 1, and the cylindrical sleeve can be matched with the structure of the cylinder 1. The second reinforcing plate 602 functions in the same manner as the first reinforcing plate 601. Similarly, the second reinforcing plate 602 is also the reinforcing structure 6.
Referring to fig. 1, in some embodiments of the present invention, a pouring opening 9 is formed on a sidewall of the column body 1, the pouring opening 9 is communicated with the cavity structure, a pouring frame 7 is disposed at the pouring opening 9, and the pouring frame 7 is detachably connected to the column body 1.
In this embodiment, the pouring opening 9 may facilitate pouring of the concrete layer 2, and concrete may enter the cavity structure by pouring concrete into the pouring opening 9 of each column body 1, so as to form reinforced concrete with the steel mesh columns. Above-mentioned frame 7 of pouring can make things convenient for pouring of concrete, prevents that the concrete from unrestrained. The pouring frame 7 is detachably connected with the column body 1, the pouring frame 7 can be detached after pouring is finished, and the pouring frame 7 is prevented from being an obstacle.
Referring to fig. 1, in some embodiments of the present invention, a baffle 8 is disposed on a sidewall of the column body 1, and the baffle 8 is slidably disposed along the sidewall and can slide to the pouring opening 9 along the sidewall to block the pouring opening 9.
In this embodiment, the baffle 8 disposed at the pouring opening 9 is used to seal the pouring opening 9, after the concrete layer 2 is poured, the baffle 8 can be moved to make the baffle 8 close to the pouring opening 9 until the pouring opening 9 is completely blocked by the baffle 8, so as to prevent the concrete layer 2 from overflowing along the pouring opening 9.
Referring to fig. 4, in some embodiments of the present invention, a bracket hoop 15 is disposed on the column body 1, a connecting member 10 is disposed on the bracket hoop 15, and a connecting rod 11 is disposed between the connecting members 10.
In this embodiment, the bracket 15 is used to be fixed to the column 1, so that the connecting rods 11 of the bracket 15 can be connected to the connecting rods 11. The connecting rod 11 can realize the transverse connection between the adjacent columns 1, so that the transverse adjacent columns 1 are connected, and the stability is improved. Meanwhile, the position of the bracket hoop 15 on the column body 1 can be adjusted at will. When the bracket anchor ear 15 moves between two vertically adjacent columns 1, the connection stability can be enhanced.
The invention also provides a construction method of the assembled frame column, which comprises the following steps:
1) the position of the frame column is required to be installed in the positioning mode, the position of the frame column is installed in the positioning mode, and the column body 1 located at the bottom is conveniently located to the required position.
2) And (3) conveying the assembly for assembling the frame column to the site, and conveying the prefabricated column body 1, the bracket hoop 15, the connecting sleeve 5, the fixed rod, the connecting rod 11 and other parts to the site.
3) Set up the reinforcing bar net post in the cavity structure along 1 lower part of cylinder, make and keep off piece 3 and block the reinforcing bar net post, set up the cylinder 1 of first layer on the position of installing the frame post, cramp bracket staple bolt 15 in the middle part of cylinder 1, connect connecting rod 11 between adjacent bracket staple bolt 15 through connecting piece 10. The reinforcing mesh is installed in the cavity structure on site, so that the stopper 3 just blocks the reinforcing mesh column to stop. The column body 1 of the first layer is positioned at the lowest part, and the horizontally adjacent column bodies 1 are fixedly connected through the bracket hoops 15, the connecting pieces 10 and the connecting rods 11, so that the stability of the column body 1 positioned at the first layer is improved.
4) One end of a connecting sleeve 5 extends into the column body 1 of the first layer, so that the connecting sleeve 5 reaches the stopper 3, the stopper 3 stops the connecting sleeve 5, and a fixing rod is inserted into a through hole 14 corresponding to the column body 1 of the first layer, so that the fixing rod penetrates through the connecting sleeve 5 and the column body 1 of the first layer. The connecting sleeve 5 is installed, and the connecting sleeve 5 is extended into the corresponding cavity structure until the connecting sleeve 5 is abutted against the stopper 3. The fixing rods are inserted into the corresponding through holes 14 and can be matched with the connecting sleeve 5, so that the connecting sleeve 5 is connected with the column body 1 of the first layer.
5) Set up the reinforcing bar net post in the cylinder 1 on second floor, the reinforcing bar net post contact keeps off piece 3, and is spacing through keeping off 3, hoists the cylinder 1 on second floor, with the cylinder 1 on second floor with the butt joint of adapter sleeve 5, make adapter sleeve 5 stretch into the cylinder 1 on second floor in, adapter sleeve 5 contact keeps off piece 3, and is spacing. The cylinder 1 of the second layer is arranged on the cylinder 1 of the first layer, so that the height can be increased, and the height of the assembled frame column can be increased after the cylinder 1 of the second layer is in butt joint with the corresponding connecting sleeve 5.
6) And inserting a fixing rod into the through hole 14 of the column body 1 of the second layer, so that the fixing rod penetrates through the connecting sleeve 5 and the column body 1 of the second layer. The fixing rods are inserted into the corresponding through holes 14 and can be matched with the connecting sleeves 5 to realize the connection of the connecting sleeves 5 and the column bodies 1 of the second layer, so that the column bodies 1 of the first layer are connected with the column bodies 1 of the second layer.
7) And (3) arranging bracket hoops 15 on the column body 1 on the second layer, arranging connecting rods 11 between the adjacent bracket hoops 15 through connecting pieces 10, and repeating the steps from 3) to 7) in sequence. Repeating the steps, and increasing the height of the assembled frame column according to the requirement.
8) And installing a pouring frame 7 at the pouring opening 9 of each column body 1, pouring concrete into the cavity structure through the pouring frame 7, moving the baffle 8 after pouring is finished, enabling the baffle 8 to cover the pouring opening 9, and removing the pouring frame 7 after the concrete is dried to form the concrete layer 2.
The construction method of the assembled frame column has the advantages that: the construction method of the assembly type frame column can be used for rapidly installing the assembly type frame column, and the installed frame column is stable in structure and high in quality.
In summary, the embodiment of the present invention provides an assembled frame column, which includes a plurality of columns 1, where the columns 1 are columns 1 of the assembled frame column, and are main load-bearing components of the assembled frame. The column body 1 is of a cavity structure, and a steel bar net column is arranged in the cavity structure. Above-mentioned cylinder 1 is the cavity structure, and cylinder 1 chooses for use the cavity structure can alleviate the weight of cylinder 1, convenient transport and quick hoist and mount. The reinforcing mesh column in the cavity structure can enhance the strength of the column body 1 and improve the bearing capacity of the column body 1. Be provided with adapter sleeve 5 between above-mentioned two adjacent cylinders 1, adapter sleeve 5 one end stretches into in cylinder 1, and the other end stretches into rather than adjacent cylinder 1 in, evenly spaced apart on the cylinder 1 is equipped with a plurality of through-holes 14, and through-hole 14 is two liang of correspondences, is provided with the dead lever in the through-hole 14 that corresponds, and the dead lever runs through adapter sleeve 5. The connecting sleeve 5 is used for connecting two adjacent columns 1, and the connecting sleeve 5 can be connected with the two adjacent columns 1 by inserting the fixing rods into the corresponding two through holes 14. By using the hole type connecting mode, the connecting sleeve 5 can be quickly and conveniently connected with the two adjacent columns 1, and the fixed rod bears the shear stress, so that the fixed rod can stably connect the two adjacent columns 1 to the connecting sleeve. The structure is relatively simple, convenient to install, relatively stable and low in price. Therefore, the assembled frame column has the characteristics of simple structure, convenience in installation, stable structure, low price and the like. The invention also provides a construction method of the assembled frame column, which comprises the following steps: 1) positioning the position of a frame column to be installed; 2) transporting the assembly of assembled frame columns to the site; 3) arranging a steel bar net column in the cavity structure along the lower part of the column body 1, enabling the blocking piece 3 to block the steel bar net column, arranging the column body 1 on the first layer at the position for installing a frame column, hooping the bracket hoop 15 at the middle part of the column body 1, and connecting the connecting rod 11 between the adjacent bracket hoops 15 through the connecting piece 10; 4) one end of a connecting sleeve 5 extends into the column body 1 of the first layer, so that the connecting sleeve 5 reaches the stopper 3, the stopper 3 stops the connecting sleeve 5, and a fixing rod is inserted into a through hole 14 corresponding to the column body 1 of the first layer, so that the fixing rod penetrates through the connecting sleeve 5 and the column body 1 of the first layer; 5) arranging a steel bar net column in the column body 1 of the second layer, enabling the steel bar net column to contact with the stopper 3, limiting through the stopper 3, hoisting the column body 1 of the second layer, butting the column body 1 of the second layer with the connecting sleeve 5, enabling the connecting sleeve 5 to extend into the column body 1 of the second layer, and enabling the connecting sleeve 5 to contact with the stopper 3 for limiting; 6) inserting a fixing rod into the through hole 14 of the column body 1 of the second layer, so that the fixing rod penetrates through the connecting sleeve 5 and the column body 1 of the second layer; 7) arranging bracket hoops 15 on the column body 1 on the second layer, arranging connecting rods 11 between the adjacent bracket hoops 15 through connecting pieces 10, and repeating the steps 3) to 7) in sequence; 8) and installing a pouring frame 7 at the pouring opening 9 of each column body 1, pouring concrete into the cavity structure through the pouring frame 7, moving the baffle 8 after pouring is finished, enabling the baffle 8 to cover the pouring opening 9, and removing the pouring frame 7 after the concrete is dried to form the concrete layer 2. The construction method of the assembly type frame column can be used for rapidly installing the assembly type frame column, and the installed frame column is stable in structure and high in quality.
The above is only a preferred embodiment of the present invention, and is not intended to limit the present invention, and various modifications and changes will occur to those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. The utility model provides an assembled frame post, its characterized in that, includes a plurality of cylinders, the cylinder is the cavity structure, be provided with reinforcing bar net post in the cavity structure, two are adjacent be provided with the adapter sleeve between the cylinder, adapter sleeve one end is stretched into in the cylinder, the other end stretches into rather than adjacent in the cylinder, even spaced apart is equipped with a plurality of through-holes on the cylinder, two liang of correspondences of through-hole correspond corresponds be provided with the dead lever in the through-hole, the dead lever runs through the adapter sleeve.
2. The assembled frame column as claimed in claim 1, wherein the steel mesh column comprises a plurality of transverse ribs and a plurality of vertical ribs, the transverse ribs and the vertical ribs are arranged in a crossed manner to form a mesh column structure, the vertical ribs extend out of the tail end of the mesh column structure, and the extending vertical ribs penetrate through the connecting sleeves to extend into the adjacent columns.
3. An assembled frame post according to claim 2 wherein a stop is provided within the cavity structure, the end of the post structure contacting the stop, the stop for limiting the post structure.
4. The fabricated frame column of claim 1, wherein a concrete layer is cast within the cavity structure, and the rebar mesh column is encased within the concrete layer.
5. An assembled frame column according to claim 1, wherein the column body comprises a rectangular structure, the connecting sleeve is a rectangular frame corresponding to the rectangular structure, a second reinforcing plate is arranged in the rectangular frame, and two ends of the second reinforcing plate are respectively connected to two side walls of the rectangular frame.
6. An assembled frame column according to claim 1, wherein the column body comprises a cylindrical structure, the connecting sleeves are cylindrical sleeves corresponding to the cylindrical structure, and second reinforcing plates are arranged in the cylindrical sleeves.
7. The assembled frame column according to claim 1, wherein a pouring opening is formed in a side wall of the column body, the pouring opening is communicated with the cavity structure, a pouring frame is arranged at the pouring opening, and the pouring frame is detachably connected with the column body.
8. The fabricated frame post of claim 7, wherein the post sidewall has a baffle slidably disposed thereon, the baffle being slidable along the sidewall to the pour opening to block the pour opening.
9. The fabricated frame column of claim 1, wherein a corbel hoop is disposed on the column body, and wherein connectors are disposed on the corbel hoop with connecting rods disposed therebetween.
10. A construction method of an assembled frame column is characterized by comprising the following steps:
1) positioning the position of a frame column to be installed;
2) transporting the assembly of assembled frame columns to the site;
3) arranging the steel bar net post in the cavity structure along the lower part of the post body, enabling the blocking piece to block the steel bar net post, arranging the first layer of post body at the position for installing the frame post, hooping the bracket hoop at the middle part of the post body, and connecting the connecting rod between the adjacent bracket hoops through the connecting piece;
4) one end of the connecting sleeve extends into the column body of the first layer to enable the connecting sleeve to reach the stopper, the stopper blocks the connecting sleeve, and a fixing rod is inserted into the through hole corresponding to the column body of the first layer to enable the fixing rod to penetrate through the connecting sleeve and the column body of the first layer;
5) arranging a steel bar net column in the cylinder body of the second layer, wherein the steel bar net column is contacted with the stopper, limiting through the stopper, hoisting the cylinder body of the second layer, butting the cylinder body of the second layer with the connecting sleeve to enable the connecting sleeve to extend into the cylinder body of the second layer, and limiting through the connecting sleeve contacted with the stopper;
6) inserting a fixing rod into the through hole of the cylinder of the second layer, and enabling the fixing rod to penetrate through the connecting sleeve and the cylinder of the second layer;
7) arranging bracket hoops on the column body of the second layer, arranging connecting rods between adjacent bracket hoops through connecting pieces, and repeating the steps 3) -7) in sequence;
8) and installing a pouring frame at the pouring opening of each column body, pouring concrete into the cavity structure through the pouring frame, moving the baffle plate after pouring is finished, covering the pouring opening with the baffle plate, and removing the pouring frame after the concrete is dried to form a concrete layer.
CN202110297097.7A 2021-03-19 2021-03-19 Assembled frame column and construction method Pending CN112982830A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110297097.7A CN112982830A (en) 2021-03-19 2021-03-19 Assembled frame column and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110297097.7A CN112982830A (en) 2021-03-19 2021-03-19 Assembled frame column and construction method

Publications (1)

Publication Number Publication Date
CN112982830A true CN112982830A (en) 2021-06-18

Family

ID=76334059

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110297097.7A Pending CN112982830A (en) 2021-03-19 2021-03-19 Assembled frame column and construction method

Country Status (1)

Country Link
CN (1) CN112982830A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733490A (en) * 2012-06-29 2012-10-17 中国建筑股份有限公司 Square steel core filling inner sleeve and opposing screw bolt splicing joint and construction method of splicing joint
CN103741881A (en) * 2013-12-12 2014-04-23 王睿敏 Fabricated frame column and construction method
EP2966236A1 (en) * 2014-07-07 2016-01-13 Fundacíon Tecnalia Research & Innovation Joining device for precast reinforced concrete columns with a dry joint
EA201492155A1 (en) * 2014-12-17 2016-06-30 Геннадий Александрович Мордич JOINT OF CONSTRUCTED CONCRETE COLUMNS OF THE ARKOS-2014 "FRAME" AND THE METHOD OF ITS DEVICE
CN207211392U (en) * 2017-09-21 2018-04-10 安阳工学院 The post column connected node of assembly concrete-filled steel tube framework
CN208363269U (en) * 2018-06-26 2019-01-11 青岛理工大学 A kind of steel column and column assembled grafting node
CN110206229A (en) * 2019-06-10 2019-09-06 上海建工四建集团有限公司 A kind of concrete column splicing structure and its construction method
CN209585431U (en) * 2018-07-06 2019-11-05 沈阳三一建筑设计研究有限公司 Frame column formwork and exempt from template reinforced column

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733490A (en) * 2012-06-29 2012-10-17 中国建筑股份有限公司 Square steel core filling inner sleeve and opposing screw bolt splicing joint and construction method of splicing joint
CN103741881A (en) * 2013-12-12 2014-04-23 王睿敏 Fabricated frame column and construction method
EP2966236A1 (en) * 2014-07-07 2016-01-13 Fundacíon Tecnalia Research & Innovation Joining device for precast reinforced concrete columns with a dry joint
EA201492155A1 (en) * 2014-12-17 2016-06-30 Геннадий Александрович Мордич JOINT OF CONSTRUCTED CONCRETE COLUMNS OF THE ARKOS-2014 "FRAME" AND THE METHOD OF ITS DEVICE
CN207211392U (en) * 2017-09-21 2018-04-10 安阳工学院 The post column connected node of assembly concrete-filled steel tube framework
CN208363269U (en) * 2018-06-26 2019-01-11 青岛理工大学 A kind of steel column and column assembled grafting node
CN209585431U (en) * 2018-07-06 2019-11-05 沈阳三一建筑设计研究有限公司 Frame column formwork and exempt from template reinforced column
CN110206229A (en) * 2019-06-10 2019-09-06 上海建工四建集团有限公司 A kind of concrete column splicing structure and its construction method

Similar Documents

Publication Publication Date Title
CN104912190B (en) Dry type joggle frame structure
CN110747736B (en) Rigid skeleton integrated device integrated with lifting appliance and steel reinforcement cage lifting construction method
CN111769508A (en) Assembled cable trench and construction method thereof
CN112726819B (en) Section steel reinforced assembled reinforced concrete cross joint and construction method
CN112982830A (en) Assembled frame column and construction method
CN211596824U (en) Construction elevator foundation capable of being circulated
CN113982108A (en) Prefabricated post and precast beam connected node and adopt beam column structure of this node
CN210288825U (en) Assembled and cast-in-situ combined beam plate structure
CN210917711U (en) Prefabricated assembly type foundation's assembled building
CN210530084U (en) Open type steel reinforced concrete composite truss floor
CN210827936U (en) Assembled modularization lightweight steel construction wall body
CN210066818U (en) Assembled flat top has post underground structure
CN113737966A (en) Assembled RCS lotus root beam column connecting node and application thereof
CN113513089A (en) FRP (fiber reinforced plastic) wrapped crossed steel reinforced concrete column-H-shaped steel beam connecting node and mounting method
CN216810599U (en) Composite heat-insulation prefabricated outer-leaf wallboard
CN216360839U (en) Double-deck heat preservation prefabricated wallboard
CN218346554U (en) Steel joint concrete precast beam component
JPH08302808A (en) Connecting method of large pc wall board
CN219195962U (en) Fill pile hopper stop device
CN216865691U (en) Prefabricated assembled concrete superimposed sheet
CN211172689U (en) Precast concrete wall
CN214302475U (en) Steel frame floor plate
CN214752455U (en) Assembled wallboard teaching aid for teaching
CN217759259U (en) Prefabricated balcony slab that stability is strong
CN211030495U (en) Prefabricated assembled integral balcony mold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210618

RJ01 Rejection of invention patent application after publication