CN112982693A - Blocking structure of tower crane opening and construction method thereof - Google Patents

Blocking structure of tower crane opening and construction method thereof Download PDF

Info

Publication number
CN112982693A
CN112982693A CN202110265515.4A CN202110265515A CN112982693A CN 112982693 A CN112982693 A CN 112982693A CN 202110265515 A CN202110265515 A CN 202110265515A CN 112982693 A CN112982693 A CN 112982693A
Authority
CN
China
Prior art keywords
floor slab
embedded
opening
tower crane
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110265515.4A
Other languages
Chinese (zh)
Inventor
谢燕辉
王刚
陈新喜
陈华
李赟
庞程程
李承龙
肖晓
冯蒙
余少乐
吴振东
邓文超
蔡睿欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN202110265515.4A priority Critical patent/CN112982693A/en
Publication of CN112982693A publication Critical patent/CN112982693A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Abstract

The invention relates to a blocking structure of a tower crane portal and a construction method thereof, wherein the blocking structure comprises: at least one pair of embedded parts pre-embedded in the floor slab and oppositely arranged on the opposite side edges of the opening of the floor slab; the support frame is arranged at the opening in a blocking mode, is arranged at the bottom of the floor slab and is fixed to the embedded part; the template is plugged in the opening and arranged on the support frame; and the concrete structure is poured on the template and is fixedly connected with the floor slab at the edge of the opening. According to the invention, the embedded part is arranged in the floor slab, the support frame is fixedly connected with the embedded part, the template is arranged on the support frame, the template support is realized, the surface of a concrete structure poured on the template is ensured to be flush with the top of the floor slab 10, and the blocking quality of the tower crane hole on the floor slab is ensured. The invention can simultaneously carry out the plugging construction of the hole of the multi-layer floor slab, thereby improving the construction efficiency.

Description

Blocking structure of tower crane opening and construction method thereof
Technical Field
The invention relates to the field of building construction, in particular to a blocking structure of a tower crane opening and a construction method thereof.
Background
In the building construction, a square hole is reserved on a floor slab when a tower crane is installed. And after the tower crane is dismantled, the hole needs to be plugged.
In the prior art, a scaffold is erected at the bottom of a hole to support a formwork, and concrete is poured on the formwork to be fixedly connected with an original floor so as to plug the hole.
When the tower crane entrance to a cave wears multilayer floor, need from bottom to top set up the scaffold frame gradually in proper order layer by layer, set up the template layer by layer and pour and carry out the shutoff, the formwork support construction reinforcement can not reach the position and influence the floor roughness easily, and is inefficient, extravagant manpower and materials.
Disclosure of Invention
The invention aims to overcome the defects of the prior art, provides a tower crane entrance plugging structure and a construction method thereof, and solves the problems that the flatness of a floor is influenced and the efficiency is low due to the fact that a scaffold is erected to plug the tower crane entrance in the prior art.
The technical scheme for realizing the purpose is as follows:
the invention provides a blocking structure of a tower crane entrance to a cave, which comprises:
at least one pair of embedded parts pre-embedded in the floor slab and oppositely arranged on the opposite side edges of the opening of the floor slab;
the supporting frame is arranged at the opening in a blocking mode, is arranged at the bottom of the floor slab and is fixed to the embedded part;
the template is plugged in the hole and arranged on the support frame;
and the concrete structure is poured on the template and is fixedly connected with the floor slab at the edge of the opening.
The invention further improves the plugging structure of the tower crane hole, wherein the embedded part comprises:
the embedded plate positioned above is embedded in the floor slab, the embedded plate positioned below is attached to the bottom surface of the floor slab, and the top of the support frame is fixedly connected with the embedded plate positioned below;
and the connecting rods are vertically connected with the two buried plates.
The invention further improves the blocking structure of the tower crane opening,
the hole is a rectangular hole;
two pairs of embedded parts are arranged on the four edges of the hole respectively.
The invention further improves the blocking structure of the tower crane opening,
the support frame comprises two support rods which are arranged in a crossed mode, and the end portions of the support rods are fixed on the corresponding buried plates located below.
The invention further improves the blocking structure of the tower crane opening,
the top of the concrete structure is flush with the top of the floor slab.
The invention also provides a construction method of the blocking structure of the tower crane opening, which comprises the following steps:
providing at least one pair of embedded parts, and pre-embedding the embedded parts in a floor slab, wherein the embedded parts are oppositely arranged on the opposite side edges of the opening of the floor slab;
providing a support frame, blocking the support frame at the opening, wherein the support frame is arranged at the bottom of the floor slab and is fixed on the embedded part;
providing a template, arranging the template on the support frame and plugging the template at the hole;
and a concrete structure is formed by pouring on the template, and the concrete structure is fixedly connected with the floor slab at the edge of the opening.
The construction method of the blocking structure of the tower crane entrance to a cave of the invention is further improved in that the step of providing the embedded part comprises the following steps:
providing two embedded plates, arranging the two embedded plates vertically and horizontally, embedding the embedded plate above in the floor slab, attaching the embedded plate below to the bottom surface of the floor slab, and fixedly connecting the top of the support frame with the embedded plate below;
and providing a connecting rod, and vertically connecting the connecting rod to the two buried plates.
The construction method of the blocking structure of the tower crane opening is further improved in that,
the hole is a rectangular hole;
two pairs of embedded parts are arranged, and four embedded parts are respectively arranged on four edges of the hole.
The construction method of the blocking structure of the tower crane opening is further improved in that,
providing the support frame comprises providing two support rods which are arranged in a crossed mode, and fixing the end portions of the support rods to corresponding buried plates located below.
The blocking structure of the tower crane opening and the construction method thereof have the beneficial effects that:
according to the invention, the embedded part is arranged in the floor slab, the support frame is fixedly connected with the embedded part, the template is arranged on the support frame, the template support is realized, the surface of a concrete structure poured on the template is ensured to be flush with the top of the floor slab 10, and the blocking quality of the tower crane hole on the floor slab is ensured. The invention can simultaneously carry out the plugging construction of the hole of the multi-layer floor slab, thereby improving the construction efficiency.
Drawings
FIG. 1 is a perspective view of a plugging structure of a tower crane opening.
FIG. 2 is a front view of a blocking structure of a tower crane opening.
Detailed Description
The invention is further described with reference to the following figures and specific examples.
Referring to fig. 1, a perspective view of a plugging structure of a tower crane opening of the invention is shown. FIG. 2 is a front view of a blocking structure of a tower crane opening. Referring to fig. 1 and 2, the blocking structure of the tower crane opening of the invention comprises:
at least one pair of embedded parts 20 embedded in the floor slab 10 and oppositely arranged on the two opposite side edges of the hole of the floor slab 10;
the support frame 30 is arranged at the opening in a blocking mode, and the support frame 30 is arranged at the bottom of the floor slab 10 and fixed to the embedded part;
the template 40 is plugged in the hole, and the template 40 is arranged on the support frame 30;
and the concrete structure 50 is poured on the template 40, and the concrete structure 50 is fixedly connected with the floor 10 at the edge of the opening.
Further, sealant is filled in a gap between the template 40 and the floor slab at the edge of the opening to seal the gap, so that the slurry leakage around the gap is prevented. Namely, sealing gum is adopted at the joint of the new concrete and the old concrete for sealing and leakage-proof treatment.
As a preferred embodiment of the plugging structure of the tower crane opening of the present invention, the embedded part 20 includes: the two embedded plates 21 are arranged vertically and horizontally, the embedded plate 21 positioned above is embedded in the floor slab 10, the embedded plate 21 positioned below is attached to the bottom surface of the floor slab 10, and the top of the support frame 30 is fixedly connected with the embedded plate 21 positioned below; a connecting rod 22 connected vertically to the two buried plates 21.
Specifically, the connecting rod 22 and the two buried plates 21 are fixedly connected into an integral structure through perforation welding, so that the firmness and stability of the whole structure are enhanced. The buried plate 21 located above is buried in the floor slab 10 for fixing, and the buried plate 21 located below is stuck to the bottom surface of the floor slab 10 and used for being welded and fixed with the support frame 30 to provide a fixing point for the support frame 30.
As a preferred embodiment of the blocking structure of the tower crane opening, the opening is a rectangular opening; two pairs of embedded parts 20 are respectively arranged on the four edges of the hole. The number and size of the embedded parts 20 are determined according to the size of the actual opening, and stable support needs to be provided for the support frame 30.
As a preferred embodiment of the blocking structure for the tower crane opening, the supporting frame 30 includes two supporting rods arranged in a crossing manner, and the ends of the supporting rods are fixed to the corresponding buried plate 21 located below.
Specifically, the stay bar is I-shaped steel, and comprises two wing plates which are oppositely arranged up and down and a web plate which is vertically connected with the two wing plates. The wing plate located above and the buried plate 21 located below of the embedment 20 are fixed by welding. Through connecting the relative both ends and the built-in fitting 20 with the vaulting pole to be fixed in the floor with support frame 30 and keep off and locate hole department, be convenient for follow-up locate support frame 30 with the template level on, thereby need not to set up the scaffold frame from the floor below to the top, reduce process raise the efficiency.
As a preferred embodiment of the blocking structure of the tower crane hole, the top of the concrete structure 50 is flush with the top of the floor slab 10.
According to the invention, the embedded part is arranged in the floor slab, the support frame is fixedly connected with the embedded part, the template is arranged on the support frame, the template support is realized, the surface of a concrete structure poured on the template is ensured to be flush with the top of the floor slab 10, and the blocking quality of the tower crane hole on the floor slab is ensured. The invention can simultaneously carry out the plugging construction of the hole of the multi-layer floor slab, thereby improving the construction efficiency.
The invention also provides a construction method of the blocking structure of the tower crane opening, which comprises the following steps:
providing at least one pair of embedded parts 20, embedding the embedded parts 20 in the floor slab 10, and arranging the embedded parts 20 on the opposite side edges of the opening of the floor slab 10;
providing a support frame 30, blocking the support frame 30 at the hole, wherein the support frame 30 is arranged at the bottom of the floor slab 10 and is fixed on the embedded part 20;
providing a template 40, arranging the template 40 on the support frame 30 and blocking the hole by the template 40;
and a concrete structure 50 is formed on the template 40 in a pouring mode, and the concrete structure 50 is fixedly connected with the floor 10 at the edge of the opening.
Further, sealant is filled in a gap between the template 40 and the floor slab at the edge of the opening to seal the gap, so that the slurry leakage around the gap is prevented. Namely, sealing gum is adopted at the joint of the new concrete and the old concrete for sealing and leakage-proof treatment.
As a preferred embodiment of the construction method of the blocking structure of the tower crane opening, the providing of the embedded part 20 includes: providing two embedded plates 21, arranging the two embedded plates 21 up and down and horizontally, embedding the embedded plate 21 positioned above in the floor slab 10, attaching the embedded plate 21 positioned below to the bottom surface of the floor slab 10, and fixedly connecting the top of the support frame 30 with the embedded plate 21 positioned below; a connecting rod 22 is provided, connecting the connecting rod 22 vertically to the two buried plates 21.
As a preferred embodiment of the construction method of the blocking structure of the tower crane opening, the opening is a rectangular opening; there are two pairs of embedded parts 20, and four embedded parts 20 are respectively arranged on four edges of the hole.
As a preferred embodiment of the construction method of the blocking structure of the tower crane opening, the support frame 30 includes two support rods 31 arranged in a crossing manner, and the end portions of the support rods 31 are fixed to the corresponding buried plates 21 located below. In this embodiment, the form is a steel plate.
The two support rods 31 are arranged to intersect vertically to form a support frame 30 for supporting the formwork disposed above. And pouring a concrete structure on the template so as to plug the hole of the floor slab. After the concrete structure is formed, the support frame and the template are removed, the next opening is moved, and the concrete structure can be used in a turnover way
The blocking structure of the tower crane opening and the construction method thereof have the beneficial effects that:
according to the invention, the embedded part is arranged in the floor slab, the support frame is fixedly connected with the embedded part, the template is arranged on the support frame, the template support is realized, the surface of a concrete structure poured on the template is ensured to be flush with the top of the floor slab 10, and the blocking quality of the tower crane hole on the floor slab is ensured. The invention can simultaneously carry out the plugging construction of the hole of the multi-layer floor slab, thereby improving the construction efficiency.
While the present invention has been described in detail and with reference to the embodiments thereof as illustrated in the accompanying drawings, it will be apparent to one skilled in the art that various changes and modifications can be made therein. Therefore, certain details of the embodiments are not to be interpreted as limiting, and the scope of the invention is to be determined by the appended claims.

Claims (9)

1. The utility model provides a block structure of tower crane entrance to a cave which characterized in that includes:
at least one pair of embedded parts pre-embedded in the floor slab and oppositely arranged on the opposite side edges of the opening of the floor slab;
the supporting frame is arranged at the opening in a blocking mode, is arranged at the bottom of the floor slab and is fixed to the embedded part;
the template is horizontally plugged at the hole and arranged on the support frame;
and the concrete structure is poured on the template and is fixedly connected with the floor slab at the edge of the opening.
2. The plugging structure of the tower crane opening of claim 1, wherein the embedded part comprises:
the embedded plate positioned above is embedded in the floor slab, the embedded plate positioned below is attached to the bottom surface of the floor slab, and the top of the support frame is fixedly connected with the embedded plate positioned below;
and the connecting rods are vertically connected with the two buried plates.
3. The plugging structure of the tower crane opening according to claim 2,
the hole is a rectangular hole;
two pairs of embedded parts are arranged on the four edges of the hole respectively.
4. The blocking structure of the tower crane opening according to claim 3, wherein the supporting frame comprises two supporting rods arranged in a crossed manner, and the ends of the supporting rods are fixed on corresponding buried plates located below.
5. The plugging structure of the tower crane opening of claim 1, wherein the top of the concrete structure is flush with the top of the floor slab.
6. A construction method of a blocking structure of a tower crane portal is characterized by comprising the following steps:
providing at least one pair of embedded parts, and pre-embedding the embedded parts in a floor slab, wherein the embedded parts are oppositely arranged on the opposite side edges of the opening of the floor slab;
providing a support frame, blocking the support frame at the opening, wherein the support frame is arranged at the bottom of the floor slab and is fixed on the embedded part;
providing a template, arranging the template on the support frame and plugging the template at the hole;
and a concrete structure is formed by pouring on the template, and the concrete structure is fixedly connected with the floor slab at the edge of the opening.
7. The construction method of the blocking structure of the tower crane opening according to claim 6, wherein the providing of the embedded part comprises:
providing two embedded plates, arranging the two embedded plates vertically and horizontally, embedding the embedded plate above in the floor slab, attaching the embedded plate below to the bottom surface of the floor slab, and fixedly connecting the top of the support frame with the embedded plate below;
and providing a connecting rod, and vertically connecting the connecting rod to the two buried plates.
8. The plugging structure of the tower crane opening according to claim 7,
the hole is a rectangular hole;
two pairs of embedded parts are arranged, and four embedded parts are respectively arranged on four edges of the hole.
9. The construction method of the blocking structure of the tower crane opening according to claim 8, wherein the step of providing the supporting frame comprises providing two supporting rods which are arranged in a crossed manner, and fixing the end parts of the supporting rods to corresponding buried plates which are positioned below.
CN202110265515.4A 2021-03-11 2021-03-11 Blocking structure of tower crane opening and construction method thereof Pending CN112982693A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110265515.4A CN112982693A (en) 2021-03-11 2021-03-11 Blocking structure of tower crane opening and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110265515.4A CN112982693A (en) 2021-03-11 2021-03-11 Blocking structure of tower crane opening and construction method thereof

Publications (1)

Publication Number Publication Date
CN112982693A true CN112982693A (en) 2021-06-18

Family

ID=76336363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110265515.4A Pending CN112982693A (en) 2021-03-11 2021-03-11 Blocking structure of tower crane opening and construction method thereof

Country Status (1)

Country Link
CN (1) CN112982693A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002070317A (en) * 2000-08-28 2002-03-08 Taisei Corp Slab provisional hole constructing and curing method
JP2007262731A (en) * 2006-03-28 2007-10-11 Nishimatsu Constr Co Ltd Handrail for curing opening
JP2011094335A (en) * 2009-10-28 2011-05-12 Takenaka Komuten Co Ltd Method for constructing floor slab
CN108842933A (en) * 2018-08-27 2018-11-20 中建八局第建设有限公司 A kind of tower crane sealing hole method
CN109594712A (en) * 2018-12-24 2019-04-09 湖北神州建材有限责任公司 A kind of assembled architecture steam-pressing aero-concrete circuit board and its assembling method
CN110173109A (en) * 2019-06-14 2019-08-27 中国五冶集团有限公司 A kind of reserved opening fast hangs hole structure and construction method
CN209817430U (en) * 2019-04-23 2019-12-20 青岛东建建设有限公司 Template supporting structure of tower crane reserved hole
CN111877759A (en) * 2020-06-15 2020-11-03 中国一冶集团有限公司 Tower crane hole plugging construction method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002070317A (en) * 2000-08-28 2002-03-08 Taisei Corp Slab provisional hole constructing and curing method
JP2007262731A (en) * 2006-03-28 2007-10-11 Nishimatsu Constr Co Ltd Handrail for curing opening
JP2011094335A (en) * 2009-10-28 2011-05-12 Takenaka Komuten Co Ltd Method for constructing floor slab
CN108842933A (en) * 2018-08-27 2018-11-20 中建八局第建设有限公司 A kind of tower crane sealing hole method
CN109594712A (en) * 2018-12-24 2019-04-09 湖北神州建材有限责任公司 A kind of assembled architecture steam-pressing aero-concrete circuit board and its assembling method
CN209817430U (en) * 2019-04-23 2019-12-20 青岛东建建设有限公司 Template supporting structure of tower crane reserved hole
CN110173109A (en) * 2019-06-14 2019-08-27 中国五冶集团有限公司 A kind of reserved opening fast hangs hole structure and construction method
CN111877759A (en) * 2020-06-15 2020-11-03 中国一冶集团有限公司 Tower crane hole plugging construction method

Similar Documents

Publication Publication Date Title
CN104631512A (en) Post-cast strip beam and slab construction method adopting formwork hanging method
CN104863274B (en) Building dilatation joint waterproof structure
CN103774699A (en) Vertical water-stop structure for concrete engineering expansion joint as well as manufacturing and construction methods for same
CN108130837A (en) A kind of prefabricated road plate and its construction method
CN110273531A (en) A kind of prefabricated rail in subway station pipeline construction method against the wind
CN207194619U (en) A kind of assembled regeneration concrete enclosure wall
CN111502255A (en) Fabricated building laminated slab joint pouring body, pouring hanging die and construction method thereof
CN203808113U (en) Concrete engineering expansion joint vertical water-stop structure
CN112900854A (en) Template system for slope bottom plate construction and construction method
CN113006152A (en) Basement construction method based on socket type steel plate water stop
CN112982693A (en) Blocking structure of tower crane opening and construction method thereof
CN107083776A (en) A kind of basement raft foundation rear pouring tape construction method
CN208890166U (en) One kind is loaded on deformation-proof frame structure in distribution box shell
CN111794388A (en) Connecting joint of steel pipe column and box column in reverse construction and construction method thereof
CN208267362U (en) A kind of constructing device of deformation joint concrete wall formwork
CN216108909U (en) Drainage ditch water grate mounting structure
CN206986918U (en) A kind of asymmetric template for blower fan crab-bolt foundation grouting
CN215979401U (en) Rubber air bag plug template for tunnel secondary lining construction
CN210887323U (en) Connect and build engineering underground structure construction joint watertight fittings
CN210738077U (en) Waterproof reverse-edge aluminum alloy hanging die
CN112502194A (en) Basement exterior wall horizontal construction joint structure and construction method thereof
CN210049373U (en) Assembly type I-steel composite floor slab mounting structure
CN204645615U (en) Top board rubber watertight strip fixed mould
CN209942156U (en) Smoke air duct mounting structure
CN208686067U (en) Plate sizing arc mould drops in toilet

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210618