CN112964235A - Engineering cost mapping device and mapping method - Google Patents

Engineering cost mapping device and mapping method Download PDF

Info

Publication number
CN112964235A
CN112964235A CN202110173825.3A CN202110173825A CN112964235A CN 112964235 A CN112964235 A CN 112964235A CN 202110173825 A CN202110173825 A CN 202110173825A CN 112964235 A CN112964235 A CN 112964235A
Authority
CN
China
Prior art keywords
leg
landing leg
containing box
surveying instrument
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110173825.3A
Other languages
Chinese (zh)
Other versions
CN112964235B (en
Inventor
黄厚华
胡勇胜
许伟
张汝翊
李国明
蔡志辉
范学清
苏伟东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Zhiheng Engineering Management Co ltd
Original Assignee
Guangdong Zhiheng Engineering Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Zhiheng Engineering Management Co ltd filed Critical Guangdong Zhiheng Engineering Management Co ltd
Priority to CN202110173825.3A priority Critical patent/CN112964235B/en
Publication of CN112964235A publication Critical patent/CN112964235A/en
Application granted granted Critical
Publication of CN112964235B publication Critical patent/CN112964235B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D11/00Component parts of measuring arrangements not specially adapted for a specific variable
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D11/00Component parts of measuring arrangements not specially adapted for a specific variable
    • G01D11/24Housings ; Casings for instruments
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D11/00Component parts of measuring arrangements not specially adapted for a specific variable
    • G01D11/30Supports specially adapted for an instrument; Supports specially adapted for a set of instruments

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Toys (AREA)
  • Details Of Measuring And Other Instruments (AREA)

Abstract

The utility model relates to an engineering cost mapping device and mapping method, relate to the field of the on-spot mapping equipment of building engineering cost, it includes surveying instrument and landing leg, set up the containing box that is used for accomodating surveying instrument and landing leg between surveying instrument and the landing leg, the cylinder has set firmly between the bottom of surveying instrument and the interior diapire of containing box, be connected with the connection rope between the bottom of surveying instrument and the top of landing leg, the inside of containing box is rotated and is connected with the guide pulley, the connection rope is walked around from the guide pulley, the perforation of running through self diapire is seted up to the bottom of containing box, landing leg and fenestrate position one-to-one, when the surveying instrument rises, the containing box is stretched out from fenestrate position to the landing leg, the bottom of containing box is provided with the. This application has and reduces surveying instrument and takes place to collide with in handling, improves the effect to surveying instrument protection.

Description

Engineering cost mapping device and mapping method
Technical Field
The application relates to the field of construction engineering cost on-site mapping equipment, in particular to a construction cost mapping device and a mapping method.
Background
The project cost is defined from the perspective of a practitioner or investor, the project cost is the construction cost of the project, namely the total sum of all expected or actually required expenses for completing the construction of the project, the total fixed asset investment expenses which are expected or actually paid for constructing the project, the expenses mainly comprise equipment and tool purchase expenses, construction project and installation project expenses, other expenses for the construction, preparation expenses, interest in construction period, fixed asset investment direction adjustment taxes and the like, the project cost is defined from the perspective of a distribution package, the project cost is the project price, namely the project is constructed, the price of the construction installation project and the total price of the construction project which are predicted or actually formed in the markets such as land, equipment, technical labor, contract and the like by the trading modes of bidding and the like are predicted or actually mapped on the site by using a construction project cost site mapping device before the construction project cost is estimated, the terrain is measured to more accurately estimate the construction cost.
The prior Chinese patent with the reference publication number of CN110345351A discloses a construction engineering cost field mapping device, which comprises a fixing device, wherein the top of the fixing device is provided with a frame head, and the side surface of the fixing device is provided with an upper supporting device; through angle measuring device, make the mapping personnel can clearly observe the angle that opens of landing leg, make things convenient for the mapping personnel unanimous with the angle control that opens of three landing legs, help reducing the mapping error, the accuracy of building engineering cost valuation has been improved, fix the landing leg through angle stop device, make the angle that opens of landing leg fixed, the angle that opens of landing leg can not be in the centering, leveling and mapping process change, the device's stability has been increased, cooperation through clamping device and adjusting device, make things convenient for the mapping personnel to finely tune the length of landing leg, the operation degree of difficulty is little, the fault rate of regulation has been reduced, the time of centering leveling work cost has been shortened, the plotting speed has been accelerated, work efficiency has been increased, engineering's process has been accelerated, the device's practicality has been improved.
To the correlation technique among the above-mentioned, the inventor thinks when carrying surveying instrument, cause the clashing and colliding with to the surveying instrument easily to lead to surveying instrument to take place to damage, there is the defect that can't protect surveying instrument in the transport.
Disclosure of Invention
In order to reduce surveying instrument and take place to collide with in handling, improve the protection to surveying instrument, this application provides an engineering cost mapping device and mapping method.
The engineering cost mapping device and the mapping method provided by the application adopt the following technical scheme:
the utility model provides an engineering cost mapping device, including surveying instrument and landing leg, set up the containing box that is used for accomodating surveying instrument and landing leg between surveying instrument and the landing leg, the cylinder has set firmly between the bottom of surveying instrument and the interior diapire of containing box, be connected with the connection rope between the bottom of surveying instrument and the top of landing leg, the inside of containing box is rotated and is connected with the guide pulley, the connection rope is walked around from the guide pulley, the perforation that runs through self diapire is seted up to the bottom of containing box, landing leg and fenestrate position one-to-one, when the surveying instrument rises, the containing box is stretched out from fenestrate position to the landing leg, the bottom of containing box is provided with the fixed subassembly that is.
Through adopting above-mentioned technical scheme, the staff need carry out the survey and drawing during operation, start the cylinder, make the cylinder drive the surveying instrument and stretch out from the top of containing box, the surveying instrument drives at the in-process that rises and connects the rope and remove, the landing leg stretches out from the perforation under the effect of dead weight, stretches out the containing box messenger completely when the surveying instrument, the landing leg stretches out to the containing box outer maximum length, fixes the landing leg through fixed subassembly simultaneously to guarantee to have good stability when using this equipment to survey and draw. Through above structure, under the normal circumstances of accomplishing of survey and drawing work of guaranteeing, also can realize in the handling with surveying instrument and landing leg income containing box to protect landing leg and surveying instrument through the containing box, make this mapping device difficult emergence collide with and cause the damage in the handling.
Optionally, the landing leg is provided with a plurality ofly, and fixed subassembly is located between the landing leg, and fixed subassembly includes the dead lever, the lateral wall of dead lever and the diapire fixed connection of containing box, and the fixed slot has been seted up at the both ends of dead lever, is provided with the fixed block in the fixed slot and is used for popping out the fixed block tip from the fixed slot fixed spring, and fixed spring is located between fixed block and the dead lever, and the lateral wall that is close to the top at the landing leg is seted up with fixed block joint complex first draw.
Through adopting above-mentioned technical scheme, when the landing leg stretches out from the receiver bottom to when fixed slot and first draw-in groove align, fixed spring pops out the fixed block and blocks into to first draw-in groove in, thereby has guaranteed that the landing leg stretches out the back and has good stability between the containing box.
Optionally, the inside of landing leg is hollow structure, and the bottom of landing leg is opening structure and link up to the inside of landing leg, and the inside of landing leg is provided with the extension leg, and the extension leg is provided with the joint subassembly that is used for both fixings along the length direction and the landing leg sliding connection of landing leg between landing leg and the extension leg.
Through adopting above-mentioned technical scheme, stretch out the back with the landing leg from the bottom of receiver, stretch out the inside of extension leg again to through the joint subassembly, make between landing leg and the extension leg fixed, both guaranteed the stability between landing leg and the extension leg, played elongated effect to the landing leg again simultaneously, made the surveying instrument can be located suitable height and carried out the survey and drawing work.
Optionally, the lateral wall that the extension leg is close to the top has seted up the standing groove, the joint subassembly is located the standing groove, the joint subassembly includes the fixture block and is used for popping out the joint spring with the fixture block from the standing groove, the landing leg is close to the lateral wall of bottom and sets up the second draw-in groove with fixture block looks adaptation, the extension leg is close to and is provided with the extension spring that is used for popping out from the landing leg is inside with the extension leg between one end and the landing leg that the surveying instrument, when extension leg income to landing leg is inside, fixture block and first draw-in groove joint, when stretching out the long leg from the landing leg, fixture block and second joint groove joint.
By adopting the technical scheme, when the lengthened leg is positioned in the leg, the clamping block is clamped with the first clamping groove, so that the leg and the lengthened leg are relatively fixed, and meanwhile, the lengthened spring is in a compressed state; when the landing leg stretches out from the receiver is inside, and the fixed block pushes the fixture block to the standing groove in, extension spring release elasticity makes extension leg along landing leg length direction roll-off, and when the standing groove aligns with the second draw-in groove, the joint spring released the fixture block from the standing groove and made the fixture block insert to the second draw-in groove in, makes landing leg and extension leg fixed. Through above structure, realized lengthening leg and the automatic effect that stretches out and fix of landing leg, provide convenience for the staff.
Optionally, the landing leg is provided with four, and four landing legs are located the four corners position of containing box bottom respectively, and the dead lever setting is provided with two, and two dead levers are located respectively between two landing legs, all rotate at the middle part of two dead levers and are connected with the winding wheel, are connected with the receipts stay cord between winding wheel and fixed block, receive the one end and the fixture block fixed connection of stay cord, receive the other end of stay cord and the circumference lateral wall fixed connection of winding wheel.
Through adopting above-mentioned technical scheme, when needs take in fixed block to the fixed slot in, through rotating the winding wheel, make to receive the stay cord and twine to the winding wheel on, pulling the fixed block through receiving the stay cord and take in to the standing groove in to make fixed spring be in compression state, thereby can provide convenience to the work of taking in to the receiver for this landing leg of staff and surveying instrument.
Optionally, a connecting rod is fixedly connected between the two winding wheels along a rotation axis of the winding wheel, and one end of one winding wheel is fixedly connected with a hand wheel.
Through adopting above-mentioned technical scheme, the staff accessible rotates the hand wheel and accomplishes the rotation work to the winding wheel to it provides convenience to rotate the winding wheel for the staff.
Optionally, one end of the winding wheel, which is close to the hand wheel, is provided with a ratchet wheel and a pawl, the ratchet wheel is fixedly connected with the hand wheel, the top of the pawl is hinged to the bottom of the storage box, and the bottom of the pawl is clamped with the ratchet wheel.
By adopting the technical scheme, when a worker rotates the hand wheel, the ratchet wheel and the pawl are automatically clamped and fixed, so that the hand wheel is prevented from rotating, and the fixed block is prevented from being ejected again; when the fixing block needs to be popped out of the fixing groove, a worker can manually lift the pawl to be separated from the ratchet wheel, and the fixing spring can automatically pop out the fixing block.
Optionally, the circumferential side wall of the supporting leg is sleeved with a guide sleeve, and the guide sleeve is fixedly connected with the inner wall of the storage box.
Through adopting above-mentioned technical scheme, the uide bushing provides good stability for the landing leg in the containing box, provides good stability when stretching out in the containing box for the landing leg simultaneously, makes the landing leg be difficult for taking place to rock in the containing box.
Optionally, the storage box top is provided with two apron, and the one side that the apron deviates from each other is articulated with the top of storage box, is provided with between two apron to be used for two fixed hasps of apron.
Through adopting above-mentioned technical scheme, when need not to survey and drawing, can with detain between two apron and fixed with the hasp, make the apron play the effect of protection to this mapping device's top, when needs survey and drawing, open the hasp, turn over the apron and can stretch out surveying instrument from the containing box is inside.
A construction cost mapping method comprises the following steps:
s1, before surveying and mapping are needed, the cover plate is opened, the surveying and mapping instrument is driven by the cylinder to extend out of the storage box, and meanwhile, the supporting legs extend out of the bottom of the storage box;
s2, when the first clamping groove is aligned with the fixed rod, the fixed block is popped out from the end part of the fixed rod and clamped into the first clamping groove, meanwhile, the fixed block pushes the clamping block into the placing groove, the lengthening spring pops the lengthening leg out of the supporting leg, the clamping block is clamped into the second clamping groove, and the supporting leg and the lengthening leg are fixed;
s3, after the measurement is finished, the hand wheel is rotated to enable the fixing block to be retracted into the fixing groove, the clamping block is pressed into the placing groove, the lengthened leg is pushed upwards to be retracted into the supporting leg, the clamping block is clamped into the first clamping groove, and finally the surveying instrument and the supporting leg are retracted into the containing box again through the cylinder.
Through adopting above-mentioned technical scheme, need carry out the survey and drawing during operation at the staff, only need to drive the surveying instrument through the cylinder and rise, then can make the surveying instrument stretch out from the containing box, the landing leg stretches out from the bottom of containing box simultaneously, can fix the landing leg automatically through fixed subassembly simultaneously, and the landing leg makes to extend out in the landing leg from the landing leg when going on fixing, adds the automatic fixation between long leg and the landing leg simultaneously. When needs were with surveying instrument and landing leg income to the containing box in, the staff rotated the hand wheel to earlier, made in the fixed block income fixed slot, pressed into the standing groove with the fixture block again in, made the fixture block shift out from the second draw-in groove, then will add long leg income to the landing leg in, rethread cylinder is driving landing leg and surveying instrument income to the containing box in. Thereby through above structure, for the staff take out mapping device and accomodate mapping device in from the containing box and all provide convenience.
In summary, the present application includes at least one of the following beneficial technical effects:
1. a storage box is additionally arranged between the supporting leg and the surveying instrument, so that the supporting leg and the surveying instrument can be stored in the storage box when surveying and mapping are not needed, and a good protection effect is provided for the surveying instrument and the supporting leg;
2. the bottom of the containing box is additionally provided with the fixing assembly, and after the supporting legs extend out of the containing box, good stability can be provided for the supporting legs through the fixing assembly;
3. add extension leg in the landing leg, can improve the height of surveying instrument through the extension leg, make the surveying instrument be located suitable height when carrying out the survey and drawing work.
Drawings
FIG. 1 is a schematic diagram of a construction cost mapping apparatus of the present document;
FIG. 2 is a sectional view showing the configuration of the device when it is extended from the interior of the storage case;
FIG. 3 is a sectional view showing the structure of the device when it is stored in the storage box;
FIG. 4 is a schematic view of the bottom of the storage box;
fig. 5 is a partial schematic view showing a structure between the ratchet and the pawl.
Description of reference numerals: 1. a surveying instrument; 2. a support leg; 21. a first card slot; 22. a second card slot; 23. lengthening the spring; 24. a guide sleeve; 3. a storage box; 31. a cylinder; 32. connecting ropes; 33. a guide wheel; 34. perforating; 4. lengthening legs; 41. a placement groove; 5. a fixing assembly; 51. fixing the rod; 511. fixing grooves; 512. drawing back the rope; 513. a winding wheel; 52. fixed block, 53, fixed spring; 6. a clamping assembly; 61. a clamping block; 62. clamping a spring; 7. a connecting rod; 8. a hand wheel; 81. a ratchet wheel; 82. a pawl; 9. a cover plate; 91. and (5) locking.
Detailed Description
The present application is described in further detail below with reference to figures 1-5.
The embodiment of the application discloses a construction cost mapping device and a mapping method.
Referring to fig. 1 and 2, an engineering cost mapping device includes surveying instrument 1 and landing leg 2, is provided with the containing box 3 that is used for accomodating surveying instrument 1 and landing leg 2 between surveying instrument 1 and the landing leg 2, has set firmly cylinder 31 between the inner diapire of surveying instrument 1 and containing box 3, and landing leg 2 is provided with four, and four landing legs 2 are located the four corners position of containing box 3 respectively, and the perforation 34 that supplies landing leg 2 to follow the inside roll-off of containing box 3 is seted up to the four corners position of containing box 3 bottom. Be connected with between the bottom of surveying instrument 1 and the top of landing leg 2 and connect rope 32, be provided with guide pulley 33 directly over landing leg 2, guide pulley 33 rotates with the inner wall of containing box 3 to be connected, connects rope 32 and walks around from guide pulley 33. Need not to carry out the survey and drawing during operation, the staff can all take in surveying instrument 1 and landing leg 2 to containing box 3 in, survey and drawing when needs and receive, staff's accessible cylinder 31 drives surveying instrument 1 and stretches out from the top of containing box 3, and surveying instrument 1 drives simultaneously and connects rope 32 and remove, makes landing leg 2 move down under the effect of dead weight to stretch out from the inside of containing box 3 through perforation 34. To sum up, need not to carry out the survey and drawing during operation, containing box 3 has played good guard action to surveying instrument 1 and landing leg 2, makes this mapping device be difficult because of colliding with and cause the damage in handling.
Referring to fig. 3 and 4, the bottom of containing box 3 sets firmly fixed subassembly 5 that is used for fixed landing leg 2, fixed subassembly 5 is provided with two sets ofly, two sets of fixed subassemblies 5 are located respectively between two landing legs 2 of homonymy, the inside of landing leg 2 is hollow structure, 2 bottoms of landing leg are open structure and link up mutually with the inside of landing leg 2, be provided with extension leg 4 in the landing leg 2, extension leg 4 is along the length direction and the landing leg 2 sliding connection of landing leg 2, be provided with between extension leg 4 and the landing leg 2 and be used for joint subassembly 6 that both are fixed.
Referring to fig. 2 and 3, the fixing assembly 5 includes a fixing rod 51, a fixing block 52, and a fixing spring 53. The roof of dead lever 51 and containing box 3's bottom fixed connection, landing leg 2 is located the both ends of dead lever 51, and fixed slot 511 has been seted up towards the direction of landing leg 2 at the both ends of dead lever 51, and fixed block 52 and fixed spring 53 all are located fixed slot 511, and fixed spring 53's one end is connected with fixed block 52, and fixed spring 53's the other end is connected with dead lever 51, and landing leg 2 is provided with the first draw-in groove 21 that supplies fixed block 52 male near the lateral wall at top.
Referring to fig. 2 and 3, the side wall of the lengthened leg 4 near the top is provided with a placing groove 41, the clamping assembly 6 is located in the placing groove 41, the clamping assembly 6 comprises a clamping block 61 and a clamping spring 62, one end of the clamping spring 62 is fixedly connected with the lengthened leg 4, the other end of the clamping spring 62 is fixedly connected with the clamping block 61, and the side wall of the leg 2 near the bottom is provided with a second clamping groove 22 matched with the clamping block 61. A lengthening spring 23 is arranged in the supporting leg 2, the lengthening leg 4 is positioned between the supporting leg 2 and the lengthening leg 4, one end of the lengthening spring 23 is fixedly connected with the supporting leg 2, and the other end of the lengthening spring 23 is fixedly connected with the lengthening leg 4.
When the lengthening leg 4 is positioned in the support leg, the lengthening spring 23 is in a compressed state, the clamping spring 62 pushes the fixture block 61 out of the placing groove 41, and the fixture block 61 is clamped into the first clamping groove 21, so that the stability of the lengthening leg 4 in the support leg 2 is maintained; after the supporting leg 2 extends out of the bottom of the containing box 3, when the first clamping groove 21 is aligned with the fixing groove 511, the fixing block 52 is ejected out of the fixing groove 511 through the fixing spring 53, the fixing block 52 pushes the clamping block 61 into the placing groove 41, and the fixing block 52 is clamped with the first clamping groove 21, so that the containing box 3 and the supporting leg 2 are fixed; the lengthening spring 23 releases the elastic force to extend the lengthening leg 4 from the bottom of the leg 2, and when the lengthening leg 4 moves until the placement groove 41 is aligned with the second clamping groove 22, the clamping spring 62 ejects the clamping block 61 from the placement groove 41 and clamps the clamping block into the second clamping groove 22, so that the lengthening leg 4 and the leg 2 are fixed, and the stability between the leg 2 and the lengthening leg 4 is improved. Through above structure, realized landing leg 2 from 3 in stretch out the back and the containing box 3 between fixed to make extension leg 4 can stretch out from landing leg 2 automatically, accomplished the landing leg 2 simultaneously and lengthened between the leg 4 fixed.
Referring to fig. 3 and 4, a winding wheel 513 is rotatably connected to the inside of the fixing rod 51, a rotation axis of the winding wheel 513 is arranged along the horizontal direction and is perpendicular to the length direction of the fixing rod 51, a pull rope 512 is arranged between the winding wheel 513 and the fixing block 52, one end of the pull rope 512 is connected to the fixing block 52, the other end of the pull rope 512 is fixedly connected to a side wall of the winding wheel 513, and a connecting rod 7 is fixedly arranged between the two winding wheels 513 along the rotation axis.
Referring to fig. 4 and 5, a hand wheel 8 is fixedly connected to one end of one winding wheel 513, which is away from the connecting rod 7, a ratchet 81 and a pawl 82 are arranged between the hand wheel 8 and the winding wheel 513, the ratchet 81 is fixedly connected with the hand wheel 8 along the rotation axis of the hand wheel 8, the top of the pawl 82 is hinged to the bottom of the containing box 3, and the bottom of the pawl 82 is clamped with the ratchet 81. When the fixed block 52 needs to be retracted into the fixing groove 511, a worker rotates the hand wheel 8, so that the hand wheel 8 drives the winding wheel 513 to rotate, the winding wheel 513 winds the winding rope 512 onto the side wall of the worker, the fixed block 52 is pulled into the fixing groove 511 through the winding rope 512, and meanwhile, the pawl 82 and the ratchet 81 are clamped and fixed, so that the winding wheel 513 cannot rotate, and the stability of the fixed block 52 in the fixing groove 511 is guaranteed; when the fixing block 52 needs to be ejected from the fixing groove 511, the worker only needs to lift the pawl 82 to separate the pawl 82 from the ratchet 81, and then the fixing spring 53 can automatically eject the fixing block 52 from the fixing groove 511. Thereby achieving an effect of receiving the fixing block 52 into the fixing groove 511 or ejecting the fixing block from the fixing groove 511.
Referring to fig. 1 and 3, the top of the storage box 3 is covered with two cover plates 9, one side of the two cover plates 9 departing from each other is hinged with the top of the storage box 3, and a lock catch 91 for fixing the two cover plates 9 is arranged between the two cover plates 9. When the staff need use this mapping device, open hasp 91, open the both sides of containing box 3 and lap 9 and open, then release surveying instrument 1 from the top of containing box 3 through cylinder 31 again, when need not to carry out the mapping work, with two apron 9 detain with, and fix between two apron 9 with hasp 91 to play the effect of protection through apron 9 for this mapping device's top.
Referring to fig. 2 and 3, a guide sleeve 24 is sleeved outside the circumferential side wall of the supporting leg 2, and the guide sleeve 24 is fixedly connected with the inner wall of the containing box 3. The guide sleeve 24 has a guiding function for the moving direction of the supporting leg 2, so that the supporting leg 2 can be guided and limited by the guide sleeve 24 to extend out of the through hole 34, and the stability of the supporting leg 2 in the storage box 3 is improved.
The implementation principle of the engineering cost mapping device in the embodiment of the application is as follows: the staff is carrying out the survey and drawing work time, can open apron 9 earlier, makes cylinder 31 drive surveying instrument 1 and stretches out from the top of containing box 3, and landing leg 2 stretches out from the bottom of containing box 3, stretches out to furthest back when landing leg 2, and the staff separates ratchet 81 and pawl 82 again, makes fixed block 52 insert to first draw-in groove 21 in to make extension leg 4 stretch out and the automatic fixation from the bottom of landing leg 2, then alright carry out the survey and drawing work. After the survey and drawing work, 4 income to landing leg 2 of extension leg will be earlier with the staff, then reuse cylinder 31 is driving surveying instrument 1 and 2 income of landing leg to containing box 3 in, provides good guard action for surveying instrument 1 and landing leg 2 through containing box 3, avoids when carrying this mapping device, because of colliding with and causing the damage.
A construction cost mapping method comprises the following steps:
s1, before surveying and mapping, the cover plate 9 is opened, the surveying and mapping instrument 1 is driven by the cylinder 31 to extend out of the storage box 3, and meanwhile the supporting legs 2 extend out of the bottom of the storage box 3;
s2, when the first clamping groove 21 is aligned with the fixing rod 51, the fixing block 52 is popped out from the end part of the fixing rod 51 and clamped into the first clamping groove 21, meanwhile, the fixing block 52 pushes the clamping block 61 into the placing groove 41, the lengthening spring 23 pops the lengthening leg 4 out from the supporting leg 2, the clamping block 61 is clamped into the second clamping groove 22, and the supporting leg 2 and the lengthening leg 4 are fixed;
s3, after the measurement is finished, the hand wheel 8 is rotated to enable the fixing block 52 to be retracted into the fixing groove 511, the clamping block 61 is pressed into the placing groove 41, the lengthening leg 4 is pushed upwards to enable the lengthening leg 4 to be retracted into the supporting leg 2, the clamping block 61 is clamped into the first clamping groove 21, and finally the air cylinder 31 drives the surveying instrument 1 and the supporting leg 2 to be retracted into the storage box 3 again.
The implementation principle of the engineering cost mapping method in the embodiment of the application is as follows: when using this mapping device, the staff only needs to open the apron 9 earlier, then can stretch out surveying instrument 1 and landing leg 2 from the inside of containing box 3 through cylinder 31, after landing leg 2 stretches out to maximum position, only needs to separate pawl 82 and ratchet 81, alright make extension leg 4 stretch out from the inside of landing leg 2 to it is fixed between the two to make automatically. After surveying and mapping finishes, the staff only need earlier with extension leg 4 income to landing leg 2 in, then rotate hand wheel 8 again, with fixed block 52 income to fixed slot 511 in, through the drive of cylinder 31 again alright withdraw surveying instrument 1 and landing leg 2 to in the containing box 3 entirely. Through above structure, make the staff through simple and convenient operation alright take out or withdraw surveying and mapping device from containing box 3, and then provide convenience for the staff.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (10)

1. A construction cost mapping device is characterized in that: comprises a surveying instrument (1) and supporting legs (2), a containing box (3) used for containing the surveying instrument (1) and the supporting legs (2) is arranged between the surveying instrument (1) and the supporting legs (2), a cylinder (31) is fixedly arranged between the bottom of the surveying instrument (1) and the inner bottom wall of the containing box (3), a connecting rope (32) is connected between the bottom of the surveying instrument (1) and the top of the supporting legs (2), a guide wheel (33) is rotatably connected inside the containing box (3), the connecting rope (32) is wound around the guide wheel (33), a through hole (34) penetrating through the bottom wall of the containing box (3) is arranged at the bottom of the containing box (3), the supporting legs (2) and the through hole (34) are in one-to-one correspondence with each, when the surveying instrument (1) ascends, the supporting legs (2) extend out of the containing box (3) from the positions of the through holes (34), and the bottom of the containing box (3) is provided with a fixing component (5) for fixing the supporting legs (2) and the containing box (3).
2. A construction cost mapping apparatus according to claim 1, wherein: landing leg (2) are provided with a plurality ofly, fixed subassembly (5) are located between landing leg (2), fixed subassembly (5) are including dead lever (51), the lateral wall of dead lever (51) and the diapire fixed connection of containing box (3), fixed slot (511) have been seted up at the both ends of dead lever (51), be provided with fixed block (52) in fixed slot (511) and be used for fixing spring (53) of popping out fixed block (52) tip from fixed slot (511), fixing spring (53) are located between fixed block (52) and dead lever (51), landing leg (2) are close to the lateral wall at top and seted up first draw-in groove (21) of fixed block (52) joint complex.
3. A construction cost mapping apparatus according to claim 2, wherein: the inside of landing leg (2) is hollow structure, and the bottom of landing leg (2) is opening structure and link up to the inside of landing leg (2), and the inside of landing leg (2) is provided with extension leg (4), and extension leg (4) are provided with between landing leg (2) and extension leg (4) and are used for joint subassembly (6) that both are fixed along the length direction and landing leg (2) sliding connection of landing leg (2).
4. A construction cost mapping apparatus according to claim 3, wherein: add long leg (4) and be close to the lateral wall at top and seted up standing groove (41), joint subassembly (6) are located standing groove (41), joint subassembly (6) include fixture block (61) and be used for popping out joint spring (62) with fixture block (61) from standing groove (41), second draw-in groove (22) with fixture block (61) looks adaptation are seted up to lateral wall that landing leg (2) are close to the bottom, it is used for adding long leg (4) from inside extension spring (23) that pop out of landing leg (2) to be provided with between one end that long leg (4) are close to surveying instrument (1) and landing leg (2), when adding long leg (4) income to landing leg (2) inside, fixture block (61) and first draw-in groove (21) joint, when stretching out long leg from landing leg (2), fixture block (61) and second joint groove joint.
5. A construction cost mapping apparatus according to claim 2, wherein: landing leg (2) are provided with four, four landing legs (2) are located the four corners position of containing box (3) bottom respectively, dead lever (51) set up and are provided with two, two dead lever (51) are located respectively between two landing legs (2), the middle part of two dead lever (51) is all rotated and is connected with winding wheel (513), be connected with receipts stay cord (512) between winding wheel (513) and fixed block (52), the one end and fixture block (61) fixed connection of receipts stay cord (512), the other end of receipts stay cord (512) and the circumference lateral wall fixed connection of winding wheel (513).
6. A construction cost mapping apparatus according to claim 5, wherein: a connecting rod (7) is fixedly connected between the two winding wheels (513) along the rotating axis of the winding wheels (513), and one end of one winding wheel (513) is fixedly connected with a hand wheel (8).
7. A construction cost mapping apparatus according to claim 6, wherein: one end of the winding wheel (513) close to the hand wheel (8) is provided with a ratchet wheel (81) and a pawl (82), the ratchet wheel (81) is fixedly connected with the hand wheel (8), the top of the pawl (82) is hinged to the bottom of the storage box (3), and the bottom of the pawl (82) is connected with the ratchet wheel (81) in a clamping mode.
8. A construction cost mapping apparatus according to claim 1, wherein: the circumference lateral wall overcoat of landing leg (2) is equipped with uide bushing (24), uide bushing (24) and the inner wall fixed connection of containing box (3).
9. A construction cost mapping apparatus according to claim 1, wherein: the storage box is characterized in that two cover plates (9) are arranged at the top of the storage box (3), one side, away from each other, of each cover plate (9) is hinged to the top of the storage box (3), and a lock catch (91) used for fixing the two cover plates (9) is arranged between the two cover plates (9).
10. A construction cost mapping method is characterized by comprising the following steps:
s1, before surveying and mapping, the cover plate (9) is opened, the surveying and mapping instrument (1) is driven to extend out of the containing box (3) through the cylinder (31), and meanwhile, the supporting legs (2) extend out of the bottom of the containing box (3);
s2, when the first clamping groove (21) is aligned with the fixing rod (51), the fixing block (52) is popped out from the end part of the fixing rod (51) and clamped into the first clamping groove (21), meanwhile, the fixing block (52) pushes the clamping block (61) into the placing groove (41), the lengthening spring (23) pops out the lengthening leg (4) from the leg (2), the clamping block (61) is clamped into the second clamping groove (22), and the leg (2) and the lengthening leg (4) are fixed;
s3, after the measurement is finished, the hand wheel (8) is rotated to enable the fixing block (52) to be retracted into the fixing groove (511), the clamping block (61) is pressed into the placing groove (41), the lengthening leg (4) is pushed upwards, the lengthening leg (4) is retracted into the supporting leg (2), the clamping block (61) is clamped into the first clamping groove (21), and finally the surveying instrument (1) and the supporting leg (2) are driven by the cylinder (31) to be retracted into the storage box (3) again.
CN202110173825.3A 2021-02-06 2021-02-06 Engineering cost mapping device and mapping method Active CN112964235B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110173825.3A CN112964235B (en) 2021-02-06 2021-02-06 Engineering cost mapping device and mapping method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110173825.3A CN112964235B (en) 2021-02-06 2021-02-06 Engineering cost mapping device and mapping method

Publications (2)

Publication Number Publication Date
CN112964235A true CN112964235A (en) 2021-06-15
CN112964235B CN112964235B (en) 2022-09-02

Family

ID=76273805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110173825.3A Active CN112964235B (en) 2021-02-06 2021-02-06 Engineering cost mapping device and mapping method

Country Status (1)

Country Link
CN (1) CN112964235B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114484231A (en) * 2022-01-27 2022-05-13 王娟 Territorial space planning device based on GIS
CN115046111A (en) * 2022-05-20 2022-09-13 浙江同信工程项目管理有限公司 On-spot intelligent measuring device of building engineering cost

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206206950U (en) * 2017-03-18 2017-05-31 刘安伟 A kind of Surveying Engineering frame
KR101833057B1 (en) * 2017-12-14 2018-04-13 (주)지스페이스코리아 3-dimension space image drawing system
CN207649603U (en) * 2018-01-05 2018-07-24 宋长青 A kind of project cost survey tool
CN109458532A (en) * 2018-10-23 2019-03-12 陈斌 Construction instrument of surveying and mapping protective device
CN109708625A (en) * 2018-12-29 2019-05-03 王子华 A kind of multifunction architecture engineering cost field surveys device and its application method
CN110296695A (en) * 2019-07-25 2019-10-01 绍兴市诚信工程造价咨询事务所有限公司 A kind of construction engineering cost field surveys device
CN211108791U (en) * 2019-12-13 2020-07-28 江涛 Surveying instrument for land resource management
CN212080644U (en) * 2020-04-21 2020-12-04 四川君和工程项目管理咨询有限公司 On-spot mapping device is used to engineering cost

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206206950U (en) * 2017-03-18 2017-05-31 刘安伟 A kind of Surveying Engineering frame
KR101833057B1 (en) * 2017-12-14 2018-04-13 (주)지스페이스코리아 3-dimension space image drawing system
CN207649603U (en) * 2018-01-05 2018-07-24 宋长青 A kind of project cost survey tool
CN109458532A (en) * 2018-10-23 2019-03-12 陈斌 Construction instrument of surveying and mapping protective device
CN109708625A (en) * 2018-12-29 2019-05-03 王子华 A kind of multifunction architecture engineering cost field surveys device and its application method
CN110296695A (en) * 2019-07-25 2019-10-01 绍兴市诚信工程造价咨询事务所有限公司 A kind of construction engineering cost field surveys device
CN211108791U (en) * 2019-12-13 2020-07-28 江涛 Surveying instrument for land resource management
CN212080644U (en) * 2020-04-21 2020-12-04 四川君和工程项目管理咨询有限公司 On-spot mapping device is used to engineering cost

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114484231A (en) * 2022-01-27 2022-05-13 王娟 Territorial space planning device based on GIS
CN114484231B (en) * 2022-01-27 2023-04-14 王娟 Territorial space planning device based on GIS
CN115046111A (en) * 2022-05-20 2022-09-13 浙江同信工程项目管理有限公司 On-spot intelligent measuring device of building engineering cost

Also Published As

Publication number Publication date
CN112964235B (en) 2022-09-02

Similar Documents

Publication Publication Date Title
CN112964235B (en) Engineering cost mapping device and mapping method
CN102960122B (en) Beat type hickory picking machine
CN105692350B (en) A kind of multifunction power scene transmission of facility
CN115973417A (en) Unmanned aerial vehicle shooting and identifying device for broken tiles
CN210393169U (en) Portable cable unwrapping wire support
KR101102888B1 (en) Garden taping machine head
CN108207330B (en) Artificially-assisted fruit picking device
CN106477398B (en) A kind of adhesive tape dismounting vehicle
CN111502764A (en) Device for measuring row spacing between portable magnetic claw supports in coal mine
CN113443271B (en) Tool device for wind power tower transportation
CN209761319U (en) brick clamp convenient to maintenance
CN213243379U (en) Special maintenance device for power transformation
CN207993463U (en) A kind of quick seven-stringed plucked instrument in some ways similar to the zither winds up tool
CN209795935U (en) automatic sticking film machine of glass
CN112727037A (en) Beam frame device for building construction
CN208142663U (en) A kind of mobile protective device of power system transformer substation maintenance
CN220625307U (en) Indoor decoration pay-off
CN214200113U (en) Portable bridge surveying instrument
CN217997968U (en) Slope protection structure for hydraulic engineering
CN216845929U (en) Measuring device for planning construction of ecological garden landscape engineering
CN216665212U (en) Convenient fence net device
CN219844104U (en) Hawthorn fruit picker convenient to flexible regulation
CN218723817U (en) Land resource area calculation device
CN221059036U (en) Afforestation plant fixing device
CN209623700U (en) A kind of portable agricultural field planning survey device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant