CN112942748A - Steel-pipe column plastering unit - Google Patents

Steel-pipe column plastering unit Download PDF

Info

Publication number
CN112942748A
CN112942748A CN202110159338.1A CN202110159338A CN112942748A CN 112942748 A CN112942748 A CN 112942748A CN 202110159338 A CN202110159338 A CN 202110159338A CN 112942748 A CN112942748 A CN 112942748A
Authority
CN
China
Prior art keywords
bucket
bucket body
pipe column
steel pipe
toothed ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202110159338.1A
Other languages
Chinese (zh)
Inventor
王炳川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Li Deshui
Original Assignee
Guangzhou Luge Industrial Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Luge Industrial Co ltd filed Critical Guangzhou Luge Industrial Co ltd
Priority to CN202110159338.1A priority Critical patent/CN112942748A/en
Publication of CN112942748A publication Critical patent/CN112942748A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/06Implements for applying plaster, insulating material, or the like
    • E04F21/08Mechanical implements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a steel pipe column plastering device which structurally comprises a first bucket body, a second bucket body and a power-assisted structure, wherein the first bucket body is connected with the second bucket body, the power-assisted structure is arranged on the second bucket body, the first bucket body is consistent with the second bucket body in structure, the second bucket body comprises a first half bucket, a second half bucket, a counterpoint piece and a semicircular hole, the first half bucket is mechanically connected with the second half bucket, the counterpoint piece is arranged on the outer sides of the first half bucket and the second half bucket, the first half bucket and the second half bucket are respectively provided with the semicircular hole, the power-assisted structure comprises a supporting plate, a motor, a gear, a first half toothed ring, a second half toothed ring and a pushing piece, the supporting plate is connected to the outer side of the second half bucket, and the motor is arranged on the supporting plate, and the plastering device has the advantages that: can realize even plastering, and one shot forming, need not the secondary and plaster evenly, can accelerate concrete flow to the steel-pipe column through helping hand structure to the efficiency that the messenger plastered is improved, and can tamp the concrete through the striking of impeller afterbody to the bucket body.

Description

Steel-pipe column plastering unit
Technical Field
The invention relates to the field of buildings, in particular to a plastering device for a steel pipe column.
Background
After the construction of the main body structure of the steel pipe column is completed, according to the requirements of design files, the outer side of the steel pipe column is plastered to 50mm in thickness, rust removal is performed on the rusted steel pipe column, then slurry is thrown and plastered, a steel wire mesh is hung at the position of 20-30mm, then plastering is performed again to finish the finished surface, the finished surface press polishing of the arc surface is a construction difficulty, and a traditional plasterer master is difficult to operate.
The prior art discloses a plastering device and a plastering method for a steel pipe column with the patent number of 201811104253.8, which belong to the field of constructional engineering, and the plastering device for the steel pipe column comprises a first hopper body and a second hopper body which are oppositely arranged; the first hopper body comprises a first half hopper and a second half hopper which are detachably connected; the second bucket body comprises a third half bucket and a fourth half bucket which are detachably connected; the first hopper body and the second hopper body are coaxial, and a working hole for the steel pipe column to pass through is formed in the axis of the steel pipe column plastering device. Through steel-pipe column plastering unit and steel-pipe column plastering unit, can realize the even plastering in the steel-pipe column outside, guarantee that the steel-pipe column outside lime body is smooth and be cylindricly. The steel pipe column plastering device is designed in a split manner, so that the plastering device can be conveniently sleeved on the outer side of the steel pipe column. And the design of the guide piece can ensure that the movement direction of the steel pipe column plastering device is parallel to the axial direction of the steel pipe column.
The prior art can only carry out evenly after plastering when using, can't once accomplish even plastering, and is comparatively troublesome, and the concrete flows to the flow direction steel-pipe column through the autologous in the bucket body, and the autologous mobility of concrete is slower, reduces the efficiency of plastering.
Disclosure of Invention
The invention mainly aims to overcome the defects of the prior art and provide a plastering device for a steel pipe column.
The invention is realized by adopting the following technical scheme: the steel pipe column plastering device structurally comprises a first bucket body, a second bucket body and a power assisting structure, wherein the first bucket body is connected with the second bucket body, and the power assisting structure is installed on the second bucket body.
As optimization, the first bucket body and the second bucket body are consistent in structure, the second bucket body comprises a first half bucket, a second half bucket, a counterpoint piece and a semicircular hole, the first half bucket is mechanically connected with the second half bucket, the counterpoint piece is arranged on the outer sides of the first half bucket and the second half bucket, and the semicircular hole is formed in each of the first half bucket and the second half bucket.
Preferably, the boosting structure comprises a supporting plate, a motor, a gear, a first half gear ring, a second half gear ring and a pushing piece, the supporting plate is connected to the outer side of the second half hopper, the motor is mounted on the supporting plate and connected with the gear, the first half gear ring and the second half gear ring are respectively mounted on the first half hopper and the second half hopper, the first half gear ring and the second half gear ring form a circle, the outer sides of the first half gear ring and the second half gear ring are meshed with the gear, and the pushing piece is arranged in the first half gear ring and the second half gear ring.
As optimization, the first half bucket and the second half bucket are respectively provided with 3 pushing pieces.
Preferably, the first half bucket and the second half bucket are respectively provided with a convex block, and the convex blocks are arranged on the side faces of the semicircular holes.
As optimization, the bottom of the first half-toothed ring and the bottom of the second half-toothed ring are provided with sliding strips, the top of the first half-bucket and the top of the second half-bucket are provided with sliding grooves, and the sliding strips are matched with the sliding grooves.
Preferably, one end of the pushing piece, which is close to the first semi-toothed ring, is provided with a matching groove, the other end of the pushing piece is provided with a magnet block, a supporting structure is installed in the matching groove, and the supporting structure is connected with the first semi-toothed ring.
Preferably, the supporting structure comprises a cylinder, a rubber sleeve and a supporting rod, one end of the supporting rod is connected with the first semi-toothed ring, the other end of the supporting rod is connected with the cylinder, the cylinder is matched with the matching groove, and the outer side of the supporting rod is connected with the pushing piece through the rubber sleeve.
Preferably, the rubber sleeve is in a conical shape and has elasticity.
Preferably, the second bucket body is made of metal, and the second bucket body faces upwards.
Advantageous effects
When the invention is used, the first bucket body and the second bucket body are sleeved on the outer side of the steel pipe column and locked, then the guide piece penetrates through the alignment piece of the first bucket body and the second bucket body, so that the first bucket body and the second bucket body can be lifted on the outer side of the steel pipe column, concrete is added on the upward second bucket body, simultaneously the motor is started to drive the gear to rotate, the gear drives the first half-tooth ring and the second half-tooth ring to rotate on the sliding groove, so as to drive the pushing piece to rotate, the pushing piece is arc-shaped, the concrete on the pushing piece can be pushed downwards along with the rotation of the pushing piece, so that the downward speed of the concrete is accelerated, the concrete is quickly attached to the outer side of the steel pipe column, uniform forming can be realized, secondary plastering is not needed, the tail part can move upwards when the pushing piece passes through the lug in the rotation process due to the design of the lug, and the magnetic attraction of the magnet block can be quickly attached to the inner wall of the second bucket body after the lug leaves, the tail of the pushing piece can impact the second bucket body through the falling magnetic attraction of the magnet block, so that the second bucket body vibrates to tamp concrete.
Compared with the prior art, the invention has the beneficial effects that: can realize even plastering, and one shot forming, need not the secondary and plaster evenly, can accelerate concrete flow to the steel-pipe column through helping hand structure to the efficiency that the messenger plastered is improved, and can tamp the concrete through the striking of impeller afterbody to the bucket body.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is a schematic structural view of a steel pipe column plastering device of the present invention.
FIG. 2 is a schematic structural view of a second bucket according to the present invention.
Fig. 3 is a schematic structural diagram of the boosting structure of the invention.
FIG. 4 is a cross-sectional view of the first bucket half and the first ring half of the present invention.
Fig. 5 is an enlarged schematic view of a portion a in fig. 2.
Fig. 6 is an enlarged schematic view of a portion B in fig. 3.
In the figure: the bucket comprises a first bucket body 1, a second bucket body 2, a power assisting structure 3, a first half bucket 20, a second half bucket 21, an aligning piece 22, a semicircular hole 23, a supporting plate 30, a motor 31, a gear 32, a first half gear ring 33, a second half gear ring 34, a pushing piece 35, a bump 210, a sliding strip 330, a sliding groove 200, a matching groove 350, a magnet block 351, a supporting structure a, a cylinder a1, a rubber sleeve a2 and a supporting rod a 3.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1
Referring to fig. 1-4, the present invention provides a steel pipe column plastering apparatus, which comprises: the structure of the bucket comprises a first bucket body 1, a second bucket body 2 and a power-assisted structure 3, wherein the first bucket body 1 is connected with the second bucket body 2, the power-assisted structure 3 is installed on the second bucket body 2, the first bucket body 1 and the second bucket body 2 are in the same structure, the second bucket body 2 comprises a first half bucket 20, a second half bucket 21, aligning pieces 22 and semicircular holes 23, the first half bucket 20 is mechanically connected with the second half bucket 21, the aligning pieces 22 are arranged on the outer sides of the first half bucket 20 and the second half bucket 21, the semicircular holes 23 are respectively arranged on the first half bucket 20 and the second half bucket 21, the power-assisted structure 3 comprises a support plate 30, a motor 31, a gear 32, a first half-toothed ring 33, a second half-toothed ring 34 and a pushing piece 35, the support plate 30 is connected to the outer side of the second half bucket 21, the motor 31 is installed on the support plate 30, the motor 31 is connected with the gear 32, the first half-toothed ring 33, The second half-toothed ring 34 is respectively installed on the first half bucket 20 and the second half bucket 21, the first half-toothed ring 33 and the second half-toothed ring 34 form a circle, the outer sides of the first half-toothed ring 33 and the second half-toothed ring 34 are meshed with the gear 32, pushing pieces 35 are arranged in the first half-toothed ring 33 and the second half- toothed ring 34, 3 pushing pieces 35 are respectively arranged on the first half bucket 20 and the second half bucket 21, sliding strips 330 are arranged at the bottoms of the first half-toothed ring 33 and the second half-toothed ring 34, sliding grooves 200 are arranged at the tops of the first half bucket 20 and the second half bucket 21, the sliding strips 330 are matched with the sliding grooves 200 to prevent the first half-toothed ring 33 and the second half-toothed ring 34 from being separated from the first half bucket 20 and the second half bucket 21, and the second bucket body 2 faces upwards.
The working principle is as follows: when the concrete plastering device is used, the first bucket body 1 and the second bucket body 2 are sleeved on the outer side of a steel pipe column and locked, then the guide piece penetrates through the aligning pieces 22 of the first bucket body 1 and the second bucket body 2, so that the first bucket body 1 and the second bucket body 2 are lifted on the outer side of the steel pipe column, concrete is added on the upward second bucket body 2, meanwhile, the motor 31 is started to drive the gear 32 to rotate, the gear 32 drives the first half-toothed ring 33 and the second half-toothed ring 34 to rotate on the sliding groove 200, and the pushing piece 35 is driven to rotate.
Example 2
Referring to fig. 1-6, the present invention provides a steel pipe column plastering apparatus, which comprises: the structure of the bucket comprises a first bucket body 1, a second bucket body 2 and a power-assisted structure 3, wherein the first bucket body 1 is connected with the second bucket body 2, the power-assisted structure 3 is installed on the second bucket body 2, the first bucket body 1 and the second bucket body 2 are in the same structure, the second bucket body 2 comprises a first half bucket 20, a second half bucket 21, aligning pieces 22 and semicircular holes 23, the first half bucket 20 is mechanically connected with the second half bucket 21, the aligning pieces 22 are arranged on the outer sides of the first half bucket 20 and the second half bucket 21, the semicircular holes 23 are respectively arranged on the first half bucket 20 and the second half bucket 21, the power-assisted structure 3 comprises a support plate 30, a motor 31, a gear 32, a first half-toothed ring 33, a second half-toothed ring 34 and a pushing piece 35, the support plate 30 is connected to the outer side of the second half bucket 21, the motor 31 is installed on the support plate 30, the motor 31 is connected with the gear 32, the first half-toothed ring 33, The second half-toothed ring 34 is respectively installed on the first half-bucket 20 and the second half-bucket 21, the first half-toothed ring 33 and the second half-toothed ring 34 form a circle, the outer sides of the first half-toothed ring 33 and the second half-toothed ring 34 are meshed with the gear 32, pushing pieces 35 are arranged in the first half-toothed ring 33 and the second half- toothed ring 34, 3 pushing pieces 35 are respectively arranged on the first half-bucket 20 and the second half-bucket 21, sliding strips 330 are arranged at the bottoms of the first half-toothed ring 33 and the second half-toothed ring 34, sliding grooves 200 are arranged at the tops of the first half-bucket 20 and the second half-bucket 21, the sliding strips 330 are matched with the sliding grooves 200 to prevent the first half-toothed ring 33 and the second half-toothed ring 34 from being separated from the first half-bucket 20 and the second half-bucket 21, the second bucket body 2 faces upwards, lugs 210 are respectively arranged in the first half-bucket 20 and the second half-bucket 21, the lugs 210 are arranged at the side of the semicircular hole 23, and a matching groove 350 is arranged at one end, close to the pushing, the other end of the second bucket body 2 is provided with a magnet block 351, a supporting structure a is installed in the matching groove 350, the supporting structure a is connected with the first half-toothed ring 33, the supporting structure a comprises a cylinder a1, a rubber sleeve a2 and a supporting rod a3, one end of the supporting rod a3 is connected with the first half-toothed ring 33, the other end of the supporting rod a3 is connected with the cylinder a1, the cylinder a1 is matched with the matching groove 350, the outer side of the supporting rod a3 is connected with the pushing piece 35 through the rubber sleeve a2, the rubber sleeve a2 is in a conical shape, the rubber sleeve a2 has elasticity, the pushing piece 35 can rotate conveniently, the position of the matching groove 350 of the pushing piece 35 can be sealed, foreign bodies can be prevented from entering and being clamped, and the second bucket body 2 is made of metal and can attract.
The working principle is as follows: because lug 210 is in the design, the afterbody can upwards move when impeller 35 passes lug 210 in the rotation, leaves lug 210 and makes consequently magnet block 351's magnetic attraction can laminate at second bucket 2 inner wall fast again, through magnet block 351's whereabouts magnetism, can make impeller 35 afterbody strike second bucket 2 to make second bucket 2 produce the vibration, tamp the concrete.
Compared with the prior art, the invention has the technical progress that: can realize even plastering, and one shot forming, need not the secondary and plaster evenly, can accelerate concrete flow to the steel-pipe column through helping hand structure to the efficiency that the messenger plastered is improved, and can tamp the concrete through the striking of impeller afterbody to the bucket body.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that various changes in the embodiments and/or modifications of the invention can be made, and equivalents and modifications of some features of the invention can be made without departing from the spirit and scope of the invention.

Claims (8)

1. The utility model provides a steel-pipe column plastering unit, its structure includes first bucket body (1), second bucket body (2), helping hand structure (3), first bucket body (1) is connected with second bucket body (2), its characterized in that: and a power assisting structure (3) is arranged on the second bucket body (2).
2. The steel pipe column plastering device of claim 1, wherein: the first bucket body (1) is consistent with the second bucket body (2) in structure, the second bucket body (2) comprises a first half bucket (20), a second half bucket (21), a counterpoint piece (22) and a semicircular hole (23), the first half bucket (20) is mechanically connected with the second half bucket (21), the counterpoint piece (22) is arranged on the outer sides of the first half bucket (20) and the second half bucket (21), and the first half bucket (20) and the second half bucket (21) are respectively provided with the semicircular hole (23).
3. The steel pipe column plastering device of claim 1, wherein: the power assisting structure (3) comprises a supporting plate (30), a motor (31), a gear (32), a first half gear ring (33), a second half gear ring (34) and a pushing piece (35), the supporting plate (30) is connected to the outer side of the second half bucket (21), the motor (31) is installed on the supporting plate (30), the motor (31) is connected with the gear (32), the first half gear ring (33) and the second half gear ring (34) are installed on the first half bucket (20) and the second half bucket (21) respectively, the first half gear ring (33) and the second half gear ring (34) form a circle, the outer sides of the first half gear ring (33) and the second half gear ring (34) are meshed with the gear (32), and the pushing piece (35) is arranged in the first half gear ring (33) and the second half gear ring (34).
4. The steel pipe column plastering device of claim 2, wherein: the first half bucket (20) and the second half bucket (21) are respectively provided with 3 pushing pieces (35).
5. The steel pipe column plastering device of claim 2, wherein: the first half bucket (20) and the second half bucket (21) are internally provided with a convex block (210) respectively, and the convex block (210) is arranged on the side surface of the semicircular hole (23).
6. The steel pipe column plastering device of claim 3, wherein: the bottom of the first half-toothed ring (33) and the bottom of the second half-toothed ring (34) are provided with sliding strips (330), the top of the first half hopper (20) and the top of the second half hopper (21) are provided with sliding grooves (200), and the sliding strips (330) are matched with the sliding grooves (200).
7. The steel pipe column plastering device of claim 3, wherein: one end, close to the first half-toothed ring (33), of the pushing piece (35) is provided with a matching groove (350), the other end of the pushing piece is provided with a magnet block (351), a supporting structure (a) is installed in the matching groove (350), and the supporting structure (a) is connected with the first half-toothed ring (33).
8. The steel pipe column plastering device of claim 7, wherein: the supporting structure (a) comprises a cylinder (a1), a rubber sleeve (a2) and a supporting rod (a3), one end of the supporting rod (a3) is connected with the first half-toothed ring (33), the other end of the supporting rod is connected with the cylinder (a1), the cylinder (a1) is matched with the matching groove (350), and the outer side of the supporting rod (a3) is connected with the pushing piece (35) through the rubber sleeve (a 2).
CN202110159338.1A 2021-02-04 2021-02-04 Steel-pipe column plastering unit Withdrawn CN112942748A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110159338.1A CN112942748A (en) 2021-02-04 2021-02-04 Steel-pipe column plastering unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110159338.1A CN112942748A (en) 2021-02-04 2021-02-04 Steel-pipe column plastering unit

Publications (1)

Publication Number Publication Date
CN112942748A true CN112942748A (en) 2021-06-11

Family

ID=76242404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110159338.1A Withdrawn CN112942748A (en) 2021-02-04 2021-02-04 Steel-pipe column plastering unit

Country Status (1)

Country Link
CN (1) CN112942748A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204110649U (en) * 2014-09-22 2015-01-21 中国水利水电第十工程局有限公司 A kind of cutting agency of concrete hopper
CN205959600U (en) * 2016-08-29 2017-02-15 浦江佳昌工艺品有限公司 Clockwork spring music box
CN207673016U (en) * 2017-12-23 2018-07-31 河南省康源生物工程技术有限公司 A kind of architectural engineering hopper that can accelerate blanking
CN109138380A (en) * 2018-09-21 2019-01-04 中国五冶集团有限公司 A kind of steel pipe column apparatus of plastering and plastering method
WO2020254975A1 (en) * 2019-06-18 2020-12-24 R.U.R. Czech A.S. Jet adapter for plastering machines

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204110649U (en) * 2014-09-22 2015-01-21 中国水利水电第十工程局有限公司 A kind of cutting agency of concrete hopper
CN205959600U (en) * 2016-08-29 2017-02-15 浦江佳昌工艺品有限公司 Clockwork spring music box
CN207673016U (en) * 2017-12-23 2018-07-31 河南省康源生物工程技术有限公司 A kind of architectural engineering hopper that can accelerate blanking
CN109138380A (en) * 2018-09-21 2019-01-04 中国五冶集团有限公司 A kind of steel pipe column apparatus of plastering and plastering method
WO2020254975A1 (en) * 2019-06-18 2020-12-24 R.U.R. Czech A.S. Jet adapter for plastering machines

Similar Documents

Publication Publication Date Title
CN207387253U (en) A kind of ratio-frequency welded tube processing welded tube outer circle derusting device
CN106140422A (en) A kind of industrial cement making lapping device
CN204149009U (en) A kind of through type neodymium iron boron grinding machine
CN106827181A (en) A kind of cement brick is made of stablizing shaped device
CN203993493U (en) A kind of hone
CN112942748A (en) Steel-pipe column plastering unit
CN208697184U (en) Sand blasting unit is used in a kind of processing of steel pipe
CN211637819U (en) Quick straightening device for building nail
CN107791370B (en) Lightweight wall plate core pulling technique
CN211492106U (en) Prefabricated superimposed sheet of assembled draws a mao processing apparatus
CN201091981Y (en) Electric screw remover
CN216228661U (en) Steel pipe rust cleaning device that polishes for machining
CN109123940B (en) Decorative bead drilling equipment
CN109718931B (en) Fine sand preparation facilities for engineering building
CN111941245A (en) Building steel pipe deruster
CN112692958A (en) Concrete vibration delay stay assembly capable of preventing honeycomb phenomenon
CN215700636U (en) Rust removal assembly for construction engineering technical service
CN221546417U (en) Accurate device of taking one's place of light wallboard installation
CN213438954U (en) Steel pipe inner wall clearance peening equipment
CN220197358U (en) Robot with sand blasting and rust removing functions
CN216179430U (en) Construction steel bar surface rust removal device
CN204566414U (en) Cement lining cuts machine
CN211103312U (en) Green low carbon is rust cleaning device for tubular product
CN219768634U (en) Pipe outer wall guniting equipment
CN211729741U (en) Brick cutting mechanism of building brick processing device for building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20220118

Address after: 510665 No.9, bingwai street, Guangzhi, Haizhu District, Guangzhou City, Guangdong Province

Applicant after: Li Deshui

Address before: 510665 No.9, bingwai street, Guangzhi, Haizhu District, Guangzhou City, Guangdong Province

Applicant before: Guangzhou luge Industrial Co.,Ltd.

WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20210611