CN112942487A - Automatic and emergent water charging system of data center - Google Patents
Automatic and emergent water charging system of data center Download PDFInfo
- Publication number
- CN112942487A CN112942487A CN202110151678.XA CN202110151678A CN112942487A CN 112942487 A CN112942487 A CN 112942487A CN 202110151678 A CN202110151678 A CN 202110151678A CN 112942487 A CN112942487 A CN 112942487A
- Authority
- CN
- China
- Prior art keywords
- water
- pipeline
- storage tank
- branch pipeline
- cooling tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 288
- 238000001816 cooling Methods 0.000 claims abstract description 49
- 239000008399 tap water Substances 0.000 claims abstract description 16
- 235000020679 tap water Nutrition 0.000 claims abstract description 16
- 239000007788 liquid Substances 0.000 claims abstract description 13
- 238000005086 pumping Methods 0.000 claims abstract description 5
- 230000001502 supplementing effect Effects 0.000 claims description 5
- 238000009434 installation Methods 0.000 claims description 3
- 239000008400 supply water Substances 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 238000013500 data storage Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000017525 heat dissipation Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000000844 transformation Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03B—INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
- E03B1/00—Methods or layout of installations for water supply
- E03B1/02—Methods or layout of installations for water supply for public or like main supply for industrial use
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03B—INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
- E03B11/00—Arrangements or adaptations of tanks for water supply
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03B—INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
- E03B7/00—Water main or service pipe systems
- E03B7/07—Arrangement of devices, e.g. filters, flow controls, measuring devices, siphons or valves, in the pipe systems
Landscapes
- Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Structural Engineering (AREA)
- Cooling Or The Like Of Electrical Apparatus (AREA)
Abstract
The invention relates to the technical field of cooling tower water supply systems, in particular to an automatic and emergency water supply system of a data center, which comprises a cooling tower set and a pump room water supply system for supplying water to the cooling tower set, and is characterized in that: the emergency water replenishing system is also included; the emergency water replenishing system comprises a water storage tank and a water pump which is connected with the water storage tank and used for pumping water in the water storage tank to the cooling tower set, and the water storage tank is connected with municipal tap water through a water inlet pipeline; an electric valve is arranged on the water inlet pipeline; an overflow detector is arranged in the water storage tank, and when the liquid level in the water storage tank reaches the position of the overflow detector, the electric valve is closed. When the water supply system of the pump house fails, the emergency water supply system is started, and municipal tap water is supplied to the cooling tower set through the water pump for use; when the municipal tap water is cut off, the water stored in the water storage tank can be used for supplying the cooling tower set.
Description
Technical Field
The invention relates to the technical field of cooling tower water supply systems, in particular to an automatic and emergency water supply system of a data center.
Background
With the rapid development of industries such as industrial intelligence, cloud computing, big data storage and the like, a data center becomes an important infrastructure, and the safety problem of a water supply system of a water-cooled heat dissipation data machine room is increasingly prominent, so that the safe operation of the data center is directly influenced. Most of the water-cooling data centers still adopt the traditional water supply mode, and once a pipeline is broken, a pipeline valve is broken or municipal tap water is cut off, a water supply system is interrupted, and high-temperature downtime of a data machine room is caused.
Disclosure of Invention
In view of the above, the present invention provides an automatic and emergency water replenishment system for a data center.
In order to solve the technical problems, the technical scheme of the invention is as follows:
an automatic and emergency water supplementing system of a data center comprises a cooling tower set, a pump room water supply system for supplying water to the cooling tower set and an emergency water supplementing system; the emergency water replenishing system comprises a water storage tank and a water pump which is connected with the water storage tank and used for pumping water in the water storage tank to the cooling tower set, and the water storage tank is connected with municipal tap water through a water inlet pipeline; an electric valve is arranged on the water inlet pipeline; an overflow detector is arranged in the water storage tank, and when the liquid level in the water storage tank reaches the position of the overflow detector, the electric valve is closed.
Furthermore, the water inlet pipeline comprises a first annular pipeline, a water inlet branch pipeline and a water outlet branch pipeline; one end of the water inlet branch pipeline is connected with municipal tap water, and the other end of the water inlet branch pipeline is connected with the first annular pipeline; one end of the water outlet branch pipeline is connected with the first annular pipeline, and the other end of the water outlet branch pipeline is connected with the water storage tank; the electric valve is arranged on the water outlet branch pipeline.
Furthermore, one end of the water outlet branch pipeline connected with the water storage tank is provided with a ball float valve, the ball float valve is positioned in the water storage tank, and the installation height of the ball float valve is lower than that of the overflow detector.
Furthermore, two sides of a connection point of the first annular pipeline and the water inlet branch pipeline and two sides of a connection point of the first annular pipeline and the water outlet branch pipeline are provided with first stop valves; and a first one-way valve is arranged on the water inlet branch pipeline.
Furthermore, the water inlet end of the water pump is connected with the water storage tank, and the water outlet end of the water pump is connected with a water supplementing pipeline; the water replenishing pipeline comprises a second annular pipeline and a water replenishing branch pipeline; the water outlet end of the water pump is connected with the second annular pipeline; and one end of the water replenishing branch pipeline is connected with the second annular pipeline, and the other end of the water replenishing branch pipeline is communicated with the cooling tower set and used for supplying water to the cooling tower set.
Furthermore, second stop valves are arranged on two sides of a connection point of the second annular pipeline and the water pump and two sides of a connection point of the second annular pipeline and the water replenishing branch pipeline; and the water outlet end of the water pump and the water replenishing branch pipeline are respectively provided with a second one-way valve.
Furthermore, a pressure sensor is arranged at the water outlet end of the water pump.
Further, the pump room water supply system comprises a third annular pipeline and branch pipelines; the third annular pipeline is connected with the water supply end of the pump room; both ends of the branch pipeline are connected to the third annular pipeline; the water inlet pipe of the cooling tower group is connected to the branch pipeline; the water replenishing branch pipeline is connected to the branch pipeline.
Furthermore, third stop valves are arranged on two sides of a connection point of the third annular pipeline and the branch pipeline and two sides of a connection point of the third annular pipeline and the pump room; and third one-way valves are arranged at the two ends of the branch pipeline and on a connecting pipeline of the pump room and the third annular pipeline.
Furthermore, fourth stop valves are arranged on two sides of the connection point of the branch pipeline and the water inlet pipe of the cooling tower set.
Compared with the prior art, the invention has the advantages that:
when the water supply system of the pump house fails, the emergency water supply system is started, and municipal tap water is supplied to the cooling tower set through the water pump for use; when the municipal tap water is cut off, the water stored in the water storage tank can be used for supplying the cooling tower set.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
Reference numerals:
1. a cooling tower set; 11. a liquid level sensor; 12. a water inlet pipe;
2. a pump house water supply system; 21. a third annular conduit; 22. a branch line; 23. a third stop valve; 24. a third check valve; 25. a fourth stop valve;
3. an emergency water replenishing system; 31. a water storage tank; 311. an overflow detector; 312. a water replenishing port; 313. a float valve; 32. a water pump; 33. a water inlet pipeline; 331. a first annular conduit; 332. a water inlet branch pipe; 333. a water outlet branch pipeline; 334. a first shut-off valve; 335. a first check valve; 336. an electrically operated valve; 34. a water replenishing pipeline; 341. a second looped pipeline; 342. a water replenishing branch pipeline; 343. a second stop valve; 344. a second one-way valve; 345. a pressure sensor;
4. and a controller.
Detailed Description
The following detailed description of the embodiments of the present invention is provided in order to make the technical solution of the present invention easier to understand and understand.
Example (b):
referring to fig. 1, the embodiment provides an automatic and emergency water replenishing system for a data center, which includes a cooling tower set 1, a controller 4, and a pump room water supply system 2 for supplying water to the cooling tower set 1, and it should be noted that the embodiment can be used for multiple cooling tower sets 1, and a dashed line part in fig. 1 is a connection relationship between the controller 4 and each device.
The cooling tower set 1 is mainly used for cooling equipment, and mainly comprises a cooling tower, a water pan in the cooling tower, a water inlet pipe 12 for supplying water to the cooling tower, a liquid level sensor 11 for detecting the liquid level in the cooling tower, and other components.
Wherein the pump room water supply system 2 comprises a third annular pipeline 21 and a branch pipeline 22; the third annular pipeline 21 is connected with the water supply end of the pump room, specifically, the third annular pipeline 21 is connected with the water pump equipment in the pump room, and it should be noted that a plurality of water pump equipment can be arranged in the pump room to supply water.
Specifically, the method comprises the following steps: both ends of the branch pipeline 22 are connected to the third annular pipeline 21; the water inlet pipe 12 of the cooling tower group 1 is connected to a branch pipeline 22; the pump house supplies water to the third annular pipeline 21, then the third annular pipeline 21 leads the water into the branch pipeline 22, finally the branch pipeline 22 leads the water into the water inlet pipe 12, and the water is led into the cooling tower for use through the water inlet pipe 12.
In this embodiment, both sides of the connection point between the third annular pipeline 21 and the branch pipeline 22 and both sides of the connection point between the third annular pipeline 21 and the pump room are provided with third stop valves 23; thus, when a failure occurs at a certain point (for example, a certain point is broken) on the third ring line 21, the third stop valves 23 on both sides of the failure point can be closed, so that the third ring line 21 can be normally supplied with water. Also in order to overcome the single point failure in the branch line 22, in the present embodiment, the fourth stop valves 25 are provided on both sides of the connection point of the branch line 22 and the inlet pipe 12 of the cooling tower assembly 1.
And third one-way valves 24 are arranged at the two ends of the branch pipeline 22 and on a connecting pipeline between the pump room and the third annular pipeline 21. The connection point of the inlet pipe 12 of the cooling tower assembly 1 and the third loop pipe 21 is located between the two third check valves 24 on the branch pipe 22.
The automatic and emergency water charging system 3 of the data center provided by the embodiment further comprises an emergency water charging system 3; the emergency water replenishing system 3 comprises a water storage tank 31 and a water pump 32 connected with the water storage tank 31 for pumping water in the water storage tank 31 to the cooling tower set 1.
The water storage tank 31 is mainly used for storing water for the cooling tower group 1; wherein, the top of the water storage tank 31 is provided with a water replenishing port 312, and water can be directly filled into the water storage tank 31 through the water replenishing port 312.
The water storage tank 31 is connected with municipal tap water through a water inlet pipeline 33; an electric valve 336 is arranged on the water inlet pipeline 33; the municipal tap water is pumped into the water storage tank 31 through the water inlet line 33, and the electric valve 336 is normally opened.
An overflow detector 311 is arranged at the top of the water storage tank 31, when the liquid level in the water storage tank 31 reaches the position of the overflow detector 311, the electric valve 336 is closed, specifically, both the overflow detector 311 and the electric valve 336 are connected with the controller 4, when the overflow detector 311 detects that the water storage tank 31 overflows (the water level reaches the position of the overflow detector 311), a signal is transmitted to the controller 4, and the electric valve 336 is controlled by the controller 4 to be closed so as to cut off the water inlet pipeline 33.
Wherein, concretely: the inlet line 33 includes a first circular line 331, an inlet branch line 332, and an outlet branch line 333.
One end of the water inlet branch pipeline 332 is connected with municipal tap water, and the other end is connected with the first annular pipeline 331; in this way, municipal tap water is pumped into the first annular pipeline 331 through the water inlet branch pipeline 332, and it should be noted that a plurality of water inlet branch pipelines 22 may be provided.
One end of the water outlet branch pipeline 333 is connected with the first annular pipeline 331, and the other end is connected with the water storage tank 31; the electric valve 336 is disposed on the water outlet branch pipe 333, and when the electric valve 336 is opened, the water in the first annular pipe 331 is pumped into the water storage tank 31 through the water outlet branch pipe 333.
One end of the water outlet branch pipe 333 connected with the water storage tank 31 is provided with a ball float valve 313, the ball float valve 313 is positioned in the water storage tank 31, and the installation height of the ball float valve 313 is lower than that of the overflow detector 311.
In this embodiment, the first stop valves 334 are disposed on both sides of the connection point between the first annular pipeline 331 and the water inlet branch pipeline 332, and both sides of the connection point between the first annular pipeline 331 and the water outlet branch pipeline 333, and the first stop valves 334 are disposed on the first annular pipeline 331; thus, when a failure occurs at a certain point (for example, a certain point is broken) on the first circular pipe 331, the first stop valves 334 on both sides of the failure point may be closed, so that the first circular pipe 331 can be normally supplied with water.
The water inlet branch pipe 332 is provided with a first one-way valve 335 to ensure one-way water passing through of the water inlet branch pipe 332.
The water inlet end of the water pump 32 is connected with the water storage tank 31, and the water outlet end is connected with a water supplementing pipeline 34; the water pump 32 is mainly used for pumping water in the water storage tank 31 and guiding the water to the water replenishing pipeline 34 from the water outlet end of the water pump; it should be noted that a plurality of water pumps 32 may be provided to connect with the water storage tank 31, and the specific number is not limited herein, wherein the water pumps 32 are connected with the controller 4.
In this embodiment, the water replenishing pipeline 34 includes a second annular pipeline 341 and a water replenishing branch pipeline 342; the water outlet end of the water pump 32 is connected with the second annular pipeline 341; one end of the water replenishing branch pipe 342 is connected to the second annular pipe 341, and the other end of the water replenishing branch pipe 342 is communicated with the cooling tower unit 1 to supply water to the cooling tower unit 1, specifically, the water replenishing branch pipe 342 is connected to the branch pipe 22. Thus, in the event of a pump house failure, the water pump 32 pumps water from the water storage tank 31 to the second annular conduit 341, which in turn directs the water to the refill branch conduit 342, and then to the branch conduit 22, and finally to the cooling tower via the inlet conduit 12 of the cooling tower.
A second stop valve 343 is arranged on both sides of the connection point of the second annular pipeline 341 and the water pump 32 and both sides of the connection point of the second annular pipeline 341 and the water supply branch pipeline 342; thus, when a certain point on the second annular pipeline 341 fails (for example, a certain point is broken), the second stop valves 343 on both sides of the failure point can be closed, so that the second annular pipeline 341 can also supply water normally. The outlet end of the water pump 32 and the water replenishing branch pipe 342 are provided with a second one-way valve 344.
In this embodiment, a pressure sensor 345 connected to the controller 4 is disposed at the water outlet end of the water pump 32, and the operating frequency of the water pump 32 is controlled by a pressure signal detected by the pressure sensor 345.
The implementation principle is as follows: under normal conditions, the pump room water supply system 2 supplies water for the cooling tower.
When the pump room water supply system 2 breaks down, the liquid level in the water pan of cooling tower descends gradually, the liquid level sensor 11 in the cooling tower transmits the detected liquid level signal to the controller 4, and when the liquid level is lower than the preset value, the controller 4 sends an instruction to start the water pump 32 in the emergency water supply system 3. At this time, the water pump 32 pumps the water in the water replenishing tank to the water replenishing pipeline 34, and then the water is guided into the cooling tower through the branch pipeline 22 and the water inlet pipe 12 of the cooling tower for the equipment to use.
In the process, the liquid level in the water storage tank 31 is lowered, at the moment, the electric valve 336 is in an open state, tap water is continuously pumped into the water storage tank 31 through the water inlet pipeline 33, and when the liquid level in the water storage tank 31 reaches the position of the overflow detector, the electric valve 336 is closed, and water inlet is stopped; thus, the dynamic circulation water replenishing ensures that a certain amount of water is always stored in the water storage tank 31. Therefore, when the municipal tap water is cut off, the water can be used by depending on the amount of water stored in the water storage tank 31, and the water can be supported to the arrival of the waterwheel by depending on the amount of water stored therein. When the water truck arrives, water can be replenished into the water tank 31 through the water replenishing port 312 of the water tank 31.
The above are only typical examples of the present invention, and besides, the present invention may have other embodiments, and all technical solutions formed by equivalent substitutions or equivalent transformations fall within the scope of the present invention.
Claims (10)
1. The utility model provides an automatic and emergent water charging system of data center, includes cooling tower group to and be used for the pump house water supply system to cooling tower group water supply, its characterized in that: the emergency water replenishing system is also included; the emergency water replenishing system comprises a water storage tank and a water pump which is connected with the water storage tank and used for pumping water in the water storage tank to the cooling tower set, and the water storage tank is connected with municipal tap water through a water inlet pipeline; an electric valve is arranged on the water inlet pipeline; an overflow detector is arranged in the water storage tank, and when the liquid level in the water storage tank reaches the position of the overflow detector, the electric valve is closed.
2. The automatic and emergency water replenishing system of the data center according to claim 1, wherein: the water inlet pipeline comprises a first annular pipeline, a water inlet branch pipeline and a water outlet branch pipeline; one end of the water inlet branch pipeline is connected with municipal tap water, and the other end of the water inlet branch pipeline is connected with the first annular pipeline; one end of the water outlet branch pipeline is connected with the first annular pipeline, and the other end of the water outlet branch pipeline is connected with the water storage tank; the electric valve is arranged on the water outlet branch pipeline.
3. The automatic and emergency water replenishing system of the data center according to claim 2, wherein: one end of the water outlet branch pipeline connected with the water storage tank is provided with a ball float valve, the ball float valve is positioned in the water storage tank, and the installation height of the ball float valve is lower than that of the overflow detector.
4. The automatic and emergency water replenishing system of the data center according to claim 2, wherein: first stop valves are arranged on two sides of a connecting point of the first annular pipeline and the water inlet branch pipeline and two sides of a connecting point of the first annular pipeline and the water outlet branch pipeline; and a first one-way valve is arranged on the water inlet branch pipeline.
5. The automatic and emergency water replenishing system of the data center according to claim 1, wherein: the water inlet end of the water pump is connected with the water storage tank, and the water outlet end of the water pump is connected with a water supplementing pipeline; the water replenishing pipeline comprises a second annular pipeline and a water replenishing branch pipeline; the water outlet end of the water pump is connected with the second annular pipeline; and one end of the water replenishing branch pipeline is connected with the second annular pipeline, and the other end of the water replenishing branch pipeline is communicated with the cooling tower set and used for supplying water to the cooling tower set.
6. The automatic and emergency water replenishing system of the data center according to claim 5, wherein: second stop valves are arranged on two sides of a connection point of the second annular pipeline and the water pump and two sides of a connection point of the second annular pipeline and the water replenishing branch pipeline; and the water outlet end of the water pump and the water replenishing branch pipeline are respectively provided with a second one-way valve.
7. The automatic and emergency water replenishing system of the data center according to claim 6, wherein: and a pressure sensor is arranged at the water outlet end of the water pump.
8. The automatic and emergency water replenishing system of the data center according to any one of claims 5 to 7, wherein: the pump room water supply system comprises a third annular pipeline and branch pipelines; the third annular pipeline is connected with the water supply end of the pump room; both ends of the branch pipeline are connected to the third annular pipeline; the water inlet pipe of the cooling tower group is connected to the branch pipeline; the water replenishing branch pipeline is connected to the branch pipeline.
9. The automatic and emergency water replenishing system of the data center according to claim 8, wherein: third stop valves are arranged on both sides of the connection point of the third annular pipeline and the branch pipeline and on both sides of the connection point of the third annular pipeline and the pump room; and third one-way valves are arranged at the two ends of the branch pipeline and on a connecting pipeline of the pump room and the third annular pipeline.
10. The automatic and emergency water replenishing system of the data center according to claim 9, wherein: and fourth stop valves are arranged on two sides of the connecting point of the branch pipeline and the water inlet pipe of the cooling tower set.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110151678.XA CN112942487A (en) | 2021-02-03 | 2021-02-03 | Automatic and emergent water charging system of data center |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110151678.XA CN112942487A (en) | 2021-02-03 | 2021-02-03 | Automatic and emergent water charging system of data center |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112942487A true CN112942487A (en) | 2021-06-11 |
Family
ID=76243526
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110151678.XA Pending CN112942487A (en) | 2021-02-03 | 2021-02-03 | Automatic and emergent water charging system of data center |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112942487A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114719192A (en) * | 2022-03-24 | 2022-07-08 | 河南中烟工业有限责任公司 | Water supplementing device for improving refrigerating efficiency of water chilling unit and water supplementing control method |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1030956A (en) * | 1987-07-24 | 1989-02-08 | 吴宗吉 | The method of high-reliability link of looped network water supply system |
JPH03156038A (en) * | 1989-11-13 | 1991-07-04 | Hokkaido Rousui Chiyousa:Kk | Loop shaped pipeline net type distributing section in water supply plant |
CN1059007A (en) * | 1990-08-16 | 1992-02-26 | 吴宗吉 | The dendritic method of high-reliability link of ring net pipe system |
CN202990007U (en) * | 2012-12-07 | 2013-06-12 | 广东华鳌合金新材料有限公司 | Improved water supply system for high-temperature alloy production line |
CN105704986A (en) * | 2016-03-25 | 2016-06-22 | 广东申菱环境系统股份有限公司 | Water-supply water-return dual-loop cooling circulation system |
CN108755849A (en) * | 2018-08-20 | 2018-11-06 | 佛山市海恒环保工程有限公司 | Cooling water emergence compensating water system and cooling water emergence compensating water method |
CN109611980A (en) * | 2018-10-31 | 2019-04-12 | 厦门华睿晟智能科技有限责任公司 | A kind of air-conditioning water piping system and air-conditioning system |
CN110274315A (en) * | 2018-12-27 | 2019-09-24 | 国家计算机网络与信息安全管理中心 | A kind of data center's cold source system |
CN111491482A (en) * | 2019-01-25 | 2020-08-04 | 维谛技术有限公司 | Cooling device, server cabinet system and fault processing method |
CN211922843U (en) * | 2020-03-21 | 2020-11-13 | 遂宁安通商品混凝土有限公司 | Automatic water replenishing system of water tower |
CN112064715A (en) * | 2020-09-08 | 2020-12-11 | 上海市政工程设计研究总院(集团)有限公司 | Municipal administration circulation water delivery and distribution pipe network system |
-
2021
- 2021-02-03 CN CN202110151678.XA patent/CN112942487A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1030956A (en) * | 1987-07-24 | 1989-02-08 | 吴宗吉 | The method of high-reliability link of looped network water supply system |
JPH03156038A (en) * | 1989-11-13 | 1991-07-04 | Hokkaido Rousui Chiyousa:Kk | Loop shaped pipeline net type distributing section in water supply plant |
CN1059007A (en) * | 1990-08-16 | 1992-02-26 | 吴宗吉 | The dendritic method of high-reliability link of ring net pipe system |
CN202990007U (en) * | 2012-12-07 | 2013-06-12 | 广东华鳌合金新材料有限公司 | Improved water supply system for high-temperature alloy production line |
CN105704986A (en) * | 2016-03-25 | 2016-06-22 | 广东申菱环境系统股份有限公司 | Water-supply water-return dual-loop cooling circulation system |
CN108755849A (en) * | 2018-08-20 | 2018-11-06 | 佛山市海恒环保工程有限公司 | Cooling water emergence compensating water system and cooling water emergence compensating water method |
CN109611980A (en) * | 2018-10-31 | 2019-04-12 | 厦门华睿晟智能科技有限责任公司 | A kind of air-conditioning water piping system and air-conditioning system |
CN110274315A (en) * | 2018-12-27 | 2019-09-24 | 国家计算机网络与信息安全管理中心 | A kind of data center's cold source system |
CN111491482A (en) * | 2019-01-25 | 2020-08-04 | 维谛技术有限公司 | Cooling device, server cabinet system and fault processing method |
CN211922843U (en) * | 2020-03-21 | 2020-11-13 | 遂宁安通商品混凝土有限公司 | Automatic water replenishing system of water tower |
CN112064715A (en) * | 2020-09-08 | 2020-12-11 | 上海市政工程设计研究总院(集团)有限公司 | Municipal administration circulation water delivery and distribution pipe network system |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114719192A (en) * | 2022-03-24 | 2022-07-08 | 河南中烟工业有限责任公司 | Water supplementing device for improving refrigerating efficiency of water chilling unit and water supplementing control method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112942487A (en) | Automatic and emergent water charging system of data center | |
CN111712101A (en) | Gas pressure stabilizer and water cooling system of wind power generation converter | |
TW202223326A (en) | A cooling system for implementing automatic liquid injection function and automatic liquid injection method | |
CN105806146A (en) | Water supplementing constant-pressure system of pipe type heat exchanger and abnormal operation control method | |
CN105502696A (en) | Constant pressure water-supplementing and degassing unit | |
JP6033321B2 (en) | Hot water system | |
CN205367782U (en) | Imitate intelligent level pressure moisturizing degasification unit by force | |
CN213599821U (en) | Closed circulation system for cooling and supplying water to crucible | |
CN114459013A (en) | Protection system and method for high-temperature gas cooled reactor steam generator | |
CN113670622A (en) | Cooling water return system and method for marine diesel engine bench test | |
CN112460463A (en) | Monitoring and detecting system for lubricating oil storage tank of compressor | |
CN206207015U (en) | A kind of fluid infusion system | |
CN213507233U (en) | Anode liquid tank overflow adjusting system | |
CN214581540U (en) | Automatic steady voltage water charging system of data center refrigerated water | |
CN215050437U (en) | Closed circulating water system of blast furnace and emergency water supply device | |
CN114413178B (en) | Automatic liquid supply system | |
CN204784234U (en) | A cooling device | |
CN217460760U (en) | Take intelligent protection's sealed water supply installation for pump | |
CN216616041U (en) | High-level water tank relay steady flow tank partition water supply system | |
CN110185934A (en) | A kind of fluid conveying pipe network automatic monitored control system | |
CN114413551B (en) | Cooling water emergency water supply system and method | |
CN214788365U (en) | Cooling oil return device of hydraulic station | |
CN221683175U (en) | Steam generator and water-adding split-flow type exhaust device thereof | |
CN219974833U (en) | Automatic water diversion device of coal mine centrifugal pump | |
CN213885033U (en) | Distillation tower cooling water interlocking protection system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210611 |
|
RJ01 | Rejection of invention patent application after publication |