CN112924236A - Construction sewage collecting device and detection method using same - Google Patents
Construction sewage collecting device and detection method using same Download PDFInfo
- Publication number
- CN112924236A CN112924236A CN202110090475.4A CN202110090475A CN112924236A CN 112924236 A CN112924236 A CN 112924236A CN 202110090475 A CN202110090475 A CN 202110090475A CN 112924236 A CN112924236 A CN 112924236A
- Authority
- CN
- China
- Prior art keywords
- sewage
- pipe
- water receiving
- installation pipe
- installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000010865 sewage Substances 0.000 title claims abstract description 128
- 238000010276 construction Methods 0.000 title claims abstract description 22
- 238000001514 detection method Methods 0.000 title claims description 31
- 238000009434 installation Methods 0.000 claims abstract description 56
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 41
- 239000000463 material Substances 0.000 claims abstract description 22
- 244000309464 bull Species 0.000 claims description 14
- 230000003014 reinforcing effect Effects 0.000 claims description 9
- 238000005070 sampling Methods 0.000 claims description 7
- 230000000694 effects Effects 0.000 abstract description 2
- 230000002787 reinforcement Effects 0.000 description 9
- 238000010790 dilution Methods 0.000 description 3
- 239000012895 dilution Substances 0.000 description 3
- 238000007599 discharging Methods 0.000 description 3
- 229910001385 heavy metal Inorganic materials 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000011010 flushing procedure Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N1/00—Sampling; Preparing specimens for investigation
- G01N1/02—Devices for withdrawing samples
- G01N1/10—Devices for withdrawing samples in the liquid or fluent state
- G01N1/14—Suction devices, e.g. pumps; Ejector devices
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N1/00—Sampling; Preparing specimens for investigation
- G01N1/28—Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q
- G01N1/38—Diluting, dispersing or mixing samples
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N1/00—Sampling; Preparing specimens for investigation
- G01N1/28—Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q
- G01N1/38—Diluting, dispersing or mixing samples
- G01N2001/386—Other diluting or mixing processes
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Biochemistry (AREA)
- General Health & Medical Sciences (AREA)
- General Physics & Mathematics (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Hydrology & Water Resources (AREA)
- Sampling And Sample Adjustment (AREA)
Abstract
The utility model relates to a construction sewage collection device, including the installation pipe, the water receiving mouth has been seted up to the installation intraductal wall, water receiving mouth department installs the material receiving bottle, the material receiving bottle passes through water receiving mouth and installation pipe intercommunication, and water receiving mouth department installs and opens and close the subassembly, it includes fixed plate and rotor plate to open and close the subassembly, the fixed plate sets firmly in water receiving mouth department, the rotor plate rotates and sets up on the fixed plate, all seted up the through-hole on fixed plate and the rotor plate, the rotor plate is closed or open the through-hole through rotating. This application has through installing the installation pipe on sewage pipes, makes sewage get into through the water receiving mouth and connects in the material bottle, can receive sewage when sewage discharges, reduces the effect that sewage is diluted by the river and influences the probability of testing result.
Description
Technical Field
The application relates to the field of environmental detection, in particular to a construction sewage collecting device and a detection method using the same.
Background
Can produce a large amount of sewage during construction, sewage is in the sewer pipe or the river course of discharging into through pipeline discharge construction site after handling, in order to guarantee that heavy metal content does not exceed sewage discharge's standard in the sewage of emission, need extract the sample and detect in the sewage of emission.
The existing building sewage detection generally carries out sampling detection on sewage discharged in a river channel or a sewer pipeline after the sewage is discharged.
In view of the above-mentioned related technologies, the inventor believes that the heavy metal content of the sewage discharged in the river channel is diluted by the river water after the sewage is mixed with the river water, so that the detection result is inaccurate.
Disclosure of Invention
In order to promote the precision of testing result, this application provides a construction sewage collection device and application device's detection method.
The application provides a construction sewage collection device adopts following technical scheme:
the utility model provides a construction sewage collection device, includes the installation pipe, the water receiving mouth has been seted up to the installation intraductal wall, water receiving mouth department installs and connects the material bottle, connect the material bottle to pass through water receiving mouth and installation pipe intercommunication, water receiving mouth department installs and opens and close the subassembly, it includes fixed plate and rotor plate to open and close the subassembly, the fixed plate sets firmly in water receiving mouth department, the rotor plate rotates and sets up on the fixed plate, the through-hole has all been seted up on fixed plate and the rotor plate, and the rotor plate is closed or open the through-hole through rotating.
By adopting the technical scheme, the mounting pipe is mounted on the sewage discharge pipeline, so that sewage enters the material receiving bottle through the water receiving port, the sewage can be received when the sewage is discharged, and the probability that the detection result is influenced by the dilution of the sewage by river water is reduced; remaining debris in the pipeline can be taken to the foremost sewage when just discharging, and a last some sewage can have partial debris to be preserved in the pipeline, therefore the sewage of front end and the detection precision of the sewage of rear end all have the error, rotate through the rotor plate and control the through-hole and open and close can select to collect the sewage in the middle of, promote the precision that detects.
Optionally, the filter screen is installed to water receiving mouth department, the filter screen sets firmly on the installation pipe in opening and close subassembly orientation body one side.
Through adopting above-mentioned technical scheme, the setting of filter screen can reduce the probability that debris got into in the material receiving bottle to reduce the influence that the debris piled up the detection.
Optionally, the rotating rod is fixedly arranged on the rotating plate, the rotating rod and the rotating plate are arranged in the same rotating shaft, the rotating rod penetrates through the fixing plate and the filter screen to extend into the installation pipe, and the rotating rod penetrates through the installation pipe to extend out of one side of the water receiving port.
Through adopting above-mentioned technical scheme, the setting of bull stick can conveniently be adjusted the rotation of rotor plate.
Optionally, the rotating rod stretches out installation pipe one end and is provided with the reinforcement subassembly, the reinforcement subassembly is including consolidating the screw thread and consolidating the nut, it sets up on the rotating rod to consolidate the screw thread, consolidate nut threaded connection on the rotating rod.
Through adopting above-mentioned technical scheme, consolidate the subassembly and consolidate the bull stick, reduce the probability that rivers impact the bull stick and make the bull stick pivoted.
Optionally, a fixing assembly is fixedly arranged at one end of the installation pipe, the fixing assembly comprises a pipe sleeve and a plurality of clamping pieces, one end of the pipe sleeve is fixedly arranged on the installation pipe, and the clamping pieces are uniformly arranged in the circumferential direction of the pipe sleeve.
Through adopting above-mentioned technical scheme, fixed subassembly is used for fixing the installation pipe on sewage pipe, makes sewage pipe can be in the same place with the installation pipe more stable firm installation.
Optionally, the holder includes slide bar, butt piece and butt spring, the slide bar slides and sets up on the pipe box, and the slide bar runs through the pipe box and towards being close to or keeping away from the pipe box axis direction and slide, the butt piece sets firmly in slide bar towards pipe box axis one side, the butt spring housing is established on the slide bar, and butt spring one end butt deviates from pipe box axis one end in the butt piece, and other end butt is on the pipe box inner wall.
Through adopting above-mentioned technical scheme, thereby polylith butt piece carries out the butt to sewer line circumference and carries out the centre gripping to the sewer line to make the centre gripping more stable through the butt spring.
Optionally, one end of the sliding rod extending out of the pipe sleeve is fixedly provided with an anti-falling block.
Through adopting above-mentioned technical scheme, the setting of anticreep piece can reduce the elasticity of butt spring and make the probability that the pole that slides breaks away from the body.
Optionally, the outer side of the pipe sleeve is in threaded connection with a limiting ring, and the limiting ring is abutted to one side, departing from the pipe sleeve, of the anti-falling block through rotation.
Through adopting above-mentioned technical scheme, the setting of spacing ring can be through the resilience of butt restriction slide bar on slide bar, further fixes the installation pipe on sewage pipe.
Optionally, a rubber pad is fixedly arranged at one end of the abutting sheet facing the axis of the pipe sleeve.
Through adopting above-mentioned technical scheme, the setting of rubber pad can further strengthen the fixed of installation pipe on sewage pipe.
A detection method using a construction sewage collection device comprises the following steps:
step 1: sampling sewage, namely sampling the discharged sewage through a collecting device;
step 2: shaking up the sewage, and shaking up the sampled sewage;
and step 3: extracting sewage, sucking the sewage through a suction pipe and placing the sewage in a placing vessel;
and 4, step 4: and (4) sewage detection, namely placing the placing vessel in sewage detection equipment for sewage detection.
Through adopting above-mentioned technical scheme, collect the sewage of middle section through collection device, improve the accuracy of advancing of testing result.
In summary, the present application includes at least one of the following beneficial technical effects:
the installation pipe is arranged on the sewage discharge pipeline, so that sewage enters the material receiving bottle through the water receiving port, the sewage can be received when the sewage is discharged, and the probability that the detection result is influenced by the dilution of the sewage by river water is reduced; when sewage is just discharged, the foremost sewage can carry sundries remained in the pipeline, and the last part of sewage can have part of sundries remained in the pipeline, so that errors exist in detection accuracy of the front-end sewage and the rear-end sewage, the opening and closing of the through hole are controlled by rotating the rotating plate, the middle sewage can be selectively collected, and the detection accuracy is improved;
the arrangement of the filter screen can reduce the probability of sundries entering the material receiving bottle, thereby reducing the influence of sundry pile detection;
the arrangement of the rotating rod can facilitate the rotation adjustment of the rotating plate;
the fixing component is used for fixing the installation pipe on the sewage pipeline, so that the sewage pipeline and the installation pipe can be more stably and firmly installed together;
collect the sewage of middle section through collection device, improve the accuracy of advancing of testing result.
Drawings
Fig. 1 is a schematic view of the overall structure of the present embodiment.
Fig. 2 is a schematic sectional structure diagram of the present embodiment.
Fig. 3 is a schematic view of another view of the overall structure of the present embodiment.
Description of reference numerals: 1. installing a pipe; 2. a water receiving port; 3. a receiving bottle; 4. an opening and closing assembly; 41. a fixing plate; 42. a rotating plate; 5. a through hole; 6. a filter screen; 7. a rotating rod; 8. a reinforcement assembly; 81. reinforcing the threads; 82. reinforcing the screw cap; 9. a fixing assembly; 91. pipe sleeve; 92. a clamping member; 921. a slide bar; 922. abutting the sheet; 923. an abutment spring; 10. an anti-drop block; 11. a limiting ring; 12. and (7) a rubber pad.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses a construction sewage collecting device, refer to fig. 1 and 2, which comprises an installation pipe 1, wherein the installation pipe 1 is a circular pipe body, the inner side wall of the installation pipe 1 is provided with a water receiving port 2, a material receiving bottle 3 is arranged at the water receiving port 2, the material receiving bottle 3 is connected with the water receiving port 2 through a thread, the material receiving bottle 3 is sealed with the water receiving port 2 when being arranged at the water receiving port 2, the material receiving bottle 3 is communicated with the installation pipe 1 through the water receiving port 2, an opening and closing assembly 4 is arranged at the water receiving port 2, the opening and closing assembly 4 comprises a fixed plate 41 fixedly arranged at the water receiving port 2 and a rotating plate 42 rotatably arranged on the fixed plate 41, a plurality of fan-shaped through holes 5 are respectively arranged on the fixed plate 41 and the rotating plate 42, the through holes 5 are fan-shaped holes, when the rotating plate 42 rotates to enable the through holes 5 to be overlapped with each other, at the time, sewage in the pipeline, through-hole 5 is closed, can block sewage entering at this moment and connect in the material bottle 3, sealed setting between rotor plate 42 and the fixed plate 41 to in sewage leaks into material bottle 3 when preventing through-hole 5 closed. The installation pipe 1 is installed on a sewage discharge pipeline, so that sewage enters the material receiving bottle 3 through the water receiving port 2, the sewage can be received when the sewage is discharged, and the probability that the detection result is influenced by the dilution of the sewage by river water is reduced; remaining debris in the pipeline can be taken to the foremost sewage when just discharging, and the last some sewage can have partial debris to be preserved in the pipeline, therefore the sewage of front end and the detection precision of the sewage of rear end all have the error, rotate control through-hole 5 through rotor plate 42 and open and close can select to collect the sewage in the middle of, promote the precision that detects.
Referring to fig. 2 and 3, a filter screen 6 is arranged at the water receiving opening 2, the filter screen 6 is fixedly arranged on the installation pipe 1 at one side of the opening and closing assembly 4 facing the pipe body, and the arrangement of the filter screen 6 can reduce the probability of sundries entering the material receiving bottle 3, so that the influence of sundry pile detection is reduced; the filter screen 6 is arranged in an arc shape, and the upper surface of the filter screen 6 is flush with the inner wall of the installation pipe 1, so that the influence of the filter screen on water flow is reduced; the rotating rod 7 is fixedly arranged on the rotating plate 42, the rotating rod 7 and the rotating plate 42 are arranged in the same rotating shaft, the rotating rod 7 penetrates through the fixing plate 41 and the filter screen 6 and extends into the installation pipe 1, one side of the rotating rod 7, which is far away from the water receiving port 2, extends out of the installation pipe 1, the rotating rod 7 penetrates through one side of the installation pipe 1 and is closely arranged with the installation pipe 1, the probability that the joint of the sewage flushing rotating rod 7 and the installation pipe 1 leaks out is reduced, the extending installation rod of the rotating rod 7 can adjust the rotating plate 42 by rotating the rotating rod 7, and the adjusting and controlling of the rotating plate 42 are facilitated; the bull stick 7 stretches out 1 one end of installation pipe and is provided with reinforcement assembly 8, reinforcement assembly 8 is including offering reinforcement screw thread 81 and the reinforcement nut 82 of threaded connection on the bull stick 7, the mount table has set firmly on the installation pipe 1, it reinforces the nut 82 to screw up and makes reinforcement nut 82 butt mount table consolidate the bull stick 7, reduce water impact bull stick 7 and make bull stick 7 pivoted probability, it makes the bull stick 7 rotate to unscrew reinforcement nut 82, thereby adjust rotor plate 42.
Referring to fig. 2 and 3, a fixing assembly 9 is fixedly arranged at one end of the installation pipe 1, the fixing assembly 9 comprises a pipe sleeve 91 and a plurality of clamping pieces 92, one end of each pipe sleeve 91 is integrally formed and fixedly arranged on the installation pipe 1, the clamping pieces 92 are uniformly arranged in the circumferential direction of the pipe sleeve 91, the pipe sleeve 91 is a circular ring sleeve, and the fixing assembly 9 is used for fixing the installation pipe 1 on a sewage pipeline so that the sewage pipeline and the installation pipe 1 can be stably and firmly installed together; the clamping piece 92 comprises a sliding rod 921 arranged on the pipe sleeve 91 in a sliding manner, a butting piece 922 and a butting spring 923 are fixedly arranged on the sliding rod 921 towards one side of the axis of the pipe sleeve 91, the butting piece 922 is an arc-shaped piece, the butting piece 922 is fixedly provided with a rubber pad 12 towards one end of the axis of the pipe sleeve 91, the rubber pad 12 is arranged to further enhance the fixation of the installation pipe 1 on the sewage pipeline, one end of the butting spring 923 is butted against one end, deviating from the axis of the pipe sleeve 91, of the butting piece 922, the other end of the butting spring is butted against the inner wall of the pipe sleeve 91, the butting piece 922 slides towards the axis of the pipe sleeve 91 through elasticity, and the plurality of butting pieces 922 are used for butting against the periphery of the sewage pipeline so as to clamp the sewage pipeline, and the clamping is more stable through the butting spring 923; the slip rod 921 stretches out pipe box 91 one end and sets firmly and is equipped with anticreep piece 10, and the setting of anticreep piece 10 can reduce the elasticity of butt spring 923 and make the probability that slip rod 921 breaks away from the body.
Referring to fig. 2 and 3, a limiting ring 11 is in threaded connection with the outer side of the pipe sleeve 91, a ring block with a wedge-shaped cross section is fixedly arranged at one end, facing the sliding rod 921, of the limiting ring 11, the limiting ring 11 abuts against one side, facing away from the pipe sleeve 91, of the anti-disengaging block 10 through rotation, and a chamfer matched with the wedge-shaped ring block is formed at one end, facing away from the abutting piece 922, of the anti-disengaging block 10; the stop ring 11 is provided to further fix the mounting pipe 1 to the sewage pipe by abutting the slide bar 921 to limit the rebound of the slide bar 921.
The embodiment of the application discloses a detection method for applying a construction sewage collecting device, which comprises the following steps: step 1: sampling sewage, namely mounting the mounting pipe 1 on a sewage pipeline, rotating the rotating rod 7 to open the through hole 5 when the sewage is discharged, and receiving and sampling the sewage; step 2: shaking up the sewage, taking the receiving bottle 3 down from the mounting pipe 1, sealing the opening of the receiving bottle 3 by using a bottle cap, and then shaking up the receiving bottle 3 to shake up the sewage; and step 3: extracting sewage, sucking the shaken sewage through a suction pipe and placing the sewage in a placing vessel; and 4, step 4: sewage detection, namely placing the placing vessel in sewage detection equipment for sewage detection, wherein the sewage detection equipment adopts a sewage detector; collect the sewage of middle section through collection device, improve the accuracy of advancing of testing result.
The implementation principle of the embodiment of the application is as follows: the pipe sleeve 91 is sleeved on the sewage pipeline, the abutting piece 922 abuts against the sewage pipeline under the action of the abutting spring 923, so that the installation pipe 1 is fixedly arranged on the sewage pipeline, then the limiting ring 11 is rotated to enable the limiting ring 11 to abut against one end, away from the sliding rod 921, of the limiting block to reinforce the installation pipe 1, the rotating rod 7 is rotated to enable the through hole 5 to be closed, the rotating rod 7 is rotated to open the through hole 5 after sewage is discharged for a period of time, so that the sewage enters the material receiving bottle 3, the rotating rod 7 is rotated to close the through hole 5 after the sewage in the material receiving bottle 3 is fully received, then the fixing nut is screwed, the material receiving bottle 3 is detached from the installation pipe 1, a bottle cover is screwed on the installation bottle, the installation bottle is shaken to shake the sewage uniformly, then the sewage is sucked through the suction pipe and is placed into the placing vessel, and then the placing vessel is placed into a sewage detector.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.
Claims (10)
1. The utility model provides a construction sewage collection device which characterized in that: including installation pipe (1), water receiving mouth (2) have been seted up to installation pipe (1) inside wall, water receiving mouth (2) department installs material receiving bottle (3), material receiving bottle (3) are through water receiving mouth (2) and installation pipe (1) intercommunication, and water receiving mouth (2) department installs and opens and close subassembly (4), it includes fixed plate (41) and rotor plate (42) to open and close subassembly (4), fixed plate (41) set firmly in water receiving mouth (2) department, rotor plate (42) rotate and set up on fixed plate (41), through-hole (5) have all been seted up on fixed plate (41) and rotor plate (42), and rotor plate (42) are closed or open through-hole (5) through rotating.
2. The construction sewage collecting apparatus according to claim 1, wherein: a filter screen (6) is installed at the water receiving port (2), and the filter screen (6) is fixedly arranged on the installation pipe (1) towards one side of the pipe body in the opening and closing assembly (4).
3. The construction sewage collecting apparatus according to claim 2, wherein: the rotary rod (7) is fixedly arranged on the rotary plate (42), the rotary rod (7) and the rotary plate (42) are arranged in the same rotary shaft, the rotary rod (7) penetrates through the fixing plate (41) and the filter screen (6) to stretch into the installation pipe (1), and penetrates through one side, away from the water receiving opening (2), of the installation pipe (1) to stretch out of the installation pipe (1).
4. The construction sewage collecting apparatus according to claim 3, wherein: the utility model discloses a reinforcing structure, including bull stick (7), installation pipe (1), reinforcing subassembly (8) are stretched out to bull stick (7), reinforcing subassembly (8) are including reinforcing screw thread (81) and reinforcing nut (82), reinforcing screw thread (81) are seted up on bull stick (7), reinforcing nut (82) threaded connection is on bull stick (7).
5. The construction sewage collecting apparatus according to claim 1, wherein: the installation pipe (1) one end has set firmly fixed subassembly (9), fixed subassembly (9) include pipe box (91) and holder (92), pipe box (91) one end sets firmly on installation pipe (1), holder (92) have a plurality ofly, a plurality of holder (92) evenly set up in pipe box (91) circumference.
6. The construction sewage collecting apparatus according to claim 5, wherein: holder (92) are including sliding pole (921), butt piece (922) and butt spring (923), slide pole (921) and slide and set up on pipe box (91), and slide pole (921) runs through pipe box (91) and the orientation is close to or keeps away from pipe box (91) axis direction and slides, butt piece (922) sets firmly at sliding pole (921) towards pipe box (91) axis one side, butt spring (923) cover is established on sliding pole (921), and butt spring (923) one end butt deviates from pipe box (91) axis one end in butt piece (922), and the other end butt is on pipe box (91) inner wall.
7. The construction sewage collecting apparatus according to claim 6, wherein: one end of the sliding rod (921) extending out of the pipe sleeve (91) is fixedly provided with an anti-falling block (10).
8. The construction sewage collecting apparatus according to claim 7, wherein: the outer side of the pipe sleeve (91) is in threaded connection with a limiting ring (11), and the limiting ring (11) abuts against one side, departing from the pipe sleeve (91), of the anti-falling block (10) through rotation.
9. The construction sewage collecting apparatus according to claim 6, wherein: and a rubber pad (12) is fixedly arranged at one end of the abutting piece (922) facing the axis of the pipe sleeve (91).
10. A detection method using a construction sewage collection device comprises the following steps:
step 1: sampling sewage, namely sampling the discharged sewage through a collecting device;
step 2: shaking up the sewage, and shaking up the sampled sewage;
and step 3: extracting sewage, sucking the sewage through a suction pipe and placing the sewage in a placing vessel;
and 4, step 4: and (4) sewage detection, namely placing the placing vessel in sewage detection equipment for sewage detection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110090475.4A CN112924236A (en) | 2021-01-22 | 2021-01-22 | Construction sewage collecting device and detection method using same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110090475.4A CN112924236A (en) | 2021-01-22 | 2021-01-22 | Construction sewage collecting device and detection method using same |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112924236A true CN112924236A (en) | 2021-06-08 |
Family
ID=76165184
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110090475.4A Pending CN112924236A (en) | 2021-01-22 | 2021-01-22 | Construction sewage collecting device and detection method using same |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112924236A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116147990A (en) * | 2023-03-17 | 2023-05-23 | 中国医学科学院医学生物学研究所 | Sewage sampling and detecting equipment |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5783758A (en) * | 1996-02-12 | 1998-07-21 | Vortox Company | Liquid sampling apparatus for conduit liquid flow |
CN207215519U (en) * | 2017-09-15 | 2018-04-10 | 宁波国谱环保科技有限公司 | A kind of water supply line water quality detection sampler |
CN209945803U (en) * | 2019-06-10 | 2020-01-14 | 天津国投津能发电有限公司 | Sampling device for power plant sewage pH detection |
CN210774889U (en) * | 2019-06-04 | 2020-06-16 | 武汉鑫测检测技术有限公司 | Domestic wastewater sampling and detecting device |
CN211651727U (en) * | 2020-03-08 | 2020-10-09 | 珠海市康源纸业有限公司 | Sampling detection device is used in wood pulp processing |
CN111766116A (en) * | 2020-07-14 | 2020-10-13 | 廖锦超 | Sampling equipment for water quality testing |
CN212060212U (en) * | 2020-03-25 | 2020-12-01 | 安徽锦森环境科学有限公司 | Chemical drainage pipeline sewage detection device |
-
2021
- 2021-01-22 CN CN202110090475.4A patent/CN112924236A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5783758A (en) * | 1996-02-12 | 1998-07-21 | Vortox Company | Liquid sampling apparatus for conduit liquid flow |
CN207215519U (en) * | 2017-09-15 | 2018-04-10 | 宁波国谱环保科技有限公司 | A kind of water supply line water quality detection sampler |
CN210774889U (en) * | 2019-06-04 | 2020-06-16 | 武汉鑫测检测技术有限公司 | Domestic wastewater sampling and detecting device |
CN209945803U (en) * | 2019-06-10 | 2020-01-14 | 天津国投津能发电有限公司 | Sampling device for power plant sewage pH detection |
CN211651727U (en) * | 2020-03-08 | 2020-10-09 | 珠海市康源纸业有限公司 | Sampling detection device is used in wood pulp processing |
CN212060212U (en) * | 2020-03-25 | 2020-12-01 | 安徽锦森环境科学有限公司 | Chemical drainage pipeline sewage detection device |
CN111766116A (en) * | 2020-07-14 | 2020-10-13 | 廖锦超 | Sampling equipment for water quality testing |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116147990A (en) * | 2023-03-17 | 2023-05-23 | 中国医学科学院医学生物学研究所 | Sewage sampling and detecting equipment |
CN116147990B (en) * | 2023-03-17 | 2023-10-20 | 中国医学科学院医学生物学研究所 | Sewage sampling and detecting equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112924236A (en) | Construction sewage collecting device and detection method using same | |
CN210893799U (en) | Sample collection system for sewage detection | |
CN108613834B (en) | Water quality testing sampling equipment | |
CN217199819U (en) | Soil sampling storage device for paddy field | |
CN212110641U (en) | Underwater sediment sampling device | |
CN210533762U (en) | Shallow layer soil sampling device for geological exploration | |
CN217930947U (en) | Portable soil water sampling detection device | |
CN216361690U (en) | Soil detection and sampling device | |
CN115307978A (en) | Sampling repair equipment and sampling repair method for water quality and sludge | |
CN212166644U (en) | Water quality testing equipment of filter screen automatically cleaning | |
CN211553413U (en) | Quicksand sediment sampling device | |
CN211504832U (en) | Water conservancy water quality testing equipment to many-sided detection of water | |
CN115096660A (en) | High concentration waste water detects and draws equipment with waste water | |
CN208488294U (en) | A kind of ground water fixed depth sampler | |
CN210863259U (en) | Food detects quick sampling device | |
CN213902993U (en) | Sampling device for wastewater treatment detection | |
CN219455601U (en) | Concrete alkali content detector | |
CN211978419U (en) | Engineering supervision sampling device | |
CN210803001U (en) | Detection apparatus for lake surface layer sediment phosphorus nitrogen content | |
CN108680399A (en) | A kind of ground water fixed depth sampler | |
CN213209610U (en) | Improve sampler of fertilizer detection degree of accuracy | |
CN220939421U (en) | Waste water collecting pipe with solid-liquid separation function | |
CN110686935A (en) | Sampling device for river water treatment | |
CN211205904U (en) | Sewage quality testing device for environmental protection detection | |
CN209559554U (en) | A kind of environmental protection assay water sample acquisition device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210608 |
|
RJ01 | Rejection of invention patent application after publication |