CN112911713B - Configuration method and device of uplink control channel - Google Patents
Configuration method and device of uplink control channel Download PDFInfo
- Publication number
- CN112911713B CN112911713B CN202110057926.4A CN202110057926A CN112911713B CN 112911713 B CN112911713 B CN 112911713B CN 202110057926 A CN202110057926 A CN 202110057926A CN 112911713 B CN112911713 B CN 112911713B
- Authority
- CN
- China
- Prior art keywords
- pucch
- harq
- ack
- target
- determining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/23—Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L1/00—Arrangements for detecting or preventing errors in the information received
- H04L1/12—Arrangements for detecting or preventing errors in the information received by using return channel
- H04L1/16—Arrangements for detecting or preventing errors in the information received by using return channel in which the return channel carries supervisory signals, e.g. repetition request signals
- H04L1/18—Automatic repetition systems, e.g. Van Duuren systems
- H04L1/1812—Hybrid protocols; Hybrid automatic repeat request [HARQ]
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/003—Arrangements for allocating sub-channels of the transmission path
- H04L5/0053—Allocation of signaling, i.e. of overhead other than pilot signals
- H04L5/0055—Physical resource allocation for ACK/NACK
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/04—Wireless resource allocation
- H04W72/044—Wireless resource allocation based on the type of the allocated resource
- H04W72/0446—Resources in time domain, e.g. slots or frames
Landscapes
- Engineering & Computer Science (AREA)
- Signal Processing (AREA)
- Computer Networks & Wireless Communication (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The application discloses a configuration method of an uplink control channel, which is used for configuring at least 2 PUCCH sets when HARQ-ACK feedback of PDSCH configured by SPS is canceled due to configuration conflict, wherein each 1 PUCCH set comprises at least one PUCCH; the first PUCCH is the largest capacity in the first PUCCH set, the second PUCCH is the largest capacity in the second PUCCH set, and the capacity of the second PUCCH is larger than that of the first PUCCH; in the target time unit, when the number of the delayed HARQ-ACKs supported in the UCI is not more than a preset value, determining a target PUCCH in the first PUCCH set, and when the number of the delayed HARQ-ACKs supported in the UCI is more than the preset value, determining a target PUCCH in the second PUCCH set; the target PUCCH is configured to carry the UCI. The application also includes an apparatus for applying the method. The method and the device solve the technical problem of how to transmit the delayed HARQ-ACK when the PUCCH is cancelled under the configuration conflict condition.
Description
Technical Field
The present disclosure relates to the field of wireless communications technologies, and in particular, to a method and an apparatus for configuring an uplink control channel.
Background
Semi-persistent scheduling SPS (Semi-Persistent Scheduling, or Semi-persistent scheduling) allows resources of a PDSCH or PUSCH to be periodically allocated to a specific UE through one physical downlink control channel PDCCH scheduling, unlike when the network device transmits the physical downlink control information to the terminal device UE once every scheduling of the physical downlink shared channel PDSCH or the physical uplink shared channel PUSCH during dynamic scheduling. In this procedure, the base station uses the CS-RNTI-scrambled PDCCH to specify radio resources (which will be referred to herein as SPS resources) used by the UE, which the UE uses to receive or transmit data every one period. The base station does not need to issue PDCCH to assign the allocated resources, namely SPS scheduling has the characteristics of one-time allocation and multiple use. In addition, SPS scheduling can avoid the base station from sending scheduling information corresponding to PDSCH to the UE when downlink data is required, can reduce the time delay of downlink data transmission, and can meet the requirement of time delay sensitive service transmission.
The SPS scheduled data supports HARQ transmission, and for each PDSCH transmission according to SPS scheduling, the UE transmits acknowledgement ACK or non-acknowledgement NACK information corresponding to each PDSCH on PUCCH resources corresponding to the PDSCH. The ACK and NACK information are collectively referred to as hybrid automatic repeat request acknowledgement information HARQ-ACK. The entirety of HARQ-ACK information fed back by the UE on one HARQ feedback resource (PUCCH or PUSCH) is referred to as a HARQ-ACK codebook.
The timing relationship between PDSCH and PUCCH is as follows: if the UE receives the PDSCH related to SPS scheduling in the time slot n, the UE feeds back the HARQ-ACK corresponding to the PDSCH in the time slot n+k. The value of k is determined by a "PDSCH-to-HARQ-timing-indicator" field in the PDCCH, or by higher layer signaling "dl-DataToUL-ACK". If the value of k is determined by "PDSCH-to-HARQ-timing-indicator" in the PDCCH, the field indicates that the value of k is one of a plurality of values configured by "dl-DataToUL-ACK". Taking k=4 as an example, when the period of SPS configuration is 2ms, after acquiring PDCCH activating SPS, UE receives PDSCH configured by SPS in time slots n, n+2, n+4, n+6, … …, and sends acknowledgement ACK or non-acknowledgement NACK information of each PDSCH configured by feedback SPS in time slots n+4, n+6, … … according to decoding result.
In the NR TDD system, the frame format configuration is very flexible, and if a slot in which a PUCCH for feeding back HARQ-ACK of the SPS PDSCH is located is configured as a downlink slot, or a symbol of a PUCCH resource for feeding back HARQ-ACK of the SPS PDSCH is configured as a downlink symbol or a flexible symbol, the PUCCH will be cancelled. Accordingly, the network device can only execute retransmission scheduling on the corresponding SPS PDSCH under the condition that HARQ-ACK information is not acquired. In case the terminal device has actually correctly acquired PDSCH of the SPS, the system efficiency is low.
The above problem is particularly serious in the case where the period of SPS configuration is short.
Disclosure of Invention
The application provides a configuration method and device of an uplink control channel, which solve the technical problem of how to transmit delayed HARQ-ACK when a PUCCH is canceled under the condition of configuration conflict, and are particularly suitable for dynamically realizing the transmission of the delayed HARQ-ACK under the condition of SPS configuration.
In a first aspect, the present application proposes a method for configuring an uplink control channel, where when HARQ-ACK feedback of a PDSCH configured by SPS is cancelled due to a configuration collision, the method includes the following steps:
configuring at least 2 PUCCH sets, each 1 PUCCH set containing at least one individual PUCCH (or PUCCH resource group); wherein, the first PUCCH is the largest capacity PUCCH (or PUCCH resource group) in the first PUCCH set, the second PUCCH is the largest capacity PUCCH (or PUCCH resource group) in the second PUCCH set, and the capacity of the second PUCCH is larger than the capacity of the first PUCCH;
in the target time unit, when the number of the delayed HARQ-ACKs supported in the UCI is not more than a preset value, determining a target PUCCH in the first PUCCH set, and when the number of the delayed HARQ-ACKs supported in the UCI is more than the preset value, determining a target PUCCH in the second PUCCH set;
The target PUCCH is configured to carry the UCI.
Optionally, the first PUCCH set and the second PUCCH set are a first type PUCCH. The first type PUCCH is used for transmitting HARQ-ACK information of a PDSCH configured by a downlink SPS; when an SR transmission requirement exists, the first type PUCCH comprises an SR; and the first PUCCH does not contain other uplink control information.
Optionally, the first PUCCH set and the second PUCCH set are a second class PUCCH. The second-class PUCCH is used for transmitting channel state information; when there is a transmission requirement of HARQ-ACK information of PDSCH configured by SR and downlink SPS, the second-class PUCCH contains the HARQ-ACK information of the PDSCH configured by SR and SPS; and the HARQ-ACK of the PDSCH which is dynamically scheduled is not included in the second-type PUCCH.
Optionally, the first PUCCH set and the second PUCCH set are a third type PUCCH. The third type of PUCCH is used for transmitting HARQ-ACK of the dynamically scheduled PDSCH; when there is a transmission requirement of any item of HARQ-ACK and CSI information of the PDSCH configured by the SR and the downlink SPS, the second-class PUCCH comprises the HARQ-ACK and the CSI information of the PDSCH configured by the SR and the SPS.
In several embodiments of the present application, the second PUCCH set includes at least a portion of the PUCCH (or PUCCH resource group) in the first PUCCH set.
Preferably, the configuration conflict comprises that a preset PUCCH resource for feeding back HARQ-ACK conflicts with a flexible symbol or a downlink symbol in TDD configuration.
The values of at least one of the following parameters of the first PUCCH and the second PUCCH are different: the number of resource blocks and the number of symbols.
The method according to any one of the embodiments of the first aspect of the present application, for a network device, includes the following steps:
transmitting the first configuration information and the second configuration information; the first configuration information is used for configuring a first PUCCH set; the second configuration information is used for configuring a second PUCCH set;
determining configuration conflict, comparing the number of the delayed HARQ-ACKs supported in UCI with a preset value in a target time unit, and determining a target PUCCH in a first PUCCH set or a second PUCCH set;
and receiving UCI in the target PUCCH.
The method of any one embodiment of the first aspect of the present application is used for a terminal device, and includes the following steps:
receiving first configuration information and second configuration information; the first configuration information is used for configuring a first PUCCH set; the second configuration information is used for configuring a second PUCCH set;
determining configuration conflict, comparing the number of the delayed HARQ-ACKs supported in UCI with a preset value in a target time unit, and determining a target PUCCH in a first PUCCH set or a second PUCCH set;
The delayed UCI is transmitted in the target PUCCH.
In a second aspect, the present application further proposes a network device, with a method according to any one of the first aspects of the present application, the network device being configured to:
transmitting the first configuration information and the second configuration information; the first configuration information is used for configuring a first PUCCH set; the second configuration information is used for configuring a second PUCCH set;
determining configuration conflict, comparing the number of the delayed HARQ-ACKs supported in UCI with a preset value in a target time unit, and determining a target PUCCH in a first PUCCH set or a second PUCCH set;
the delayed UCI in the target PUCCH is received.
In a third aspect, the present application further proposes a terminal device, with a method according to any one of the first aspects of the present application, where the terminal device is configured to:
receiving first configuration information and second configuration information; the first configuration information is used for configuring a first PUCCH set; the second configuration information is used for configuring a second PUCCH set;
determining configuration conflict, comparing the number of the delayed HARQ-ACKs supported in UCI with a preset value in a target time unit, and determining a target PUCCH in a first PUCCH set or a second PUCCH set;
the UCI is transmitted in the target PUCCH.
In the apparatus of the second and third aspects, the present application further proposes a communication device comprising: a memory, a processor and a computer program stored on the memory and executable on the processor, which when executed by the processor performs the steps of the method according to any one of the embodiments of the first aspect of the present application.
In a fourth aspect, the present application also proposes a computer-readable medium, on which a computer program is stored, which computer program, when being executed by a processor, carries out the steps of the method according to any one of the embodiments of the first aspect of the present application.
In a fifth aspect, the present application further proposes a mobile communication system, which includes at least one network device according to any one embodiment of the present application and/or at least one terminal device according to any one embodiment of the present application.
The above-mentioned at least one technical scheme that this application embodiment adopted can reach following beneficial effect:
and the PUCCH resources with different capacities are configured for the PUCCH carrying the HARQ-ACK of the SPS PDSCH transmitted by different delays, so that the feedback requirement of UCI can be met, and the system efficiency is improved.
In a specific embodiment of the present application, by using any one of the higher layer signaling PUCCH-Config SPS-PUCCH-AN-List-r16, multi-CSI-PUCCH-resource List for CSI feedback, and resource esttolaselist message for HARQ-ACK of dynamically scheduled PDSCH, different PUCCH resources are configured for PUCCH carrying HARQ-ACK of SPS PDSCH transmitted with different delays, so that feedback requirements of UCI can be satisfied, and system efficiency is improved.
Drawings
The accompanying drawings, which are included to provide a further understanding of the application and are incorporated in and constitute a part of this application, illustrate embodiments of the application and together with the description serve to explain the application and do not constitute an undue limitation to the application. In the drawings:
fig. 1 is a schematic diagram of canceling HARQ-ACK feedback corresponding to SPS configured PDSCH in a TDD system;
fig. 2 is a modification of HARQ-ACK feedback timing corresponding to SPS configured PDSCH in a TDD system;
FIG. 3 is a flow chart of an embodiment of the method of the present application;
FIG. 4 is a flow chart of an embodiment of a method of the present application for a network device;
fig. 5 is a flowchart of an embodiment of a method for a terminal device according to the present application;
FIG. 6 is a schematic diagram of an embodiment of a network device;
fig. 7 is a schematic diagram of an embodiment of a terminal device;
fig. 8 is a schematic structural diagram of a network device according to another embodiment of the present invention;
fig. 9 is a block diagram of a terminal device according to another embodiment of the present invention.
Detailed Description
For the purposes, technical solutions and advantages of the present application, the technical solutions of the present application will be clearly and completely described below with reference to specific embodiments of the present application and corresponding drawings. It will be apparent that the described embodiments are only some, but not all, of the embodiments of the present application. All other embodiments, which can be made by one of ordinary skill in the art without undue burden from the present disclosure, are within the scope of the present disclosure.
The following describes in detail the technical solutions provided by the embodiments of the present application with reference to the accompanying drawings.
Fig. 1 is a schematic diagram illustrating that HARQ-ACK feedback corresponding to SPS configured PDSCH in a TDD system is cancelled.
Taking the configuration period of SPS as 1 slot as an example, as shown in fig. 1, k=3. If the slot is configured as "DDDUU", the HARQ-ACK of SPS PDSCH transmitted by slot n, slot n+1, slot n+2 are respectively in slot n+3, slot n+4, and slot n+ 5. Since slot n+5 is configured as a downlink slot, the HARQ-ACK of SPS PDSCH transmitted by slot n+2 will be forced to cancel, affecting system efficiency.
Fig. 2 is a modification of HARQ-ACK feedback timing corresponding to SPS configured PDSCH in a TDD system.
For the problem that the HARQ-ACK feedback corresponding to the SPS configuration PDSCH in the TDD system is cancelled, and the system efficiency is affected, one possible solution is to delay the cancelled HARQ-ACK feedback to be transmitted on the next PUCCH. As shown in fig. 2, HARQ-ACK delay for SPS PDSCH of slot n+2 is transmitted on PUCCH of slot n+ 8.
In the prior art, the configuration information used by all slots is the same whether the PUCCH resources for HARQ-ACK information feedback configured to SPS, PUCCH resources for channel state information feedback, or PUCCH resources for HARQ-ACK information feedback configured to dynamically scheduled PDSCH. Therefore, the maximum capacity of each type of PUCCH is the same in all slots on the basis of ensuring a specific transmission performance.
However, the delayed transmission of HARQ-ACKs corresponding to SPS configured PDSCH in TDD systems may cause great differences in HARQ-ACK feedback requirements for different time slots. For example, slot n+8 shown in fig. 2 needs to carry a delayed HARQ-ACK while slot n+9 does not need to carry a delayed HARQ-ACK. The configuration resource of the PUCCH can ensure the transmission performance of the control information without delaying the HARQ-ACK, but when the PUCCH is used to carry the delayed HARQ-ACK, the performance of the delayed HARQ-ACK cannot be ensured, and the performance of the uplink control information originally carried by the PUCCH is affected.
For example, if the bearer delay HARQ-ACK is not considered or the number of delay HARQ-ACKs is small, the network device configures two PUCCH resources to the UE through AN SPS-PUCCH-AN-List-r16 message (or a multi-CSI-PUCCH-resource List message, a resource esttolelease message) in the higher layer signaling PUCCH-Config configuration information: PUCCH-a and PUCCH-B. PUCCH-A resources are used for bearing 1-X 1 Bit information, PUCCH-B for bearer (X 1 +1)~X 2 Bit information. However, the UE needs to carry a large amount of delayed HARQ-ACKs of the burst, and UCI information needed to be carried may reach X 3 Bits, where X 3 >>X 2 . At this time, the PUCCH-B cannot directly carry X 3 Bit information, if a large number of delayed HARQ-ACKs are carried, the coding rate must be increased or a part of the information must be discarded, resulting in a significant decrease in the reliability of the PUCCH. On the other hand, if the configured PUCCH-B capacity is suitable for the bearer (X 1 +1)~X 3 The bit information inevitably causes resource waste in a time slot in which the delay of the HARQ-ACK does not occur or occurs less, the multiplexing capability of the uplink resource of the system is deteriorated, and the efficiency is reduced.
Referring to 3gpp TS 38.213 V16.3.0 and 3gpp TS 38.331 V16.3.0, PUCCH resources for transmitting HARQ-ACK information for downlink SPS are configured using SPS-PUCCH-AN-List-r16 message in configuration information PUCCH-Config. If the bearing delay HARQ-ACK is not considered, the maximum capacity PUCCH in the PUCCH configuration has the number of resource blocks ofInformation that may cause actual transmission when delayed HARQ-ACK occurs exceeds + ->The number of uplink control information bits which can be carried by each resource block according to the set coding rate can only be carried by a mode of improving the coding rate, thus affecting the performance of HARQ-ACK and further affecting the downlink efficiency of the system. On the contrary, the method comprises the steps of,if the maximum demand of the bearing delay HARQ-ACK is considered, the configured PUCCH resource capacity is larger than the actual demand in the time slot with no or less occurrence of the delay HARQ-ACK, and the multiplexing efficiency of the uplink resource of the system is affected.
For another example, PUCCH resources for transmitting channel state information are configured using a multi-CSI-PUCCH-resource list message in the configuration information PUCCH-Config. If the bearing delay HARQ-ACK is not considered, the maximum capacity PUCCH in the PUCCH configuration has the number of resource blocks of Information that may cause actual transmission when delayed HARQ-ACK occurs exceeds + ->The number of uplink control information bits which can be carried by the resource blocks according to the set coding rate, and partial CSI on the PUCCH are discarded, so that the uplink control information carried on the PUCCH does not exceed +.>The number of uplink control information bits that can be carried by each resource block according to the set coding rate. Discarding CSI will affect the performance of CSI feedback, further affecting the downlink efficiency of the system. Otherwise, if the maximum requirement of carrying delayed HARQ-ACK is considered, the configured PUCCH resource capacity is larger than the actual requirement in the time slot in which the delayed HARQ-ACK does not occur or occurs less, and the multiplexing efficiency of the uplink resource of the system is affected.
For another example, HARQ-ACKs for transmitting dynamically scheduled PDSCH are configured using a resourcesettetreleaselist message in the configuration information PUCCH-Config. If the bearing delay HARQ-ACK is not considered, the PUCCH resources in the PUCCH resource group with the largest capacity in the PUCCH configuration have the number of resource blocks ofInformation that may cause actual transmission when delayed HARQ-ACK occurs exceeds + ->The uplink control information bit number that can be carried by each resource block according to the set coding rate, the CSI with lower priority on these PUCCH resource groups will be discarded, affecting the performance of CSI feedback, and further affecting the downlink efficiency of the system. If the uplink control information is still above +. >The number of uplink control information bits that can be carried by each resource block according to the set coding rate is required to be carried by increasing the coding rate. Otherwise, if the maximum requirement of carrying delayed HARQ-ACK is considered, the capacity of the configured PUCCH resource group is larger than the actual requirement in the time slot in which the delayed HARQ-ACK does not occur or occurs less, and the multiplexing efficiency of the uplink resource of the system is affected.
The invention solves the problem of how the network equipment configures PUCCH resources under the condition of HARQ-ACK delay transmission of SPS PDSCH so as to meet UCI feedback requirements at different moments and solve the problem of low system efficiency.
FIG. 3 is a flow chart of an embodiment of the method of the present application;
the application provides a configuration method of an uplink control channel, which comprises the following steps:
The number of "at least one" herein is 1 or more, and a specific number of embodiments are described in step 103B.
At least one of the following is different between the first PUCCH and the second PUCCH: the number of included resource blocks, the number of symbols, the modulation order, and the maximum coding rate.
In several embodiments of the present application, the second PUCCH set includes at least a portion of the PUCCH (or PUCCH resource group) in the first PUCCH set.
Optionally, the first PUCCH set and the second PUCCH set are a first type PUCCH. The first type PUCCH is used for transmitting HARQ-ACK information of a PDSCH configured by a downlink SPS; when an SR transmission requirement exists, the first type PUCCH comprises an SR; and the first PUCCH does not contain other uplink control information.
Optionally, the first PUCCH set and the second PUCCH set are a second class PUCCH. The second-class PUCCH is used for transmitting channel state information; when there is a transmission requirement of HARQ-ACK information of PDSCH configured by SR and downlink SPS, the second-class PUCCH contains the HARQ-ACK information of the PDSCH configured by SR and SPS; and the HARQ-ACK of the PDSCH which is dynamically scheduled is not included in the second-type PUCCH.
Optionally, the first PUCCH set and the second PUCCH set are a third type PUCCH. The third type of PUCCH is used for transmitting HARQ-ACK of the dynamically scheduled PDSCH; when there is a transmission requirement of any item of HARQ-ACK and CSI information of the PDSCH configured by the SR and the downlink SPS, the second-class PUCCH comprises the HARQ-ACK and the CSI information of the PDSCH configured by the SR and the SPS.
The configuration collision means that a slot in which a PUCCH for feeding back HARQ-ACK of SPS PDSCH is located is configured as a downlink slot, or a symbol of a PUCCH resource for feeding back HARQ-ACK of SPS PDSCH is configured as a downlink symbol or a flexible symbol. In particular, the configuration conflict includes that a preset PUCCH resource for feeding back HARQ-ACK conflicts with a flexible symbol or a downlink symbol in TDD configuration.
The timing relationship between the PDSCH of SPS and the corresponding HARQ-ACK feedback is determined by the "PDSCH-to-HARQ-timing-indicator" field in the PDCCH that activates SPS, or by higher layer signaling "dl-DataToUL-ACK". For one active SPS configuration, the feedback time difference between each SPS PDSCH and its corresponding HARQ-ACK is "k". In the TDD system, if a slot in which a PUCCH for feeding back HARQ-ACK of SPS PDSCH is located is configured as a downlink slot, or at least one symbol of a PUCCH resource for feeding back HARQ-ACK of SPS PDSCH is configured as a downlink symbol or a flexible symbol, the PUCCH will be cancelled. And the network equipment can only execute retransmission scheduling on the PDSCH of the SPS corresponding to the network equipment under the condition that the HARQ-ACK information is not acquired. In case the terminal device has actually correctly acquired PDSCH of the SPS, the system efficiency is low. The above problem is particularly serious in the case where the period of SPS configuration is short.
Therefore, when the preset PUCCH resources corresponding to the HARQ-ACKs of the SPS-configured PDSCH are cancelled due to collision with the flexible symbols or downlink symbols in the TDD configuration, the HARQ-ACKs of the SPS-configured PDSCH will be transmitted in other PUCCH delays, and in this application, these delayed transmitted HARQ-ACKs are referred to as "delayed HARQ-ACKs".
The target time unit here, for example, a subsequent symbol or slot including PUCCH discarded due to configuration collision, is a time unit in which the target PUCCH for transmitting the delayed HARQ-ACK is located.
For example, the PUCCH transmitting the delayed HARQ-ACK is a PUCCH resource configured for HARQ-ACK information feedback of SPS. Some uplink timeslots need to carry HARQ-ACKs for SPS PDSCH transmitted with delay, e.g., slot n+8, while some uplink timeslots do not need to carry HARQ-ACKs for SPS PDSCH transmitted with delay, e.g., slot n+ 9. Further, for different TDD configurations, there are more HARQ-ACKs for the SPS PDSCH that needs to be carried with delay in some uplink timeslots, and there are fewer HARQ-ACKs for the SPS PDSCH that needs to be carried with delay in some uplink timeslots. This means that the demands of different slots on the PUCCH resources with the largest capacity are different, so that the corresponding PUCCH sets in determining the target PUCCH may be different in slots with different numbers of supported delayed HARQ-ACKs.
Step 103A, selecting a group of PUCCH configurations in an uplink slot in which HARQ-ACK is transmitted.
In the subsequent uplink time slot, when the number of the delayed HARQ-ACKs supported in the UCI is not greater than a preset value, determining a target PUCCH in the first PUCCH set, and when the number of the delayed HARQ-ACKs supported in the UCI is greater than the preset value, determining a target PUCCH in the second PUCCH set.
The PUCCH resources configured for HARQ-ACK information feedback for SPS in the prior art are the same for all slots, which means that the maximum capacity of PUCCH is the same for all slots on the basis of guaranteeing specific transmission performance. If there are uplink timeslots that need to carry more HARQ-ACKs for the SPS PDSCH that is transmitted with delay, there are uplink timeslots that need to carry fewer HARQ-ACKs for the SPS PDSCH that is transmitted with delay. This means that different slots have different demands for the maximum capacity PUCCH resources. The PUCCH configuration in the prior art may cause that the reliability of the uplink control information may not meet the requirement, or the resource usage efficiency of the system is poor.
In order to solve the problem, the network device base station gNB may determine the maximum capacity of the second PUCCH according to the number of delayed HARQ-ACKs supported by the UE and the maximum capacity of the first PUCCH, and when the number of delayed HARQ-ACKs for carrying is greater than a preset value, use any one of the second PUCCH sets to carry uplink control information. The delayed HARQ-ACK information which can be carried by at least one PUCCH in the second PUCCH set is larger than a preset value, the transmission performance of the delayed HARQ-ACK and other uplink control information in the target PUCCH is not affected, excessive resources are not allocated to the uplink control information, and the system efficiency is not affected.
By using the scheme of the invention, the gNB can configure the first PUCCH set and the second PUCCH set according to the quantity of the delayed HARQ-ACK information supported by the UE, and the gNB is respectively used for determining the target PUCCH under the condition that the quantity of the delayed HARQ-ACK carried by the gNB is not more than a preset value and the quantity of the delayed HARQ-ACK carried by the gNB is more than the preset value.
For example, configured PUCCH-A resources are used to carry 1-X 1 Bit information, PUCCH-B for bearer (X 1 +1)~X 2 Bit information, PUCCH-C, for carrying (X 1 +1)~X 3 Bit information. In the time slot that the number of the carried delayed HARQ-ACK is not more than the preset value, the UE considers the PUCCH resources configured for the HARQ-ACK information feedback of the SPS to comprise PUCCH-A and PUCCH-B. The number of delayed HARQ-ACKs on the bearer is largeIn a time slot with a preset value, the UE considers that the PUCCH resources for feeding back the HARQ-ACK information configured to the SPS comprise PUCCH-A and PUCCH-C. At this time, the first PUCCH set includes PUCCH-A and PUCCH-B, and the second PUCCH set includes PUCCH-A and PUCCH-C. The first PUCCH is PUCCH-B, and the second PUCCH is PUCCH-C. Or in the time slot that the number of the carried delayed HARQ-ACKs is larger than the preset value, the UE considers that the PUCCH resources configured for the HARQ-ACK information feedback of the SPS comprise PUCCH-A, PUCCH-B and PUCCH-C, and at the moment, the second PUCCH set comprises PUCCH-A, PUCCH-B and PUCCH-C. The first PUCCH is PUCCH-B, and the second PUCCH is PUCCH-C.
Step 103B, determining a target PUCCH in the selected PUCCH set configuration.
For example, the selected PUCCH set is configured as the first type PUCCH.
The network equipment configures 1-4 PUCCH resources with different capacities to the UE through SPS-PUCCH-AN-List-r16 information in the high-layer signaling PUCCH-Config configuration information, and the capacities are sequentially increased. According to O by UE UCI One of the 1-4 PUCCH resources is determined as a target PUCCH of a feedback HARQ-ACK codebook, wherein O UCI Is the total number of bits of the HARQ-ACK codebook (containing delayed HARQ-ACK information) and possibly SRs:
if O UCI 2, wherein the target PUCCH is 1 st of 4 PUCCH resources;
if 2<O UCI ≤N 1,SPS The target PUCCH is 2 nd of 4 PUCCH resources, and if the configuration parameter of the second PUCCH includes maximum bit number configuration information, N 1,SPS Is the number of bits of the configuration, otherwise N 1,SPS Equal to 1706;
if N 1,SPS <O UCI ≤N 2,SPS The target PUCCH is 3 rd, N of 4 PUCCH resources 1,SPS Is the maximum number of bits configured for the 2 nd PUCCH, if the configuration parameter of the 3 rd PUCCH includes the maximum number of bits configuration information, N 2,SPS Is the number of bits of the configuration, otherwise N 2,SPS Equal to 1706;
if N 2,SPS <O UCI ≤N 3,SPS The target PUCCH is the 4 th, N, of 4 PUCCH resources 2,SPS Is the maximum number of bits configured for the 2 nd PUCCH, N 3,SPS Equal to 1706.
After determining the target PUCCH, if the target PUCCH is format 2 or format 3 of the PUCCH, the target PUCCH resource includesThe number of resource blocks, the resources actually used for transmitting the HARQ-ACK are a plurality of resource blocks starting from the initial resource block of the target PUCCH, and the specific number of the plurality of resource blocks is one of the following:
if it isThe number of resource blocks actually used for transmitting HARQ-ACK and possible SR in the target PUCCH is +.>And (b) whereinIs not greater than->And satisfy the condition-> And-> Is an integer of (a). That is, when the UCI bit number does not exceed the limit, the number of PUCCH resource blocks actually used is determined according to the actual requirement of the HARQ-ACK bit number, and fewer HARQ-ACK bit numbers use fewer resource blocks.
If it isThe number of resource blocks actually used for transmitting HARQ-ACKs and possibly SRs is +.>And each. I.e. the UCI number of bits exceeds a certain limit, only +.>Is available. When the UCI bit number is large, the coding rate will be high and the transmission performance is poor.
Wherein O is ACK Is the number of bits of HARQ-ACK, O CRC Is the number of cyclic redundancy check bits appended before the coding of the HARQ-ACK information,Q m and r are the number of subcarriers included in a resource block of one PUCCH, the number of symbols included in the PUCCH, the modulation order of the PUCCH, and the maximum coding rate of the PUCCH, respectively.
It should be noted that, when the number of delayed HARQ-ACKs of the supported bearers is not greater than the preset value, the number of bits that the first PUCCH set may accommodate UCI is not greater than 1706. When the delayed HARQ-ACK of the supported bearer is large, the number of bits that the second PUCCH can accommodate UCI may be greater than 1706.
For another example, the selected PUCCH set is configured as a second type PUCCH.
The network device configures resources of J.ltoreq.2 PUCCH formats 2, 3 or 4 for the UE through a multi-CSI-PUCCH-resource list message in the high-level signaling PUCCH-Config configuration information. The capacity of the J PUCCHs increases in sequence. The UE determines one of the J PUCCH resources as a target PUCCH for transmitting the channel state information and HARQ-ACK information of the DL SPS, and possibly an uplink scheduling request SR.
if it isAnd taking the J-th PUCCH as a target PUCCH. And the UE selects O according to the priority of the preset CSI report CSI Is->The CSI is reported on the target PUCCH together with HARQ-ACK and possibly SR. UE selected +.>The number of bits reported by the CSI is O' CSI And the corresponding cyclic redundancy check bit number is O' CRC The sum with the HARQ-ACK, possibly SR, to be transmitted satisfies +.>
Wherein O is ACK Is the number of bits of HARQ-ACK, O SR Is the number of bits of SR, O CSI Is the bit number of CSI, O' CSI Is the number of bits to select the reported CSI.Q m And r are the number of subcarriers included in a resource block of one PUCCH, the number of symbols included in the PUCCH, the modulation order of the PUCCH, and the maximum coding rate, respectively. That is, according to O ACK +O SR +O CSI +O CRC After determining which PUCCH resource to use as the target PUCCH, all resource blocks of the target PUCCH are actually used for CSI/HARQ-ACK/SR information.
For another example, the selected PUCCH set is configured as a third type PUCCH.
When the HARQ-ACK of the dynamically scheduled PDSCH and the HARQ-ACK of the SPS configured PDSCH are located in the same slot, the HARQ-ACK codebook includes two types of HARQ-ACK information: HARQ-ACKs for DL SPS and HARQ-ACKs for dynamically scheduled PDSCH, where SPS configured PDSCH HARQ-ACKs in turn contain delayed HARQ-ACK information. In addition to the HARQ-ACK codebook, at the feedback time of the PUCCH, the terminal device may need to feed back other uplink control information such as the scheduling request SR and/or channel state information to the network device, where the number of bits of the uplink control information UCI is denoted as O UCI 。
The network device configures 1-4 PUCCH resource groups for the UE through a resource eSeretToReleaseList message in the PUCCH-Config configuration information. Each PUCCH resource group is applicable to different O UCI Is not limited in terms of the range of (a). According to O by UE UCI And determining one PUCCH resource group from the 1-4 PUCCH resource groups as a standby PUCCH group of a feedback HARQ-ACK codebook, and then determining one of the standby PUCCH resource groups as a target PUCCH resource group along with scheduling indication information of a dynamic scheduling PDSCH. The determination method of the spare PUCCH group is as follows:
if O UCI 2 or less, the target PUCCH resource group is a PUCCH resource group with pucch=0;
if 2<O UCI ≤N 2 The target PUCCH resource group is a PUCCH resource group of PUCCH-resourcesetid=1, and if the configuration parameter of the PUCCH resource group of PUCCH-resourcesetid=1 includes the maximum bit number configuration information, N 2 Is the number of bits of the configuration, otherwise N 2 Equal to 1706;
if N 2 <O UCI ≤N 3 The target PUCCH resource group is a PUCCH resource group of PUCCH-resourcesetid=2, and if the configuration parameter of the PUCCH resource group of PUCCH-resourcesetid=2 includes the maximum bit number configuration information, N 3 Is the number of bits of the configuration, otherwise N 3 Equal to 1706;
if N 3 <O UCI And 1706, the target PUCCH resource group is PUCCH resource group of PUCCH-resource estid=3.
After determining the target PUCCH resource group in the spare PUCCH group, e.gIf the target PUCCH resource group is format 2 or format 3 of PUCCH, the target PUCCH resource group comprises The number of resource blocks actually used for transmitting HARQ-ACKs is one of:
if it isThe number of resource blocks actually used for transmitting HARQ-ACK is +.>Individual, wherein->Is not greater than->And satisfy the condition-> Is a minimum integer of (a). That is, when the number of HARQ-ACK/SR/CSI bits does not exceed the limit, the number of PUCCH resource blocks actually used is determined according to the actual requirement of the number of HARQ-ACK bits, and fewer HARQ-ACK bits use fewer resource blocks.
If it isThe number of resource blocks actually used for transmitting HARQ-ACK is +.>And each. The UE selects O according to the preset priority of CSI reporting CSI Is->Reporting of individual CSI, and HARQ-ACK and mayThe available SRs are reported together on the target PUCCH. UE selected +.>The number of bits reported by the CSI is O' CSI And the corresponding cyclic redundancy check bit number is O' CRC The sum with the HARQ-ACK, possibly SR, to be transmitted satisfies +.>That is, after the number of bits of the HARQ-ACK/SR/CSI exceeds a certain limit, at most +.>At this time, a part of CSI information with a lower priority level may be discarded, so that the coding rate of HARQ-ACK/SR/CSI when transmitted in the target PUCCH is guaranteed not to be higher than the preset maximum coding rate of the target PUCCH.
Wherein O is ACK Is the number of bits of HARQ-ACK, O SR Is the number of bits of SR, O CSI Is the number of bits of the CSI,is the number of CSI reports to be transmitted at the PUCCH transmission time. O's' CSI Is the number of bits to select the reported CSI. />Q m And r are the number of subcarriers included in a resource block of one PUCCH, the number of symbols included in the PUCCH, the modulation order of the PUCCH, and the maximum coding rate, respectively.
The target PUCCH selected in the first PUCCH set, or the target PUCCH resource group selected in the first PUCCH set, and the target PUCCH is determined in the target PUCCH resource group. Determining actual resources in a target PUCCH according to the number of UCI, and transmitting first type uplink control information by occupying the actual resources, wherein the number of delay HARQ-ACK information included in the first type uplink control information is not more than a preset value; and in the target PUCCH or the target PUCCH resource group selected in the second PUCCH set, the second type of uplink control information is transmitted by occupying actual resources, and the number of the delayed HARQ-ACK information included in the second type of uplink control information is larger than a preset value.
Assuming that the maximum capacity of the first target PUCCH is Q and the maximum capacity of the second target PUCCH is Q ', Q' >. Different PUCCH maximum resources are configured for different time slots, so that the transmission performance of uplink control information including delayed HARQ-ACK in the PUCCH can be ensured, and the system efficiency is ensured.
Fig. 4 is a flowchart of an embodiment of a method of the present application for a network device.
The method according to any one of the embodiments of the first aspect of the present application, for a network device, includes the following steps 201 to 204:
transmitting the first configuration information and the second configuration information; the first configuration information is used for determining a first PUCCH set, and the number of the delayed HARQ-ACKs used for the supported bearer by the first PUCCH set is not larger than a preset value; the second configuration information is used for determining a second PUCCH set, the number of delayed HARQ-ACKs used for supported bearers is greater than a preset value, the preset value is greater than or equal to zero, the delayed HARQ-ACKs are HARQ-ACK information of SPS PDSCH that is delayed to be sent, and when HARQ-ACK feedback of PDSCH configured by SPS is cancelled due to configuration collision.
In an embodiment, the first configuration information and the second configuration information may be used to configure the first PUCCH and the second PUCCH, respectively. The capacity of the second PUCCH is greater than the capacity of the first PUCCH. The specific configuration information about the first PUCCH and the second PUCCH in the first configuration information and the second configuration information is different in at least one of the number of resource blocks of the PUCCH, the number of symbols included in the PUCCH, the modulation order of the PUCCH, the maximum coding rate of the PUCCH, and the format parameter of the PUCCH. For the configuration items with the same parameters and parameter values in the first configuration information and the second configuration information, the network device may send only once.
With the scheme of the invention, the gNB can configure the first PUCCH and the second PUCCH according to the quantity of the delayed HARQ-ACK information supported by the UE. As in the example above, the first configuration information configures PUCCH-B for the bearer (X 1 +1)~X 2 Bit information. The second configuration information configures PUCCH-C for a bearer (X 1 +1)~X 3 Bit information. The UE considers that the first PUCCH set resources configured for HARQ-ACK information feedback of the SPS are PUCCH-A and PUCCH-B, and the second PUCCH set resources are PUCCH-A and PUCCH-C.
Alternatively, the first configuration information configures PUCCH-B for a bearer (X 1 +1)~X 2 Bit information. Second configuration information configures PUCCH-C for bearer (X 2 +1)~X 3 Bits. The UE considers that the first PUCCH set resources configured for HARQ-ACK information feedback of the SPS are PUCCH-A and PUCCH-B, and the second PUCCH set resources are PUCCH-A, PUCCH-B and PUCCH-C.
In this way, in some time slots, the second PUCCH corresponding to the second configuration information may carry delayed HARQ-ACK information greater than a preset value, and the transmission performance of the delayed HARQ-ACK and other uplink control information is not affected; in other time slots, the first PUCCH corresponding to the first configuration information may carry delayed HARQ-ACK information smaller than a preset value, and may not allocate excessive resources for the uplink control information, so as to affect system efficiency.
by adopting the scheme of the embodiment, different from the prior art, the transmission performance of uplink control information including delay HARQ-ACK in the PUCCH can be ensured and the system efficiency can be ensured by independently selecting and configuring different time slots according to the quantity of delay HARQ-ACK information supported by the UE and configuring different PUCCH maximum resources for different time slots.
Receiving first type uplink control information at an actual resource of a target PUCCH, wherein the number of delay HARQ-ACK included in the first type uplink control information is not more than a preset value; and receiving second-type uplink control information at the actual resource of the target PUCCH, wherein the delay HARQ-ACK information included in the second-type uplink control information is larger than a preset value.
If it is determined that the first type of uplink control information is received in the target PUCCH, the actual resource on the target PUCCH for transmission of the first type of uplink control information may be part or all of the target PUCCH.
Fig. 5 is a flowchart of an embodiment of a method for a terminal device according to the present application.
The method according to any one of the embodiments of the first aspect of the present application is used for a terminal device, and includes the following steps 301 to 304:
step 301, receiving first configuration information and second configuration information; the first configuration information is used for configuring a first PUCCH set; the second configuration information is used for configuring a second PUCCH set;
the terminal equipment acquires first configuration information and second configuration information; determining a first PUCCH set when the number of the delayed HARQ-ACKs supported by the carrier is not more than a preset value through first configuration information; and determining a second PUCCH set when the number of the delayed HARQ-ACKs of the supported bearer is larger than a preset value through second configuration information.
the terminal equipment determines the number of the delayed HARQ-ACKs supported by the target UCI; when the number of the carried delayed HARQ-ACKs is not greater than a preset value, determining a target PUCCH in a first PUCCH set, further determining actual resources and sending the target UCI; and when the number of the supported delayed HARQ-ACKs is larger than a preset value, determining a target PUCCH in the second PUCCH set, further determining actual resources and sending the target UCI. The UE may determine a target PUCCH at the target PUCCH resource group through scheduling indication information transmitted by the network device.
As described above, in the related art, the configuration information is the same in all slots regardless of PUCCH resources for HARQ-ACK information feedback configured for PDSCH configured for SPS, PUCCH resources for channel state information feedback, or PUCCH resources for HARQ-ACK information feedback including dynamically scheduled PDSCH. If the number of HARQ-ACKs of the SPS PDSCH that needs to be carried and delayed for transmission in some uplink timeslots is large, and the number of HARQ-ACKs of the SPS PDSCH that needs to be carried and delayed for transmission in some uplink timeslots is small, the PUCCH configuration method in the prior art may cause that the reliability of uplink control information cannot meet the requirement, or the resource utilization efficiency of the system is poor. By adopting the scheme of the embodiment, the gNB determines the maximum capacity of the second PUCCH set according to the quantity of the delayed HARQ-ACK information supported by the UE and the maximum capacity of the first PUCCH set, and when the quantity of the delayed HARQ-ACK for the supported bearer is larger than a preset value, the gNB uses a target PUCCH in the second PUCCH set to bear uplink control information.
It should be noted that, in the embodiment of the present application, the preset value may be greater than or equal to zero. If the preset value is equal to zero, the present embodiment is equivalent to configuring different maximum resources for PUCCHs carrying and not carrying delayed HARQ-ACKs through configuration information of the target PUCCH. If the preset value is greater than zero, the present embodiment configures different resources for the supported PUCCHs carrying different numbers of delayed HARQ-ACKs through the configuration information of the PUCCHs.
When the first PUCCH set and the second PUCCH set in the present application include a plurality of PUCCH resource groups, the first PUCCH may be a first PUCCH resource group, the second PUCCH may be a second PUCCH resource group, and the target PUCCH may be a target PUCCH resource group.
Fig. 6 is a schematic diagram of an embodiment of a network device.
The embodiment of the application also provides a network device, and the network device is used for: transmitting the first configuration information and the second configuration information; the first configuration information is used for configuring a first PUCCH set; the second configuration information is used for configuring a second PUCCH set; determining configuration conflict, comparing the number of delayed HARQ-ACKs with a preset value in a subsequent uplink time slot, and determining a target PUCCH in a first PUCCH set or a second PUCCH set; and receiving the delayed HARQ-ACK in the target PUCCH.
In order to implement the above technical solution, the network device 400 provided in the present application includes a network sending module 401, a network determining module 402, and a network receiving module 403.
The network sending module is used for sending the configuration information (including the first configuration information and the second configuration information) and also used for sending the PDSCH.
The network determining module is used for determining a first PUCCH set and a second PUCCH set and further determining configuration information of the first PUCCH and the second PUCCH; determining a configuration conflict; determining whether to select a target PUCCH in the first PUCCH set or the second PUCCH set according to the relation between the number of the delayed HARQ-ACKs and a preset value; further, a target PUCCH is determined.
The network receiving module is configured to receive a target PUCCH, and identify HARQ-ACK information in a HARQ-ACK codebook.
Specific methods for implementing the functions of the network sending module, the network determining module and the network receiving module are described in the embodiments of the methods of the present application, and are not described here again.
Fig. 7 is a schematic diagram of an embodiment of a terminal device.
The application also proposes a terminal device, using the method of any one of the embodiments of the application, the terminal device being configured to: receiving first configuration information and second configuration information; the first configuration information is used for configuring a first PUCCH set; the second configuration information is used for configuring a second PUCCH set; determining configuration conflict, comparing the number of delayed HARQ-ACKs with a preset value in a subsequent uplink time slot, and determining a target PUCCH in a first PUCCH set or a second PUCCH set; and transmitting the delayed HARQ-ACK in the target PUCCH.
In order to implement the above technical solution, the terminal device 500 provided in the present application includes a terminal sending module 501, a terminal determining module 502, and a terminal receiving module 503.
The terminal receiving module is configured to receive the configuration information (including the first configuration information and the second configuration information) and further configured to send a PDSCH.
The terminal determining module is used for determining the configuration of the first PUCCH and the second PUCCH according to the configuration information, and further determining a first PUCCH set and a second PUCCH set; determining a configuration conflict; determining whether to select a target PUCCH in the first PUCCH set or the second PUCCH set according to the relation between the number of the delayed HARQ-ACKs and a preset value; further, a target PUCCH is determined.
The terminal sending module is configured to send a target PUCCH including delayed HARQ-ACK information.
Specific methods for implementing the functions of the terminal sending module, the terminal determining module and the terminal receiving module are described in the embodiments of the methods of the present application, and are not described herein.
The terminal devices described in the application may refer to mobile terminal devices; it may also refer to a terminal device that is fixed or mobile with the ground in ground-air communication.
Fig. 8 shows a schematic structural diagram of a network device according to another embodiment of the present invention. As shown, the network device 600 includes a processor 601, a wireless interface 602, and a memory 603. Wherein the wireless interface may be a plurality of components, i.e. comprising a transmitter and a receiver, providing a means for communicating with various other apparatuses over a transmission medium. The wireless interface performs the communication function with the terminal device, and processes wireless signals through the receiving and transmitting device, and data carried by the signals are communicated with the memory or the processor through the internal bus structure. The memory 603 contains a computer program for executing any of the embodiments of the present application, which computer program runs or changes on the processor 601. When the memory, processor, wireless interface circuit are connected through a bus system. The bus system includes a data bus, a power bus, a control bus, and a status signal bus, which are not described here again.
Fig. 9 is a block diagram of a terminal device according to another embodiment of the present invention. The terminal device 700 comprises at least one processor 701, a memory 702, a user interface 703 and at least one network interface 704. The various components in terminal device 700 are coupled together by a bus system. Bus systems are used to enable connected communication between these components. The bus system includes a data bus, a power bus, a control bus, and a status signal bus.
The user interface 703 may include a display, keyboard, or pointing device, such as a mouse, trackball, touch pad, or touch screen, among others.
The memory 702 stores executable modules or data structures. The memory may store an operating system and application programs. The operating system includes various system programs, such as a framework layer, a core library layer, a driver layer, and the like, for implementing various basic services and processing hardware-based tasks. The application programs include various application programs such as a media player, a browser, etc. for implementing various application services.
In an embodiment of the present invention, the memory 702 contains a computer program that executes any of the embodiments of the present application, the computer program running or changing on the processor 701.
The memory 702 contains a computer readable storage medium, and the processor 701 reads the information in the memory 702 and performs the steps of the above method in combination with its hardware. In particular, the computer readable storage medium has stored thereon a computer program which, when executed by the processor 701, implements the steps of the method embodiments as described in any of the embodiments above.
The processor 701 may be an integrated circuit chip having signal processing capabilities. In implementation, the steps of the methods of the present application may be performed by integrated logic circuitry in hardware or instructions in software in processor 701. The processor 701 may be a general purpose processor, a digital signal processor, an application specific integrated circuit, an off-the-shelf programmable gate array or other programmable logic device, a discrete gate or transistor logic device, a discrete hardware component. The disclosed methods, steps, and logic blocks in the embodiments of the present invention may be implemented or performed. A general purpose processor may be a microprocessor or the processor may be any conventional processor or the like. The steps of the method disclosed in connection with the embodiments of the present invention may be embodied directly in the execution of a hardware decoding processor, or in the execution of a combination of hardware and software modules in a decoding processor.
It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as a method, system, or computer program product. Accordingly, the present invention may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. In one typical configuration, the device of the present application includes one or more processors (CPUs), an input/output user interface, a network interface, and memory.
Furthermore, the present invention may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
Accordingly, the present application also proposes a computer readable medium having stored thereon a computer program which, when executed by a processor, implements the steps of the method according to any of the embodiments of the present application. For example, the memory 603, 702 of the present invention may include non-volatile memory in a computer-readable medium, random Access Memory (RAM) and/or non-volatile memory, etc., such as read-only memory (ROM) or flash RAM.
Computer readable media, including both non-transitory and non-transitory, removable and non-removable media, may implement information storage by any method or technology. The information may be computer readable instructions, data structures, modules of a program, or other data. Examples of storage media for a computer include, but are not limited to, phase change memory (PRAM), static Random Access Memory (SRAM), dynamic Random Access Memory (DRAM), other types of Random Access Memory (RAM), read Only Memory (ROM), electrically Erasable Programmable Read Only Memory (EEPROM), flash memory or other memory technology, compact disc read only memory (CD-ROM), digital Versatile Discs (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices, or any other non-transmission medium, which can be used to store information that can be accessed by a computing device. Computer-readable media, as defined herein, does not include transitory computer-readable media (transmission media), such as modulated data signals and carrier waves.
Based on the embodiments of fig. 6-9, the present application also proposes a mobile communication system comprising at least 1 embodiment of any one of the terminal devices of the present application and/or at least 1 embodiment of any one of the network devices of the present application.
It should also be noted that the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one … …" does not exclude the presence of other like elements in a process, method, article or apparatus that comprises the element.
The "first" and "second" in the present application are intended to distinguish a plurality of objects having the same name, and their specific meanings are referred to in the description in the present application.
The foregoing is merely exemplary of the present application and is not intended to limit the present application. Various modifications and changes may be made to the present application by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc. which are within the spirit and principles of the present application are intended to be included within the scope of the claims of the present application.
Claims (14)
1. A configuration method of uplink control channel, when HARQ-ACK feedback of PDSCH used for SPS configuration is cancelled due to configuration conflict, is characterized in that,
Configuring a first PUCCH set and a second PUCCH set according to the number of the delayed HARQ-ACK information supported by the UE, wherein the first PUCCH set and the second PUCCH set are respectively used for determining a target PUCCH under the condition that the number of the delayed HARQ-ACKs carried is not larger than a preset value and the number of the delayed HARQ-ACKs carried is larger than the preset value; the first PUCCH is the largest capacity in the first PUCCH set, the second PUCCH is the largest capacity in the second PUCCH set, and the capacity of the second PUCCH is larger than that of the first PUCCH;
in the target time unit, when the number of the delayed HARQ-ACKs supported in the UCI is not more than a preset value, determining a target PUCCH in the first PUCCH set, and when the number of the delayed HARQ-ACKs supported in the UCI is more than the preset value, determining a target PUCCH in the second PUCCH set; the target PUCCH is configured to carry the UCI;
in the selected PUCCH set configuration, determining the target PUCCH includes: according to O UCI Determining a target PUCCH, or, according to O ACK +O SR +O CSI +O CRC Determining a target PUCCH; wherein O is UCI Total number of bits, O, comprising HARQ-ACK codebook and SR ACK Is the number of bits of HARQ-ACK, O SR Is the number of bits of SR, O CSI Is the bit number of CSI, O CRC Is the number of cyclic redundancy check bits;
the delayed HARQ-ACK is that a preset PUCCH resource corresponding to the HARQ-ACK of the PDSCH configured by SPS collides with a flexible symbol or a downlink symbol in TDD configuration, and is delayed to be sent in other PUCCHs.
2. The method of claim 1, wherein,
the first PUCCH set and the second PUCCH set are first-class PUCCHs;
the first type PUCCH is used for transmitting HARQ-ACK information of a PDSCH configured by a downlink SPS;
when an SR transmission requirement exists, the first type PUCCH comprises an SR;
and the first PUCCH does not contain other uplink control information.
3. The method of claim 1, wherein,
the first PUCCH set and the second PUCCH set are the second class PUCCH;
the second-class PUCCH is used for transmitting channel state information;
when there is a transmission requirement of HARQ-ACK information of PDSCH configured by SR and downlink SPS, the second-class PUCCH contains the HARQ-ACK information of the PDSCH configured by SR and SPS;
and the HARQ-ACK of the PDSCH which is dynamically scheduled is not included in the second-type PUCCH.
4. The method of claim 1, wherein,
the first PUCCH set and the second PUCCH set are of a third type;
the third type of PUCCH is used for transmitting HARQ-ACK of the dynamically scheduled PDSCH;
when there is a transmission requirement of any item of HARQ-ACK and CSI of PDSCH configured by SR and downlink SPS, the third PUCCH comprises the HARQ-ACK and the CSI of the PDSCH configured by SR and SPS.
5. The method of claim 1, wherein,
the second PUCCH set includes at least a portion of the PUCCHs in the first PUCCH set.
6. The method of claim 1, wherein,
the configuration conflict comprises that a preset PUCCH resource for feeding back HARQ-ACK conflicts with a flexible symbol or a downlink symbol in TDD configuration.
7. The method of claim 1, wherein at least one of the following parameters of the first PUCCH and the second PUCCH are different in value:
the number of resource blocks and the number of symbols.
8. A method according to any of claims 1-7, for a network device, comprising the steps of:
transmitting the first configuration information and the second configuration information; the first configuration information is used for configuring a first PUCCH set; the second configuration information is used for configuring a second PUCCH set;
determining configuration conflict, comparing the number of the delayed HARQ-ACKs supported in UCI with a preset value in a target time unit, and determining a target PUCCH in a first PUCCH set or a second PUCCH set;
and receiving UCI in the target PUCCH.
9. A method according to any of claims 1-7, for a terminal device, comprising the steps of:
Receiving first configuration information and second configuration information; the first configuration information is used for configuring a first PUCCH set; the second configuration information is used for configuring a second PUCCH set;
determining configuration conflict, comparing the number of HARQ-ACKs supported in UCI with a preset value in a target time unit, and determining a target PUCCH in a first PUCCH set or a second PUCCH set;
the UCI is transmitted in the target PUCCH.
10. A network device, using the method of any one of claims 1-8, comprising a network sending module, a network determining module, and a network receiving module;
the network sending module is used for: transmitting the first configuration information and the second configuration information; the first configuration information is used for configuring a first PUCCH set; the second configuration information is used for configuring a second PUCCH set;
the network determining module is configured to: determining configuration conflict, comparing the number of the delayed HARQ-ACKs supported in UCI with a preset value in a target time unit, and determining a target PUCCH in a first PUCCH set or a second PUCCH set;
the network receiving module: and receiving UCI in the target PUCCH.
11. A terminal device, using the method of any one of claims 1-7, 9, characterized in that,
The terminal comprises a terminal receiving module, a terminal determining module and a terminal sending module;
the terminal receiving module is used for: receiving first configuration information and second configuration information; the first configuration information is used for configuring a first PUCCH set; the second configuration information is used for configuring a second PUCCH set;
the terminal determining module is used for: determining configuration conflict, comparing the number of HARQ-ACKs supported in UCI with a preset value in a target time unit, and determining a target PUCCH in a first PUCCH set or a second PUCCH set;
the terminal sending module is used for: the UCI is transmitted in the target PUCCH.
12. A communication device, comprising: memory, a processor and a computer program stored on the memory and executable on the processor, which when executed by the processor performs the steps of the method according to any one of claims 1 to 9.
13. A computer readable medium having stored thereon a computer program which, when executed by a processor, implements the steps of the method according to any of claims 1 to 9.
14. A mobile communication system comprising at least one network device according to claim 10 and/or at least one terminal device according to claim 11.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110057926.4A CN112911713B (en) | 2021-01-15 | 2021-01-15 | Configuration method and device of uplink control channel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110057926.4A CN112911713B (en) | 2021-01-15 | 2021-01-15 | Configuration method and device of uplink control channel |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112911713A CN112911713A (en) | 2021-06-04 |
CN112911713B true CN112911713B (en) | 2023-07-11 |
Family
ID=76113805
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110057926.4A Active CN112911713B (en) | 2021-01-15 | 2021-01-15 | Configuration method and device of uplink control channel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112911713B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112910610B (en) * | 2021-01-15 | 2022-05-24 | 中国信息通信研究院 | Hybrid automatic repeat request response method and device |
WO2023004796A1 (en) * | 2021-07-30 | 2023-02-02 | 北京小米移动软件有限公司 | Hybrid automatic repeat request feedback method and device |
CN113572590B (en) * | 2021-08-17 | 2024-02-02 | 杭州红岭通信息科技有限公司 | PUCCH (physical uplink control channel) resource multiplexing and distributing method |
CN115551106B (en) * | 2022-09-30 | 2024-03-26 | 中国移动紫金(江苏)创新研究院有限公司 | Resource scheduling method, device, equipment, storage medium and program product |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110768773A (en) * | 2019-09-30 | 2020-02-07 | 中国信息通信研究院 | Uplink information multiplexing method and device |
CN110856265A (en) * | 2019-11-08 | 2020-02-28 | 中国信息通信研究院 | Multiplexing method and equipment of uplink control information |
WO2020057565A1 (en) * | 2018-09-21 | 2020-03-26 | 电信科学技术研究院有限公司 | Method for transmitting harq-ack, terminal device, and network device |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10708866B2 (en) * | 2018-04-05 | 2020-07-07 | Samsung Electronics Co., Ltd. | Signaling of control information in a communication system |
CN110830204B (en) * | 2018-08-10 | 2022-04-15 | 大唐移动通信设备有限公司 | PUCCH sending method, PUCCH receiving method, terminal and base station |
US10979200B2 (en) * | 2019-05-24 | 2021-04-13 | Qualcomm Incorporated | Acknowledgment feedback for multiple active downlink semi-persistent scheduling configurations |
-
2021
- 2021-01-15 CN CN202110057926.4A patent/CN112911713B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020057565A1 (en) * | 2018-09-21 | 2020-03-26 | 电信科学技术研究院有限公司 | Method for transmitting harq-ack, terminal device, and network device |
CN110768773A (en) * | 2019-09-30 | 2020-02-07 | 中国信息通信研究院 | Uplink information multiplexing method and device |
CN110856265A (en) * | 2019-11-08 | 2020-02-28 | 中国信息通信研究院 | Multiplexing method and equipment of uplink control information |
Also Published As
Publication number | Publication date |
---|---|
CN112911713A (en) | 2021-06-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112911713B (en) | Configuration method and device of uplink control channel | |
EP2745593B1 (en) | Scheduling communications | |
CN107743695B (en) | Method and apparatus for transmitting uplink control information | |
US20180098345A1 (en) | Dynamic codebook adaptation for enhanced carrier aggregation | |
EP3026839A1 (en) | Selecting between two modes of ack/nack bundling for two layers | |
CN112910610B (en) | Hybrid automatic repeat request response method and device | |
US20170317790A1 (en) | Method and apparatus for performing hybrid automatic repeat request processes | |
EP3050236B1 (en) | Bundling harq feedback in a time division duplexing communication system | |
WO2021203790A1 (en) | Harq-ack codebook generation method, harq-ack codebook transmission method, and pdsch receiving method | |
WO2019105341A1 (en) | Data sending method and device, and data receiving method and device | |
CN111836366B (en) | Uplink transmission method and communication device | |
US20220174669A1 (en) | Channel determining method and apparatus | |
WO2022000318A1 (en) | Harq feedback transmission method, base station and user equipment | |
CN114374490B (en) | Method, equipment and communication system for sending physical downlink control information | |
CN112970213B (en) | Determining a feedback codebook | |
JP7462749B2 (en) | Uplink data transmission method and uplink data transmission device | |
CN113207186B (en) | Multiplexing method and equipment of uplink control information | |
CN107113119A (en) | Transmission method, user equipment and the base station of mixed automatic retransfer response message | |
CN114070481B (en) | Physical channel transmission method and equipment | |
CN114374480B (en) | HARQ-ACK codebook generation method, device and communication system | |
CN114070526B (en) | Information determining method, information indicating method, terminal and network side equipment | |
WO2024096769A1 (en) | Methods, devices, computer programs and computer program products for reducing feedback signalling in a wireless communications system | |
WO2021007796A1 (en) | Integrated signaling of harq acknowledgements | |
CN116800386A (en) | PUCCH demodulation method and device and base station | |
CN116095861A (en) | Information transmission method, terminal and network side equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |