CN112900835A - Auxiliary fixing device for building construction scaffold - Google Patents
Auxiliary fixing device for building construction scaffold Download PDFInfo
- Publication number
- CN112900835A CN112900835A CN202110089583.XA CN202110089583A CN112900835A CN 112900835 A CN112900835 A CN 112900835A CN 202110089583 A CN202110089583 A CN 202110089583A CN 112900835 A CN112900835 A CN 112900835A
- Authority
- CN
- China
- Prior art keywords
- connecting block
- block
- fixing device
- rod
- connecting rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G7/00—Connections between parts of the scaffold
- E04G7/02—Connections between parts of the scaffold with separate coupling elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
The invention relates to the technical field of building construction equipment and discloses a building construction scaffold auxiliary fixing device which comprises a cross rod, wherein the outer side of the cross rod is movably connected with a first connecting pipe, the middle part of the first connecting pipe is fixedly connected with a first connecting block, the middle part of the first connecting block is rotatably connected with a clamping plate, the inner part of the clamping plate is fixedly connected with a vertical rod, and the bottom end of the vertical rod is movably connected with a second connecting block. This fixing device is assisted to construction scaffold, through the horizontal pole, the connection of first connecting rod, the scaffold that has solved prior art has had insecure problem through the criss-cross clamp connection of cross, when connecting bolt is ageing to make the montant drop, through auxiliary device, it is fixed to cushion and the secondary the montant, improve equipment's security, utilize magnetism to stabilize and adsorb, avoid causing the incident, improve the nimble application in the work progress, the advantage of improve equipment's stability has been realized.
Description
Technical Field
The invention relates to the technical field of building construction equipment, in particular to an auxiliary fixing device for a building construction scaffold.
Background
The horizontal pole and the montant of prior art's scaffold frame are usually through criss-cross clamp connection, have insecure problem, and connecting bolt is ageing easily for the montant drops easily, has the potential safety hazard, takes place the incident easily, and when the montant dropped simultaneously, can not effectively cushion, current fixing device does not set up buffering auxiliary device, and it is inconvenient to use, has restricted the nimble application in the work progress.
In order to solve the problems, the inventor provides an auxiliary fixing device for a scaffold for building construction, the problem that the scaffold in the prior art is infirm in connection through a cross clamp is solved through connection of a cross rod and a first connecting rod, when a vertical rod drops due to aging of a connecting bolt, the vertical rod is buffered and secondarily fixed through an auxiliary device, the safety of equipment is improved, stable adsorption is performed through magnetism, safety accidents are avoided, flexible application in the construction process is improved, and the advantage of improving the stability of the equipment is achieved.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides the auxiliary fixing device for the building construction scaffold, which has the advantages of strong practicability and strong reliability and solves the problems of poor practicability and poor reliability.
(II) technical scheme
In order to achieve the purposes of strong practicability and strong reliability, the invention provides the following technical scheme: a scaffold auxiliary fixing device for building construction comprises a cross rod, wherein a first connecting pipe is movably connected to the outer side of the cross rod, a first connecting block is fixedly connected to the middle of the first connecting pipe, a clamping plate is rotatably connected to the middle of the first connecting block, a vertical rod is fixedly connected to the inner portion of the clamping plate, a second connecting block is movably connected to the bottom end of the vertical rod, first connecting rods are rotatably connected to the two ends of the second connecting block, a first connecting rod is rotatably connected to the middle of the first connecting rod, a sliding block is slidably connected to the bottom end of the first connecting rod, a second connecting rod is rotatably connected to the bottom end of the sliding block, a rotating member is rotatably connected to the bottom end of the second connecting rod, a first gear is rotatably connected to the outer side of the rotating member, a rack is meshed with the outer side of the first gear, a third connecting rod is rotatably connected to the top end, the outer side of the second gear is meshed with a connecting plate, and a sliding block is connected inside the second connecting block in a sliding mode.
Preferably, the first connecting block is slidably connected with the first connecting rod, and the first connecting block and the first connecting rod are both fixedly connected with the spring, so that the spring plays a role in connecting and reducing vibration.
Preferably, the number of the first connecting rods is not less than two, and the first connecting rods are uniformly distributed about the center line of the second connecting block.
Preferably, first connecting rod and sliding block all with spring fixed connection, the outside of sliding block is provided with the spout, spout and second connecting block fixed connection, consequently, elasticity through the spring plays the effect of connecting and reducing vibrations.
Preferably, the second connecting block is rotatably connected with the first gear, a reaction reagent is arranged in the second connecting block, and the second connecting block and the connecting plate are both fixedly connected with the spring.
Preferably, the inside fixedly connected with slide of second connecting block, slide and slider sliding connection.
Preferably, one end of each of the rack and the sliding block is fixedly connected with the permanent magnet.
(III) advantageous effects
Compared with the prior art, the invention provides an auxiliary fixing device for a scaffold for building construction, which has the following beneficial effects:
1. this supplementary fixing device of construction scaffold frame, through the horizontal pole, first connecting pipe, first connecting block, splint, montant, second connecting block, the connection of first connecting rod, the horizontal pole and the montant of having solved prior art scaffold frame have insecure problem through criss-cross's clamp connection usually, when connecting bolt is ageing to make the montant drop, through auxiliary device, cushion and the secondary is fixed the montant, improve equipment's security.
2. This fixing device is assisted to construction scaffold frame through the connection of first connecting rod, sliding block, second connecting rod, rotation piece, first gear, has solved the problem that there is the potential safety hazard in prior art's scaffold frame fixing device, utilizes magnetism to stabilize and adsorbs, avoids causing the incident, improves the nimble application in the work progress, has realized the advantage of improve equipment's stability.
Drawings
FIG. 1 is a schematic sectional view of the present invention;
FIG. 2 is a schematic top sectional view of a second connecting block according to the present invention;
FIG. 3 is a schematic view showing a structure of a second joint block portion according to the present invention;
FIG. 4 is an enlarged view of the structure at A in FIG. 3 according to the present invention.
In the figure: 1. a cross bar; 2. a first connecting pipe; 3. a first connection block; 4. a splint; 5. a vertical rod; 6. a second connecting block; 7. a first connecting rod; 8. a first link; 9. a slider; 10. a second link; 11. a rotating member; 12. a first gear; 13. a rack; 14. a third link; 15. a second gear; 16. a connecting plate; 17. a slide block.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, a scaffold auxiliary fixing device for building construction comprises a cross bar 1, a first connecting pipe 2 is movably connected to the outer side of the cross bar 1, a first connecting block 3 is fixedly connected to the middle of the first connecting pipe 2, the first connecting block 3 is slidably connected to a first connecting rod 7, both the first connecting block 3 and the first connecting rod 7 are fixedly connected to a spring, so that the connecting and vibration reducing effects are achieved through the elasticity of the spring, a clamping plate 4 is rotatably connected to the middle of the first connecting block 3, a vertical rod 5 is fixedly connected to the inside of the clamping plate 4, a second connecting block 6 is movably connected to the bottom end of the vertical rod 5, both ends of the second connecting block 6 are rotatably connected to the first connecting rod 7, a first connecting rod 8 is rotatably connected to the middle of the first connecting rod 7, the first connecting rod 7 and the first connecting rod 8 are not less than two, and are uniformly distributed about the central line of, the bottom end of the first connecting rod 8 is connected with a sliding block 9 in a sliding manner, the first connecting rod 8 and the sliding block 9 are both fixedly connected with a spring, the outer side of the sliding block 9 is provided with a sliding groove which is fixedly connected with the second connecting block 6, the inner part of the second connecting block 6 is fixedly connected with a sliding way which is connected with a sliding block 17 in a sliding manner, the second connecting block 6 is rotatably connected with a first gear 12, the inner part of the second connecting block 6 is provided with a reaction reagent, the second connecting block 6 and a connecting plate 16 are both fixedly connected with the spring, therefore, the effects of connecting and reducing vibration are achieved through the elasticity of the spring, the bottom end of the sliding block 9 is rotatably connected with a second connecting rod 10, the bottom end of the second connecting rod 10 is rotatably connected with a rotating piece 11, the outer side of the rotating piece 11 is rotatably connected with a first gear 12, the outer side of the first gear 12 is engaged with a rack 13, the outside meshing of second gear 15 has connecting plate 16, and the inside sliding connection of second connecting block 6 has slider 17, and rack 13 all with permanent magnet fixed connection with the one end of slider 17.
The working principle is that when the device is used, the bolts of the clamping plates 4 age and fall off, so that the cross rod 1 and the first connecting pipe 2 move downwards, the first connecting rod 7 slides towards two sides in the first connecting block 3, the first connecting rod 8 is extruded, the first connecting rod 8 extrudes the spring by moving towards the lower end, the spring pushes the sliding block 9 to move downwards, the sliding block 9 moves downwards to drive the second connecting rod 10 to rotate, the second connecting rod 10 drives the rotating piece 11 on the right side to rotate anticlockwise, the second connecting rod 10 drives the rotating piece 11 on the left side to rotate clockwise, the rotating piece 11 drives the first gear 12 shown in figure 3 to rotate anticlockwise on an X plane by rotating, the first gear 12 drives the rack 13 to move inwards by meshing, and the permanent magnet at one end of the rack 13 fixes the vertical rod 5, third connecting rod 14 through rack 13 pulling both sides rotates for third connecting rod 14 drives second gear 15 and rotates to both sides, makes second gear 15 open connecting plate 16 through the meshing, makes connecting plate 16 extrusion spring, makes the inside reactant that sets up of second connecting block 6 react with outside chemical reagent, makes gas expansion, promotes slider 17, makes the permanent magnet fix montant 5, thereby effectively cushions.
To sum up, this supplementary fixing device of construction scaffold frame, through horizontal pole 1, first connecting pipe 2, first connecting block 3, splint 4, montant 5, second connecting block 6, the connection of head rod 7, the horizontal pole 1 and the montant 5 of having solved prior art's scaffold frame are usually connected through the criss-cross clamp and have insecure problem, when connecting bolt is ageing to make montant 5 drop, through auxiliary device, cushion and the secondary is fixed montant 5, improve equipment's security.
This fixing device is assisted to construction scaffold frame through head rod 7, first connecting rod 8, sliding block 9, second connecting rod 10, rotates the connection of piece 11, first gear 12, has solved the problem that there is the potential safety hazard in prior art's scaffold frame fixing device, utilizes magnetism to stabilize and adsorbs, avoids causing the incident, improves the nimble application in the work progress, has realized the advantage of improve equipment's stability.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. The utility model provides a construction scaffold frame auxiliary fixture, includes horizontal pole (1), its characterized in that: the outer side of the cross rod (1) is movably connected with a first connecting pipe (2), the middle part of the first connecting pipe (2) is fixedly connected with a first connecting block (3), the middle part of the first connecting block (3) is rotatably connected with a clamping plate (4), the inner part of the clamping plate (4) is fixedly connected with a vertical rod (5), the bottom end of the vertical rod (5) is movably connected with a second connecting block (6), the two ends of the second connecting block (6) are rotatably connected with first connecting rods (7), the middle part of the first connecting rods (7) is rotatably connected with a first connecting rod (8), the bottom end of the first connecting rod (8) is slidably connected with a sliding block (9), the bottom end of the sliding block (9) is rotatably connected with a second connecting rod (10), the bottom end of the second connecting rod (10) is rotatably connected with a rotating piece (11), the outer side of the rotating piece (11) is, the outside meshing of first gear (12) has rack (13), the top of rack (13) is rotated and is connected with third connecting rod (14), the one end rotation of third connecting rod (14) is connected with second gear (15), the outside meshing of second gear (15) has connecting plate (16), the inside sliding connection of second connecting block (6) has slider (17).
2. The auxiliary fixing device for the construction scaffold as claimed in claim 1, wherein: the first connecting block (3) is connected with the first connecting rod (7) in a sliding mode, and the first connecting block (3) and the first connecting rod (7) are fixedly connected with the spring.
3. The auxiliary fixing device for the construction scaffold as claimed in claim 1, wherein: the number of the first connecting rods (7) and the number of the first connecting rods (8) are not less than two, and the first connecting rods are uniformly distributed on the center line of the second connecting block (6).
4. The auxiliary fixing device for the construction scaffold as claimed in claim 1, wherein: first connecting rod (8) and sliding block (9) all with spring fixed connection, the outside of sliding block (9) is provided with the spout, spout and second connecting block (6) fixed connection.
5. The auxiliary fixing device for the construction scaffold as claimed in claim 1, wherein: second connecting block (6) and first gear (12) rotate to be connected, the inside of second connecting block (6) is provided with reaction agent, second connecting block (6) and connecting plate (16) all with spring fixed connection.
6. The auxiliary fixing device for the construction scaffold as claimed in claim 1, wherein: the inside fixedly connected with slide of second connecting block (6), slide and slider (17) sliding connection.
7. The auxiliary fixing device for the construction scaffold as claimed in claim 1, wherein: one end of each of the rack (13) and the sliding block (17) is fixedly connected with the permanent magnet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110089583.XA CN112900835A (en) | 2021-01-22 | 2021-01-22 | Auxiliary fixing device for building construction scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110089583.XA CN112900835A (en) | 2021-01-22 | 2021-01-22 | Auxiliary fixing device for building construction scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112900835A true CN112900835A (en) | 2021-06-04 |
Family
ID=76117660
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110089583.XA Withdrawn CN112900835A (en) | 2021-01-22 | 2021-01-22 | Auxiliary fixing device for building construction scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112900835A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20030031939A (en) * | 2003-03-24 | 2003-04-23 | (주)아지트 | Pipe couplings and joint construction of pipe structure using pipe couplings |
KR20040103850A (en) * | 2004-11-10 | 2004-12-09 | 김종영 | A scaffold for architecture |
KR20050030404A (en) * | 2003-09-26 | 2005-03-30 | 박정진 | Bracket for erection timbering and timbering system using the same |
CN108560901A (en) * | 2018-04-24 | 2018-09-21 | 芜湖天梦信息科技有限公司 | A kind of fixing device for construction site scaffold |
CN211257737U (en) * | 2019-07-19 | 2020-08-14 | 广东锦华建设工程有限公司 | Scaffold frame for building engineering convenient to build |
-
2021
- 2021-01-22 CN CN202110089583.XA patent/CN112900835A/en not_active Withdrawn
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20030031939A (en) * | 2003-03-24 | 2003-04-23 | (주)아지트 | Pipe couplings and joint construction of pipe structure using pipe couplings |
KR20050030404A (en) * | 2003-09-26 | 2005-03-30 | 박정진 | Bracket for erection timbering and timbering system using the same |
KR20040103850A (en) * | 2004-11-10 | 2004-12-09 | 김종영 | A scaffold for architecture |
CN108560901A (en) * | 2018-04-24 | 2018-09-21 | 芜湖天梦信息科技有限公司 | A kind of fixing device for construction site scaffold |
CN211257737U (en) * | 2019-07-19 | 2020-08-14 | 广东锦华建设工程有限公司 | Scaffold frame for building engineering convenient to build |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111447508B (en) | Assembly structure of small-size 5G basic station | |
CN218771219U (en) | Adjustable cable tunnel self-supporting type round tunnel combined support | |
CN112900835A (en) | Auxiliary fixing device for building construction scaffold | |
CN113005953B (en) | Protective fence mounting mechanism for municipal engineering and operation method thereof | |
CN211655626U (en) | High strength CPVC electric power tubular construction | |
CN218150243U (en) | Assembled building sound insulation wall | |
CN213554721U (en) | Multi-channel oropharyngeal ventilation device for anesthesia department | |
CN213144052U (en) | Corner cross arm for power equipment | |
CN221201987U (en) | Weak current engineering line wiring auxiliary device | |
CN209925761U (en) | Water pipe side longitudinal anti-seismic support | |
CN109780917B (en) | Combined heat exchanger | |
CN208226469U (en) | A kind of device convenient for communication cable solidus | |
CN111618769A (en) | Positioning and supporting device for assembling rail vehicle body | |
CN215226678U (en) | Track convenient to install for electric curtain | |
CN211974245U (en) | Assembled building support frame | |
CN217855133U (en) | Plastic burning plate dust remover with emission concentration below 10mg/Nm3 | |
CN217581568U (en) | Construction fence for road construction | |
CN217027596U (en) | Wall body for building construction | |
CN211714404U (en) | Light steel keel for eave convenient to install | |
CN213560823U (en) | Commercial freezer door frame production is with section bar welding with fixed station | |
CN219857561U (en) | Circular pipe fitting fastening device for ship | |
CN213586700U (en) | Boats and ships electrical control box convenient to winding displacement | |
CN220710945U (en) | Power distribution cabinet | |
CN216031402U (en) | A clamping device for building engineering plank cutting | |
CN215053874U (en) | Make things convenient for high strength auxiliary girder frame of dismouting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20210604 |
|
WW01 | Invention patent application withdrawn after publication |