CN112897346A CN202110347911.1A CN202110347911A CN112897346A CN 112897346 A CN112897346 A CN 112897346A CN 202110347911 A CN202110347911 A CN 202110347911A CN 112897346 A CN112897346 A CN 112897346A
Authority
CN
China
Prior art keywords
orifice
crane
plc
formula
coordinate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110347911.1A
Other languages
Chinese (zh)
Other versions
CN112897346B (en
Inventor
蒋从军
徐建洪
张建
杜强
干双全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 7 Co Ltd
Sinohydro Jiajiang Hydraulic Machinery Co Ltd
Original Assignee
Sinohydro Bureau 7 Co Ltd
Sinohydro Jiajiang Hydraulic Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 7 Co Ltd, Sinohydro Jiajiang Hydraulic Machinery Co Ltd filed Critical Sinohydro Bureau 7 Co Ltd
Priority to CN202110347911.1A priority Critical patent/CN112897346B/en
Publication of CN112897346A publication Critical patent/CN112897346A/en
Application granted granted Critical
Publication of CN112897346B publication Critical patent/CN112897346B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/18Control systems or devices
    • B66C13/48Automatic control of crane drives for producing a single or repeated working cycle; Programme control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/18Control systems or devices
    • B66C13/46Position indicators for suspended loads or for crane elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C15/00Safety gear

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Automation & Control Theory (AREA)
  • Control And Safety Of Cranes (AREA)

Abstract

The invention discloses a method for planning a running route of a crane, which belongs to the technical field of electrical control of the crane and is characterized by comprising the following steps of: a. a three-dimensional coordinate system is established; b. setting the passing space of the objects allowed to be hoisted of each orifice in the PLC according to a three-dimensional coordinate system through a human-computer interface, and setting the overall dimension of the objects with the maximum size to be hoisted in the PLC according to the three-dimensional coordinate system; c. writing a PLC program; d. comparing and judging whether the hoisted object is in a safe area in the orifice according to real-time traveling coordinate values of the cart and the trolley detected by the PLC; e. and calculating the distance between the positions of the lifting hook and the steel wire rope and the edge of the opening through formulas 6 to 9. The invention can ensure that the crane safely bypasses the barrier in the operation interval, and simultaneously releases a larger allowable operation area to the crane, thereby greatly improving the operation space and the operation efficiency.

Description

Crane operation route planning method
Technical Field
The invention relates to the technical field of electrical control of cranes, in particular to a method for planning a running route of a crane.
Background
Generally, in the running process of hoisting operation, the running limit positions of hoisting of a crane, a cart and a trolley are preset to control each mechanism of the crane not to exceed the normal running working range in the running process. And a small part of cranes realize further related area forbidden protection besides the extreme position protection by increasing a part of forbidden areas. For the hoisting operation of the crane on some specific occasions, special requirements are made on forbidden areas of each mechanism of the crane. If temporary supports are required to be arranged in different height directions of the orifices on the site in different time periods of project construction, after the object hoisted by the crane is placed at the lower part of the orifice along a safety region between the temporary supports, the object needs to slightly move for a certain distance along the track direction, so that the object can be conveniently installed in place. A simple method of setting the forbidden area cannot satisfy such a requirement.
Chinese patent publication No. CN 105883623a, publication No. 2016, 08, month 24, discloses a control method for automatically planning crane operation route, which is characterized in that: the method comprises the following steps:
step (1), acquiring coordinates of obstacle points, and recording the coordinates into a database;
step (2), establishing a running path database, wherein the running path comprises an initial position, a preselection device, a preset running speed, a running target position, a running direction and a running curve parameter;
step (3), according to the position of the on-site obstacle, the initial position and the running target position of the crane, a WINCC process monitoring module on the industrial personal computer calculates the position of the passing point of the crane and the optimal path capable of avoiding the obstacle;
step (4), downloading the path to the PLC by using a WINCC configuration downloading button;
and (5) compiling a PLC program to enable the crane to automatically run according to a specified path.
The control method for automatically planning the crane operation route disclosed in the patent document plans the crane operation route according to the field condition and stores the crane operation route in the database, automatically selects the operation route according to the starting and stopping positions when the crane automatically operates, downloads the operation route into the PLC, automatically operates according to the planned route by writing a program in the PLC, and has high automation degree. However, the crane cannot be guaranteed to safely bypass the obstacle in the operation interval, and a larger allowable operation area is released for the crane, so that the operation efficiency is influenced.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provides a method for planning the running route of the crane, which can release a larger allowable running area to the crane while ensuring that the crane safely bypasses the obstacle in a running interval, thereby greatly improving the working space and the working efficiency.
The invention is realized by the following technical scheme:
a method for planning a running route of a crane is characterized by comprising the following steps:
a. defining the running position relation of the crane along different directions by adopting a three-dimensional coordinate model, and establishing a three-dimensional coordinate system by using position data of lifting, a cart and a trolley;
b. setting the passing space of the objects allowed to be hoisted of each orifice in the PLC according to a three-dimensional coordinate system through a human-computer interface, and setting the overall dimension of the objects with the maximum size to be hoisted in the PLC according to the three-dimensional coordinate system;
c. compiling a PLC program, detecting a lifting height value of the crane in real time in the running process of the crane, and judging whether the lifted object of the crane is close to or lower than the upper plane of the orifice or not through formula 1 by combining the lifting height of the largest object arranged in a PLC controller;
Y-C≤Y1formula 1
Wherein Y is the real-time position coordinate value of the hoisting mechanism of the crane,c is the lifting height of the largest-size object set through the human-computer interface, Y1Is an orifice elevation set by a human-machine interface;
d. when the crane runs to an orifice area, if the PLC detects that the hoisted object is close to or lower than the orifice elevation, whether the hoisted object is in a safe area in the orifice or not is judged according to the real-time traveling coordinate values of the cart and the trolley detected by the PLC by comparing;
e. when the PLC detects that the hoisted object passes through the obstacle above the orifice, the PLC controls to cancel the size calculation of the hoisted object along the length and width directions of the orifice, and calculates the distance between the positions of the lifting hook and the steel wire rope and the edge of the orifice according to the formulas 6 to 9;
Xm=X-Max(X1,X2) Formula 6
Xn=Min(X3,X4) -X formula 7
Zm=Z-Max(Z1,Z2) Formula 8
Zn=Min(Z3,Z4) -Z formula 9
Wherein Xm is the distance from the object to the left edge of the orifice, Xn is the distance from the object to the right edge of the orifice, Zm is the distance from the object to the rear edge of the orifice, Zn is the distance from the object to the front edge of the orifice, X1Is the X axial coordinate, X, of the front left side of the orifice2Is the X axial coordinate, X, of the left rear of the orifice3Is the X axial coordinate, X, of the front of the right side of the orifice4Is the X axial coordinate, Z, of the rear right side of the orifice1Is the Z axial coordinate of the front left side of the orifice, Z2Is the Z axial coordinate behind the left side of the orifice, Z3Z axial coordinate of the front of the right side of the orifice, Z4And Z axial coordinate is arranged behind the right side of the orifice, X is a real-time position coordinate value of a crane-operated cart, and Z is a real-time position coordinate value of a crane-operated cart.
In the step a, establishing a three-dimensional stereo coordinate system specifically means that the cart direction is taken as an x axis, the left limit position is taken as a starting point zero, and the right direction is taken as a data positive direction; positioning a y axis in a lifting direction, taking a lower limit position as a starting point zero, and taking an upward direction as a positive direction of data; the direction of the trolley is defined as the z axis, the rear limit position is zero, and the forward direction is the positive direction of the data.
And d, in the step d, when the safety region of the hoisted object in the orifice is judged to be specifically the entrance orifice, calling a parameter setting model of the orifice, and calculating the safety distance of the hoisted object from each edge of the orifice in real time according to the orifice model data and the detected real-time traveling coordinate values of the cart and the trolley by combining the preset maximum size object outline size.
The real-time calculation of the safe distance between the hoisted object and each edge of the orifice is obtained by calculation according to the formula 2-formula 5;
Xm=X-B/2-Max(X1,X2) Formula 2
Xn=Min(X3,X4) -X-B/2 formula 3
Zm=Z-A/2-Max(Z1,Z2) Formula 4
Zn=Min(Z3,Z4) -Z-A/2 formula 5
Wherein Xm is the distance from the object to the left edge of the orifice, Xn is the distance from the object to the right edge of the orifice, Zm is the distance from the object to the rear edge of the orifice, Zn is the distance from the object to the front edge of the orifice, X1Is the X axial coordinate, X, of the front left side of the orifice2Is the X axial coordinate, X, of the left rear of the orifice3Is the X axial coordinate, X, of the front of the right side of the orifice4Is the X axial coordinate, Z, of the rear right side of the orifice1Is the Z axial coordinate of the front left side of the orifice, Z2Is the Z axial coordinate behind the left side of the orifice, Z3Z axial coordinate of the front of the right side of the orifice, Z4And a Z axial coordinate is arranged behind the right side of the orifice, A is the length of the trolley in the direction, B is the width of the trolley in the direction, X is a real-time position coordinate value of the trolley operated by the crane, and Z is a real-time position coordinate value of the trolley operated by the crane.
The beneficial effects of the invention are mainly shown in the following aspects:
1. the method comprises the following steps that a, a three-dimensional coordinate model is adopted to define the running position relation of a crane along different directions, and a three-dimensional coordinate system is established by using position data of lifting, a cart and a trolley; b. setting the passing space of the objects allowed to be hoisted of each orifice in the PLC according to a three-dimensional coordinate system through a human-computer interface, and setting the overall dimension of the objects with the maximum size to be hoisted in the PLC according to the three-dimensional coordinate system; c. compiling a PLC program, detecting a lifting height value of the crane in real time in the running process of the crane, and judging whether the lifted object of the crane is close to or lower than the upper plane of the orifice or not through formula 1 by combining the lifting height of the largest object arranged in a PLC controller; d. when the crane runs to an orifice area, if the PLC detects that the hoisted object is close to or lower than the orifice elevation, whether the hoisted object is in a safe area in the orifice or not is judged according to the real-time traveling coordinate values of the cart and the trolley detected by the PLC by comparing; e. when the PLC detects that the hoisting object passes through the obstacle above the orifice, the PLC controls to cancel size calculation of the hoisting object along the length direction and the width direction of the orifice, and calculates the distance between the positions of the lifting hook and the steel wire rope and the edge of the orifice through the formulas 6 to 9.
2. According to the invention, on the premise of keeping a certain safety distance, the PLC limits the traveling mechanisms of the cart and the trolley in the area to only operate at a low speed, so that the safety is ensured, and the hoisted objects can be smoothly hoisted in place.
3. According to the temporary supports arranged in different height directions of the orifices on the site in different periods of project construction, the temporary supports are redefined through the arrangement of the forbidden areas, so that the hoisted object of the crane can be placed on the lower portion of the orifices along the safe area between the supports and then slightly moved for a certain distance along the track direction, the hoisted object is installed in place, and the hoisting operation is safe and reliable.
Drawings
The invention will be further described in detail with reference to the drawings and the detailed description, wherein:
FIG. 1 is a schematic diagram of the operating conditions for which the route planning of the present invention is applicable;
FIG. 2 is a schematic diagram of the calculation parameters of the present invention.
Detailed Description
Example 1
Referring to fig. 1 and 2, a method for planning a crane operation route includes the following steps:
a. defining the running position relation of the crane along different directions by adopting a three-dimensional coordinate model, and establishing a three-dimensional coordinate system by using position data of lifting, a cart and a trolley;
b. setting the passing space of the objects allowed to be hoisted of each orifice in the PLC according to a three-dimensional coordinate system through a human-computer interface, and setting the overall dimension of the objects with the maximum size to be hoisted in the PLC according to the three-dimensional coordinate system;
c. compiling a PLC program, detecting a lifting height value of the crane in real time in the running process of the crane, and judging whether the lifted object of the crane is close to or lower than the upper plane of the orifice or not through formula 1 by combining the lifting height of the largest object arranged in a PLC controller;
Y-C≤Y1formula 1
Wherein Y is the real-time position coordinate value of a hoisting mechanism operated by the crane, C is the hoisting height of the largest-size object set through a human-computer interface, and Y1Is an orifice elevation set by a human-machine interface;
d. when the crane runs to an orifice area, if the PLC detects that the hoisted object is close to or lower than the orifice elevation, whether the hoisted object is in a safe area in the orifice or not is judged according to the real-time traveling coordinate values of the cart and the trolley detected by the PLC by comparing;
e. when the PLC detects that the hoisted object passes through the obstacle above the orifice, the PLC controls to cancel the size calculation of the hoisted object along the length and width directions of the orifice, and calculates the distance between the positions of the lifting hook and the steel wire rope and the edge of the orifice according to the formulas 6 to 9;
Xm=X-Max(X1,X2) Formula 6
Xn=Min(X3,X4) -X formula 7
Zm=Z-Max(Z1,Z2) Formula 8
Zn=Min(Z3,Z4) -Z formula 9
Wherein Xm is the distance from the object to the left edge of the orifice, Xn is the distance from the object to the right edge of the orifice, Zm is the distance from the object to the rear edge of the orifice, Zn is the distance from the object to the front edge of the orifice, X1Is the X axial coordinate, X, of the front left side of the orifice2Is the X axial coordinate, X, of the left rear of the orifice3Is the X axial coordinate, X, of the front of the right side of the orifice4Is the X axial coordinate, Z, of the rear right side of the orifice1Is the Z axial coordinate of the front left side of the orifice, Z2Is the Z axial coordinate behind the left side of the orifice, Z3Z axial coordinate of the front of the right side of the orifice, Z4And Z axial coordinate is arranged behind the right side of the orifice, X is a real-time position coordinate value of a crane-operated cart, and Z is a real-time position coordinate value of a crane-operated cart.
a. Defining the running position relation of the crane along different directions by adopting a three-dimensional coordinate model, and establishing a three-dimensional coordinate system by using position data of lifting, a cart and a trolley; b. setting the passing space of the objects allowed to be hoisted of each orifice in the PLC according to a three-dimensional coordinate system through a human-computer interface, and setting the overall dimension of the objects with the maximum size to be hoisted in the PLC according to the three-dimensional coordinate system; c. compiling a PLC program, detecting a lifting height value of the crane in real time in the running process of the crane, and judging whether the lifted object of the crane is close to or lower than the upper plane of the orifice or not through formula 1 by combining the lifting height of the largest object arranged in a PLC controller; d. when the crane runs to an orifice area, if the PLC detects that the hoisted object is close to or lower than the orifice elevation, whether the hoisted object is in a safe area in the orifice or not is judged according to the real-time traveling coordinate values of the cart and the trolley detected by the PLC by comparing; e. when the PLC detects that the hoisting object passes through the obstacle above the orifice, the PLC controls to cancel size calculation of the hoisting object along the length direction and the width direction of the orifice, and calculates the distance between the positions of the lifting hook and the steel wire rope and the edge of the orifice through the formulas 6 to 9.
Example 2
Referring to fig. 1 and 2, a method for planning a crane operation route includes the following steps:
a. defining the running position relation of the crane along different directions by adopting a three-dimensional coordinate model, and establishing a three-dimensional coordinate system by using position data of lifting, a cart and a trolley;
b. setting the passing space of the objects allowed to be hoisted of each orifice in the PLC according to a three-dimensional coordinate system through a human-computer interface, and setting the overall dimension of the objects with the maximum size to be hoisted in the PLC according to the three-dimensional coordinate system;
c. compiling a PLC program, detecting a lifting height value of the crane in real time in the running process of the crane, and judging whether the lifted object of the crane is close to or lower than the upper plane of the orifice or not through formula 1 by combining the lifting height of the largest object arranged in a PLC controller;
Y-C≤Y1formula 1
Wherein Y is the real-time position coordinate value of a hoisting mechanism operated by the crane, C is the hoisting height of the largest-size object set through a human-computer interface, and Y1Is an orifice elevation set by a human-machine interface;
d. when the crane runs to an orifice area, if the PLC detects that the hoisted object is close to or lower than the orifice elevation, whether the hoisted object is in a safe area in the orifice or not is judged according to the real-time traveling coordinate values of the cart and the trolley detected by the PLC by comparing;
e. when the PLC detects that the hoisted object passes through the obstacle above the orifice, the PLC controls to cancel the size calculation of the hoisted object along the length and width directions of the orifice, and calculates the distance between the positions of the lifting hook and the steel wire rope and the edge of the orifice according to the formulas 6 to 9;
Xm=X-Max(X1,X2) Formula 6
Xn=Min(X3,X4) -X formula 7
Zm=Z-Max(Z1,Z2) Formula 8
Zn=Min(Z3,Z4) -Z formula 9
Wherein Xm is the distance from the object to the left edge of the orifice, Xn is the distance from the object to the right edge of the orifice, Zm is the distance from the object to the rear edge of the orifice, Zn is the distance from the object to the front edge of the orifice, X1Is the X axial coordinate, X, of the front left side of the orifice2Is the X axial coordinate, X, of the left rear of the orifice3Is the X axial coordinate, X, of the front of the right side of the orifice4Is the X axial coordinate, Z, of the rear right side of the orifice1Is the Z axial coordinate of the front left side of the orifice, Z2Is the Z axial coordinate behind the left side of the orifice, Z3Z axial coordinate of the front of the right side of the orifice, Z4And Z axial coordinate is arranged behind the right side of the orifice, X is a real-time position coordinate value of a crane-operated cart, and Z is a real-time position coordinate value of a crane-operated cart.
In the step a, establishing a three-dimensional stereo coordinate system specifically means that the cart direction is taken as an x axis, the left limit position is taken as a starting point zero, and the right direction is taken as a data positive direction; positioning a y axis in a lifting direction, taking a lower limit position as a starting point zero, and taking an upward direction as a positive direction of data; the direction of the trolley is defined as the z axis, the rear limit position is zero, and the forward direction is the positive direction of the data.
Example 3
Referring to fig. 1 and 2, a method for planning a crane operation route includes the following steps:
a. defining the running position relation of the crane along different directions by adopting a three-dimensional coordinate model, and establishing a three-dimensional coordinate system by using position data of lifting, a cart and a trolley;
b. setting the passing space of the objects allowed to be hoisted of each orifice in the PLC according to a three-dimensional coordinate system through a human-computer interface, and setting the overall dimension of the objects with the maximum size to be hoisted in the PLC according to the three-dimensional coordinate system;
c. compiling a PLC program, detecting a lifting height value of the crane in real time in the running process of the crane, and judging whether the lifted object of the crane is close to or lower than the upper plane of the orifice or not through formula 1 by combining the lifting height of the largest object arranged in a PLC controller;
Y-C≤Y1formula 1
Wherein Y is the real-time position coordinate value of a hoisting mechanism operated by the crane, C is the hoisting height of the largest-size object set through a human-computer interface, and Y1Is an orifice elevation set by a human-machine interface;
d. when the crane runs to an orifice area, if the PLC detects that the hoisted object is close to or lower than the orifice elevation, whether the hoisted object is in a safe area in the orifice or not is judged according to the real-time traveling coordinate values of the cart and the trolley detected by the PLC by comparing;
e. when the PLC detects that the hoisted object passes through the obstacle above the orifice, the PLC controls to cancel the size calculation of the hoisted object along the length and width directions of the orifice, and calculates the distance between the positions of the lifting hook and the steel wire rope and the edge of the orifice according to the formulas 6 to 9;
Xm=X-Max(X1,X2) Formula 6
Xn=Min(X3,X4) -X formula 7
Zm=Z-Max(Z1,Z2) Formula 8
Zn=Min(Z3,Z4) -Z formula 9
Wherein Xm is the distance from the object to the left edge of the orifice, Xn is the distance from the object to the right edge of the orifice, Zm is the distance from the object to the rear edge of the orifice, Zn is the distance from the object to the front edge of the orifice, X1Is the X axial coordinate, X, of the front left side of the orifice2Is the X axial coordinate, X, of the left rear of the orifice3Is the X axial coordinate, X, of the front of the right side of the orifice4Is the X axial coordinate, Z, of the rear right side of the orifice1Is the Z axial coordinate of the front left side of the orifice, Z2Is the Z axial coordinate behind the left side of the orifice, Z3Z axial coordinate of the front of the right side of the orifice, Z4And Z axial coordinate is arranged behind the right side of the orifice, X is a real-time position coordinate value of a crane-operated cart, and Z is a real-time position coordinate value of a crane-operated cart.
In the step a, establishing a three-dimensional stereo coordinate system specifically means that the cart direction is taken as an x axis, the left limit position is taken as a starting point zero, and the right direction is taken as a data positive direction; positioning a y axis in a lifting direction, taking a lower limit position as a starting point zero, and taking an upward direction as a positive direction of data; the direction of the trolley is defined as the z axis, the rear limit position is zero, and the forward direction is the positive direction of the data.
And d, in the step d, when the safety region of the hoisted object in the orifice is judged to be specifically the entrance orifice, calling a parameter setting model of the orifice, and calculating the safety distance of the hoisted object from each edge of the orifice in real time according to the orifice model data and the detected real-time traveling coordinate values of the cart and the trolley by combining the preset maximum size object outline size.
On the premise of keeping a certain safety distance, the PLC limits the traveling mechanisms of the cart and the trolley in the area to only operate at a low speed, so that the safety is ensured, and the hoisted objects can be smoothly hoisted in place.
Example 4
Referring to fig. 1 and 2, a method for planning a crane operation route includes the following steps:
a. defining the running position relation of the crane along different directions by adopting a three-dimensional coordinate model, and establishing a three-dimensional coordinate system by using position data of lifting, a cart and a trolley;
b. setting the passing space of the objects allowed to be hoisted of each orifice in the PLC according to a three-dimensional coordinate system through a human-computer interface, and setting the overall dimension of the objects with the maximum size to be hoisted in the PLC according to the three-dimensional coordinate system;
c. compiling a PLC program, detecting a lifting height value of the crane in real time in the running process of the crane, and judging whether the lifted object of the crane is close to or lower than the upper plane of the orifice or not through formula 1 by combining the lifting height of the largest object arranged in a PLC controller;
Y-C≤Y1formula 1
Wherein Y is the real-time position coordinate value of a hoisting mechanism operated by the crane, and C is the hoisting height of the largest-size object set through a human-computer interface,Y1Is an orifice elevation set by a human-machine interface;
d. when the crane runs to an orifice area, if the PLC detects that the hoisted object is close to or lower than the orifice elevation, whether the hoisted object is in a safe area in the orifice or not is judged according to the real-time traveling coordinate values of the cart and the trolley detected by the PLC by comparing;
e. when the PLC detects that the hoisted object passes through the obstacle above the orifice, the PLC controls to cancel the size calculation of the hoisted object along the length and width directions of the orifice, and calculates the distance between the positions of the lifting hook and the steel wire rope and the edge of the orifice according to the formulas 6 to 9;
Xm=X-Max(X1,X2) Formula 6
Xn=Min(X3,X4) -X formula 7
Zm=Z-Max(Z1,Z2) Formula 8
Zn=Min(Z3,Z4) -Z formula 9
Wherein Xm is the distance from the object to the left edge of the orifice, Xn is the distance from the object to the right edge of the orifice, Zm is the distance from the object to the rear edge of the orifice, Zn is the distance from the object to the front edge of the orifice, X1Is the X axial coordinate, X, of the front left side of the orifice2Is the X axial coordinate, X, of the left rear of the orifice3Is the X axial coordinate, X, of the front of the right side of the orifice4Is the X axial coordinate, Z, of the rear right side of the orifice1Is the Z axial coordinate of the front left side of the orifice, Z2Is the Z axial coordinate behind the left side of the orifice, Z3Z axial coordinate of the front of the right side of the orifice, Z4And Z axial coordinate is arranged behind the right side of the orifice, X is a real-time position coordinate value of a crane-operated cart, and Z is a real-time position coordinate value of a crane-operated cart.
In the step a, establishing a three-dimensional stereo coordinate system specifically means that the cart direction is taken as an x axis, the left limit position is taken as a starting point zero, and the right direction is taken as a data positive direction; positioning a y axis in a lifting direction, taking a lower limit position as a starting point zero, and taking an upward direction as a positive direction of data; the direction of the trolley is defined as the z axis, the rear limit position is zero, and the forward direction is the positive direction of the data.
And d, in the step d, when the safety region of the hoisted object in the orifice is judged to be specifically the entrance orifice, calling a parameter setting model of the orifice, and calculating the safety distance of the hoisted object from each edge of the orifice in real time according to the orifice model data and the detected real-time traveling coordinate values of the cart and the trolley by combining the preset maximum size object outline size.
The real-time calculation of the safe distance between the hoisted object and each edge of the orifice is obtained by calculation according to the formula 2-formula 5;
Xm=X-B/2-Max(X1,X2) Formula 2
Xn=Min(X3,X4) -X-B/2 formula 3
Zm=Z-A/2-Max(Z1,Z2) Formula 4
Zn=Min(Z3,Z4) -Z-A/2 formula 5
Wherein Xm is the distance from the object to the left edge of the orifice, Xn is the distance from the object to the right edge of the orifice, Zm is the distance from the object to the rear edge of the orifice, Zn is the distance from the object to the front edge of the orifice, X1Is the X axial coordinate, X, of the front left side of the orifice2Is the X axial coordinate, X, of the left rear of the orifice3Is the X axial coordinate, X, of the front of the right side of the orifice4Is the X axial coordinate, Z, of the rear right side of the orifice1Is the Z axial coordinate of the front left side of the orifice, Z2Is the Z axial coordinate behind the left side of the orifice, Z3Z axial coordinate of the front of the right side of the orifice, Z4And a Z axial coordinate is arranged behind the right side of the orifice, A is the length of the trolley in the direction, B is the width of the trolley in the direction, X is a real-time position coordinate value of the trolley operated by the crane, and Z is a real-time position coordinate value of the trolley operated by the crane.
According to different time periods of project construction, temporary supports arranged in different height directions of orifices on site are redefined through arrangement of forbidden areas, so that a crane can place a hoisting object in place after the hoisting object is placed on the lower portion of the orifice along a safe area between the supports and slightly moves for a certain distance along the track direction, and hoisting operation is safe and reliable.

Claims (4)

1. A method for planning a running route of a crane is characterized by comprising the following steps:
a. defining the running position relation of the crane along different directions by adopting a three-dimensional coordinate model, and establishing a three-dimensional coordinate system by using position data of lifting, a cart and a trolley;
b. setting the passing space of the objects allowed to be hoisted of each orifice in the PLC according to a three-dimensional coordinate system through a human-computer interface, and setting the overall dimension of the objects with the maximum size to be hoisted in the PLC according to the three-dimensional coordinate system;
c. compiling a PLC program, detecting a lifting height value of the crane in real time in the running process of the crane, and judging whether the lifted object of the crane is close to or lower than the upper plane of the orifice or not through formula 1 by combining the lifting height of the largest object arranged in a PLC controller;
Y-C≤Y1formula 1
Wherein Y is the real-time position coordinate value of a hoisting mechanism operated by the crane, C is the hoisting height of the largest-size object set through a human-computer interface, and Y1Is an orifice elevation set by a human-machine interface;
d. when the crane runs to an orifice area, if the PLC detects that the hoisted object is close to or lower than the orifice elevation, whether the hoisted object is in a safe area in the orifice or not is judged according to the real-time traveling coordinate values of the cart and the trolley detected by the PLC by comparing;
e. when the PLC detects that the hoisted object passes through the obstacle above the orifice, the PLC controls to cancel the size calculation of the hoisted object along the length and width directions of the orifice, and calculates the distance between the positions of the lifting hook and the steel wire rope and the edge of the orifice according to the formulas 6 to 9;
Xm=X-Max(X1,X2) Formula 6
Xn=Min(X3,X4) -X formula 7
Zm=Z-Max(Z1,Z2) Formula 8
Zn=Min(Z3,Z4) -Z formula 9
Wherein Xm is the distance from the object to the left edge of the orifice, Xn is the distance from the object to the right edge of the orifice, Zm is the distance from the object to the rear edge of the orifice, Zn is the distance from the object to the front edge of the orifice, X1Is the X axial coordinate, X, of the front left side of the orifice2Is the X axial coordinate, X, of the left rear of the orifice3Is the X axial coordinate, X, of the front of the right side of the orifice4Is the X axial coordinate, Z, of the rear right side of the orifice1Is the Z axial coordinate of the front left side of the orifice, Z2Is the Z axial coordinate behind the left side of the orifice, Z3Z axial coordinate of the front of the right side of the orifice, Z4And Z axial coordinate is arranged behind the right side of the orifice, X is a real-time position coordinate value of a crane-operated cart, and Z is a real-time position coordinate value of a crane-operated cart.
2. The crane operation route planning method according to claim 1, wherein: in the step a, establishing a three-dimensional stereo coordinate system specifically means that the cart direction is taken as an x axis, the left limit position is taken as a starting point zero, and the right direction is taken as a data positive direction; positioning a y axis in a lifting direction, taking a lower limit position as a starting point zero, and taking an upward direction as a positive direction of data; the direction of the trolley is defined as the z axis, the rear limit position is zero, and the forward direction is the positive direction of the data.
3. The crane operation route planning method according to claim 1, wherein: and d, in the step d, when the safety region of the hoisted object in the orifice is judged to be specifically the entrance orifice, calling a parameter setting model of the orifice, and calculating the safety distance of the hoisted object from each edge of the orifice in real time according to the orifice model data and the detected real-time traveling coordinate values of the cart and the trolley by combining the preset maximum size object outline size.
4. A crane operation route planning method according to claim 3, wherein: the real-time calculation of the safe distance between the hoisted object and each edge of the orifice is obtained by calculation according to the formula 2-formula 5;
Xm=X-B/2-Max(X1,X2) Formula 2
Xn=Min(X3,X4) -X-B/2 formula 3
Zm=Z-A/2-Max(Z1,Z2) Formula 4
Zn=Min(Z3,Z4) -Z-A/2 formula 5
Wherein Xm is the distance from the object to the left edge of the orifice, Xn is the distance from the object to the right edge of the orifice, Zm is the distance from the object to the rear edge of the orifice, Zn is the distance from the object to the front edge of the orifice, X1Is the X axial coordinate, X, of the front left side of the orifice2Is the X axial coordinate, X, of the left rear of the orifice3Is the X axial coordinate, X, of the front of the right side of the orifice4Is the X axial coordinate, Z, of the rear right side of the orifice1Is the Z axial coordinate of the front left side of the orifice, Z2Is the Z axial coordinate behind the left side of the orifice, Z3Z axial coordinate of the front of the right side of the orifice, Z4And a Z axial coordinate is arranged behind the right side of the orifice, A is the length of the trolley in the direction, B is the width of the trolley in the direction, X is a real-time position coordinate value of the trolley operated by the crane, and Z is a real-time position coordinate value of the trolley operated by the crane.
CN202110347911.1A 2021-03-31 2021-03-31 Crane operation route planning method Active CN112897346B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110347911.1A CN112897346B (en) 2021-03-31 2021-03-31 Crane operation route planning method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110347911.1A CN112897346B (en) 2021-03-31 2021-03-31 Crane operation route planning method

Publications (2)

Publication Number Publication Date
CN112897346A true CN112897346A (en) 2021-06-04
CN112897346B CN112897346B (en) 2022-05-13

Family

ID=76109723

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110347911.1A Active CN112897346B (en) 2021-03-31 2021-03-31 Crane operation route planning method

Country Status (1)

Country Link
CN (1) CN112897346B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117208770A (en) * 2023-09-13 2023-12-12 浙江大学 Safety track planning and control method for shortest time of container port machine lifting appliance

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU464099A3 (en) * 1966-02-02 1975-03-15 Аллменна Свенска Электриска Актиеболагет (Фирма) Device for programmatically controlling the rotation mechanisms and changing the boom of a load-lifting crane
CN86108688A (en) * 1985-12-27 1987-07-01 石川岛播磨重工业株式会社 Container handling crane
JPH0769576A (en) * 1993-09-02 1995-03-14 Ishikawajima Harima Heavy Ind Co Ltd Travel state measurement device for track vehicle
CN101441736A (en) * 2007-11-21 2009-05-27 新乡市起重机厂有限公司 Path planning method of motor crane robot
CN102542361A (en) * 2012-01-11 2012-07-04 中联重科股份有限公司 Method for planning path of lift object for crane
CN110989603A (en) * 2019-12-13 2020-04-10 苏州大学应用技术学院 Crane carrying operation path planning method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU464099A3 (en) * 1966-02-02 1975-03-15 Аллменна Свенска Электриска Актиеболагет (Фирма) Device for programmatically controlling the rotation mechanisms and changing the boom of a load-lifting crane
CN86108688A (en) * 1985-12-27 1987-07-01 石川岛播磨重工业株式会社 Container handling crane
JPH0769576A (en) * 1993-09-02 1995-03-14 Ishikawajima Harima Heavy Ind Co Ltd Travel state measurement device for track vehicle
CN101441736A (en) * 2007-11-21 2009-05-27 新乡市起重机厂有限公司 Path planning method of motor crane robot
CN102542361A (en) * 2012-01-11 2012-07-04 中联重科股份有限公司 Method for planning path of lift object for crane
CN110989603A (en) * 2019-12-13 2020-04-10 苏州大学应用技术学院 Crane carrying operation path planning method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
范卿等: "起重机吊装路径规划算法", 《建设机械技术与管理》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117208770A (en) * 2023-09-13 2023-12-12 浙江大学 Safety track planning and control method for shortest time of container port machine lifting appliance
CN117208770B (en) * 2023-09-13 2024-03-01 浙江大学 Safety track planning and control method for shortest time of container port machine lifting appliance

Also Published As

Publication number Publication date
CN112897346B (en) 2022-05-13

Similar Documents

Publication Publication Date Title
CN107450571B (en) AGV dolly laser navigation based on ROS
US20220185637A1 (en) Work area monitoring system for lifting machines
CN112897346B (en) Crane operation route planning method
CN109534165B (en) Smelting slag ladle slow cooling treatment scheduling control method
CN107145149A (en) A kind of bridge type vehicle-driving device and its avoidance traveling method
CN105883623A (en) Control method and system for automatic planning of crane traveling route
CN104787594A (en) Automatic stacking control system of bulk cargo wharf stacker
CN111422739A (en) Electronic anti-swing method of bridge crane based on vision technology
CN109502484B (en) Control method and system for crane operation area
CN114200942A (en) Unmanned overhead traveling crane whole-course speed planning control and positioning system with anti-swing function and method
CN115448185A (en) Ultra-large intelligent tower crane and construction method
CN102942116A (en) Container reach stacker as well as hanging appliance positioning control method and system thereof
CN114233312A (en) Free section cutting control system and control method for cantilever excavator
CN109704201B (en) Intelligent operation control system of bridge crane
JP3268932B2 (en) Crane operating area monitoring device
JP3630468B2 (en) Cable crane
CN109534164A (en) One kind is for smelting cinder ladle slow cooling processing scheduling system
CN111590574B (en) Anti-theft method and system for high-intelligence robot
CN210594964U (en) Safety protection device of grinding machine on gantry crane hanging roller
CN210163020U (en) Be used for smelting slag ladle slow cooling to handle dispatch system
CN111232845A (en) Steel coil crane automatic grabbing algorithm based on machine vision
CN110815221A (en) Safety control system of bionic robot and control method thereof
CN205973489U (en) Anti -swing equipment based on converter
CN1613747A (en) Automatic controlling system of crane
CN112781583B (en) Route guidance system for man-machine cooperation environment and man-machine cooperation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant