CN112892011A - Intelligent filter tank control method based on process optimization operation - Google Patents
Intelligent filter tank control method based on process optimization operation Download PDFInfo
- Publication number
- CN112892011A CN112892011A CN202110093498.0A CN202110093498A CN112892011A CN 112892011 A CN112892011 A CN 112892011A CN 202110093498 A CN202110093498 A CN 202110093498A CN 112892011 A CN112892011 A CN 112892011A
- Authority
- CN
- China
- Prior art keywords
- valve
- water
- plc
- intelligent control
- filter tank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D24/00—Filters comprising loose filtering material, i.e. filtering material without any binder between the individual particles or fibres thereof
- B01D24/48—Filters comprising loose filtering material, i.e. filtering material without any binder between the individual particles or fibres thereof integrally combined with devices for controlling the filtration
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D24/00—Filters comprising loose filtering material, i.e. filtering material without any binder between the individual particles or fibres thereof
- B01D24/46—Regenerating the filtering material in the filter
- B01D24/4631—Counter-current flushing, e.g. by air
Landscapes
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Feedback Control In General (AREA)
- Activated Sludge Processes (AREA)
Abstract
The invention discloses a filter tank intelligent control method based on process optimization operation, which comprises the following steps of firstly, installing a detector; step two, installing a controller; step three, equipment connection; step four, programming; step five, setting parameters; step six, data acquisition; step seven, intelligent control; compared with the existing filter control method, the automatic control method has the advantages that an automatic control function is designed, the intelligent control method is forcefully used for improving the intelligent degree of the control method and realizing unmanned management of the filter, the method is high in flexibility and editability, offline or online programming and parameter setting modification can be carried out, the running state of the equipment can be rapidly adjusted, the method is wide in application field, and the method is suitable for the filter with various functions.
Description
Technical Field
The invention relates to the technical field of intelligent control of a filter tank, in particular to an intelligent control method of the filter tank based on process optimization operation.
Background
The filter tank is a device for filtering liquid, the existing filter tank control method has low automation degree, most of the existing filter tank control methods need manual regulation and control, not only consumes manpower, but also is easy to generate errors, so that the filtering cost is increased, and the filter tank has poor flexibility and poor editability due to low intelligent degree, cannot regulate and set control parameters in real time, and cannot realize convenient regulation and control of filtering equipment.
Disclosure of Invention
The invention aims to provide an intelligent filter tank control method based on process optimization operation, so as to solve the problems in the background technology.
In order to solve the technical problems, the invention provides the following technical scheme: a filtering pool intelligent control method based on process optimization operation comprises the following steps of firstly, installing a detector; step two, installing a controller; step three, equipment connection; step four, programming; step five, setting parameters; step six, data acquisition; step seven, intelligent control;
in the first step, the detector installation comprises the following steps:
1) a temperature detector, a dissolved oxygen detector, a pH detector, a turbidimeter and a liquid level detector are arranged in each filter;
2) installing flow detectors at an input port and an output port of the filter;
in the second step, intelligent control valves are arranged at the input port and the output port of the filter tank;
in the third step, the equipment connection comprises the following steps:
1) connecting each detector with a signal input module of a computer;
2) connecting a signal output module of a computer with an input serial port of the PLC;
3) connecting the controller with an output serial port of the PLC;
in the fourth step, the programming comprises the following steps:
1) compiling a PLC control program and a PID operation program;
2) implanting a PLC control program into the PLC;
in the fifth step, the standard parameter values of all the functional modules in the PLC control program are set according to the requirements, and the PLC control program is updated;
in the sixth step, the detector collects the water temperature, dissolved oxygen value, pH value, turbidity value and liquid level value data of the filter tank and transmits the data to the computer;
in the seventh step, the intelligent control comprises the following steps:
1) the computer compares the water temperature, the dissolved oxygen value, the pH value, the turbidity value and the liquid level value of the filter with set standard values to obtain deviation signals;
2) obtaining an output signal after PID operation of the deviation signal;
3) the output signal is transmitted to a PLC, the PLC generates a control signal to control an intelligent control valve, and the liquid inlet quantity and the liquid outlet quantity are controlled by adjusting the opening and closing degree of the valve;
4) the PLC program continuously runs, all modules are sequentially and circularly started, and the filter tank is subjected to intermittent backwashing.
According to the technical scheme, in the step 1), a back washing device is installed inside the filter.
According to the technical scheme, in the second step, the intelligent control valve comprises a water inlet valve, a water outlet valve, a blowdown valve, a backflushing air inlet valve, an exhaust valve and a backflushing water valve.
According to the technical scheme, in the step four 1), a back washing control module and a liquid level control module are designed in the PLC control program.
According to the technical scheme, in the fifth step, the running time of each functional module in the PLC control program is set.
According to the technical scheme, in the seventh step 4), the backwashing process is as follows: closing the water inlet valve for water filtration, closing the clear water outlet valve when the water level is reduced to a set backflushing water level, opening the wastewater drain valve, closing the exhaust valve after the signal of the drain valve is in place, opening the backflushing air inlet valve, and starting the fan for air flushing; after the air flushing is finished, a backflushing water inlet valve is opened, a water pump is started, and air-water mixed flushing is carried out; after the flushing is finished, closing the fan, closing the backflushing air inlet valve, opening the exhaust valve and flushing with single water; after the flushing is finished, the backflushing water inlet valve is closed, the backflushing water pump is closed, the waste water discharge valve is closed, the filtered clean water valve is opened after the water inlet valve is opened, and when the water level rises to the filtering constant water level, the normal filtering procedure is carried out.
Compared with the prior art, the invention has the following beneficial effects: compared with the existing filter pool control method, the automatic control function is designed, the intelligent degree of the control method is improved powerfully, the unmanned management of the filter pool is realized, the method is high in flexibility and editability, off-line or on-line programming and parameter setting modification can be carried out, the running state of equipment can be adjusted rapidly, the application field of the method is wide, and the method is suitable for filter pools with various functions.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention and not to limit the invention. In the drawings:
FIG. 1 is a flow chart of the method of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, the present invention provides a technical solution: a filter pool intelligent control method based on process optimization operation comprises the following steps of firstly, installing a detector; step two, installing a controller; step three, equipment connection; step four, programming; step five, setting parameters; step six, data acquisition; step seven, intelligent control;
in the first step, the detector installation comprises the following steps:
1) a temperature detector, a dissolved oxygen detector, a pH detector, a turbidimeter and a liquid level detector are arranged in each filter, and a back washing device is arranged in each filter;
2) installing flow detectors at an input port and an output port of the filter;
in the second step, intelligent control valves are arranged at the input port and the output port of the filter tank, and each intelligent control valve comprises a water inlet valve, a water outlet valve, a sewage discharge valve, a backflushing air inlet valve, an exhaust valve and a backflushing water valve;
in the third step, the equipment connection comprises the following steps:
1) connecting each detector with a signal input module of a computer;
2) connecting a signal output module of a computer with an input serial port of the PLC;
3) connecting the controller with an output serial port of the PLC;
in the fourth step, the programming comprises the following steps:
1) compiling a PLC control program and a PID operation program, wherein a back washing control module and a liquid level control module are designed in the PLC control program;
2) implanting a PLC control program into the PLC;
in the fifth step, the standard parameter values of all the function modules in the PLC control program are set according to the requirements, the running time of all the function modules in the PLC control program is set, and the PLC control program is updated;
in the sixth step, the detector collects the water temperature, dissolved oxygen value, pH value, turbidity value and liquid level value data of the filter tank and transmits the data to the computer;
in the seventh step, the intelligent control comprises the following steps:
1) the computer compares the water temperature, the dissolved oxygen value, the pH value, the turbidity value and the liquid level value of the filter with set standard values to obtain deviation signals;
2) obtaining an output signal after PID operation of the deviation signal;
3) the output signal is transmitted to a PLC, the PLC generates a control signal to control an intelligent control valve, and the liquid inlet quantity and the liquid outlet quantity are controlled by adjusting the opening and closing degree of the valve;
4) the PLC program continuously operates, all modules are sequentially and circularly started, the filter tank is intermittently backwashed, and the backwashing process is as follows: closing the water inlet valve for water filtration, closing the clear water outlet valve when the water level is reduced to a set backflushing water level, opening the wastewater drain valve, closing the exhaust valve after the signal of the drain valve is in place, opening the backflushing air inlet valve, and starting the fan for air flushing; after the air flushing is finished, a backflushing water inlet valve is opened, a water pump is started, and air-water mixed flushing is carried out; after the flushing is finished, closing the fan, closing the backflushing air inlet valve, opening the exhaust valve and flushing with single water; after the flushing is finished, the backflushing water inlet valve is closed, the backflushing water pump is closed, the waste water discharge valve is closed, the filtered clean water valve is opened after the water inlet valve is opened, and when the water level rises to the filtering constant water level, the normal filtering procedure is carried out.
Based on the above, the invention has the advantages that the PLC is utilized to carry out automatic control, the intelligent degree is improved powerfully, the unmanned management is realized, the flexibility is high, the editability is strong, the operation state of the equipment can be adjusted rapidly only by changing the control parameters through the computer, the application field of the invention is wide, the invention is suitable for the filter tanks with various functions, and the automation degree of the filter tanks is improved.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the invention. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (6)
1. A filtering pool intelligent control method based on process optimization operation comprises the following steps of firstly, installing a detector; step two, installing a controller; step three, equipment connection; step four, programming; step five, setting parameters; step six, data acquisition; step seven, intelligent control; the method is characterized in that:
in the first step, the detector installation comprises the following steps:
1) a temperature detector, a dissolved oxygen detector, a pH detector, a turbidimeter and a liquid level detector are arranged in each filter;
2) installing flow detectors at an input port and an output port of the filter;
in the second step, intelligent control valves are arranged at the input port and the output port of the filter tank;
in the third step, the equipment connection comprises the following steps:
1) connecting each detector with a signal input module of a computer;
2) connecting a signal output module of a computer with an input serial port of the PLC;
3) connecting the controller with an output serial port of the PLC;
in the fourth step, the programming comprises the following steps:
1) compiling a PLC control program and a PID operation program;
2) implanting a PLC control program into the PLC;
in the fifth step, the standard parameter values of all the functional modules in the PLC control program are set according to the requirements, and the PLC control program is updated;
in the sixth step, the detector collects the water temperature, dissolved oxygen value, pH value, turbidity value and liquid level value data of the filter tank and transmits the data to the computer;
in the seventh step, the intelligent control comprises the following steps:
1) the computer compares the water temperature, the dissolved oxygen value, the pH value, the turbidity value and the liquid level value of the filter with set standard values to obtain deviation signals;
2) obtaining an output signal after PID operation of the deviation signal;
3) the output signal is transmitted to a PLC, the PLC generates a control signal to control an intelligent control valve, and the liquid inlet quantity and the liquid outlet quantity are controlled by adjusting the opening and closing degree of the valve;
4) the PLC program continuously runs, all modules are sequentially and circularly started, and the filter tank is subjected to intermittent backwashing.
2. The intelligent control method for the filter tank based on the process optimization operation according to claim 1, characterized in that: in the step 1), a back washing device is arranged in the filter.
3. The intelligent control method for the filter tank based on the process optimization operation according to claim 1, characterized in that: in the second step, the intelligent control valve comprises a water inlet valve, a water outlet valve, a blowdown valve, a recoil air inlet valve, an exhaust valve and a recoil water valve.
4. The intelligent control method for the filter tank based on the process optimization operation according to claim 1, characterized in that: in the step four 1), a back flush control module and a liquid level control module are designed in the PLC control program.
5. The intelligent control method for the filter tank based on the process optimization operation according to claim 1, characterized in that: and in the fifth step, the running time of each functional module in the PLC control program is set.
6. The intelligent control method for the filter tank based on the process optimization operation according to claim 1, characterized in that: in the seventh step 4), the backwashing process is as follows: closing the water inlet valve for water filtration, closing the clear water outlet valve when the water level is reduced to a set backflushing water level, opening the wastewater drain valve, closing the exhaust valve after the signal of the drain valve is in place, opening the backflushing air inlet valve, and starting the fan for air flushing; after the air flushing is finished, a backflushing water inlet valve is opened, a water pump is started, and air-water mixed flushing is carried out; after the flushing is finished, closing the fan, closing the backflushing air inlet valve, opening the exhaust valve and flushing with single water; after the flushing is finished, the backflushing water inlet valve is closed, the backflushing water pump is closed, the waste water discharge valve is closed, the filtered clean water valve is opened after the water inlet valve is opened, and when the water level rises to the filtering constant water level, the normal filtering procedure is carried out.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110093498.0A CN112892011A (en) | 2021-01-25 | 2021-01-25 | Intelligent filter tank control method based on process optimization operation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110093498.0A CN112892011A (en) | 2021-01-25 | 2021-01-25 | Intelligent filter tank control method based on process optimization operation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112892011A true CN112892011A (en) | 2021-06-04 |
Family
ID=76117100
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110093498.0A Pending CN112892011A (en) | 2021-01-25 | 2021-01-25 | Intelligent filter tank control method based on process optimization operation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112892011A (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109857056A (en) * | 2019-03-08 | 2019-06-07 | 中冶华天南京电气工程技术有限公司 | A kind of Intelligent sewage processing control system |
CN110968024A (en) * | 2019-10-14 | 2020-04-07 | 广东科创工程技术有限公司 | Method for collecting data of various different complete equipment of sewage plant |
-
2021
- 2021-01-25 CN CN202110093498.0A patent/CN112892011A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109857056A (en) * | 2019-03-08 | 2019-06-07 | 中冶华天南京电气工程技术有限公司 | A kind of Intelligent sewage processing control system |
CN110968024A (en) * | 2019-10-14 | 2020-04-07 | 广东科创工程技术有限公司 | Method for collecting data of various different complete equipment of sewage plant |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20130062288A1 (en) | Programmable fluid treatment system and method | |
CN108532720A (en) | Multifunctional rain storage pond intelligence control system and control method | |
CN111320272A (en) | Multi-condition controlled automatic back-flushing device for denitrification biological filter and operation method thereof | |
CN113041844A (en) | Reverse osmosis automatic cleaning device and method | |
CN111547948B (en) | Optimized operation method of integrated sewage treatment equipment | |
CN112892011A (en) | Intelligent filter tank control method based on process optimization operation | |
CN2677366Y (en) | Medium and small size integrated reverse asmosis sea water desalination device | |
CN202527006U (en) | Integral water purifier with PLC (Programmable Logic Controller) intelligent control | |
CN104140172A (en) | Seawater desalination pretreatment method | |
CN209583711U (en) | Mutual backwashing ultrafiltration device | |
CN114534325B (en) | Online purifier of central air conditioner circulating water system | |
CN216878785U (en) | Quick screening evaluation device for reverse osmosis membrane scale inhibitor | |
CN112870822B (en) | Heat supply network circulating water bypass flow treatment system and control method | |
CN116088450A (en) | Intelligent terminal control system of sewage treatment plant, construction method and control method | |
CN215137633U (en) | Heat supply network circulating water by-pass flow processing system | |
CN105417832A (en) | Integrated intelligent oil production wastewater treatment device and method for oil fields | |
CN205473161U (en) | It adopts oily waste water treatment device to integrate intelligent oil field | |
CN114534497A (en) | Automatic ultrafiltration control system | |
CN210719735U (en) | Water efficiency testing system of drinking water purifier | |
CN208762315U (en) | A kind of rainwater recycles the device of manufacture recirculated water | |
CN219815397U (en) | Automatic back flush V type filtering pond | |
CN110510817A (en) | A kind of processing unit and method of wine wastewater | |
CN214862570U (en) | Reverse osmosis self-cleaning device | |
CN218025620U (en) | Laboratory is with high desalination RO reverse osmosis unit | |
CN220976738U (en) | Automatic sewage treatment system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 523000 Room 301, building 9, No.1, North 4th Industrial Road, Songshanhu Park, Dongguan City, Guangdong Province Applicant after: Guangdong Kechuang Zhishui Technology Co.,Ltd. Address before: 523000 Room 301, building 9, No.1, North 4th Industrial Road, Songshanhu Park, Dongguan City, Guangdong Province Applicant before: GUANGDONG FORCON ENGINEERING TECHNOLOGY Co.,Ltd. |
|
CB02 | Change of applicant information | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210604 |
|
RJ01 | Rejection of invention patent application after publication |