CN112878745A - Assembling type toilet side plate sealing structure - Google Patents

Assembling type toilet side plate sealing structure Download PDF

Info

Publication number
CN112878745A
CN112878745A CN202110182659.3A CN202110182659A CN112878745A CN 112878745 A CN112878745 A CN 112878745A CN 202110182659 A CN202110182659 A CN 202110182659A CN 112878745 A CN112878745 A CN 112878745A
Authority
CN
China
Prior art keywords
blocks
side plate
plate
frame
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202110182659.3A
Other languages
Chinese (zh)
Inventor
姚杰
赵宝军
王琼
张宗军
曾维来
陈志河
廖逸安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Hailong Construction Technology Co Ltd
Original Assignee
Shenzhen Hailong Construction Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Hailong Construction Technology Co Ltd filed Critical Shenzhen Hailong Construction Technology Co Ltd
Priority to CN202110182659.3A priority Critical patent/CN112878745A/en
Publication of CN112878745A publication Critical patent/CN112878745A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/125Small buildings, arranged in other buildings
    • E04H1/1266Cubicles for dressing; Toilets
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6801Fillings therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6806Waterstops

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Road Paving Structures (AREA)

Abstract

The application relates to an assembled toilet side plate sealing structure which comprises at least three side plates, wherein a connecting piece is arranged between every two adjacent side plates, each side plate comprises four frame blocks, the four frame blocks enclose a rectangular frame, and two vertical frame blocks are vertical edge blocks; the connecting piece comprises two connecting blocks, the two connecting blocks are respectively arranged on the two side surfaces of the two vertical side blocks which are close to each other, the ends of the two connecting blocks which are close to each other are arranged in a staggered mode, and the ends of the two connecting blocks which are close to each other are abutted to each other; the connecting block is arranged in parallel with the side plate. This application has the effect that makes the inside water of bathroom be difficult for permeating away from the junction between the curb plate.

Description

Assembling type toilet side plate sealing structure
Technical Field
The application relates to the field of toilets, in particular to a side plate sealing structure of an assembled toilet.
Background
The construction cycle is shorter in the mode of building the bathroom at present and prefabricates bottom plate, curb plate and the roof of bathroom earlier, then transport to the job site installation after the makeup is good, wherein need splice together between two adjacent curb plates in the pin-connected panel bathroom, so concatenation between the curb plate is an indispensable link in the pin-connected panel bathroom.
In the related art, four side plates are arranged, and when the four side plates are spliced together, a square pipe with a rectangular cross section is formed; fill concrete layer and can set up between four frame pieces to fill concrete layer's all side surfaces respectively with four frame piece fixed connection, then when adjacent curb plate concatenation together, the frame piece on two adjacent curb plates can the butt be in the same place, and butt department can be glued firmly with cement usually, thereby just reach the purpose of splicing two adjacent curb plates.
In view of the above-mentioned related art, the inventor thinks that there is a defect that water falling to the joint of the side plates easily permeates to the outside of the toilet from the contact position between the side plates due to the plane contact between the side plates, resulting in a poor sealing effect between the side plates.
Disclosure of Invention
In order to make the difficult butt department of following between the curb plate of water in the bathroom permeate away, this application provides a pin-connected panel bathroom curb plate seal structure.
The application provides a pin-connected panel bathroom curb plate seal structure adopts following technical scheme:
a split mounting type toilet side plate sealing structure comprises at least three side plates, a connecting piece is arranged between every two adjacent side plates, each side plate comprises four frame blocks, the four frame blocks enclose a rectangular frame, and two vertical frame blocks are vertical frame blocks; the connecting piece comprises two connecting blocks, the two connecting blocks are respectively arranged on the two side surfaces of the two vertical side blocks which are close to each other, the ends of the two connecting blocks which are close to each other are arranged in a staggered mode, and the ends of the two connecting blocks which are close to each other are abutted to each other; the connecting block is arranged in parallel with the connecting part of the side plate.
Through adopting above-mentioned technical scheme, when rivers in the bathroom during to the junction between the curb plate, water will pass the gap between the mutual butt department of two connecting blocks earlier, just can permeate to the outside of bathroom, and at this in-process, the route that rivers crossed two connecting block butts department is the flow of buckling, compares in the mode for plane contact between the curb plate, this kind of design for the junction that water is difficult to follow the curb plate permeates to the bathroom outside, thereby can promote the sealed effect of curb plate.
Preferably, the connecting pieces are arranged in plurality and are parallel to each other and arranged at intervals; two mutually abutted connecting blocks close to the interior of the toilet are provided with drain holes, and the drain holes are positioned at the lower ends of the connecting blocks; one end of the drain hole is communicated with the cavity between the two adjacent connecting pieces, and the other end of the drain hole is communicated with the interior of the toilet.
Through adopting above-mentioned technical scheme, when rivers during to the cavity between two connecting pieces, with the help of the gravity of water, then can make board seam capillary passage cut off, thereby make the inside water of bathroom in the difficult infiltration cavity of curb plate junction, help promoting the sealed effect between the curb plate better, and wherein after rivers income is close to the first cavity of bathroom inside direction, water can fall to the bottom of cavity, discharge from the drain hole department after that, thereby make difficult the accumulation of water in the first cavity, then make water difficult outwards infiltration gradually in first cavity, and then make water difficult from the outside connecting piece of bathroom of following infiltration, help promoting the sealed effect of curb plate equally.
Preferably, the connecting block comprises a fixing part and an abutting part, and one end of the fixing part is fixedly arranged on the vertical edge block; the butt joint portion is fixed to be set up and is kept away from one of self and vertical limit piece junction at the fixed part and serve, and after the curb plate concatenation was in the same place, two butt joint portions separated each other and keep off in order to form that two connecting blocks collude each other and link.
Through adopting above-mentioned technical scheme, when two curb plates splice together, two connecting blocks can collude each other and link up, make the curb plate splice together more stably to make the overall structure of bathroom can be more stable, and still make the gap between the curb plate difficult grow under receiving external force influence, and then be difficult for influencing sealed effect between the curb plate.
Preferably, the joint of the two side plates is provided with a reinforcing plate on the outer side of the side plate, and two ends of the reinforcing plate are respectively fixedly connected with the vertical edge blocks on the two side plates.
Through adopting above-mentioned technical scheme, because of connecting piece a little precision error when making, then two blocks of curb plates are in the back of linking together through the connecting piece, still can take place a little between two blocks of curb plates and rock, so the setting of reinforcing plate can make two blocks of curb plates link together more stably to can promote bathroom overall structure's firm degree.
Preferably, a sealing gasket is arranged on the surface of one side, close to each other, of each vertical edge block, one surface of each sealing gasket is abutted against the corresponding vertical edge block, and the other surface of each sealing gasket is abutted against the corresponding connecting block and deforms; and a sealing gasket is also arranged between the surfaces of the two connecting blocks which are mutually abutted.
Through adopting above-mentioned technical scheme, because of the setting of sealed pad, both make the gap between connecting block and the vertical limit piece obtain certain stopping, also make the gap between the mutual butt of two connecting blocks obtain certain stopping to make water be difficult for outwards permeating from the gap between connecting block and the vertical limit piece and the gap between two connecting blocks, and then can further promote the sealed effect between the curb plate.
Preferably, the side plate comprises a filling layer, and the filling layer is arranged among the four frame blocks and fixedly connected with the four frame blocks; the side surface of the frame block close to the filling layer is provided with a filling groove, the length direction of the filling groove is parallel to the length direction of the frame block, and the filling layer is positioned in the filling groove.
Through adopting above-mentioned technical scheme, because of the setting of filling the groove, then when making the curb plate, the concrete can flow into the filling inslot, and what make between frame piece and the filling layer can be connected is inseparabler, compares in not setting up filling the groove in addition to make the mode for the plane butt between frame piece and the filling layer, this kind of design makes water be difficult for outwards permeating from the gap between filling layer and the frame piece, helps promoting the sealed effect of curb plate self.
Preferably, the two inner side walls of the filling groove parallel to the length direction of the frame block are respectively provided with a connecting plate, and the length direction of the connecting plate is parallel to the length direction of the filling groove.
Through adopting above-mentioned technical scheme, because of the setting of connecting plate, when making the filling layer solidify at the filling inslot, area of contact between filling layer and the frame piece can be bigger, thereby the concrete can adhere in the filling inslot better, and the length direction of setting up position and self of connecting plate, even make the connecting plate catch the filling layer like a hook, also make the frame piece can be in the same place with the filling layer adhesion more evenly on length direction, help promoting the structural strength of curb plate.
Preferably, the inner walls of the two sides of the filling groove in the length direction are open, and an exhaust hole is formed in the inner wall of the filling groove close to the inner side of the side plate.
Through adopting above-mentioned technical scheme, at the in-process of concreting in order to produce the curb plate, it pours to keep flat because of the frame piece, so fill the setting of groove both sides inner wall opening and exhaust hole, make the concrete can flow from these positions with the air of discharging the filling inslot, thereby make the concrete of pouring more closely knit, help promoting the bulk strength of curb plate, the position that sets up of exhaust hole in addition, still make the concrete of filling the inslot be difficult for exposing the outside at the bathroom after solidifying, thereby make the concrete of filling the inslot be difficult for receiving external influence.
Preferably, a water inlet is formed at the joint between the two adjacent side plates, the water inlet is arranged on one side plate, a first water baffle is arranged on the inner surface of the side plate, one side surface of the first water baffle is arranged on the side plate where the water inlet is arranged, and the other adjacent side surface of the first water baffle is fixedly connected to the other adjacent side plate.
Through adopting above-mentioned technical scheme for when making the inside water of bathroom will flow into the water inlet that forms between the adjacent both sides board, will follow first breakwater earlier and keep away from the gap department between the curb plate of water inlet and flow through, just can flow to water inlet department after that, compare in the mode that does not set up first breakwater, make the inside water of bathroom difficult entering water inlet, thereby make sealed effect between the curb plate can promote.
Preferably, a second water baffle is arranged on the surface of one side, away from the water inlet, of the first water baffle, and the second water baffle is arranged on the side plate away from the water inlet.
Through adopting above-mentioned technical scheme for when making the water in the bathroom flow to the water inlet, will flow into the gap between second breakwater and the first breakwater earlier, flow into the gap between first breakwater and the curb plate of keeping away from the water inlet after that, just can flow to water inlet department at last, so under the cooperation of first breakwater and second breakwater, make the inside water of bathroom be difficult for more flowing to the water inlet, thereby make the sealed effect between the curb plate promote better.
In summary, the present application includes at least one of the following beneficial technical effects:
1. through the arrangement of the vertical edge blocks and the connecting pieces, water can penetrate through the gap between the two connecting blocks in a mutually abutted mode and can penetrate to the outside of the toilet, and in the process, the water flows through the paths at the abutted positions of the two connecting blocks in a bending mode, so that the water is not easy to penetrate out of the connecting positions of the side plates, and the sealing effect between the side plates is improved;
2. through the arrangement of the connecting pieces and the drain holes, when water flows into the cavity between the two connecting pieces, the plate seam capillary passage is cut off by means of the gravity of the water, so that the water in the toilet is difficult to permeate into the connecting part of the side plates, and the sealing effect between the side plates is favorably improved;
3. separate the setting that keeps off so that two connecting blocks collude even each other through two butt portions for the curb plate can splice together more steadily, thereby makes the overall structure of bathroom can be more stable, and still makes the gap between the curb plate difficult grow under receiving external force influence, and then is difficult for influencing sealed effect between the curb plate.
Drawings
Fig. 1 is a perspective view of a side plate seal structure in an embodiment of the present application.
Fig. 2 is a partial structural view for embodying a connection relationship between side plates.
Fig. 3 is an enlarged view at a in fig. 1.
Description of reference numerals: 1. a side plate; 11. a frame block; 12. a filling layer; 2. a connecting member; 21. connecting blocks; 211. a fixed part; 212. an abutting portion; 3. a vertical edge block; 4. a drain hole; 5. a reinforcing plate; 6. a gasket; 7. filling the groove; 71. a connecting plate; 72. an exhaust hole; 8. a water inlet; 9. a first water baffle; 10. and a second water baffle.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses pin-connected panel bathroom curb plate seal structure. Referring to fig. 1, the side plate sealing structure includes four blocks of curb plates 1, four blocks of curb plates 1 splice into a cuboid week side surface in proper order, and every block of curb plate 1 corresponds a side surface of cuboid, in this embodiment, wherein two blocks of curb plates 1 correspond the position at bathroom door and window place, and the length of these two blocks of curb plates 1 is less than the length of two other blocks of curb plates 1, and when four blocks of curb plates 1 splice together, the junction between curb plate 1 and the curb plate 1 can be located two blocks of longer curb plates 1 of length, and two blocks of longer curb plates 1 of length are curb plates 1 at wall place.
Referring to fig. 1 and 2, the side plate 1 includes four frame blocks 11 and a filling layer 12, the four frame blocks 11 can enclose a rectangular frame, specifically, a filling groove 7 is provided on a side surface of the frame blocks 11 close to each other, a notch of the filling groove 7 is rectangular, and a length direction of the filling groove 7 is parallel to a length direction of the frame blocks 11, and both ends of the length direction of the filling groove 7 are also communicated with an outer surface of the frame blocks 11.
Referring to fig. 1 and 2, the filling layer 12 is disposed inside the four frame blocks 11, the filling layer 12 is fixedly connected to the four frame blocks 11, and the filling layer 12 is also located in the filling groove 7, in this embodiment, the filling layer 12 is made of concrete, when concrete is poured to manufacture the side plate 1, the frame blocks 11 are horizontally placed on a formwork table, the frame blocks 11 are spliced into a rectangular frame, then the concrete is injected between the frame blocks 11, the concrete flows into the filling groove 7, and after the concrete is solidified, the side plate 1 is manufactured.
Referring to fig. 1 and 2, in this embodiment, exhaust hole 72 has been seted up on the one side inner wall that packing groove 7 is close to curb plate 1 inboard, and exhaust hole 72 is provided with a plurality ofly, every two one row of length direction along border piece 11 in a plurality of exhaust holes 72 evenly set up, then when concreting in order to produce curb plate 1, the air in filling groove 7 can be flowed in order to discharge from exhaust hole 72 to the concrete, thereby make the concrete of pouring more closely knit, the position that sets up of exhaust hole 72 in addition, still make the difficult direct outside of exposing at the bathroom of concrete, and then make the difficult concrete that destroys in packing groove 7 of external world.
Referring to fig. 1 and 2, two inside walls of filling groove 7 are respectively provided with connecting plate 71 by one-piece forming, concretely, each side inner wall is provided with two connecting plates 71, two connecting plates 71 are uniformly arranged along the direction from the bottom of filling groove 7 to the notch, and the length direction and the size of connecting plate 71 are consistent with those of filling groove 7, and the end of connecting plate 71 close to each other inclines towards the direction far away from the notch of filling groove 7, so that after filling layer 12 is solidified in filling groove 7, connecting plate 71 can catch filling layer 12 like a hook, thereby making the joint strength between frame block 11 and filling layer 12 promoted, and being helpful for promoting the structural strength of side plate 1.
Referring to fig. 1 and 2, in the present embodiment, the frame block 11 at the bottom of the four side plates 1 is connected to the bottom plate of the toilet in a fitting manner, so that the exhaust holes 72 and the connecting plate 71 are not provided in the filling groove 7; the air vent 72 and the connecting plate 71 are arranged in the filling grooves 7 of the two vertical frame blocks 11 of the four side plates 1, and as for the frame block 11 at the top of the four side plates 1, the frame block 11 at the top and the bottom of the side plate 1 with a door or a window are the same because the frame block 11 is in adaptive connection with a top plate of a toilet, and the frame block 11 at the top of the side plate 1 with a wall is the same as the frame block 11 at the top.
Referring to fig. 1 and fig. 2, in this embodiment, concatenation between four curb plates 1 is relevant with the relation of connection between the vertical frame piece 11, the event sets up vertical frame piece 11 into vertical limit piece 3, wherein be provided with connecting piece 2 between two adjacent curb plates 1, connecting piece 2 then is located between two adjacent vertical limit pieces 3, and connecting piece 2 is provided with threely, three connecting piece 2 is parallel to each other and the interval sets up, specifically, connecting piece 2 includes two connecting blocks 21, two connecting blocks 21 are integrative the fixing respectively on the side surface that two vertical limit pieces 3 are close to each other, and the one end that two connecting blocks 21 are close to each other is dislocation set.
Referring to fig. 1 and 2, in the present embodiment, the length direction and size of the connecting block 21 are the same as those of the vertical side block 3, and the connecting block 21 further includes a fixing portion 211 and an abutting portion 212, and one end of the fixing portion 211 is fixed to the vertical side block 3; the abutting part 212 is integrally fixed at one end of the fixing part 211 far away from the joint of the fixing part and the vertical side block 3, the cross section of the abutting part 212 in the length direction is in a right-angled triangle shape, one right-angled side of the right-angled triangle is connected with the fixing part 211 as a bottom side, the top angle of the right-angled triangle is far away from the fixing part 211, and the hypotenuse of the right-angled triangle faces the other abutting part 212.
Referring to fig. 1 and 2, when two curb plates 1 splice together, the right-angle side that two butt portions 212 and fixed part 211 are connected can separate the fender each other so that two connecting blocks 21 collude each other and link, and still be provided with threely because of connecting piece 2 is parallel and the interval, and wherein there are the bending orientation of connecting block 21 in two sets of connecting pieces 2 opposite, so just make two curb plates 1 link together with the mode of joint, thereby just reach the mesh of splicing curb plate 1 together, in addition in this embodiment, can be formed with two cavities between the three connecting piece 2, then when the inside rivers of bathroom flow into the cavity in, water can flow downwards with the help of the gravity of self, then can make board seam capillary passage cut off, thereby make the inside water of bathroom difficult infiltration in the cavity between the connecting piece 2, help promoting the sealed effect between the curb plate 1.
Referring to fig. 1 and 2, in the embodiment, two connecting blocks 21 abutting against each other near the inside of the toilet are provided with drain holes 4, the drain holes 4 are located at the lower ends of the connecting blocks 21, specifically, one end of each drain hole 4 is communicated with the cavity between two adjacent connecting pieces 2, and the other end is communicated with the inside of the toilet, and the drain holes 4 respectively penetrate through a fixing portion 211 on one connecting block 21 and an abutting portion 212 on the other connecting block 21, so that when water in the inside of the toilet flows into a first cavity near the toilet, the water flows downwards in the cavity, and then the water falls to the bottom of the cavity and is discharged from the drain holes 4, so that the water is not easy to accumulate in the first cavity, and the water is not easy to stay in the first cavity and gradually permeates to the outside of the toilet.
Referring to fig. 1 and 2, in the present embodiment, there are two cavities formed between the three connecting members 2, but the amount of water in the cavity on the side far from the toilet is much less than that in the cavity on the side near the toilet, but the second cavity is provided to provide double waterproof, so that the sealing effect between the side panels 1 can be further enhanced.
Referring to fig. 1 and 2, a sealing gasket 6 is arranged on one side surface of each vertical side block 3 close to each other, one side surface of each sealing gasket 6 is abutted to the vertical side block 3, the other side surface of each sealing gasket is abutted to the abutting part 212 and deforms, in the embodiment, the sealing gasket 6 is also arranged between the surfaces of the two abutting parts 212 abutted to each other, and the sealing gasket 6 is made of rubber, so that when the side plates 1 are spliced together, a gap between the connecting block 21 and the vertical side block 3 can be blocked to a certain extent, a gap between the surfaces of the two abutting parts 212 abutted to each other can be blocked to a certain extent, so that water is not easy to permeate outwards from the gap between the connecting block 21 and the vertical side block 3 and the gap between the two connecting blocks 21, and the sealing effect between the side plates 1 can be improved.
Referring to fig. 1 and 2, in this embodiment, the extending direction of the connecting block 21 on the side plate 1 where the door and window are located is perpendicular to the direction of the notch of the filling groove 7, and the extending direction of the connecting block 21 on the side plate 1 where the wall is located is parallel to the direction of the notch of the filling groove 7, so the structures of the vertical edge blocks 3 on the two side plates 1 are not completely consistent, and the joint between the side plate 1 and the side plate 1 is located at the position where one of the side plates 1 is located, and for this embodiment, the joint between the side plate 1 and the side plate 1 is located on the side plate 1 where the wall is located.
Referring to fig. 1, be fixed with reinforcing plate 5 on the curb plate 1 outside at the junction of two blocks of curb plates 1, reinforcing plate 5 is the cuboid shape, it is concrete, fix with screw respectively on vertical limit piece 3 of two blocks of curb plates 1 at the both ends of reinforcing plate 5, and reinforcing plate 5 is provided with the polylith, polylith reinforcing plate 5 evenly sets up along the length direction of vertical limit piece 3, and still be located curb plate 1 at wall place because of curb plate 1 and the junction of curb plate 1, so reinforcing plate 5 is just on the surface at wall place curb plate 1, then can pass through connecting block 21 joint back together at two blocks of curb plates 1, alright fix reinforcing plate 5 on curb plate 1, thereby can promote the firm degree between the curb plate 1.
Referring to fig. 1 and 2, in the present embodiment, the two adjacent side plates 1 are clamped together by the connecting block 21, and due to the clamping manner, the connecting block 21 does not completely seal the joint between the two adjacent side plates 1, so that the joint between the two side plates 1 forms the water inlet 8, specifically, the water inlet 8 is one end of the joint close to the inside of the toilet, so that water in the toilet can flow into the cavity between the connecting members 2 from the water inlet 8.
Referring to fig. 1 and 3, be fixed with first breakwater 9 on the internal surface of wall place curb plate 1, particularly, because of can having laid the ceramic tile on the internal surface of curb plate 1, so first breakwater 9 is that a part ceramic tile that is close to door and window place curb plate 1, wherein a side surface of first breakwater 9 is on a parallel with curb plate 1 that water inlet 8 was located, and the another side that first breakwater 9 is adjacent is then fixed on curb plate 1 that door or window place through the marine glue, thereby make first breakwater 9 seal water inlet 8, make the inside water of bathroom difficult entering water inlet 8, help promoting the sealed effect between curb plate 1.
Referring to fig. 1 and 3, a side surface of the first water baffle 9 far away from the water inlet 8 is fixed with a second water baffle 10, and the second water baffle 10 is fixed on an inner surface of the side plate 1 where the door or the window is located, specifically, the second water baffle 10 is a part of ceramic tiles close to the side plate 1 where the wall is located, wherein a side surface of the second water baffle 10 is perpendicular to the side plate 1 where the water inlet 8 is located, and another side surface of the second water baffle 10 adjacent to the first water baffle 9 is fixed together with a side surface of the first water baffle 9 far away from the water inlet 8 through waterproof glue, then under the common cooperation of the first water baffle 9 and the second water baffle 10, water inside the toilet needs to continuously pass through the second water baffle 10 and the first water baffle 9 to flow to the water inlet 8, so that the sealing effect between the side plates 1 is better improved.
The implementation principle of the split mounting type toilet side plate sealing structure is as follows: when the inside water of bathroom spatters the junction between the curb plate 1, water need pass the gap between first breakwater 9 and the second breakwater 10 earlier, need pass the gap between first breakwater 9 and the door or the window place curb plate 1 afterwards, just can flow to water inlet 8 department at last.
When water gets into water inlet 8, water then need buckle along the butt department between the first group connecting block 21 earlier and flow, just can flow to the first cavity that two connecting pieces 2 formed then, and when in the cavity, water can flow downwards with the help of self gravity, flow to the bottom of cavity after discharge from wash port 4 department, but wherein some can flow and touch the butt between the second group connecting block 21 and buckle and flow, just can flow to the second cavity that two connecting pieces 2 formed then, need pass the butt department of the third group connecting block 21 at last, just can permeate to the bathroom outside, so this kind of design has passed through multichannel water repellent, sealed effect between the feasible curb plate 1 has obtained very big promotion, thereby make water be difficult for permeating from the junction between the curb plate 1.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (10)

1. The utility model provides a pin-connected panel bathroom curb plate seal structure which characterized in that: the side plate comprises at least three side plates (1), a connecting piece (2) is arranged between every two adjacent side plates (1), each side plate (1) comprises four frame blocks (11), the four frame blocks (11) enclose a rectangular frame, and two vertical frame blocks (11) are arranged to be vertical frame blocks (3); the connecting piece (2) comprises two connecting blocks (21), the two connecting blocks (21) are respectively arranged on the surfaces of two sides, close to each other, of the two vertical side blocks (3), one ends, close to each other, of the two connecting blocks (21) are arranged in a staggered mode, and one ends, close to each other, of the two connecting blocks (21) are abutted to each other; the connecting block (21) is arranged in parallel with the connecting part of the side plate (1).
2. The assembled toilet side plate sealing structure according to claim 1, wherein: the connecting pieces (2) are arranged in plurality, and the connecting pieces (2) are parallel to each other and arranged at intervals; two mutually abutted connecting blocks (21) close to the interior of the toilet are provided with drain holes (4), and the drain holes (4) are positioned at the lower ends of the connecting blocks (21); one end of the drain hole (4) is communicated with the cavity between two adjacent connecting pieces (2), and the other end is communicated with the interior of the toilet.
3. The assembled toilet side plate sealing structure according to claim 1, wherein: the connecting block (21) comprises a fixing part (211) and an abutting part (212), and one end of the fixing part (211) is fixedly arranged on the vertical side block (3); butt portion (212) are fixed to be set up on fixed part (211) keep away from one end of self and vertical limit piece (3) junction, and when curb plate (1) concatenation back together, two butt portion (212) separate each other and keep off in order to form two connecting blocks (21) and collude each other.
4. The assembled toilet side plate sealing structure according to claim 1, wherein: the joint of the two side plates (1) is provided with a reinforcing plate (5) on the outer side of the side plate (1), and two ends of the reinforcing plate (5) are respectively fixedly connected with the vertical edge blocks (3) on the two side plates (1).
5. The assembled toilet side plate sealing structure according to claim 1, wherein: a sealing gasket (6) is arranged on the surface of one side, close to each other, of each vertical edge block (3), one surface of each sealing gasket (6) is abutted against the corresponding vertical edge block (3), and the other surface of each sealing gasket is abutted against the corresponding connecting block (21) and deforms; and a sealing gasket (6) is also arranged between the surfaces of the two connecting blocks (21) which are mutually abutted.
6. The assembled toilet side plate sealing structure according to claim 1, wherein: the side plate (1) comprises a filling layer (12), and the filling layer (12) is arranged among the four frame blocks (11) and fixedly connected with the four frame blocks (11); a filling groove (7) is formed in the surface of one side, close to the filling layer (12), of the frame block (11), the length direction of the filling groove (7) is parallel to the length direction of the frame block (11), and the filling layer (12) is located in the filling groove (7).
7. The assembled toilet side plate sealing structure according to claim 6, wherein: and the two inner side walls of the filling groove (7) parallel to the length direction of the frame block (11) are respectively provided with a connecting plate (71), and the length direction of the connecting plate (71) is parallel to the length direction of the filling groove (7).
8. The assembled toilet side plate sealing structure according to claim 6, wherein: the inner walls of two sides of the filling groove (7) in the length direction are opened, and an exhaust hole (72) is formed in the inner wall of one side, close to the inner side of the side plate (1), of the filling groove (7).
9. The assembled toilet side plate sealing structure according to claim 1, wherein: the water inlet (8) is formed at the joint between the two adjacent side plates (1), the water inlet (8) is arranged on one side plate (1), a first water baffle (9) is arranged on the inner surface of the side plate (1), one side surface of the first water baffle (9) is arranged on the side plate (1) where the water inlet (8) is arranged, and the other adjacent side surface is fixedly connected to the other adjacent side plate (1).
10. The assembled toilet side plate sealing structure according to claim 9, wherein: and a second water baffle (10) is arranged on the surface of one side, far away from the water inlet (8), of the first water baffle (9), and the second water baffle (10) is arranged on the side plate (1) far away from the water inlet (8).
CN202110182659.3A 2021-02-08 2021-02-08 Assembling type toilet side plate sealing structure Withdrawn CN112878745A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110182659.3A CN112878745A (en) 2021-02-08 2021-02-08 Assembling type toilet side plate sealing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110182659.3A CN112878745A (en) 2021-02-08 2021-02-08 Assembling type toilet side plate sealing structure

Publications (1)

Publication Number Publication Date
CN112878745A true CN112878745A (en) 2021-06-01

Family

ID=76056310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110182659.3A Withdrawn CN112878745A (en) 2021-02-08 2021-02-08 Assembling type toilet side plate sealing structure

Country Status (1)

Country Link
CN (1) CN112878745A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114179217A (en) * 2021-12-10 2022-03-15 广东海龙建筑科技有限公司 Production process of assembled toilet side plate

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114179217A (en) * 2021-12-10 2022-03-15 广东海龙建筑科技有限公司 Production process of assembled toilet side plate

Similar Documents

Publication Publication Date Title
RU2143036C1 (en) Link for shuttering walls, and construction unit with links
CN110761322A (en) Cast-in-place pipe gallery side wall horizontal construction joint reinforcing structure and construction method thereof
CN112878745A (en) Assembling type toilet side plate sealing structure
CN113513048A (en) Station house underground passage leakage-proof structure and construction process
CN110777856A (en) Back water-proof structure of basement bottom plate and construction method thereof
CN113585351A (en) Soil covering plane settlement post-cast strip prefabrication advanced reverse order closed construction method
KR100731773B1 (en) The water-storage tank worthy an undercurrent a block of loss in weight structure
CN218580969U (en) Whole ground floor of precast concrete
CN109707150A (en) A kind of encapsulating method of plastic formwork with self sealing structure and plastic formwork
CN213014510U (en) Combined surface energy waterproof system
CN211689883U (en) Screwless half cantilever bridge broach telescoping device
CN210975900U (en) Basement side wall extra front and back pouring belt periphery protection structure
CN210767213U (en) Novel public building conversion beam column node structure
CN219672098U (en) Prefabricated vertical post-pouring strip template
CN101906811B (en) Gutter inlet end module
CN218714089U (en) Vertical waterproof node structure of precast concrete side fascia
CN209837236U (en) Concrete sewer drain pipe and heightening member
CN220202767U (en) Basement outer wall post-pouring strip baffle device
CN216973509U (en) Post-cast strip both sides bottom plate concrete leak protection thick liquid structure and basement bottom plate
CN213572068U (en) Basement waterproof structure
CN215760020U (en) Horizontal structure seam pulling plate
CN211036598U (en) Pervious concrete prefabricated part for road
CN212078280U (en) Structure for reducing contraction cracks of basement exterior wall
CN215252410U (en) Precast concrete box culvert
CN110485580A (en) A kind of assembled architecture outer wall plate waterproof construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20210601

WW01 Invention patent application withdrawn after publication