CN112878738B - Interim house structure in quick detachable building site - Google Patents
Interim house structure in quick detachable building site Download PDFInfo
- Publication number
- CN112878738B CN112878738B CN202110267482.7A CN202110267482A CN112878738B CN 112878738 B CN112878738 B CN 112878738B CN 202110267482 A CN202110267482 A CN 202110267482A CN 112878738 B CN112878738 B CN 112878738B
- Authority
- CN
- China
- Prior art keywords
- side wall
- plate
- plates
- board
- construction site
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 claims abstract description 14
- 238000007789 sealing Methods 0.000 claims description 18
- 210000001503 joint Anatomy 0.000 claims description 14
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 10
- 238000004321 preservation Methods 0.000 claims description 6
- 229910052742 iron Inorganic materials 0.000 claims description 5
- 238000010030 laminating Methods 0.000 claims description 4
- 238000010521 absorption reaction Methods 0.000 claims description 2
- 230000005389 magnetism Effects 0.000 claims description 2
- 239000007787 solid Substances 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 8
- 238000004806 packaging method and process Methods 0.000 abstract description 5
- 238000009434 installation Methods 0.000 description 7
- 239000002352 surface water Substances 0.000 description 4
- 239000000853 adhesive Substances 0.000 description 3
- 230000001070 adhesive effect Effects 0.000 description 3
- 238000009413 insulation Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000001179 sorption measurement Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/02—Dwelling houses; Buildings for temporary habitation, e.g. summer houses
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/343—Structures characterised by movable, separable, or collapsible parts, e.g. for transport
- E04B1/34315—Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/388—Separate connecting elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/61—Connections for building structures in general of slab-shaped building elements with each other
- E04B1/6108—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D3/00—Roof covering by making use of flat or curved slabs or stiff sheets
- E04D3/38—Devices for sealing spaces or joints between roof-covering elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
- E04H1/1205—Small buildings erected in the open air
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Building Environments (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
The application relates to a construction site temporary house structure easy to disassemble, relating to the technical field of house assembly; the wall comprises two side wall plates and end wall plates positioned at two ends of the side wall plates, wherein the end wall plates are detachably connected to the end parts of the side wall plates; the side walls of the two side wall plates face each other, the upper ends of the two side wall plates are respectively hinged with a top plate, and the side wall of each side wall plate is provided with a locking piece for fixing the rotating position of the top plate relative to the side wall plate; the side walls of the two side wall plates facing each other are also hinged with a bottom plate; this application has the effect that improves packaging efficiency.
Description
Technical Field
The application relates to the technical field of house assembly, in particular to an easily-detachable temporary building structure in a construction site.
Background
The temporary house is a house for temporary supplies or temporary living, and is generally used in construction site operations, military operations and other scenes.
A Chinese patent with a related publication number of CN102635248B discloses a factory-produced rapid assembly house, which comprises a floor, a wall and a roof; the wall body is formed by splicing wall body blocks, and structural adhesive is arranged at the splicing position for bonding; the floor, the wall and the roof are connected through fasteners; before the installation, floor, wall and roofing are platelike structure and are convenient for transport, when reaching the assembly point, form the wall body with the wall body block through structural adhesive mutual adhesion together, rethread fastener is in the same place floor, wall body and roofing link together, realize convenient installation.
In view of the above-mentioned related technologies, the inventor believes that the above-mentioned structure needs to be assembled by splicing and assembling the dispersed floor, wall and roof together at multiple places by using fasteners and structural adhesive, and the assembly time is long, which results in low assembly efficiency, and thus needs to be improved.
Disclosure of Invention
In order to improve the lower technical problem of interim housing structure packaging efficiency who exists among the correlation technique, this application provides an easy detachable building site interim housing structure.
The application provides a pair of quick detachable building site temporary housing structure adopts following technical scheme:
a temporary building structure for a construction site easy to disassemble comprises two side wall plates and end wall plates positioned at two ends of the side wall plates, wherein the end wall plates are detachably connected to the end parts of the side wall plates; the side walls of the two side wall plates face each other, the upper ends of the two side wall plates are respectively hinged with a top plate, and the side wall of each side wall plate is provided with a locking piece for fixing the rotating position of the top plate relative to the side wall plate; the side walls of the two side wall plates facing each other are also hinged with a bottom plate.
By adopting the technical scheme, the side wall plate, the top plate and the bottom plate are connected with one another, so that the structures of the side wall plate, the top plate and the bottom plate are centralized, and the time for searching by operators and splicing the side wall plate, the top plate and the bottom plate together is saved; when the equipment, now rotate the bottom plate in order to change the bottom plate to the state of perpendicular to side wall board, then the roof is rotated towards the direction of keeping away from the bottom plate to through locking piece with roof fixed connection in side wall board top, connect the end wall board in side wall board tip at last again, thereby finally realize improving the effect of packaging efficiency.
Optionally, the locking member includes a fixed rod, a driving rod hinged to an end of the fixed rod, and a rotation stopping tube sleeved outside the driving rod in a threaded manner; the side wall plate is provided with a through hole for the fixing rod and the rotation stopping pipe to penetrate through, and one end of the fixing rod, which is far away from the driving rod, penetrates through the through hole and is hinged to the side wall of the top plate; the locking piece further comprises a locking bolt fixedly connected to the side wall plate, and a locking hole for the locking bolt to insert is formed in the side wall of the driving rod.
Through adopting above-mentioned technical scheme, when the roof after needs fixed rotation, change the driving piece to the state that is on a parallel with the dead lever, then the screw thread rotates the pipe that splines, to spline cup joint in the articulated department of actuating lever and dead lever of pipe, remove the actuating lever towards the direction that is close to the roof after that, the roof is by jack-up this moment, insert the locking pole with the locking bolt again, with the position of fixed roof, realize the firm to the roof, convenient installation, when need not to use the messenger, can fold the roof in curb plate one side, reduce and accomodate and transport space.
Optionally, each locking piece on the side wall plate is a plurality of, and all driving rods on the same side wall plate are connected with a linkage plate together.
Through adopting above-mentioned technical scheme, the support dynamics to the roof is strengthened in the setting of a plurality of locking pieces, improves overall structure's rigidity and intensity, and in addition, the setting of linkage board can rotate and remove when all actuating levers that the simultaneous drive is located same curb plate, can reach the effect that improves the packaging efficiency then.
Optionally, each the embedding groove that supplies actuating lever and linkage board to set is all seted up to the side wall board lateral wall, linkage board lateral wall is set fixedly with the magnet piece, the embedding groove diapire be provided with the magnet piece magnetism inhale solid absorption iron sheet.
Through adopting above-mentioned technical scheme, when need not to use the locking piece, with actuating lever and linkage plate commentaries on classics to the embedded groove in, and the magnet piece can realize accomodating the stability of linkage plate and actuating lever with the setting up of adsorbing the iron sheet, reduces the condition that actuating lever and linkage plate appear rocking in the transportation, also can reduce the storage space of linkage plate and actuating lever simultaneously.
Optionally, a sealing ring is arranged on the side wall of each driving rod close to the linkage plate, and the outer diameter of each sealing ring is consistent with the aperture of each through hole.
Through adopting above-mentioned technical scheme, when the locking bolt inserts the locking downthehole time, the sealing washer part inserts in the through-hole to improve the leakproofness of through-hole, reduce the rainwater among the external environment and the cold gas in the external environment through the inside possibility of through-hole infiltration house, improve the suitable degree of living in house.
Optionally, a guide plate extends from one side of the top plate close to the hinged position of the top plate and the side wall plate.
Through adopting above-mentioned technical scheme, when the roof changes to the side wall board top, one side that the roof department was kept away from to the guide plate is located the side wall board periphery to be used for sheltering from in the articulated department of roof and side wall board, reduce the possibility that external rainwater got into the room from the articulated department of roof and side wall board, and the guide plate sets up in the side wall board top along with the roof slope, the rainwater that drips on roof and the guide plate will be the roof of discharging under the guide effect of the guide plate of slope, thereby lower row of rainwater has been accelerated.
Optionally, two the roof upper surface can be dismantled jointly and be connected with the closing plate, the closing plate lateral wall is provided with the binding face of laminating in the roof respectively, be provided with first sealed pad on the binding face.
Through adopting above-mentioned technical scheme, after the installation of accomplishing the roof, at the position that two roofs contacted and be located roof top installation closing plate, the first sealed pad that is located the binding face this moment closely laminates with the roof upper surface to reduce the rainwater and flow into the room from the seam crossing of two roofs, improve the leakproofness of two roof seam crossings.
Optionally, the side wall board bottom is provided with a plurality of flexible post perpendicularly, each the side wall board bottom all is fixed and is provided with the triangular supports frame, the triangular supports frame upper surface laminating in the bottom plate lower surface.
By adopting the technical scheme, if the rotated base plates are directly placed on the ground, the situation that the surface water seeps into the room from the joint of the two base plates is easy to occur, so that the telescopic columns and the triangular support frames can support the base plates, a certain space is reserved between the base plates and the ground, and the possibility that the surface water seeps into the room from the joint of the base plates is reduced; and flexible post can realize stretching out and drawing back to make and stably set up the house on unevenness, guarantee that the bottom plate of house after the installation is accomplished is in the horizontality and improves and set up the steadiness.
Optionally, one of them the triangular supports lateral wall is provided with the butt joint pole, the one end that triangular supports department was kept away from to the butt joint pole is provided with the butt joint board, the lateral wall that the butt joint board deviates from butt joint pole department is provided with the sealed pad of second, the sealed pad of second is located the bottom plate below and laminates in the seam crossing of two bottom plates.
Through adopting above-mentioned technical scheme, when two bottom plates rotated to perpendicular to side wall board, the sealed seam crossing that closes in the bottom plate lower surface and lie in two bottom plates just of second sealed pad to improve the leakproofness of two bottom plate seam crossings, it is indoor to reduce external cold gas entering, improves the heat preservation effect and fits the degree of living.
Optionally, the top plate, the bottom plate, the side wall plates and the end wall plates are all internally provided with heat insulation layers.
Through adopting above-mentioned technical scheme, the setting of heat preservation can improve the thermal insulation performance in house after the equipment, further improves the habitability in house.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the side wall plate, the top plate and the bottom plate are connected with one another, so that the structures of the side wall plate, the top plate and the bottom plate are concentrated, and the time for searching by operators and splicing the side wall plate, the top plate and the bottom plate together is saved; during assembly, the bottom plate is rotated to enable the bottom plate to be in a state of being perpendicular to the side wall plate, then the top plate is rotated towards the direction away from the bottom plate, the top plate is fixedly connected above the side wall plate through the locking piece, and finally the end wall plate is connected to the end portion of the side wall plate, so that the effect of improving the assembly efficiency is achieved finally;
2. if the rotated base plates are directly placed on the ground, the situation that surface water seeps into a room from the joint of the two base plates is easy to occur, so that the telescopic columns and the triangular support frames can support the base plates, a certain space is reserved between the base plates and the ground, and the possibility that the surface water seeps into the room from the joint of the base plates is reduced; the telescopic columns can be stretched out and drawn back, so that the house can be stably erected on the rugged ground, and the bottom plate of the house after being installed is ensured to be in a horizontal state, so that the erection stability is improved;
3. after the installation of the top plate is completed, the sealing plate is installed at the position where the two top plates are contacted and above the top plate, and the first sealing gasket on the binding surface is closely bound with the upper surface of the top plate at the moment so as to reduce rainwater from flowing into a room from the joint of the two top plates.
Drawings
Fig. 1 is a schematic view of a temporary housing structure of an easy-to-disassemble construction site according to an embodiment.
Fig. 2 is a partial schematic view of the embodiment for showing the positional relationship among the side wall panels, the top panel and the bottom panel in the folded state.
Fig. 3 is a sectional view of a temporary housing structure of an easily disassembled construction site according to an embodiment.
Fig. 4 is a partially enlarged view of the structure of part a in fig. 3.
Description of reference numerals: 1. a side wall panel; 11. a through hole; 12. a connecting plate; 13. a telescopic column; 131. an outer tube; 1311. a fixing hole; 132. an inner rod; 133. fixing the bolt; 14. a triangular support frame; 141. a docking rod; 142. a butt plate; 143. a second gasket; 15. a locking member; 151. fixing the rod; 152. a drive rod; 1521. a locking hole; 1522. a rotation stopping pipe; 1523. a seal ring; 153. locking the bolt; 1531. a locking tube; 1532. a lock lever; 154. a linkage plate; 1541. a magnet piece; 16. an embedding groove; 161. adsorbing iron sheets; 17. a cavity; 171. a heat-insulating layer; 2. a base plate; 3. a top plate; 31. a baffle; 31. a rubber cushion layer; 4. an end wall panel; 5. a sealing plate; 51. a binding face; 52. a first seal.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses interim house structure in quick detachable building site. Referring to fig. 1 and 2, the temporary housing structure includes two side wall panels 1, a top plate 3 hinged to each side wall panel 1, a bottom plate 2 hinged to each side wall panel 1, and end wall panels 4 detachably connected to both ends of the side wall panels 1 by bolts; the two base plates 2 are rotatably connected with each other through hinges.
Referring to fig. 3, cavity 17 has all been seted up to each side wall board 1, roof 3, bottom plate 2 and end wall board 4 inside, all inserts in each cavity 17 and is equipped with heat preservation 171, and heat preservation 171 can be the extruded sheet to the heat preservation effect in reinforcing house improves and fits the degree of living.
Referring to fig. 1 and 3, the lower surface of each side wall plate 1 and the two ends thereof are respectively provided with a telescopic column 13, each telescopic column 13 includes an outer tube 131 and an inner rod 132 inserted into the outer tube 131, the inner rod 132 is screwed with a fixing bolt 133, the side wall of the outer tube 131 is provided with a plurality of fixing holes 1311, and the fixing bolt 133 penetrates through one of the fixing holes 1311 and is screwed on the side wall of the inner rod 132.
Referring to fig. 3, connecting plates 12 are vertically welded on the side walls of the two side wall plates 1 facing each other and below the side walls, and one ends of the connecting plates 12 far away from the side wall plates 1 are hinged to the bottom plate 2; the bottom wall of each connecting plate 12 is welded with a triangular support frame 14, one right-angle side of each triangular support frame 14 is attached to the side wall of the outer pipe 131, and the other right-angle side of each triangular support frame 14 is attached to the lower surface of the bottom plate 2; the side wall of one of the triangular support frame 14 is welded with a butt joint rod 141, one end of the butt joint rod 141 away from the triangular support frame 14 is welded with a butt joint plate 142, the side wall of the butt joint plate 142 facing the bottom plate 2 is bonded with a second sealing gasket 143 made of rubber, and the second sealing gasket 143 is attached to the joint of the two bottom plates 2.
Referring to fig. 3, the top plates 3 are hinged to the side walls of the side wall plates 1 near the upper part, the side walls of each top plate 3 near the hinged part with the side wall plate 1 extend to form a guide plate 31 integrally, and the guide plates 31 are located on the periphery of the side wall plates 1; a rubber cushion layer is fixed at one end of each side wall plate 1 far away from the guide plate 31, so that the two side wall plates 1 can stably rotate, and the rubber cushion layers on the two side wall plates 1 can be attached together; all be provided with the locking piece 15 that is used for the rotational position of the relative side wall board 1 of fixed roof 3 on each side wall board 1, in this embodiment, each side wall board 1 all corresponds there is three locking piece 15.
Referring to fig. 3 and 4, the locking piece 15 includes the dead lever 151, the actuating lever 152, spline pipe 1522 and locking bolt 153, the through-hole 11 that supplies dead lever 151 and spline pipe 1522 to insert to establish is seted up in the lateral wall of each side wall board 1 through, wherein one end of dead lever 151 articulates in the actuating lever 152, the other end runs through-hole 11 and articulates in roof 3 lateral wall, spline pipe 1522 thread bush in the actuating lever 152 lateral wall, the fixed cover of having connect the sealing washer 1523 of rubber material on the lateral wall that the actuating lever 152 kept away from dead lever 151 department, the external diameter of sealing washer 1523 is exactly the same with through-hole 11 internal diameters.
Referring to fig. 3 and 4, the locking bolt 153 includes a locking tube 1531 fixedly welded to the side wall of the side wall panel 1 and a locking rod 1532 inserted into the locking tube 1531, and a locking hole 1521 for the locking rod 1532 to be inserted into is formed in the side wall of the driving rod 152; the driving rod 152 is rotated to be parallel to the fixed rod 151, and then the rotation stopping tube 1522 is rotated to be sleeved at the rotating connection position of the driving rod 152 and the fixed rod 151; then, the driving rod 152 is moved toward the direction close to the top plate 3, the top plate 3 is pushed by the driving rod 152 to rotate to the upper side of the sidewall plate 1, and when the first gasket 52 is partially inserted into the through hole 11, the locking rod 1532 is inserted into the locking hole 1521, so as to fix the position of the top plate 3.
Referring to fig. 3 and 4, all the driving rods 152 on the same side wall plate 1 are welded with a linkage plate 154 together, the side wall of the side wall plate 1 away from the top plate 3 is further provided with an embedding groove 16 for embedding the linkage plate 154 and the driving rods 152, and the embedding groove 16 is communicated with the through hole 11; a magnet piece 1541 is embedded on the outer side wall of the linkage plate 154 along the length direction thereof, and an adsorption iron piece 161 magnetically attracted with the magnet piece 1541 is embedded at the bottom wall of the embedding groove 16; when the locking piece 15 is not needed, the linkage plate 154 and the driving rod 152 are embedded in the embedding groove 16, and stable storage is realized.
Referring to fig. 3, a sealing plate 5 is commonly connected above the two top plates 3 through bolts, a bonding surface 51 is arranged on a side wall of the sealing plate 5 facing the top plate 3, a first sealing gasket 52 is bonded on the bonding surface 51, and the first sealing gasket 52 is tightly bonded on the upper surface of the top plate 3.
The implementation principle of the temporary building structure of quick detachable building site of the embodiment of the application is as follows: firstly, the height of each telescopic column 13 is adjusted according to the concave-convex condition of the ground at the building position, so that two side wall plates 1 are vertically and stably placed on the ground, then the bottom plate 2 is rotated to enable the bottom plate 2 to be in a state of being perpendicular to the side wall plates 1, the lower surface of the bottom plate 2 is attached to the upper surface of the triangular support frame 14 at the moment, and the second sealing gasket 143 is attached to the joint of the two bottom plates 2; then, the linkage plate 154 and the driving rod 152 are rotated out of the embedding groove 16, the rotation stopping pipe 1522 is rotated to the hinged position of the driving rod 152 and the fixing rod 151, the top plate 3 is pushed towards the direction close to the top plate 3, the top plate 3 is rotated to the upper side of the side wall plate 1, and the locking rod 1532 is inserted into the locking hole 1521 on the driving rod 152, so that the top plate 3 is fixed.
Then close the top at two roof 3 with closing sealing plate 5 lid through the bolt to the seam crossing of sealed roof 3 connects end wall board 4 in 1 both ends of side wall board through the bolt at last, thereby accomplishes the equipment of interim house structure, improves the packaging efficiency.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.
Claims (9)
1. The utility model provides a quick detachable building site temporary housing structure which characterized in that: the side wall plate comprises two side wall plates (1) and end wall plates (4) positioned at two ends of each side wall plate (1), wherein the end wall plates (4) are detachably connected to the end parts of the side wall plates (1); the side wall plates (1) face each other, the upper ends of the side wall plates are respectively hinged with a top plate (3), and the side wall of each side wall plate (1) is provided with a locking piece (15) used for fixing the rotating position of the top plate (3) relative to the side wall plate (1); the side walls of the two side wall plates (1) facing each other are hinged with a bottom plate (2); the locking piece (15) comprises a fixed rod (151), a driving rod (152) hinged to the end part of the fixed rod (151) and a rotation stopping pipe (1522) sleeved outside the driving rod (152) in a threaded manner; a through hole (11) for the fixing rod (151) and the rotation stopping pipe (1522) to penetrate through is formed in the side wall of the side wall plate (1), and one end, far away from the driving rod (152), of the fixing rod (151) is hinged to the side wall of the top plate (3); the locking piece (15) further comprises a locking bolt (153) fixedly connected to the side wall of the side wall plate (1), and a locking hole (1521) for the locking bolt (153) to be inserted is formed in the side wall of the driving rod (152).
2. A readily removable temporary building structure for a construction site as claimed in claim 1, wherein: each locking piece (15) on the side wall board (1) is a plurality of, and all driving rods (152) on the same side wall board (1) are connected with a linkage board (154) together.
3. A readily removable temporary building structure for a construction site as claimed in claim 2, wherein: each side wall board (1) lateral wall all sets up the embedding groove (16) that supply actuating lever (152) and linkage board (154) to set up, linkage board (154) lateral wall is set up magnet piece (1541), embedding groove (16) diapire is provided with adsorbs solid absorption iron sheet (161) with magnet piece (1541) magnetism.
4. A readily removable temporary building structure for a construction site as claimed in claim 3, wherein: each lateral wall that actuating lever (152) are close to linkage plate (154) department all is provided with sealing washer (1523), sealing washer (1523) external diameter is unanimous with through-hole (11) aperture.
5. A readily removable temporary building structure for a construction site as claimed in claim 1, wherein: and a guide plate (31) extends from one side of the top plate (3) close to the hinged position of the top plate and the side wall plate (1).
6. A readily removable temporary building structure for a construction site as claimed in claim 1, wherein: two roof (3) upper surface can dismantle jointly and be connected with closing plate (5), closing plate (5) lateral wall is provided with laminating respectively in binding face (51) of roof (3), be provided with first sealed pad (52) on binding face (51).
7. A readily removable temporary building structure for a construction site as claimed in claim 1, wherein: side wall board (1) bottom is provided with a plurality of flexible post (13) perpendicularly, each side wall board (1) bottom all is fixed and is provided with triangular supports frame (14), triangular supports frame (14) upper surface laminating is in bottom plate (2) lower surface.
8. A readily removable temporary building structure for a construction site as claimed in claim 7, wherein: one of them triangular supports (14) lateral wall is provided with butt joint pole (141), the one end that triangular supports (14) department was kept away from in butt joint pole (141) is provided with butt joint board (142), the lateral wall that butt joint board (142) deviate from butt joint pole (141) department is provided with the sealed pad (143) of second, the sealed pad (143) of second is located bottom plate (2) below and laminates in the seam crossing of two bottom plates (2).
9. A readily removable temporary building structure for a construction site as claimed in claim 1, wherein: and heat preservation layers (171) are arranged inside the top plate (3), the bottom plate (2), the side wall plates (1) and the end wall plates (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110267482.7A CN112878738B (en) | 2021-03-11 | 2021-03-11 | Interim house structure in quick detachable building site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110267482.7A CN112878738B (en) | 2021-03-11 | 2021-03-11 | Interim house structure in quick detachable building site |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112878738A CN112878738A (en) | 2021-06-01 |
CN112878738B true CN112878738B (en) | 2022-06-10 |
Family
ID=76042472
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110267482.7A Active CN112878738B (en) | 2021-03-11 | 2021-03-11 | Interim house structure in quick detachable building site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112878738B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114856006B (en) * | 2022-05-09 | 2023-02-03 | 华济建设工程集团有限公司 | Full-prefabricated assembled integral reinforced concrete house |
CN114961346B (en) * | 2022-07-01 | 2024-03-12 | 中基华工程管理集团有限公司 | Quick-mounting type temporary building |
CN115217221A (en) * | 2022-07-28 | 2022-10-21 | 四川省第四建筑有限公司 | Folding and containing method for base component in space system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105735480A (en) * | 2016-04-16 | 2016-07-06 | 万华集成房屋(烟台)有限公司 | Foldable house and assembling and disassembling method thereof |
CN110485568A (en) * | 2019-08-24 | 2019-11-22 | 陕西建工第九建设集团有限公司 | A kind of construction steel structure support device |
CN111561188A (en) * | 2020-05-25 | 2020-08-21 | 康淑迎 | A removable solar protection devices for municipal garden |
CN112095803A (en) * | 2020-09-30 | 2020-12-18 | 浙江新宇建筑设计有限公司 | Prefabricated house and construction method thereof |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7509776B2 (en) * | 2005-02-28 | 2009-03-31 | Arrow Group Industries, Inc. | Modular storage shed system |
-
2021
- 2021-03-11 CN CN202110267482.7A patent/CN112878738B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105735480A (en) * | 2016-04-16 | 2016-07-06 | 万华集成房屋(烟台)有限公司 | Foldable house and assembling and disassembling method thereof |
CN110485568A (en) * | 2019-08-24 | 2019-11-22 | 陕西建工第九建设集团有限公司 | A kind of construction steel structure support device |
CN111561188A (en) * | 2020-05-25 | 2020-08-21 | 康淑迎 | A removable solar protection devices for municipal garden |
CN112095803A (en) * | 2020-09-30 | 2020-12-18 | 浙江新宇建筑设计有限公司 | Prefabricated house and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN112878738A (en) | 2021-06-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112878738B (en) | Interim house structure in quick detachable building site | |
US9187894B2 (en) | Collapsible portable shelter unit | |
CA2571631C (en) | System, method, and apparatus for frame assembly and building | |
CN113338669B (en) | Assembled anti-seismic residential building structure | |
GB2490304A (en) | Structural beam with insulation located in a cavity within the beam. | |
US4028854A (en) | Fireproof modular building | |
KR20150049829A (en) | Prefabricated sturcture and prefabricated bungalow thereby | |
CN214246281U (en) | Anti wind snow additional strengthening of metal roofing | |
WO2020244533A1 (en) | Prefabricated passive energy-saving house and construction method therefor | |
US5177914A (en) | Vertical section building construction | |
WO1998031884A1 (en) | Improved building structures | |
RU2499113C1 (en) | Method to assemble frameless rotunda site huts from sandwich panels under field conditions | |
CN2673973Y (en) | Rail type multi-layer structure section house | |
CN201372485Y (en) | Earthquake resistant villa wood house | |
CN206538849U (en) | A kind of precast inspection well | |
JP7432273B1 (en) | Housing structure and construction method of housing structure | |
CN213014801U (en) | Board seam structure of peripheral dado in severe cold district | |
CN110685377A (en) | Heat preservation ventilation wall structure suitable for paper building | |
JPH0215958Y2 (en) | ||
WO2021097994A1 (en) | Wood-plastic composite integrated garage | |
JPH0216428B2 (en) | ||
CN219298455U (en) | Temporary frame of structure is built in room | |
CN111088853B (en) | Composite material dome room capable of being assembled and disassembled quickly | |
CN117286970B (en) | Prefabricated combined system of assembled ultralow energy consumption building | |
CN215211855U (en) | Convenient heat preservation cement foaming board that gives sound insulation who dismantles |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |