CN112864975A - Equipment installation method and equipment installation structure of daylighting roof - Google Patents

Equipment installation method and equipment installation structure of daylighting roof Download PDF

Info

Publication number
CN112864975A
CN112864975A CN202110179144.8A CN202110179144A CN112864975A CN 112864975 A CN112864975 A CN 112864975A CN 202110179144 A CN202110179144 A CN 202110179144A CN 112864975 A CN112864975 A CN 112864975A
Authority
CN
China
Prior art keywords
equipment
length metal
metal wire
steel framework
daylighting roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110179144.8A
Other languages
Chinese (zh)
Inventor
卜江伟
赵民琪
许轶博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xincheng Holding Group Enterprise Management Co ltd
Original Assignee
Xincheng Holding Group Enterprise Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xincheng Holding Group Enterprise Management Co ltd filed Critical Xincheng Holding Group Enterprise Management Co ltd
Priority to CN202110179144.8A priority Critical patent/CN112864975A/en
Publication of CN112864975A publication Critical patent/CN112864975A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs
    • H02G3/0462Tubings, i.e. having a closed section
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/30Installations of cables or lines on walls, floors or ceilings
    • H02G3/34Installations of cables or lines on walls, floors or ceilings using separate protective tubing

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The invention discloses a method and a structure for mounting equipment on a daylighting roof, wherein the method comprises the steps of implanting fixing nails on a steel framework of the daylighting roof; according to the component attribute of the daylighting roof, arranging a full-length metal wire groove below the daylighting roof; a slot cover plate with an open side is arranged on the through metal slot; arranging an opening in the through-length metal wire slot according to the installation position of equipment, and fixing the through-length metal wire slot and the equipment; the structure of the lighting roof passes through the lighting roof; a steel framework disposed on the daylighting roof; the fixing nails are arranged on the steel framework; the through-length metal wire casing is arranged below the daylighting roof; a slot cover plate with an open side is arranged on the through-length metal slot; the equipment is arranged in the open hole of the through-length metal wire slot; the invention can meet the requirements of equipment installation and maintenance, maintain the lightness of the daylighting roof component and keep the permeability of the daylighting roof.

Description

Equipment installation method and equipment installation structure of daylighting roof
All as the field of technology
The invention relates to the technical field of bare daylighting roof equipment, in particular to an equipment installation method and an equipment installation structure of a daylighting roof.
All the above-mentioned background techniques
The daylighting roof is composed of a transparent panel material and a supporting system, and the light transmittance of the daylighting roof gives people a strong comfortable feeling. The single-layer composite is an indispensable or absent ring in the commercial complex of the pedestrian street model, and the unique permeability of the composite is favored by architects. However, the lighting roof has various devices and different structures, so that the lighting roof is mounted in various ways, but the use of the lighting roof is limited by the factors of beauty, permeability and the like so as to enable sufficient illumination and beauty, and is limited by many limitations when other devices are mounted on the lighting roof.
All the contents of the invention
The invention provides a method and a structure for mounting equipment on a daylighting roof, which can meet the requirements of equipment mounting and maintenance, maintain the lightness of a daylighting roof component and keep the permeability of the daylighting roof. The specific technical scheme is as follows.
According to an aspect of the present application, there is provided an apparatus installation method of a daylighting roof, including:
implanting fixing nails on a steel framework of the daylighting roof;
according to the component attribute of the daylighting roof, arranging a full-length metal wire groove below the daylighting roof;
a slot cover plate with an open side is arranged on the through metal slot;
and arranging a hole in the through-length metal wire slot according to the installation position of the equipment, and fixing the through-length metal wire slot and the equipment.
As a specific technical solution, the implanting of the fixing nail on the steel framework of the daylighting roof comprises: fixedly connecting a screw with the steel framework in the reverse direction, and positioning the left side and the right side of the steel framework according to a central line of the steel framework; the horizontal direction of the steel framework is deeply designed according to the weight of the equipment.
As a specific technical solution, the setting of a full-length metal trunking below the daylighting roof according to the component properties of the daylighting roof includes: setting the width of the full-length metal wire groove to be equal to that of the steel framework, and setting the height of the full-length metal wire groove to be matched with the height of the equipment;
arranging a first paint surface on the through-length metal wire groove; the first paint surface and the outer side surface of the steel framework are in the same color.
As a specific technical solution, the setting an opening in the through-length metal wire slot according to the installation position of the device, and fixing the through-length metal wire slot and the device includes: pre-tapping according to the positioning of the first implanted fixing nail and the installation position of the equipment; and placing the equipment at the pre-opening hole, and fixing the equipment and the through-length metal wire casing through a countersunk head screw.
As a specific technical scheme, the step of arranging an opening in the through-length metal wire slot according to the installation position of the equipment, and fixing the through-length metal wire slot and the equipment further comprises: arranging wiring and a second paint surface;
the setting wiring includes: laying an inner wire casing in the through-length metal wire casing, and arranging a laying line according to the specification of the equipment;
set up the second lacquer painting and include: and supplementing a second paint surface with the same color as the outer side surface of the steel framework to at least one of the countersunk head screw, the pre-opening position, the inner wire groove and the line.
According to another aspect of the present application, there is provided an equipment installation structure of a daylighting roof, including: lighting a roof; a steel framework disposed on the daylighting roof; the fixing nails are arranged on the steel framework; the through-length metal wire casing is arranged below the daylighting roof; a slot cover plate with an open side is arranged on the through-length metal slot; the equipment is arranged in the opening of the through-length metal wire groove.
As a specific technical scheme, screws are fixedly connected with the steel framework in the reverse direction; positioning is arranged at the left side and the right side of the central line of the steel framework; the horizontal direction of the steel framework is matched with the weight of the equipment to be deeply arranged.
As a specific technical solution, the full-length metal trunking disposed below the daylighting roof includes: setting the width of the full-length metal wire groove to be equal to that of the steel framework, and setting the height of the full-length metal wire groove to be matched with the height of the equipment; and a first paint surface matched with the outer side surface of the steel framework is arranged on the through-length metal wire groove.
As a specific technical solution, the device disposed in the opening of the through-length metal wire chase comprises: arranging a pre-opening according to the positioning of the first implanted fixing nail and the installation position of the equipment; the equipment is placed at the pre-opening hole, and the equipment and the through-length metal wire groove are fixed through countersunk screws.
As a specific technical scheme, the equipment is arranged in the open hole of the through-length metal wire slot and further comprises: arranging wiring and a second paint surface;
the setting wiring includes: laying an inner wire casing in the through-length metal wire casing, and arranging a laying line according to the specification of the equipment;
set up the second lacquer painting and include: and supplementing a second paint surface with the same color as the outer side surface of the steel framework to at least one of the countersunk head screw, the pre-opening position, the inner wire groove and the line.
In conclusion, the beneficial technical effects of the invention are as follows:
the invention provides a device installation method of a daylighting roof and a device installation structure of the daylighting roof, wherein the method is characterized in that fixing nails are implanted into a steel framework of the daylighting roof; according to the component attribute of the daylighting roof, arranging a full-length metal wire groove below the daylighting roof; a slot cover plate with an open side is arranged on the through metal slot; arranging an opening in the through-length metal wire groove according to the installation position of equipment, fixing the through-length metal wire groove and the equipment, and enabling the structure of the through-length metal wire groove to pass through a lighting roof; a steel framework disposed on the daylighting roof; the fixing nails are arranged on the steel framework; the through-length metal wire casing is arranged below the daylighting roof; a slot cover plate with an open side is arranged on the through-length metal slot; the equipment is arranged in the open hole of the through-length metal wire slot; the invention can meet the requirements of equipment installation and maintenance, maintain the lightness of the daylighting roof component and keep the permeability of the daylighting roof.
Description of the drawings
The accompanying drawings are included to provide a further understanding of the novel aspects of the present invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the novel aspects of the invention and together with the description serve to explain the principles of the novel aspects of the invention. In the drawings:
fig. 1 is a schematic flow chart of an apparatus installation method for a daylighting roof according to an embodiment of the present invention;
fig. 2 is a steel framework schematic view of an equipment installation method and an equipment installation structure of a daylighting roof according to an embodiment of the present invention;
fig. 3 is a schematic view illustrating installation of steel frame fixing nails of an equipment installation method and an equipment installation structure of a daylighting roof according to an embodiment of the present invention;
fig. 4 is a schematic view of installation of a full-length metal trunking of an equipment installation method and an equipment installation structure of a daylighting roof according to an embodiment of the present invention;
fig. 5 is a wiring diagram illustrating an apparatus mounting method and an apparatus mounting structure of a daylighting roof according to an embodiment of the present invention;
fig. 6 is a schematic equipment installation diagram of an equipment installation method and an equipment installation structure of a daylighting roof according to an embodiment of the present invention;
the steel framework-1, the fixing nail-2, the through long metal wire groove-3, the wiring-4 and the countersunk head screw-5 are arranged in the steel framework.
(specific embodiments) in all cases
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like, indicate orientations and positional relationships based on those shown in the drawings, and are used only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be considered as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically defined otherwise.
In the present invention, unless otherwise expressly specified or limited, the terms "mounted," "connected," "secured," and the like are to be construed broadly and can, for example, be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
The present application will be described in detail below with reference to the accompanying drawings in conjunction with embodiments. It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict.
As shown in fig. 1, in some possible implementation embodiments provided by the present invention, there is provided an apparatus installation method for a daylighting roof, including:
implanting fixing nails 2 into a steel framework 1 of the daylighting roof;
according to the component property of the daylighting roof, a full-length metal wire groove 3 is arranged below the daylighting roof;
a slot cover plate with an open side is arranged on the through metal slot 3;
and arranging a hole in the through-length metal wire groove 3 according to the installation position of the equipment, and fixing the through-length metal wire groove 3 and the equipment.
In some possible implementation examples provided by the present invention, the implanting of the fixing nail 2 on the steel framework 1 of the daylighting roof comprises: fixedly connecting the screws with the steel framework 1 in the reverse direction, and positioning the left side and the right side of the steel framework 1 according to the central line of the steel framework; the horizontal direction of the steel framework 1 is deeply designed according to the weight of equipment; in this embodiment, the screws are welded to the frame in the opposite direction, and the left and right sides are positioned according to the center line. The horizontal direction can be deepened according to the actual weight of each piece of equipment, and the horizontal direction is generally a group of 2 m.
In some possible implementation embodiments provided by the invention, the total length of the implanted fixing nail 2 is not too long, the length range of the fixing nail 2 is between 0.7cm and 1.5cm, in the embodiment, the length of the fixing nail 2 is 1cm, and the too long total length of the fixing nail 2 can influence the installation of equipment, further influence the height of the metal wire groove 3 with the full length, and influence the whole lightness and construction cost of the daylighting roof; the external diameter that corresponds staple 2 among them, the cell type etc. is not restricted in this embodiment, staple 2 adopts button head screw fixation nail 2 in this embodiment, adopt button head screw fixation nail 2 because when fixing on the component of daylighting frame through the nut of twisting fixation nail 2 in logical long metal wire casing 3, belong to the black box operation, if staple 2 adopts the tip can lead to appearing the construction accident, at the following in-process that sets up wiring 4 simultaneously, also can take place to scrape the accident of bad cable insulating layer, thereby lead to the condition that will connect in the electric wire appearance of wiring 4, delay man-hour, influence the whole security of daylighting top of wiring 4 electric wires.
In some possible implementation embodiments provided by the present invention, the disposing of the full length metal wireway 3 below the daylighting roof comprises, according to the component properties of the daylighting roof: the width of the full-length metal wire groove 3 is equal to that of the steel framework 1, and the height of the full-length metal wire groove 3 is matched with the height of equipment; arranging a first paint surface on the through-length metal wire groove 3; the first paint surface and the outer side surface of the steel framework 1 are in the same color. In the embodiment of the invention, the wire chase is installed, the full-length metal wire chase 3 is arranged below the steel framework 1, and the width of the wire chase is equal to that of the steel framework 1; the height is determined according to the height of the equipment; painting, and the color of the paint is the same as that of the steel framework 1; the side of the cover plate is opened. The hole is preformed according to the positioning of the first-step planting nail and the mounting position of the later-stage equipment before mounting. After the side plate is opened, the hand stretches into the wire groove to screw the screw cap.
In some possible implementation embodiments provided by the present invention, the value range of the height setting of the through metal wire slot 3 is 5cm to 9cm, and in this embodiment, the height setting of the through metal wire slot 3 is 7 cm. In this embodiment, the size of the device should be considered, and after the device is sealed, the height from the smooth surface of the device to the base should be measured; secondly, when the through-length metal wire casing 3 in the later period is installed, a constructor needs to stretch a hand into the through-length metal wire casing 3 to screw the nut of the fixing nail 2 for fixing, and the smaller the height of the through-length metal wire casing 3 is, the larger the implementation difficulty is.
In some possible embodiments provided by the present invention, the provision of the side-opening slot cover plate on the full-length metal slot 3 may be understood as that the slot cover plate is side-opening, rather than being conventionally opened by pushing; in this embodiment, the convenience that can make 4 of wiring in logical long metal wire casing 3 is opened to the wire casing apron side of logical long metal wire casing 3, and the side is opened and can effectively reduce the fixed work load of cable, does simple corner stack can.
In some possible embodiments of the present invention, the providing of the opening in the through-length metal trunking 3 according to the installation position of the equipment, and the fixing of the through-length metal trunking 3 to the equipment comprises: pre-drilling holes according to the positioning of the first implanted fixing nail 2 and the installation position of the equipment; and the equipment is placed at the pre-opened hole, and the equipment and the through long metal wire groove 3 are fixed through the countersunk head screw 5. And according to the mounted position of equipment set up the trompil at logical long metal wire casing 3 to fixed logical long metal wire casing 3 still includes with equipment: arranging a wiring 4 and a second paint surface; the setting wiring 4 includes: laying an inner wire casing in the through-length metal wire casing 3, and arranging a laying line according to the specification of equipment; set up the second lacquer painting and include: and supplementing a second paint surface with the same color as the outer side surface of the steel framework 1 to at least one of the countersunk head screw 5, the pre-open hole position, the inner wire groove and the line. In the embodiment of the invention, the wiring 4 is arranged, the wire groove is laid in the through metal wire groove 3, and the circuit is laid according to the related requirements of the equipment. In this embodiment, during erection equipment, with the position of equipment fixing to trompil in advance to fix equipment collinear groove through countersunk screw 5, in this embodiment, set up the second lacquer painting, carry out the touch-up paint to countersunk screw 5 etc. department, make the aspect of outward appearance colour keep unanimous with steel framework 1, reduce the visual conflict, improve pleasing to the eye degree.
In the embodiment provided by the invention, the pipe does not need to be penetrated when the through metal wire chase 3 is laid, so that the pipe cost is greatly reduced. When the special-shaped daylighting roof is encountered, the construction difficulty can be effectively reduced, and the construction period is saved; the countersunk head screw 5 can be selected during equipment installation, the problem that the through-long wire is regularly raised into small lumps can be effectively avoided, and the attractiveness is greatly improved.
In other possible embodiments according to the present invention, as shown in fig. 2, there is provided an equipment installation structure of a daylighting roof, including: lighting a roof; a steel framework 1 arranged on the daylighting roof; a fixing nail 2 arranged on the steel framework 1; a through-length metal wire casing 3 arranged below the daylighting roof; a slot cover plate with an open side is arranged on the through metal slot 3; the equipment is arranged in the opening of the through-length metal wire casing 3.
In some possible embodiments of the present invention, as shown in fig. 3, the screws are fixed to the steel frame 1 in opposite directions; positioning is arranged at the left side and the right side of the central line of the steel framework 1; the horizontal direction of the steel framework 1 is deeply arranged in match with the weight of the equipment. In this embodiment, the screws are welded to the frame in the opposite direction, and the left and right sides are positioned according to the center line. The horizontal direction can be deepened according to the actual weight of each piece of equipment, and the horizontal direction is generally a group of 2 m.
In some possible implementation embodiments provided by the invention, the total length of the implanted fixing nail 2 is not too long, the length range of the fixing nail 2 is between 0.7cm and 1.5cm, in the embodiment, the length of the fixing nail 2 is 1cm, and the too long total length of the fixing nail 2 can influence the installation of equipment, further influence the height of the metal wire groove 3 with the full length, and influence the whole lightness and construction cost of the daylighting roof; the external diameter that corresponds staple 2 among them, the cell type etc. is not restricted in this embodiment, staple 2 adopts button head screw fixation nail 2 in this embodiment, adopt button head screw fixation nail 2 because when fixing on the component of daylighting frame through the nut of twisting fixation nail 2 in logical long metal wire casing 3, belong to the black box operation, if staple 2 adopts the tip can lead to appearing the construction accident, at the following in-process that sets up wiring 4 simultaneously, also can take place to scrape the accident of bad cable insulating layer, thereby lead to the condition that will connect in the electric wire appearance of wiring 4, delay man-hour, influence the whole security of daylighting top of wiring 4 electric wires.
In some possible implementation embodiments provided by the present invention, as shown in fig. 4, the full length metal trunking 3 disposed below the daylighting roof comprises: the width of the full-length metal wire groove 3 is equal to that of the steel framework 1, and the height of the full-length metal wire groove 3 is matched with the height of equipment; a first paint surface matched with the outer side surface of the steel framework 1 is arranged on the full-length metal wire casing 3. In the embodiment of the invention, the wire chase is installed, the full-length metal wire chase 3 is arranged below the steel framework 1, and the width of the wire chase is equal to that of the steel framework 1; the height is determined according to the height of the equipment; painting, and the color of the paint is consistent with that of the steel framework 1; the side of the cover plate is opened. The hole is preformed according to the positioning of the first-step planting nail and the mounting position of the later-stage equipment before mounting. After the side plate is opened, the hand stretches into the wire groove to screw the screw cap.
In some possible implementation embodiments provided by the present invention, the value range of the height setting of the through metal wire slot 3 is 5cm to 9cm, and in this embodiment, the height setting of the through metal wire slot 3 is 7 cm. In this embodiment, the size of the device should be considered, and after the device is sealed, the height from the smooth surface of the device to the base should be measured; secondly, when the through-length metal wire casing 3 in the later period is installed, a constructor needs to stretch a hand into the through-length metal wire casing 3 to screw the nut of the fixing nail 2 for fixing, and the smaller the height of the through-length metal wire casing 3 is, the larger the implementation difficulty is.
In some possible embodiments of the present invention, as shown in fig. 5 and 6, the provision of the side-opening slot cover plate on the through-length metal slot 3 can be understood as that the slot cover plate is side-opening, rather than conventional top-opening; in this embodiment, the convenience that can make 4 of wiring in logical long metal wire casing 3 is opened to the wire casing apron side of logical long metal wire casing 3, and the side is opened and can effectively reduce the fixed work load of cable, does simple corner stack can.
In some possible embodiments of the invention, the device arranged in the opening of the through-length metal raceway 3 comprises: arranging a pre-opening according to the positioning of the first implanted fixing nail 2 and the installation position of the equipment; the equipment is placed at the pre-opened hole, and the equipment and the through-length metal wire casing 3 are fixed through the countersunk head screws 5.
In some possible embodiments, the disposing the device in the opening of the full-length metal trunking 3 further comprises: arranging a wiring 4 and a second paint surface;
the setting wiring 4 includes: laying an inner wire casing in the through-length metal wire casing 3, and arranging a laying line according to the specification of equipment;
set up the second lacquer painting and include: and supplementing a second paint surface with the same color as the outer side surface of the steel framework 1 to at least one of the countersunk head screw 5, the pre-open hole position, the inner wire groove and the line.
In the embodiment of the invention, the wiring 4 is arranged, the wire groove is laid in the through metal wire groove 3, and the circuit is laid according to the related requirements of the equipment. In this embodiment, during erection equipment, with the position of equipment fixing to trompil in advance to fix equipment collinear groove through countersunk screw 5, in this embodiment, set up the second lacquer painting, carry out the touch-up paint to countersunk screw 5 etc. department, make the aspect of outward appearance colour keep unanimous with steel framework 1, reduce the visual conflict, improve pleasing to the eye degree.
The invention provides a method and a structure for installing equipment on a daylighting roof, wherein the method comprises the steps of implanting fixing nails 2 into a steel framework 1 of the daylighting roof; according to the component property of the daylighting roof, a full-length metal wire groove 3 is arranged below the daylighting roof; a slot cover plate with an open side is arranged on the through-length metal slot 3; arranging an opening in the through-long metal wire groove 3 according to the installation position of the equipment, fixing the through-long metal wire groove 3 and the equipment, and enabling the structure of the through-long metal wire groove to pass through a daylighting roof; a steel framework 1 arranged on the daylighting roof; a fixing nail 2 arranged on the steel framework 1; a through-length metal wire casing 3 arranged below the daylighting roof; a slot cover plate with an open side is arranged on the through metal slot 3; the equipment is arranged in the opening of the through-long metal wire slot 3; the requirements of equipment installation and maintenance can be met, the lightness of the daylighting roof component is maintained, and the permeability of the daylighting roof is kept.
Those skilled in the art will appreciate that the figures are merely schematic representations of one preferred implementation scenario and that the blocks or flow diagrams in the figures are not necessarily required to practice the present application. Those skilled in the art will appreciate that the modules in the devices in the implementation scenario may be distributed in the devices in the implementation scenario according to the description of the implementation scenario, or may be located in one or more devices different from the present implementation scenario with corresponding changes. The modules of the implementation scenario may be combined into one module, or may be further split into a plurality of sub-modules.
The above application serial numbers are for description purposes only and do not represent the superiority or inferiority of the implementation scenarios. The above disclosure is only a few specific implementation scenarios of the present application, but the present application is not limited thereto, and any variations that can be made by those skilled in the art are intended to fall within the scope of the present application.

Claims (10)

1. A method of installing a daylighting roof apparatus, comprising:
implanting fixing nails on a steel framework of the daylighting roof;
according to the component attribute of the daylighting roof, arranging a full-length metal wire groove below the daylighting roof;
a slot cover plate with an open side is arranged on the through metal slot;
and arranging a hole in the through-length metal wire slot according to the installation position of the equipment, and fixing the through-length metal wire slot and the equipment.
2. The equipment installation method of claim 1, wherein the implanting of the fixing nail on the steel framework of the daylighting roof comprises: fixedly connecting a screw with the steel framework in the reverse direction, and positioning the left side and the right side of the steel framework according to a central line of the steel framework; the horizontal direction of the steel framework is deeply designed according to the weight of the equipment.
3. The equipment installation method of claim 2, wherein the disposing of the full length metal wireway below the daylighting roof according to the component properties of the daylighting roof comprises: setting the width of the full-length metal wire groove to be equal to that of the steel framework, and setting the height of the full-length metal wire groove to be matched with the height of the equipment;
arranging a first paint surface on the through-length metal wire groove; the first paint surface and the outer side surface of the steel framework are in the same color.
4. The equipment installation method of claim 3, wherein the providing the opening in the through-length metal trunking according to the installation position of the equipment and fixing the through-length metal trunking and the equipment comprises: pre-tapping according to the positioning of the first implanted fixing nail and the installation position of the equipment; and placing the equipment at the pre-opening hole, and fixing the equipment and the through-length metal wire casing through a countersunk head screw.
5. The equipment installation method of claim 4, wherein the providing an opening in the through-length metal trunking according to an installation location of equipment and securing the through-length metal trunking with the equipment further comprises: arranging wiring and a second paint surface;
the setting wiring includes: laying an inner wire casing in the through-length metal wire casing, and arranging a laying line according to the specification of the equipment;
set up the second lacquer painting and include: and supplementing a second paint surface with the same color as the outer side surface of the steel framework to at least one of the countersunk head screw, the pre-opening position, the inner wire groove and the line.
6. An equipment mounting structure of a daylighting roof, comprising: lighting a roof; a steel framework disposed on the daylighting roof; the fixing nails are arranged on the steel framework; the through-length metal wire casing is arranged below the daylighting roof; a slot cover plate with an open side is arranged on the through-length metal slot; the equipment is arranged in the opening of the through-length metal wire groove.
7. The equipment mounting structure according to claim 6, wherein screws are fixedly connected to the steel frame in reverse directions; positioning is arranged at the left side and the right side of the central line of the steel framework; the horizontal direction of the steel framework is matched with the weight of the equipment to be deeply arranged.
8. The equipment mounting structure of claim 7, wherein the through-length metal trunking disposed below the daylighting roof comprises: setting the width of the full-length metal wire groove to be equal to that of the steel framework, and setting the height of the full-length metal wire groove to be matched with the height of the equipment; and a first paint surface matched with the outer side surface of the steel framework is arranged on the through-length metal wire groove.
9. The equipment mounting structure of claim 8, wherein the equipment disposed within the opening of the through-length metal trunking comprises: arranging a pre-opening according to the positioning of the first implanted fixing nail and the installation position of the equipment; the equipment is placed at the pre-opening hole, and the equipment and the through-length metal wire groove are fixed through countersunk screws.
10. The equipment mounting structure of claim 9, wherein the equipment disposed within the opening of the through-length metal trunking further comprises: arranging wiring and a second paint surface;
the setting wiring includes: laying an inner wire casing in the through-length metal wire casing, and arranging a laying line according to the specification of the equipment;
set up the second lacquer painting and include: and supplementing a second paint surface with the same color as the outer side surface of the steel framework to at least one of the countersunk head screw, the pre-opening position, the inner wire groove and the line.
CN202110179144.8A 2021-02-08 2021-02-08 Equipment installation method and equipment installation structure of daylighting roof Pending CN112864975A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110179144.8A CN112864975A (en) 2021-02-08 2021-02-08 Equipment installation method and equipment installation structure of daylighting roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110179144.8A CN112864975A (en) 2021-02-08 2021-02-08 Equipment installation method and equipment installation structure of daylighting roof

Publications (1)

Publication Number Publication Date
CN112864975A true CN112864975A (en) 2021-05-28

Family

ID=75989461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110179144.8A Pending CN112864975A (en) 2021-02-08 2021-02-08 Equipment installation method and equipment installation structure of daylighting roof

Country Status (1)

Country Link
CN (1) CN112864975A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204084238U (en) * 2014-09-16 2015-01-07 中建五局第三建设有限公司 Adjustable fluorescent lamp metal wire casing hoisting structure
CN205422011U (en) * 2015-12-11 2016-08-03 广州美斯固智能家居有限公司 One -piece type sunshine room of light
CN206060633U (en) * 2016-09-12 2017-03-29 中国建筑第二工程局有限公司 Multi-functional photovoltaic board fossil fragments
CN206347526U (en) * 2016-12-26 2017-07-21 上海润尚光电科技有限公司 A kind of fixing device for installing of slot, lamp
CN109244950A (en) * 2018-10-09 2019-01-18 徐州苏惠智能电气有限公司 A kind of steel cable bridge method
CN109577656A (en) * 2018-12-30 2019-04-05 山西五建集团有限公司 Large span lighting roof glass curtain construction method of installation
CN112166222A (en) * 2018-05-16 2021-01-01 增城市碧桂园物业发展有限公司 Construction method of suspended ceiling system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204084238U (en) * 2014-09-16 2015-01-07 中建五局第三建设有限公司 Adjustable fluorescent lamp metal wire casing hoisting structure
CN205422011U (en) * 2015-12-11 2016-08-03 广州美斯固智能家居有限公司 One -piece type sunshine room of light
CN206060633U (en) * 2016-09-12 2017-03-29 中国建筑第二工程局有限公司 Multi-functional photovoltaic board fossil fragments
CN206347526U (en) * 2016-12-26 2017-07-21 上海润尚光电科技有限公司 A kind of fixing device for installing of slot, lamp
CN112166222A (en) * 2018-05-16 2021-01-01 增城市碧桂园物业发展有限公司 Construction method of suspended ceiling system
CN109244950A (en) * 2018-10-09 2019-01-18 徐州苏惠智能电气有限公司 A kind of steel cable bridge method
CN109577656A (en) * 2018-12-30 2019-04-05 山西五建集团有限公司 Large span lighting roof glass curtain construction method of installation

Similar Documents

Publication Publication Date Title
US10982827B2 (en) Modular assembled outdoor lighting device and installation method thereof, light pole structure
EP0137666A2 (en) Solar panel module and support therefor
US20100147362A1 (en) Multi-function frame and integrated mounting system for photovoltaic power generating laminates
MX2014003157A (en) Low profile slate-style solar roofing system.
CN106464200A (en) Solar cell module and roof structure
CN106439721A (en) Solar road lamp assembly
CN112864975A (en) Equipment installation method and equipment installation structure of daylighting roof
CN214498110U (en) Convenient assembling mechanism for daylighting roof
CN206961455U (en) Outdoor LED display screen
CN209267047U (en) A kind of cable gantry
US20180138855A1 (en) Solar cell module mounting device
US12034399B2 (en) Skylight with integrated solar panel
CN211646870U (en) Curtain wall unit and unitized curtain wall
JP2002194866A (en) Solar energy collecting apparatus
CN207381719U (en) A kind of wire casing modified brows and ring main unit
CN202678361U (en) Tile solar photovoltaic module
CN216431493U (en) Wisdom garden lamp
CN206379959U (en) A kind of smart home indoor set
CN108004981A (en) A kind of guardrail with advertisement
CN217282059U (en) Lamp wiring hiding box
JP6594626B2 (en) Roof structure
CN211369177U (en) Photovoltaic curtain wall system and structure-reinforced photovoltaic curtain wall module
CN214627208U (en) Multifunctional monitoring rod
CN206135242U (en) Secretly adorn information controlling means of family
CN206806793U (en) A kind of energy storage managing device in distribution box

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210528