CN112859653A - Intelligent building multistage scheduling management device based on Internet of things and use method thereof - Google Patents

Intelligent building multistage scheduling management device based on Internet of things and use method thereof Download PDF

Info

Publication number
CN112859653A
CN112859653A CN202110079403.XA CN202110079403A CN112859653A CN 112859653 A CN112859653 A CN 112859653A CN 202110079403 A CN202110079403 A CN 202110079403A CN 112859653 A CN112859653 A CN 112859653A
Authority
CN
China
Prior art keywords
management system
things
internet
management
main part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110079403.XA
Other languages
Chinese (zh)
Inventor
张庭笑
陈云
杨万鹏
王振淮
严雪瑞
薛玉龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yuanbao Construction Engineering Group Co ltd
Original Assignee
Yuanbao Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yuanbao Construction Engineering Group Co ltd filed Critical Yuanbao Construction Engineering Group Co ltd
Priority to CN202110079403.XA priority Critical patent/CN112859653A/en
Publication of CN112859653A publication Critical patent/CN112859653A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers

Abstract

The invention discloses an intelligent building multistage scheduling management device based on the Internet of things and a using method thereof. The intelligent building multistage scheduling management device based on the Internet of things and the use method thereof are provided with the line telescopic protection mechanism, the hierarchical management scheduling system and the intelligent terminal control system, so that lines can be conveniently and better connected, the lines can be conveniently protected, the service life is prolonged, better building management scheduling operation can be conveniently carried out, the intelligent building multistage scheduling management device is controlled in the Internet of things mode, is simpler and more convenient, the background terminal is convenient to observe and control, and is simple and practical, and better use prospects are brought.

Description

Intelligent building multistage scheduling management device based on Internet of things and use method thereof
Technical Field
The invention relates to the field of intelligent building multilevel scheduling management, in particular to an intelligent building multilevel scheduling management device based on the Internet of things and a use method thereof.
Background
The intelligent building multistage scheduling management device is a support device for carrying out intelligent building management and control, and when intelligent building used the management, the scheduling device was especially important in the time, need monitor and manage each aspect of building, and along with the continuous development of science and technology, people also were more and more high to the manufacturing process requirement of intelligent building multistage scheduling management device.
The existing intelligent building multistage scheduling management device has certain disadvantages when in use, firstly, connecting lines of the device cannot be protected conveniently when in use, the situation of overlong is easy to occur, the use of people is not facilitated, in addition, the management and control are troublesome, multistage management and control operation cannot be well performed, certain adverse effects are brought to the use process of people, and for the purpose, an intelligent building multistage scheduling management device based on the Internet of things and a use method thereof are provided.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides the intelligent building multistage scheduling management device based on the Internet of things and the using method thereof, the line can be conveniently and better connected, the line can be conveniently protected, the service life is prolonged, better building management scheduling operation can be conveniently carried out, the intelligent building multistage scheduling management device based on the Internet of things is controlled in the Internet of things mode, is simpler and more convenient, the background terminal is convenient to observe and control, and the intelligent building multistage scheduling management device based on the Internet of things is simple and practical, and can effectively solve the problems in the background technology.
(II) technical scheme
In order to achieve the purpose, the invention adopts the technical scheme that: intelligent building multilevel scheduling management device based on thing networking, including the device main part, the flexible protection mechanism of one side fixedly connected with circuit of device main part, the front end of device main part is provided with display window, relay switch and connector, the outer fixed surface of device main part is connected with insulating planking, the one end of device main part is provided with interconnecting link, and interconnecting link arranges the inside of the flexible protection mechanism of circuit in, the one end of interconnecting link is connected with one-level management and control terminal, second grade management and control terminal and tertiary management and control terminal.
As a preferred technical scheme, the flexible protection mechanism of circuit includes circuit export registration arm, abrasion pad, fastener, protection mechanism main part, fly leaf, articulamentum, insulation protection shield, circuit export registration arm is located one side of protection mechanism main part, the fly leaf is located the front end of protection mechanism main part, the abrasion pad is located the internal surface of circuit export registration arm, the fastener is located one side of fly leaf, insulation protection shield is located the surface of protection mechanism main part, the articulamentum is located the rear end surface of protection mechanism main part.
As a preferred technical scheme, be provided with the hinge between protection mechanism main part and the fly leaf, one side swing joint of hinge and fly leaf is passed through to one side of protection mechanism main part, be provided with the installation clamp between protection mechanism main part and the circuit export registration arm, the one end fixed connection of installation clamp and circuit export registration arm is passed through to one side of protection mechanism main part, be provided with the powerful glue between circuit export registration arm and the abrasion pad, the internal surface of circuit export registration arm passes through the internal surface fixed connection of powerful glue and abrasion pad.
As a preferred technical scheme, the device main body internally comprises a central management system, an intelligent Internet of things, a primary management system, a secondary management system, a tertiary management system, an intelligent terminal and an Ethernet, wherein the central management system is connected with the intelligent Internet of things, the intelligent Internet of things is connected with the primary management system, the secondary management system and the tertiary management system, and the primary management system, the secondary management system and the tertiary management system are connected with the intelligent terminal.
As a preferred technical scheme, the output end of the central management system is electrically connected with the input end of the intelligent internet of things, the output end of the intelligent internet of things is electrically connected with the input ends of the first-level management system, the second-level management system and the third-level management system through the ethernet, and the output ends of the first-level management system, the second-level management system and the third-level management system are electrically connected with the input end of the intelligent terminal.
As a preferred technical scheme, the intelligent terminal comprises a management module, a monitoring module, a display module, a scheduling module and a control module, wherein the management module is connected with the monitoring module, the display module, the scheduling module and the control module.
As a preferred technical scheme, the output end of the management module is electrically connected with the input ends of the monitoring module, the display module, the scheduling module and the control module.
When the intelligent building multistage dispatching management device based on the Internet of things is used, a first-stage management and control terminal, a second-stage management and control terminal and a third-stage management and control terminal are connected with a device main body in a signal transmission mode through connecting lines, the connecting lines are in an Ethernet mode, signal output is stable, the device main body is a general control center, data management equipment is connected through connectors, a relay switch plays a role of a voltage stabilizing switch, a display window can monitor the operating state of an observation device, the connecting lines stretch in a line stretching protection mechanism to protect the connecting lines from being too long or too short, signal transmission is more stable, an insulating outer plate increases the use safety performance of the device main body, the central management system is connected with the position of the Internet of things, multistage management and control are performed through the Internet of things, and the Internet of things is connected with various stages of management systems in an Ethernet mode, and finally, the data is transmitted to a terminal for overall management and control, and the monitoring, display, scheduling and control performances are achieved.
(III) advantageous effects
Compared with the prior art, the invention provides an intelligent building multistage scheduling management device based on the Internet of things and a using method thereof, and the intelligent building multistage scheduling management device has the following beneficial effects: the intelligent building multistage dispatching management device based on the Internet of things and the use method thereof can conveniently and better connect a line through a line telescopic protection mechanism, a stage management dispatching system and an intelligent terminal control system, are convenient for protecting the line, prolong the service life, can also conveniently and better manage and dispatch the operation of the building, are controlled in the way of the Internet of things, are simpler and more convenient, are convenient for observation and control by a background terminal, are simple and practical, are used by firstly connecting a first-stage control terminal, a second-stage control terminal and a third-stage control terminal with a device main body through signal transmission between a connecting line, wherein the connecting line adopts the form of Ethernet, has stable signal output, the device main body is an overall control center, is connected with a data management device through a connector, a relay switch plays the role of a voltage stabilizing switch, and a display window can monitor the operating state of the operation of the observation device, interconnecting link stretches out and draws back in the inside of the flexible protection mechanism of circuit, can protect interconnecting link, can not overlength or short excessively, signal transmission is more stable, insulating planking increases the safety in utilization performance of device main part, the position of the thing networking is connected to central authorities' management system, carry out multistage management and control through the thing networking, the thing networking is connected through the mode of ethernet and between the management systems at different levels, finally transmit the terminal and carry out whole management and control, the monitoring has, show, the dispatch, the performance of control, whole intelligent building multistage dispatch management device simple structure, high durability and convenient operation, the effect of use is better for traditional mode.
Drawings
Fig. 1 is a schematic overall structure diagram of an intelligent building multi-level scheduling management device based on the internet of things and a use method thereof.
Fig. 2 is a schematic structural diagram of a device main body in the intelligent building multi-level scheduling management device based on the internet of things and the use method thereof.
Fig. 3 is a schematic structural diagram of a primary control terminal in the intelligent building multi-level scheduling management device based on the internet of things and the use method thereof.
Fig. 4 is a schematic structural diagram of a line telescoping protection mechanism in the intelligent building multistage scheduling management device based on the internet of things and the use method thereof.
Fig. 5 is a schematic structural diagram of a central management system in the intelligent building multi-level scheduling management device based on the internet of things and the use method thereof.
Fig. 6 is a schematic structural diagram of an intelligent terminal in the intelligent building multi-level scheduling management device based on the internet of things and the use method thereof.
In the figure: 1. a device main body; 2. a first-level control terminal; 3. connecting a line; 4. a line telescoping protection mechanism; 401. a line outlet positioning tube; 402. a wear pad; 403. a fastener; 404. a protection mechanism main body; 405. a movable plate; 406. a connecting layer; 407. an insulating protection plate; 5. a display window; 6. a secondary management and control terminal; 7. a third-level control terminal; 8. a relay switch; 9. a connecting port; 10. an insulating outer plate.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the invention easy to understand, the invention is further described with the specific embodiments.
As shown in fig. 1-6, intelligent building multilevel scheduling management device based on thing networking, including device main part 1, the flexible protection mechanism 4 of one side fixedly connected with circuit of device main part 1, the front end of device main part 1 is provided with display window 5, relay switch 8 and connector 9, the outer fixed surface of device main part 1 is connected with insulating planking 10, the one end of device main part 1 is provided with interconnecting link 3, and interconnecting link 3 arranges the inside of the flexible protection mechanism 4 of circuit in, the one end of interconnecting link 3 is connected with one-level management and control terminal 2, second grade management and control terminal 6 and tertiary management and control terminal 7.
Further, the line telescopic protection mechanism 4 comprises a line outlet positioning pipe 401, a wear pad 402, a clamping piece 403, a protection mechanism main body 404, a movable plate 405, a connecting layer 406 and an insulating protection plate 407, the line outlet positioning pipe 401 is located on one side of the protection mechanism main body 404, the movable plate 405 is located at the front end of the protection mechanism main body 404, the wear pad 402 is located on the inner surface of the line outlet positioning pipe 401, the clamping piece 403 is located on one side of the movable plate 405, the insulating protection plate 407 is located on the outer surface of the protection mechanism main body 404, and the connecting layer 406 is located on the outer surface of the rear end of the protection mechanism main body 404, so that a.
Further, be provided with the hinge between protection mechanism main part 404 and the fly leaf 405, one side of protection mechanism main part 404 is through one side swing joint of hinge and fly leaf 405, be provided with the installation clamp between protection mechanism main part 404 and the circuit export registration arm 401, one side of protection mechanism main part 404 is through the one end fixed connection of installation clamp and circuit export registration arm 401, be provided with the powerful glue between circuit export registration arm 401 and the wear pad 402, the internal surface of circuit export registration arm 401 is through the internal surface fixed connection of powerful glue and wear pad 402, the protective properties is more excellent.
Further, the device main body 1 is internally provided with a central management system, an intelligent internet of things, a first-level management system, a second-level management system, a third-level management system, an intelligent terminal and an Ethernet, wherein the central management system is connected with the intelligent internet of things, the intelligent internet of things is connected with the first-level management system, the second-level management system and the third-level management system, and the first-level management system, the second-level management system and the third-level management system are connected with the intelligent terminal so as to be convenient for integral control.
Furthermore, the output end of the central management system is electrically connected with the input end of the intelligent Internet of things, the output end of the intelligent Internet of things is electrically connected with the input ends of the first-level management system, the second-level management system and the third-level management system through the Ethernet, the output ends of the first-level management system, the second-level management system and the third-level management system are electrically connected with the input end of the intelligent terminal, better buildings can be conveniently managed and scheduled, and the intelligent Internet of things mode is adopted for control.
Furthermore, the intelligent terminal comprises a management module, a monitoring module, a display module, a scheduling module and a control module, wherein the management module is connected with the monitoring module, the display module, the scheduling module and the control module.
Furthermore, the output end of the management module is electrically connected with the input ends of the monitoring module, the display module, the scheduling module and the control module, the internet of things is connected with management systems of all levels in an Ethernet mode, and finally the internet of things is transmitted to a terminal for overall management and control, so that the monitoring, displaying, scheduling and controlling performances are achieved.
When the intelligent building multistage dispatching management device based on the Internet of things is used, a first-stage management and control terminal 2, a second-stage management and control terminal 6 and a third-stage management and control terminal 7 are in signal transmission connection with a device main body 1 through a connecting circuit 3, the connecting circuit 3 is in an Ethernet form, signal output is stable, the device main body 1 is a general control center and is connected with data management equipment through a connecting port 9, a relay switch 8 plays a role of a voltage stabilizing switch, a display window 5 can monitor the operating state of an observation device, the connecting circuit 3 extends and retracts inside a circuit extension protection mechanism 4, the connecting circuit 3 can be protected, overlength or overlength cannot occur, signal transmission is more stable, the insulating outer plate 10 increases the use safety performance of the device main body 1, the central management system is connected with the position of the Internet of things, and multistage management and control are, the Internet of things is connected with all levels of management systems in an Ethernet mode, and is finally transmitted to a terminal for overall management and control, and the Internet of things has the performances of monitoring, displaying, scheduling and controlling.
The working principle is as follows: the invention comprises a device main body 1, a primary management and control terminal 2, a connecting line 3, a line extension protection mechanism 4, a line outlet positioning pipe 401, a wear-resistant pad 402, a clamping piece 403, a protection mechanism main body 404, a movable plate 405, a connecting layer 406, an insulating protection plate 407, a display window 5, a secondary management and control terminal 6, a tertiary management and control terminal 7, a relay switch 8, a connecting port 9, an insulating outer plate 10, a central management system, an intelligent Internet of things, a primary management system, a secondary management system, a tertiary management system, an intelligent terminal and an Ethernet, wherein the intelligent terminal comprises a management module, a monitoring module, a display module, a scheduling module and a control module, when in use, the primary management and control terminal 2, the secondary management and control terminal 6 and the tertiary management and control terminal 7 are in signal transmission connection with the device main body 1 through the connecting line, the device main body 1 is a general control center, the device main body is connected with data management equipment through a connector 9, a relay switch 8 plays a role of a voltage stabilizing switch, a display window 5 can monitor the operating state of the observation device, a connecting circuit 3 extends and retracts inside a circuit extension protection mechanism 4 to protect the connecting circuit 3 from being too long or too short, signal transmission is more stable, an insulating outer plate 10 increases the use safety performance of the device main body 1, a central management system is connected with the position of the Internet of things to perform multi-level management and control through the Internet of things, the Internet of things is connected with management systems of all levels through an Ethernet mode and is finally transmitted to a terminal to perform overall management and control, the device has the performances of monitoring, displaying, scheduling and controlling, and the line can be conveniently and better connected with an intelligent terminal control system through a circuit extension protection mechanism, a hierarchical management and control system and an intelligent terminal, be convenient for protect the circuit, increase of service life can also make things convenient for better building to manage the scheduling operation, adopts the mode of thing networking to control, and is more simple and convenient, and backstage terminal is convenient for observe and control, simple and practical, whole intelligent building multistage scheduling management device simple structure, convenient operation.
It is noted that, herein, relational terms such as first and second (a, b, etc.) and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (8)

1. Intelligent building multilevel scheduling management device based on thing networking, including device main part (1), its characterized in that: the flexible protection mechanism of one side fixedly connected with circuit (4) of device main part (1), the front end of device main part (1) is provided with display window (5), relay switch (8) and connector (9), the outer fixed surface of device main part (1) is connected with insulating planking (10), the one end of device main part (1) is provided with interconnecting link (3), and interconnecting link (3) arranges the inside of the flexible protection mechanism of circuit (4) in, the one end of interconnecting link (3) is connected with one-level management and control terminal (2), second grade management and control terminal (6) and tertiary management and control terminal (7).
2. The intelligent building multilevel scheduling management device based on the internet of things as claimed in claim 1, wherein: the flexible protection mechanism of circuit (4) is including circuit export registration arm (401), wear pad (402), fastener (403), protection mechanism main part (404), fly leaf (405), articulamentum (406), insulating protection board (407), circuit export registration arm (401) is located one side of protection mechanism main part (404), fly leaf (405) is located the front end of protection mechanism main part (404), wear pad (402) is located the internal surface of circuit export registration arm (401), fastener (403) are located one side of fly leaf (405), insulating protection board (407) is located the surface of protection mechanism main part (404), articulamentum (406) are located the rear end surface of protection mechanism main part (404).
3. The intelligent building multilevel scheduling management device based on the internet of things as claimed in claim 2, wherein: be provided with the hinge between protection mechanism main part (404) and fly leaf (405), one side swing joint of hinge and fly leaf (405) is passed through to one side of protection mechanism main part (404), be provided with the installation clamp between protection mechanism main part (404) and circuit export registration arm (401), the one end fixed connection of installation clamp and circuit export registration arm (401) is passed through to one side of protection mechanism main part (404), be provided with the powerful glue between circuit export registration arm (401) and abrasion pad (402), the internal surface of circuit export registration arm (401) passes through the internal surface fixed connection of powerful glue and abrasion pad (402).
4. The intelligent building multilevel scheduling management device based on the internet of things as claimed in claim 1, wherein: the device main part (1) is internally provided with a central management system, an intelligent Internet of things, a first-level management system, a second-level management system, a third-level management system, an intelligent terminal and an Ethernet, wherein the central management system is connected with the intelligent Internet of things, the intelligent Internet of things is connected with the first-level management system, the second-level management system and the third-level management system, and the first-level management system, the second-level management system and the third-level management system are connected with the intelligent terminal.
5. The intelligent building multilevel scheduling management device based on the internet of things as claimed in claim 4, wherein: the output of central management system and the input electric connection of intelligence thing networking, the output of intelligence thing networking passes through ethernet and first-level management system, second grade management system, tertiary management system's input electric connection, first-level management system, second grade management system, tertiary management system's output and intelligent terminal's input electric connection.
6. The intelligent building multilevel scheduling management device based on the internet of things as claimed in claim 1, wherein: the intelligent terminal comprises a management module, a monitoring module, a display module, a scheduling module and a control module, wherein the management module is connected with the monitoring module, the display module, the scheduling module and the control module.
7. The intelligent building multilevel scheduling management device based on the internet of things as claimed in claim 6, wherein: the output end of the management module is electrically connected with the input ends of the monitoring module, the display module, the scheduling module and the control module.
8. The use method of the intelligent building multilevel scheduling management device based on the internet of things as claimed in claim 1, wherein: when the device is used, the first-level control terminal (2), the second-level control terminal (6) and the third-level control terminal (7) are connected with the device main body (1) through the connecting circuit (3) in a signal transmission mode, the connecting circuit (3) adopts an Ethernet mode, signal output is stable, the device main body (1) is an overall control center and is connected with data management equipment through a connecting port (9), a relay switch (8) plays a role of a voltage stabilizing switch, a display window (5) can monitor the operating state of the observation device, the connecting circuit (3) stretches inside a circuit stretching protection mechanism (4) to protect the connecting circuit (3) and cannot be overlong or too short, signal transmission is more stable, an insulating outer plate (10) is used for improving the use safety performance of the device main body (1), and the central management system is connected with the position of the Internet of things, the management and control system comprises a terminal, a network management system and a network management system, wherein the network management system is connected with the network management system through the network management system, and the network management system is finally transmitted to the terminal for overall management and control.
CN202110079403.XA 2021-01-21 2021-01-21 Intelligent building multistage scheduling management device based on Internet of things and use method thereof Pending CN112859653A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110079403.XA CN112859653A (en) 2021-01-21 2021-01-21 Intelligent building multistage scheduling management device based on Internet of things and use method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110079403.XA CN112859653A (en) 2021-01-21 2021-01-21 Intelligent building multistage scheduling management device based on Internet of things and use method thereof

Publications (1)

Publication Number Publication Date
CN112859653A true CN112859653A (en) 2021-05-28

Family

ID=76008510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110079403.XA Pending CN112859653A (en) 2021-01-21 2021-01-21 Intelligent building multistage scheduling management device based on Internet of things and use method thereof

Country Status (1)

Country Link
CN (1) CN112859653A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102841595A (en) * 2012-09-27 2012-12-26 南京需求响应节能科技有限公司 Multi-stage resource scheduling management system
CN105549656A (en) * 2015-12-17 2016-05-04 天津市安佳信科技发展股份有限公司 Security system of intelligent buildings
CN108107874A (en) * 2018-01-02 2018-06-01 马鞍山佳夫尼电气科技有限公司 A kind of multi-stage scheduling automated system
CN109624753A (en) * 2018-11-27 2019-04-16 安徽恒瑞新能源股份有限公司 A kind of charging pile with charging cable defencive function
CN209434829U (en) * 2019-04-15 2019-09-24 成都师范学院 A kind of computer Cable box for preventing route in disorder
CN111115375A (en) * 2018-10-30 2020-05-08 淮安创海网络科技有限公司 Automatic winding circuit for computer
CN111137743A (en) * 2019-11-20 2020-05-12 西安微城信息科技有限公司 Communication cable winding and winding protection device and use method
CN111417245A (en) * 2020-05-19 2020-07-14 宏励照明有限公司 Internet of things illumination management system
CN211123694U (en) * 2019-12-21 2020-07-28 广东粤讯科技开发有限公司 Intelligent building BA system
CN211871014U (en) * 2020-03-11 2020-11-06 苏州千华台电子科技有限公司 Winding device for computer cable harness

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102841595A (en) * 2012-09-27 2012-12-26 南京需求响应节能科技有限公司 Multi-stage resource scheduling management system
CN105549656A (en) * 2015-12-17 2016-05-04 天津市安佳信科技发展股份有限公司 Security system of intelligent buildings
CN108107874A (en) * 2018-01-02 2018-06-01 马鞍山佳夫尼电气科技有限公司 A kind of multi-stage scheduling automated system
CN111115375A (en) * 2018-10-30 2020-05-08 淮安创海网络科技有限公司 Automatic winding circuit for computer
CN109624753A (en) * 2018-11-27 2019-04-16 安徽恒瑞新能源股份有限公司 A kind of charging pile with charging cable defencive function
CN209434829U (en) * 2019-04-15 2019-09-24 成都师范学院 A kind of computer Cable box for preventing route in disorder
CN111137743A (en) * 2019-11-20 2020-05-12 西安微城信息科技有限公司 Communication cable winding and winding protection device and use method
CN211123694U (en) * 2019-12-21 2020-07-28 广东粤讯科技开发有限公司 Intelligent building BA system
CN211871014U (en) * 2020-03-11 2020-11-06 苏州千华台电子科技有限公司 Winding device for computer cable harness
CN111417245A (en) * 2020-05-19 2020-07-14 宏励照明有限公司 Internet of things illumination management system

Similar Documents

Publication Publication Date Title
CN205490801U (en) Urgent telephone system of highway network
CN105978633B (en) The Ethernet reverse feeding device and its implementation of PON far end systems
CN112859653A (en) Intelligent building multistage scheduling management device based on Internet of things and use method thereof
CN207354524U (en) A kind of electronic wiring frame wire connection structure
CN202889350U (en) Ultra wide band (UWB) light distribution system
CN204832606U (en) Improvement structure with optical cable is connected to house lead in
CN208861026U (en) A kind of more opening door hermetic fiber distributing frames
CN209433918U (en) A kind of novel computer cable
CN204832605U (en) Optical cable is used in connection of stand wear and tear house lead in
CN205847200U (en) A kind of header box monitoring system based on optical fiber ring network
CN205720803U (en) A kind of communications optical cable junction box
CN207117096U (en) A kind of defeated spool road of glass room of convenient dismounting
CN219514180U (en) Optical fiber communication equipment
CN208873258U (en) It is contactless stop, intelligent alarm of sending a telegram here
CN2798105Y (en) Structure for fast determining medium voltage cable network fault range
CN204362070U (en) A kind of novel trans is to power supply broadband access unit
CN203457166U (en) Novel power line and telephone line bridge device
CN204832604U (en) Optical cable is connected to ageing resistance house lead in
CN218273155U (en) Remote control illumination and ventilation system of underground pipe gallery
CN207968493U (en) A kind of intelligent integral transmission box
CN209472184U (en) A kind of voice and remote motion signal multifunctional testing line
CN213547720U (en) Manageable optical switch switching device
CN218449389U (en) Bus plugging box for three-position intelligent wireless communication
CN214989483U (en) Elevator intercom system based on network connection
RU2178909C1 (en) Automatic supervisory control system for building engineering systems

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210528