CN112854661A - Self-leveling anti-static coating terrace - Google Patents

Self-leveling anti-static coating terrace Download PDF

Info

Publication number
CN112854661A
CN112854661A CN202110069458.2A CN202110069458A CN112854661A CN 112854661 A CN112854661 A CN 112854661A CN 202110069458 A CN202110069458 A CN 202110069458A CN 112854661 A CN112854661 A CN 112854661A
Authority
CN
China
Prior art keywords
arc
sliding
groove
terrace
self
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202110069458.2A
Other languages
Chinese (zh)
Inventor
田力男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202110069458.2A priority Critical patent/CN112854661A/en
Publication of CN112854661A publication Critical patent/CN112854661A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/12Flooring or floor layers made of masses in situ, e.g. seamless magnesite floors, terrazzo gypsum floors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F2290/00Specially adapted covering, lining or flooring elements not otherwise provided for
    • E04F2290/04Specially adapted covering, lining or flooring elements not otherwise provided for for insulation or surface protection, e.g. against noise, impact or fire
    • E04F2290/048Specially adapted covering, lining or flooring elements not otherwise provided for for insulation or surface protection, e.g. against noise, impact or fire against static electricity

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Floor Finish (AREA)

Abstract

The invention belongs to the technical field of floor structures, and particularly relates to a self-leveling antistatic coating floor which comprises a base layer, wherein a primer layer, a conductive layer and a finish layer formed by coating self-leveling floor paint are sequentially arranged on the top of the base layer from bottom to top; according to the invention, by arranging the structure in the terrace, the conducting rod can be integrally and stably positioned, the construction difficulty of the terrace is greatly reduced, the construction quality of the terrace is improved, and meanwhile, the damaged conducting rod can be conveniently replaced, so that the replacement difficulty of the conducting rod is reduced, and the convenience of maintenance of the coating terrace is improved.

Description

Self-leveling anti-static coating terrace
Technical Field
The invention belongs to the technical field of terrace structures, and particularly relates to a self-leveling anti-static coating terrace.
Background
Because a large amount of static charges are easily accumulated on the common terrace due to frequent friction, the common terrace often influences the production process and the product quality in special environments such as precise electronic factory workshops, warehouses, machine rooms, electrical control rooms, textile factories and other places needing static electricity prevention, and accidents such as fire disasters, explosions and the like are caused in serious cases.
Also some technical scheme about preventing static coating terrace have appeared among the prior art, like a chinese patent, patent number is 2019217716267, provided an prevent static epoxy terrace paint coating in this invention, relate to terrace structure technical field, and its technical scheme main points are: including the basic unit, from the bottom up is equipped with priming paint layer, finish paint layer in proper order on the basic unit, be equipped with the conducting layer between priming paint layer and the finish paint layer, evenly distributed has a plurality of conducting rods in the conducting layer, the conducting rod passes conducting layer, priming paint layer in proper order and contacts the basic unit. The conducting layer is formed by directly coating the conducting paint on the priming paint layer, the processing is convenient, the structural integrity of the conducting layer is strong, and the conducting capability is stable; and the conducting layer can be gathered together the static that produces in the whole terrace paint structure, and the rethread conducting rod is fast with static transmission underground, and it is lasting to prevent the static effect.
But the antistatic coating terrace among the prior art need be with solitary conducting rod vertical positioning respectively when the construction, make the conducting rod degree of difficulty when applying great, also can lead to the conducting rod to take place to incline and influence its effectual work at the in-process of construction, produce simultaneously at the finish paint layer of terrace when the damage leads to conducting rod and external contact, the conducting rod top is corroded rust easily this moment, or lead to the conductive coating on surface to be scraped off or produce the damage under external striking, thereby influence the follow-up use of conducting rod, and be difficult to change the inside whole conducting rod of terrace.
In view of the above, the invention provides a self-leveling antistatic coating terrace, through setting up the structure in the terrace, the conducting rod can be integrally positioned, the construction difficulty of the terrace is greatly reduced, and meanwhile, the connecting rod can also make the conducting rod be in a stable vertical state in the construction process, so as to prevent the conducting rod from being inclined during construction to influence the construction quality of the terrace, and meanwhile, the damaged conducting rod can be conveniently replaced, and the whole conducting rod does not need to be tilted out of the terrace in a time-consuming and labor-consuming manner, so that the replacement difficulty of the conducting rod is reduced, and the convenience of the coating terrace during maintenance is improved.
Disclosure of Invention
In order to make up the defects of the prior art, the invention provides a self-leveling antistatic coating terrace, the conducting rod can be integrally positioned by arranging a structure in the terrace, the construction difficulty of the terrace is greatly reduced, meanwhile, the conducting rod can be in a stable vertical state in the construction process by a connecting rod, the conducting rod is prevented from being inclined during construction to influence the construction quality of the terrace, meanwhile, the damaged conducting rod can be conveniently replaced, the whole conducting rod does not need to be tilted out of the terrace in a time-consuming and labor-consuming manner, the replacement difficulty of the conducting rod is reduced, and the convenience of the coating terrace during maintenance is improved.
The technical scheme adopted by the invention for solving the technical problems is as follows: the self-leveling antistatic coating floor comprises a base layer, wherein a primer layer, a conductive layer and a finish layer formed by coating self-leveling floor paint are sequentially arranged on the top of the base layer from bottom to top, uniformly distributed conductive rods are paved in the conductive layer in advance, the top ends of the conductive rods are positioned inside the finish layer, the bottom ends of the conductive rods penetrate through the primer layer and are in contact with the base layer, two adjacent conductive rods are connected through a connecting rod, each conductive rod consists of a cylindrical ejector rod and a bottom rod, a connecting cavity is formed in the middle of each ejector rod, a groove is formed in the upper end face of each ejector rod corresponding to the top end of the connecting cavity, a threaded groove is formed in the middle of the upper end face of each bottom rod, a bolt is arranged inside the connecting cavity and consists of a stud and a nut, when the bottom end of the bolt is screwed inside the threaded groove, the nut is positioned inside the groove, and the, the top surfaces of the screw caps are respectively provided with a screwing groove; when the anti-static coating terrace works, a single conducting rod needs to be vertically positioned respectively during construction, so that the conducting rod is difficult to apply, the conducting rod is inclined in the construction process to influence the effective work of the conducting rod, and meanwhile, when a finish paint layer of the terrace is damaged to cause the conducting rod to be in contact with the outside, the top end of the conducting rod is easy to corrode and rust, or conductive paint on the surface is scraped off or damaged under the external impact, so that the subsequent use of the conducting rod is influenced, and the whole conducting rod in the terrace is not easy to replace; when the terrace is laid, the conducting rods are connected into a whole through the connecting rods, then the integrated conducting rods are placed on the base layer, the conducting rods can be automatically erected and effectively positioned under the action of the connecting rods, then the primer layer, the conducting layer and the finish paint layer are sequentially laid on the base layer, and the single conducting rods are not required to be manually positioned one by one, so that the construction difficulty of the terrace is greatly reduced, meanwhile, the connecting rods can enable the conducting rods to be in a stable vertical state in the construction process, and the conducting rods are prevented from being inclined during construction to influence the construction quality of the terrace; at the moment, static electricity generated in the terrace can be quickly transferred to the base layer through the conducting layer and the conducting rod and discharged, so that the coating terrace has excellent anti-static capacity; and when the finish paint layer takes place wearing and tearing and lead to the conducting rod top to damage, through inserting the screwdriver in the groove of twisting of nut and twist the bolt this moment, make the bolt no longer be connected ejector pin and sill bar after twisting out from thread groove inside gradually, only need follow the ejector pin follow the terrace inside extract and change new ejector pin afterwards can, make damaged conducting rod can obtain convenient change and carry out the work that stably lasts, no longer need with whole conducting rod waste time and energy from the perk in the terrace, thereby the change degree of difficulty of conducting rod has been reduced, the convenience of coating terrace when the maintenance has been improved.
Preferably, a group of arc-shaped grooves which are uniformly distributed in an annular shape are formed in the side wall of the ejector rod, arc-shaped plates are respectively connected to the inner portions of the arc-shaped grooves in a sliding mode, a gap is reserved between the side end of each arc-shaped plate and the side wall of each arc-shaped groove, a first spring is connected between each arc-shaped plate and the inner end of each arc-shaped groove, a traction rope is connected to each arc-shaped plate, and the other end of each traction rope is connected with the; the during operation, when needs are discharged the ejector pin from the terrace in, the mode of comparatively relaxing this moment is rotated the ejector pin for the terrace, thereby make ejector pin lateral wall break away from with the glued terrace of contact mutually, and through set up the arc on the ejector pin lateral wall, make the arc during construction shutoff under the effect of a spring notch at the arc, when twisting the bolt, pivoted double-screw bolt can carry out the roll-up to the haulage rope this moment, make the haulage rope exert pulling force to the arc, thereby make the arc atress break away from mutually with the terrace to arc inside motion and take the lead, the contact bonding area between ejector pin lateral wall and the terrace has been reduced, thereby make the ejector pin follow-up rotate and more easy with the process that the terrace breaks away from completely, greatly reduced the construction degree of difficulty when the pole top is changed.
Preferably, the outer ends of the side walls of the arc-shaped grooves are respectively provided with an extending part, and the outer parts of the side ends of the arc-shaped plates corresponding to the extending parts are respectively provided with a positioning groove matched with the arc-shaped plates; during operation, the arc can make the effectual block of constant head tank and extension under the effect of a spring, and make the outer end of arc flush mutually with the lateral wall of ejector pin, the extension can restrict the position of arc this moment, prevent that the arc from protruding to the ejector pin outside and leading to the terrace material to spill into the inside condition of arc when the construction, extension and the constant head tank of mutually supporting simultaneously also can carry out the shutoff to the clearance between arc side and the arc, further prevent inside the terrace material spills into the arc, the construction quality of conducting rod has been improved.
Preferably, sliding grooves are formed in the side ends of the arc-shaped plates respectively, sliding blocks are connected to the outer ends of the sliding grooves in a sliding mode, supporting plates are fixedly connected to the end portions of the sliding grooves, and second springs are connected between the sliding blocks and the supporting plates; during operation, the slider is pressfitting on the arc wall all the time under the effect of No. two springs in inner to can carry out continuous stable shutoff to the clearance between arc plate side and the arc wall, further prevent that terrace material from overflowing into the inside condition of arc at the in-process of construction.
Preferably, the traction rope at the arc-shaped plate penetrates through the sliding groove to be connected with the inner end of the sliding block, a clamping groove matched with the sliding block is formed in the side wall of the arc-shaped groove, and after the positioning groove is contacted with the extending portion, the sliding block is aligned with the clamping groove and can slide into the clamping groove; when the conductive rod works, after the positioning groove and the extending part are clamped by the arc-shaped plate under the action of the first spring, the arc-shaped plate drives the sliding block to align with the clamping groove, and the sliding block is pressed into the clamping groove under the action of the second spring, so that the sliding block positioned between the clamping groove and the sliding groove can fix the arc-shaped plate at the notch of the arc-shaped groove, the arc-shaped plate is prevented from sinking towards the inside of the arc-shaped groove under the pressure of a terrace material, the terrace material flows into the notch of the arc-shaped groove, and the subsequent ejector rod is difficult to unload, and the construction quality of the conductive rod is further improved; when the ejector pin need be unloaded, the haulage rope of being rolled up by the double-screw bolt this moment can take lead the pulling slider and break away from the draw-in groove is inside, and the arc breaks away from with the terrace under the subsequent pulling force of haulage rope afterwards to make the ejector pin can easily swift unload from the terrace.
Preferably, the inner ends of the arc-shaped grooves are respectively connected with a hollow tube, the free end of the hollow tube penetrates through the side wall of the arc-shaped plate and is positioned inside the sliding groove, the hollow tube is connected with the arc-shaped plate in a sliding manner, a gap is formed between the free end of the hollow tube and the side wall of the sliding groove, and the traction rope penetrates through the interior of the hollow tube; the during operation, when the ejector pin need be unloaded in the terrace, the haulage rope also can be in step to the arc applys pulling force when applying pulling force to the slider in earlier stage this moment, make the arc produce the trend to the inside motion of arc, thereby make the slide when the motion and draw-in groove and spout between frictional force great, this moment through setting up the hollow tube, make the haulage rope change the effort of applying to the spout inner wall when the roll-up into and apply the effort to hollow tube free end, thereby can reduce the resistance that the slider received when breaking away from the draw-in groove, make the ejector pin can follow the terrace in more stable effectual unloading.
Preferably, a pressure lever is connected to the outside of the side end of the arc-shaped plate, a pressure groove is formed in the extending portion, a slot matched with the pressure lever is formed in one side, close to the positioning groove, of the extending portion, a rubber ball in interference fit with the pressure groove is connected to the inside of the pressure groove in a sliding mode, an elastic body is connected to one end, far away from the slot, of the rubber ball and the pressure groove, and an air passage communicated with the pressure groove and the clamping groove is formed in the extending portion; the during operation, drive the in-process of constant head tank and extension looks block when the arc, the arc can drive the depression bar in step and insert inside the indent, and exert pressure to rubber ball one side, make the rubber ball atress keep away from the one side compression of air flue to the indent, along with the rubber ball is close to the one end space grow of air flue with the indent, make the inside atmospheric pressure of draw-in groove reduce gradually, after slider and draw-in groove align afterwards, the slider is effectively inhaled under the effect of the inside low atmospheric pressure of draw-in groove this moment, thereby make the slider can more stabilize effectual and cooperate with the draw-in groove.
Preferably, a sliding cavity is formed in the side wall of the stud, a sliding plate is connected to the inside of the sliding cavity in a sliding manner, a third spring is connected between the sliding plate and the inner end of the sliding cavity, and a clamping cavity matched with the sliding plate is formed in the bottom end of the side wall at the joint of the connecting cavity and the stud; during operation, before the double-screw bolt slides in and connects intracavity portion, take the lead to the slide inside the sliding chamber of impressing, make the double-screw bolt can get into smoothly and connect intracavity portion, the slide is outstanding in the sliding chamber outer end under the effect of No. three springs afterwards, at the in-process that the bolt was twisted out from the thread groove, the double-screw bolt can drive the slide and block inside the card chamber gradually, along with the double-screw bolt continues to rotate, the double-screw bolt can drive the slide and apply ejector pin pivoted torque force to the sliding chamber lateral wall this moment, thereby make the ejector pin effectively rotate and break away from completely with the terrace, the convenience of ejector pin when dismantling has further been improved.
The invention has the following beneficial effects:
1. according to the invention, through arranging the structure in the terrace, the conducting rod can be integrally positioned, the construction difficulty of the terrace is greatly reduced, meanwhile, the connecting rod can also enable the conducting rod to be in a stable vertical state in the construction process, the conducting rod is prevented from being inclined during construction to influence the construction quality of the terrace, meanwhile, the damaged conducting rod can be conveniently replaced, the whole conducting rod does not need to be tilted out of the terrace in a time-consuming and labor-consuming manner, the replacement difficulty of the conducting rod is reduced, and the convenience of the coating terrace during maintenance is improved.
2. According to the invention, the arc-shaped plate is arranged on the side wall of the ejector rod, so that the arc-shaped plate can move towards the inside of the arc-shaped groove and is separated from the terrace first, and the contact bonding area between the side wall of the ejector rod and the terrace is reduced, so that the process of the ejector rod rotating in the subsequent process and being completely separated from the terrace is easier, and the construction difficulty in replacing the rod top is greatly reduced.
Drawings
The invention will be further explained with reference to the drawings.
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view at A in FIG. 1;
FIG. 3 is a cross-sectional view taken at B-B of FIG. 2;
FIG. 4 is an enlarged view at C in FIG. 3;
FIG. 5 is an enlarged view at D of FIG. 3;
in the figure: the novel conductive coating comprises a base layer 1, a primer layer 2, a conductive layer 3, a finish paint layer 4, a conductive rod 5, a connecting rod 6, a top rod 7, a bottom rod 8, a connecting cavity 9, a groove 10, a thread groove 11, a stud 12, a nut 13, a screwing groove 14, an arc-shaped groove 15, an arc-shaped plate 16, a first spring 17, a traction rope 18, an extending part 19, a positioning groove 20, a sliding groove 21, a sliding block 22, a supporting plate 23, a second spring 24, a clamping groove 25, a hollow pipe 26, a pressing rod 27, a pressing groove 28, a slot 29, a rubber ball 30, an elastic body 31, an air passage 32, a sliding cavity 33, a sliding plate 34, a third.
Detailed Description
In order to make the technical means, the creation features, the achievement purposes and the effects of the invention easy to understand, the invention is further described with the following embodiments.
As shown in fig. 1-5, the self-leveling antistatic coating terrace of the invention comprises a base layer 1, wherein a primer layer 2, a conductive layer 3 and a finish layer 4 formed by coating self-leveling terrace paint are sequentially arranged on the top of the base layer 1 from bottom to top, uniformly distributed conductive rods 5 are pre-laid in the conductive layer 3, the top ends of the conductive rods 5 are positioned in the finish layer 4, the bottom ends of the conductive rods 5 penetrate through the primer layer 2 and are in contact with the base layer 1, two adjacent conductive rods 5 are connected through a connecting rod 6, each conductive rod 5 is composed of a cylindrical ejector rod 7 and a bottom rod 8, a connecting cavity 9 is arranged in the middle of each ejector rod 7, a groove 10 is arranged on the upper end face of each ejector rod 7 corresponding to the top end of each connecting cavity 9, a thread groove 11 is arranged in the middle of the upper end face of each bottom rod 8, a bolt is arranged in each connecting cavity 9 and consists of a, when the bottom end of the bolt is screwed in the thread groove 11, the screw cap 13 is positioned in the groove 10, the top surface of the screw cap 13 is flush with the upper end surface of the ejector rod 7, and the top surfaces of the screw caps 13 are respectively provided with a screwing groove 14; when the anti-static coating terrace works, a single conducting rod 5 needs to be vertically positioned respectively when the anti-static coating terrace in the prior art is constructed, so that the conducting rod 5 is difficult to apply, the conducting rod 5 is also inclined in the construction process to influence the effective work of the conducting rod 5, and meanwhile, when the conducting rod 5 is contacted with the outside due to the damage of a finish paint layer 4 of the terrace, the top end of the conducting rod 5 is easy to corrode and rust, or the conducting paint on the surface is scraped off or damaged due to the external impact, so that the subsequent use of the conducting rod 5 is influenced, and the whole conducting rod 5 in the terrace is not easy to replace; when the terrace is laid, the conducting rods 5 are connected into a whole through the connecting rods 6, then the integrated conducting rods 5 are placed on the base layer 1, at the moment, the conducting rods 5 can be automatically erected and effectively positioned under the action of the connecting rods 6, then the base layer 1 is sequentially laid with the primer layer 2, the conducting layer 3 and the finish paint layer 4, the single conducting rods 5 are not required to be manually positioned one by one, the construction difficulty of the terrace is greatly reduced, meanwhile, the connecting rods 6 can enable the conducting rods 5 to be in a stable vertical state in the construction process, and the conducting rods 5 are prevented from being inclined during construction to influence the construction quality of the terrace; at the moment, static electricity generated in the terrace can be quickly transferred to the base layer 1 through the conducting layer 3 and the conducting rod 5 and discharged, so that the coating terrace has excellent anti-static capacity; and when the finish coat layer 4 takes place wearing and tearing and lead to 5 tops of conducting rod to damage, at this moment through insert screwdriver in the groove 14 of twisting of nut 13 and twist the bolt, make the bolt no longer be connected ejector pin 7 with sill bar 8 after 11 inside back screws out of thread groove gradually, only need follow the ejector pin 7 follow the terrace inside extract and change new ejector pin 7 can, make damaged conducting rod 5 can obtain convenient change and stabilize the work that lasts, no longer need with whole conducting rod 5 waste time and energy from the perk in the terrace, thereby the change degree of difficulty of conducting rod 5 has been reduced, the convenience of coating terrace when the maintenance has been improved.
As an implementation mode of the invention, a group of arc-shaped grooves 15 which are uniformly distributed in an annular shape are formed on the side wall of the ejector rod 7, arc-shaped plates 16 are respectively connected in the arc-shaped grooves 15 in a sliding manner, a gap is reserved between the side end of each arc-shaped plate 16 and the side wall of each arc-shaped groove 15, a first spring 17 is connected between each arc-shaped plate 16 and the inner end of each arc-shaped groove 15, a traction rope 18 is connected onto each arc-shaped plate 16, and the other end of each traction rope 18 is connected with the side wall of the; the during operation, when needs are discharged ejector pin 7 from the terrace, the mode of comparatively relaxing this moment is with ejector pin 7 for the terrace rotates, thereby make ejector pin 7 lateral wall break away from with the bonded terrace of contact mutually, and through set up arc 16 on ejector pin 7 lateral wall, make the notch of arc 16 shutoff under spring 17's effect during the construction at arc 15, when twisting the bolt, pivoted double-screw bolt 12 can roll-up haulage rope 18 this moment, make haulage rope 18 exert pulling force to arc 16, thereby make 16 atresss of arc 15 internal motion of arc and take off from with the terrace earlier mutually, the contact bonding area between ejector pin 7 lateral wall and the terrace has been reduced, thereby make ejector pin 7 follow-up rotate and the process that breaks away from completely with the terrace easier, greatly reduced the construction degree of difficulty when the pole top is changed.
As an embodiment of the present invention, the outer ends of the side walls of the arc-shaped slots 15 are respectively provided with an extending portion 19, and the outer portions of the side ends of the arc-shaped plates 16 corresponding to the extending portions 19 are respectively provided with a positioning slot 20 matched therewith; during operation, the arc 16 can make the effectual block of constant head tank 20 and extension 19 under spring 17's effect, and make the outer end of arc 16 flush with ejector pin 7's lateral wall mutually, extension 19 can restrict arc 16's position this moment, prevent that arc 16 from outstanding to ejector pin 7 outside leading to the terrace material to spill into the inside condition of arc 15 when the construction, extension 19 and constant head tank 20 of mutually supporting simultaneously also can carry out the shutoff to the clearance between 16 sides of arc and the arc 15, further prevent that terrace material from spilling into inside arc 15, the construction quality of conducting rod 5 has been improved.
As an embodiment of the invention, sliding grooves 21 are respectively formed at the side ends of the arc-shaped plates 16, the outer ends of the sliding grooves 21 are slidably connected with sliding blocks 22, the end parts of the sliding grooves 21 are fixedly connected with supporting plates 23, and second springs 24 are connected between the sliding blocks 22 and the supporting plates 23; during operation, the slider 22 is pressed on the side wall of the arc-shaped groove 15 all the time under the action of the second spring 24 at the inner end, so that the gap between the side end of the arc-shaped plate 16 and the side wall of the arc-shaped groove 15 can be continuously and stably sealed, and the terrace material is further prevented from overflowing into the inner part of the arc-shaped groove 15 in the construction process.
As an embodiment of the present invention, the pulling rope 18 at the arc-shaped plate 16 passes through the sliding groove 21 and is connected to the inner end of the sliding block 22, the side wall of the arc-shaped groove 15 is provided with a clamping groove 25 matched with the sliding block 22, and after the positioning groove 20 is contacted with the extending portion 19, the sliding block 22 is aligned with the clamping groove 25 and can slide into the clamping groove 25; when the conductive rod works, after the positioning groove 20 is clamped with the extension part 19 under the action of the first spring 17, the arc plate 16 drives the sliding block 22 to be aligned with the clamping groove 25, and the sliding block 22 is pressed into the clamping groove 25 under the action of the second spring 24, so that the sliding block 22 between the clamping groove 25 and the sliding groove 21 can fix the arc plate 16 at the notch of the arc groove 15, the arc plate 16 is prevented from sinking into the arc groove 15 under the pressure of a terrace material, the terrace material flows into the notch of the arc groove 15, and the subsequent ejector rod 7 is in a relatively labor-consuming condition when being detached, and the construction quality of the conductive rod 5 is further improved; when the ejector pin 7 needs to be discharged, the traction rope 18 coiled by the stud 12 can pull the slider 22 to separate from the inside of the clamping groove 25 first, and then the arc-shaped plate 16 separates from the floor under the subsequent tension of the traction rope 18, so that the ejector pin 7 can be discharged from the floor easily and quickly.
As an embodiment of the invention, the inner ends of the arc-shaped slots 15 are respectively connected with hollow pipes 26, the free ends of the hollow pipes 26 penetrate through the side walls of the arc-shaped plates 16 and are positioned inside the sliding grooves 21, the hollow pipes 26 are connected with the arc-shaped plates 16 in a sliding manner, a gap is arranged between the free ends of the hollow pipes 26 and the side walls of the sliding grooves 21, and the hauling ropes 18 penetrate through the inside of the hollow pipes 26; the during operation, when ejector pin 7 need be unloaded in the terrace, haulage rope 18 also can exert pulling force to arc 16 in step when exerting pulling force to slider 22 earlier stage this moment, make arc 16 produce the trend to the inside motion of arc 15, thereby make slide 34 great with draw-in groove 25 and the frictional force between spout 21 when the motion, this moment through setting up hollow tube 26, make haulage rope 18 convert the effort of exerting to spout 21 inner wall when the roll-up and exert the effort to hollow tube 26 free end, thereby can reduce the resistance that slider 22 received when breaking away from draw-in groove 25, make ejector pin 7 can follow the terrace in more stable effectual unloading.
As an embodiment of the present invention, a pressure lever 27 is connected to the outside of the side end of the arc plate 16, a pressure groove 28 is arranged inside the extending portion 19, a slot 29 matched with the pressure lever 27 is formed in one side of the extending portion 19 close to the positioning slot 20, a rubber ball 30 in interference fit with the pressure groove 28 is connected to the inside of the pressure groove 28 in a sliding manner, an elastic body 31 is connected to one end of the rubber ball 30 and the pressure groove 28 far away from the slot 29, and an air passage 32 communicating the pressure groove 28 and the clamping slot 25 is arranged inside the extending portion 19; the during operation, drive the in-process of constant head tank 20 and 19 looks block of extension when the arc 16, the arc 16 can drive depression bar 27 in step and insert inside pressure tank 28, and exert pressure to rubber ball 30 one side, make rubber ball 30 atress keep away from one side compression of air flue 32 to pressure tank 28, along with rubber ball 30 and the one end space grow that pressure tank 28 is close to air flue 32, make the inside atmospheric pressure of draw-in groove 25 reduce gradually, after slider 22 aligns with draw-in groove 25 afterwards, slider 22 is effectively inhaled under the effect of the inside low atmospheric pressure of draw-in groove 25 this moment, thereby make slider 22 can more stabilize effectual and cooperate with draw-in groove 25.
As an embodiment of the invention, a sliding cavity 33 is formed on the side wall of the stud 12, a sliding plate 34 is connected in the sliding cavity 33 in a sliding manner, a third spring 35 is connected between the sliding plate 34 and the inner end of the sliding cavity 33, and a clamping cavity 36 matched with the sliding plate 34 is arranged at the bottom end of the side wall at the connection part of the connecting cavity 9 and the stud 12; during operation, before stud 12 slided into and connects the chamber 9 inside, take lead to impress inside smooth chamber 33 with slide 34 for stud 12 can get into and connect the chamber 9 smoothly inside, slide 34 is outstanding at the smooth chamber 33 outer end under No. three spring's 35 effect afterwards, at the in-process that the bolt was twisted out from thread groove 11, stud 12 can drive slide 34 and block inside card chamber 36 gradually, continue to rotate along with stud 12, stud 12 can drive slide 34 and exert ejector pin 7 pivoted torque force to smooth chamber 33 lateral wall this moment, thereby make ejector pin 7 can effectively rotate and break away from completely with the terrace, the convenience of ejector pin 7 when dismantling has further been improved.
When the floor is in operation, the conducting rods 5 are connected into a whole through the connecting rod 6, then the integrated conducting rods 5 are placed on the base layer 1, at the moment, the conducting rods 5 can be automatically erected and effectively positioned under the action of the connecting rod 6, then the primer layer 2, the conducting layer 3 and the finish paint layer 4 are sequentially laid on the base layer 1, the single conducting rods 5 do not need to be manually positioned one by one, the construction difficulty of the floor is greatly reduced, meanwhile, the connecting rod 6 can enable the conducting rods 5 to be in a stable vertical state in the construction process, and the conducting rods 5 are prevented from being inclined during construction to influence the construction quality of the floor; at the moment, static electricity generated in the terrace can be quickly transferred to the base layer 1 through the conducting layer 3 and the conducting rod 5 and discharged, so that the coating terrace has excellent anti-static capacity; and when the finish coat layer 4 takes place wearing and tearing and lead to 5 tops of conducting rod to damage, at this moment through insert screwdriver in the groove 14 of twisting of nut 13 and twist the bolt, make the bolt no longer be connected ejector pin 7 with sill bar 8 after 11 inside back screws out of thread groove gradually, only need follow the ejector pin 7 follow the terrace inside extract and change new ejector pin 7 can, make damaged conducting rod 5 can obtain convenient change and stabilize the work that lasts, no longer need with whole conducting rod 5 waste time and energy from the perk in the terrace, thereby the change degree of difficulty of conducting rod 5 has been reduced, the convenience of coating terrace when the maintenance has been improved.
The foregoing illustrates and describes the principles, general features, and advantages of the present invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are given by way of illustration of the principles of the present invention, and that various changes and modifications may be made without departing from the spirit and scope of the invention as defined by the appended claims. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (8)

1. The utility model provides a static coating terrace is prevented to self-leveling, includes basic unit (1), basic unit (1) top is from supreme priming paint layer (2), conducting layer (3) and the finish paint layer (4) that the self-leveling floor lacquer coating formed of being equipped with in proper order down, evenly distributed's conducting rod (5) have been laid in advance in conducting layer (3), inside conducting rod (5) top is located finish paint layer (4), conducting rod (5) bottom run through priming paint layer (2) and with basic unit (1) contact, its characterized in that: adjacent two link to each other through connecting rod (6) between conducting rod (5), conducting rod (5) comprise cylindric ejector pin (7) and sill bar (8), connection chamber (9) have been seted up at ejector pin (7) middle part, ejector pin (7) up end that connection chamber (9) top corresponds is provided with recess (10), thread groove (11) have been seted up at the up end middle part of sill bar (8), it is equipped with the bolt to connect chamber (9) inside, the bolt comprises double-screw bolt (12) and nut (13), when the bolt bottom is screwed up inside thread groove (11), nut (13) are located inside recess (10), just nut (13) top surface flushes with the up end of ejector pin (7) mutually, nut (13) top surface has seted up respectively and has screwed up groove (14).
2. The self-leveling antistatic coating terrace according to claim 1, characterized in that: arc wall (15) of a set of annular equipartition are seted up on ejector pin (7) lateral wall, arc wall (15) inside respectively sliding connection has arc (16), just reserve the clearance between arc (16) side and arc wall (15) lateral wall, be connected with spring (17) between arc (16) and arc wall (15) the inner, be connected with haulage rope (18) on arc (16), the other end and double-screw bolt (12) lateral wall of haulage rope (18) link to each other.
3. The self-leveling antistatic coating terrace according to claim 2, characterized in that: the outer ends of the side walls of the arc-shaped grooves (15) are respectively provided with an extending part (19), and the outer parts of the side ends of the arc-shaped plates (16) corresponding to the extending parts (19) are respectively provided with a positioning groove (20) matched with the side ends.
4. The self-leveling antistatic coating terrace according to claim 3, characterized in that: the arc-shaped plate is characterized in that sliding grooves (21) are formed in the side ends of the arc-shaped plate (16), sliding blocks (22) are connected to the outer ends of the sliding grooves (21) in a sliding mode, supporting plates (23) are fixedly connected to the end portions of the sliding grooves (21), and second springs (24) are connected between the sliding blocks (22) and the supporting plates (23).
5. The self-leveling antistatic coating terrace according to claim 4, characterized in that: the pulling rope (18) at the arc-shaped plate (16) penetrates through the sliding groove (21) to be connected with the inner end of the sliding block (22), a clamping groove (25) matched with the sliding block (22) is formed in the side wall of the arc-shaped groove (15), and after the positioning groove (20) is contacted with the extending portion (19), the sliding block (22) is aligned to the clamping groove (25) and can slide into the clamping groove (25).
6. The self-leveling antistatic coating terrace according to claim 5, characterized in that: the inner end of the arc-shaped groove (15) is connected with a hollow pipe (26) respectively, the free end of the hollow pipe (26) penetrates through the side wall of the arc-shaped plate (16) and is located inside the sliding groove (21), the hollow pipe (26) is connected with the arc-shaped plate (16) in a sliding mode, a gap is formed between the free end of the hollow pipe (26) and the side wall of the sliding groove (21), and the traction rope (18) penetrates through the inner portion of the hollow pipe (26).
7. The self-leveling antistatic coating terrace according to claim 5, characterized in that: the utility model discloses a rubber ball sealing device, including arc (16), extension (19), constant head tank (20), slot (29) that cooperate with depression bar (27) are seted up to the side external connection of side of arc (16) depression bar (27), extension (19) inside be provided with indent (28), one side that extension (19) are close to constant head tank (20) is seted up and is pressed slot (29), inside sliding connection of indent (28) has rubber ball (30) with indent (28) interference fit, the one end that slot (29) were kept away from in rubber ball (30) and indent (28) is connected with elastomer (31), extension (19) inside is provided with air flue (32) of intercommunication indent (28) and.
8. The self-leveling antistatic coating terrace according to claim 1, characterized in that: a sliding cavity (33) is formed in the side wall of the stud (12), a sliding plate (34) is connected to the inside of the sliding cavity (33) in a sliding mode, a third spring (35) is connected between the sliding plate (34) and the inner end of the sliding cavity (33), and a clamping cavity (36) matched with the sliding plate (34) is formed in the bottom end of the side wall of the joint of the connecting cavity (9) and the stud (12).
CN202110069458.2A 2021-01-19 2021-01-19 Self-leveling anti-static coating terrace Withdrawn CN112854661A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110069458.2A CN112854661A (en) 2021-01-19 2021-01-19 Self-leveling anti-static coating terrace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110069458.2A CN112854661A (en) 2021-01-19 2021-01-19 Self-leveling anti-static coating terrace

Publications (1)

Publication Number Publication Date
CN112854661A true CN112854661A (en) 2021-05-28

Family

ID=76007377

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110069458.2A Withdrawn CN112854661A (en) 2021-01-19 2021-01-19 Self-leveling anti-static coating terrace

Country Status (1)

Country Link
CN (1) CN112854661A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2474644Y (en) * 2001-04-05 2002-01-30 郭俊祥 Anti electrostatic passage network floor
JP2009257062A (en) * 2008-03-19 2009-11-05 Ube Ind Ltd Concrete floor structure and its construction method
CN207846978U (en) * 2017-12-29 2018-09-11 南京富海装饰工程有限公司 Antistatic floor with flame retarding construction
CN210421806U (en) * 2019-08-05 2020-04-28 广东固特易新材料科技有限公司 Antistatic epoxy terrace of high strength
CN211143627U (en) * 2019-10-21 2020-07-31 深圳陆城装饰设计工程有限公司 Anti-static epoxy floor paint coating
CN211369322U (en) * 2019-10-28 2020-08-28 深圳陆城装饰设计工程有限公司 Antistatic interior wall coating
CN211473223U (en) * 2019-12-17 2020-09-11 上海旻光信息科技有限公司 Anti-static epoxy resin terrace
CN213174623U (en) * 2020-07-09 2021-05-11 广东达尔新型材料有限公司 Waterborne antistatic polyurethane mortar floor coating
CN213204846U (en) * 2020-08-03 2021-05-14 中山市景涂装饰工程有限公司 Anti-static terrace with wear-resistant structure

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2474644Y (en) * 2001-04-05 2002-01-30 郭俊祥 Anti electrostatic passage network floor
JP2009257062A (en) * 2008-03-19 2009-11-05 Ube Ind Ltd Concrete floor structure and its construction method
CN207846978U (en) * 2017-12-29 2018-09-11 南京富海装饰工程有限公司 Antistatic floor with flame retarding construction
CN210421806U (en) * 2019-08-05 2020-04-28 广东固特易新材料科技有限公司 Antistatic epoxy terrace of high strength
CN211143627U (en) * 2019-10-21 2020-07-31 深圳陆城装饰设计工程有限公司 Anti-static epoxy floor paint coating
CN211369322U (en) * 2019-10-28 2020-08-28 深圳陆城装饰设计工程有限公司 Antistatic interior wall coating
CN211473223U (en) * 2019-12-17 2020-09-11 上海旻光信息科技有限公司 Anti-static epoxy resin terrace
CN213174623U (en) * 2020-07-09 2021-05-11 广东达尔新型材料有限公司 Waterborne antistatic polyurethane mortar floor coating
CN213204846U (en) * 2020-08-03 2021-05-14 中山市景涂装饰工程有限公司 Anti-static terrace with wear-resistant structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
商先鹏: "电子厂房防静电环氧自流平地坪施工工序的研究及应用", 《建材与装饰》 *

Similar Documents

Publication Publication Date Title
CN212432441U (en) Grouting sleeve leaks thick liquid detection device for hydraulic engineering supervision
CN112854661A (en) Self-leveling anti-static coating terrace
CN107227938B (en) Repairable rotary guide shoe assembly for well bore
CN115327719A (en) Oblique slider extrusion device and optical cable joint box of optical cable joint box sealing usefulness
CN208777919U (en) A kind of oil pumping rod centering device being oriented to
CN108097506B (en) Automatic walking spraying device for screw thread oil of drill rod
CN207701103U (en) Multifunctional polish rod seal device
KR890001380B1 (en) Filling method for crack in concrete structure
DE3605747A1 (en) Threaded cone clamping bush
CN210660920U (en) Integral type inflation screw
CN110528750B (en) Inner connection type curtain wall keel triple connection structure
CN110700530B (en) Integral type discharging device
CN112211350A (en) Assembled building half grout sleeve lightning protection connecting device
CN219953447U (en) Colliery rock burst monitor
CN205613628U (en) Automobile body double -screw bolt protection tool
CN207788845U (en) Plunger pump stuffing assembly supported flange withdrawing device
CN207144419U (en) A kind of new tooled joint device
CN207315271U (en) Blanking plug push loading head and the blanking plug pulling device using the blanking plug push loading head
CN212535037U (en) High altitude construction security fence for construction
CN205882198U (en) Single core cable terminal fitting
CN217355441U (en) Screw bolt containing rust removing maintenance part
CN209461277U (en) A kind of transformer leading-out wire structure
CN211638884U (en) Triangular rubber pressure plate mechanism
CN221031206U (en) Building construction equipment of coating device
CN220705262U (en) Micro-crack repairing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20210528