CN112840692B - Cell measurement method, device and storage medium - Google Patents

Cell measurement method, device and storage medium Download PDF

Info

Publication number
CN112840692B
CN112840692B CN201880098497.1A CN201880098497A CN112840692B CN 112840692 B CN112840692 B CN 112840692B CN 201880098497 A CN201880098497 A CN 201880098497A CN 112840692 B CN112840692 B CN 112840692B
Authority
CN
China
Prior art keywords
cell
measurement
measured
frequency point
time window
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201880098497.1A
Other languages
Chinese (zh)
Other versions
CN112840692A (en
Inventor
文会
东宁
李艳良
耿晓馥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Publication of CN112840692A publication Critical patent/CN112840692A/en
Application granted granted Critical
Publication of CN112840692B publication Critical patent/CN112840692B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/24Reselection being triggered by specific parameters
    • H04W36/30Reselection being triggered by specific parameters by measured or perceived connection quality data
    • H04W36/302Reselection being triggered by specific parameters by measured or perceived connection quality data due to low signal strength
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/02Arrangements for optimising operational condition

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The application provides a measurement method, a device and a storage medium. The method comprises the following steps: when the UE measures the cells of different systems or different frequencies, the UE firstly acquires the measurement timing configuration of a first cell needing timing measurement, determines the measurement time window of a frequency point to be measured in a measurement period, then measures the frequency point to be measured in the measurement time window of the frequency point to be measured of the first cell in the measurement period, measures the frequency point to be measured of other second cells needing no measurement timing outside the measurement time window, reports the measurement result obtained by measurement, does not waste measurement time, improves the measurement efficiency of the cell, and improves the performance of cell reselection and switching.

Description

Cell measurement method, device and storage medium
Technical Field
The present application relates to communications technologies, and in particular, to a cell measurement method, device, and storage medium.
Background
In order to ensure a connection between a network and a User Equipment (UE), mobility management, which is a generic term for related procedures, is not interrupted by the movement of the UE. The mobility management can be roughly divided into an IDLE state (RRC _ IDLE state) mobility management and a CONNECTED state (RRC _ CONNECTED state) mobility management according to the current state of the UE. In the idle state, the mobility management mainly refers to a cell selection/reselection (cell selection/reselection) process, and in the connected state, the mobility management mainly refers to a cell handover (handover). Whether cell selection/reselection or handover is based on the results of the measurements.
For the 2G, 3G and 4G modes, the signal for measurement is always present. In the 5G mode, however, the signal for measurement is not always present but is present periodically. The configuration of the measurement signal in the 5G mode is referred to as measurement timing configuration (SMTC). At present, how to measure a 5G network is not described in particular, if each frequency point measures in a fixed time period according to the scheduling strategy of measuring a 2G/3G cell by using the existing 4G, when measuring 5G, since the whole continuous time period is divided into 5G mode measurement, the time which is not in the measurement time window is wasted.
At present, if the measurement mode of the 3G and 4G cells is directly applied to the measurement process of the cells including the different frequency or different system of the 5G cell, the problems of long measurement time, high power consumption of the UE and the like are easily caused.
Disclosure of Invention
The application provides a cell measurement method, a device and a storage medium, which are used for providing a cell measurement scheme and a technical scheme for measuring cells including different frequencies and different systems of a 5G cell, so that the measurement time is shortened and the power consumption of a terminal is reduced.
A first aspect of the present application provides a cell measurement method, which is applied to measure cells of different systems or different frequencies, where the cells include a first cell requiring measurement timing configuration and a second cell without measurement timing configuration, and the first cell and the second cell employ different radio access technologies, that is, networks of different standards, or the first cell and the second cell are different frequency points in the same access technology, and the method includes:
determining a measurement time window of a frequency point to be measured in a measurement period according to the measurement timing configuration corresponding to the first cell acquired in advance;
in the measurement period, measuring the frequency point to be measured of the first cell in the measurement time window of the frequency point to be measured of the first cell, and measuring the frequency point to be measured of the second cell at the time except the measurement time window of the frequency point to be measured of the first cell;
and reporting the measurement result of the first cell and the measurement result of the second cell to network equipment.
In the scheme, the UE preferentially measures the cells in the time window according to the acquired measurement timing configuration of the cell needing measurement timing, so that the cells needing measurement timing configuration can be reported quickly, the cells needing measurement timing are measured at the time outside the time window, the measurement time is not wasted, the measurement efficiency of the cells is improved, and the cell reselection and handover performance is improved.
In a specific implementation of the foregoing scheme, the measurement timing configuration corresponding to the first cell includes a measurement cycle, an offset position, and a duration.
In a specific implementation of the foregoing scheme, the method further includes:
receiving system information sent by the network equipment, wherein the system information carries the measurement timing configuration corresponding to the first cell;
alternatively, the first and second electrodes may be,
acquiring the measurement timing configuration corresponding to the first cell specified in a protocol;
alternatively, the first and second electrodes may be,
and selecting the measurement timing configuration according to a preset rule.
In the scheme, several ways of obtaining the measurement timing configuration are provided, and the UE may obtain the measurement timing configuration configured by the network side for the first cell through the system information of the network side, or may be written in the protocol in advance, and the UE may read the measurement timing configuration when it needs to be used, or may select the measurement timing configuration obtained by the UE itself for the purpose of optimizing the scheme.
In the specific process of cell measurement in this scheme, if the UE is in a connected state scene, in the measurement period, the frequency point to be measured of the first cell is measured in the measurement time window of the frequency point to be measured of the first cell, and the frequency point to be measured of the second cell is measured at a time other than the measurement time window of the frequency point to be measured of the first cell, including:
and in the measurement period, if the measurement time window of the frequency point to be measured of the first cell falls into a measurement groove, the measurement groove is used for measuring the frequency point to be measured, otherwise, the measurement groove is used for measuring the frequency point to be measured of the second cell.
The method comprises the following steps that in the measuring period, aiming at each measuring groove, if the measuring time window of the frequency point to be measured of the first cell falls into the measuring groove, the measuring groove is used for measuring the frequency point to be measured of the first cell, otherwise, the measuring groove is used for measuring the frequency point to be measured of the second cell, the measurement is carried out in the next measuring groove according to the mode until the frequency point to be measured of the first cell is measured, and the measurement is carried out on the frequency point to be measured of the second cell.
Optionally, the connected state scenario includes a CDRX not configured scenario or a CDRX active period scenario.
In another implementation scheme, if the UE is in an inactive period scenario, in the measurement period, the measurement is performed on the frequency point to be measured of the first cell in the measurement time window of the frequency point to be measured of the first cell, and the measurement is performed on the frequency point to be measured of the second cell in a time other than the measurement time window of the frequency point to be measured of the first cell, including:
and in the entering of the measurement period, selecting a measurement time window of the frequency point to be measured of the first cell, reserving the measurement time window for measuring the frequency point to be measured of the first cell, and measuring the frequency point to be measured of the second cell at the time of a non-activation period except the measurement time window of the measurement frequency point of the first cell.
The meaning of the scheme is that in the measurement period, a measurement time window is reserved for selecting the measurement time window of the frequency point to be measured of the first cell with the closest time, the frequency point to be measured of the first cell is measured at the time of the inactive period before the measurement time window, the frequency point to be measured of the second cell is measured, the measurement time window of the frequency point to be measured of the next first cell is also reserved for the frequency point to be measured of the first cell at the time of the inactive period before the measurement time window, and the frequency point to be measured of the second cell is reserved at the time side of the inactive period before the measurement time window until the measurement of the frequency point to be measured of the first cell and the measurement of the frequency point to be measured of the second cell are completed.
Optionally, the inactive period scenario includes a CDRX inactive period scenario or an idle inactive period scenario.
In any of the above implementations, the method further comprises:
after the frequency point to be measured of the first cell is measured and the measurement result is reported to the network equipment, marking the frequency point to be measured as the measured frequency point;
alternatively, the first and second electrodes may be,
and after the frequency point to be measured of the second cell is measured and the measurement result is reported to the network equipment, marking the frequency point to be measured as the measured frequency point.
The scheme shows that in the process of measuring a first cell and a second cell, the UE reports the measurement result of the corresponding frequency point to the network side, namely to the high layer, after completing the measurement of one frequency point to be measured of each cell. However, under special circumstances, the measurement reporting may be divided into the measurement reporting of the serving cell and the neighboring cell according to the cell where the UE is located, that is, the measurement result may also be reported to the higher layer after the cell is measured, and the scheme is not limited.
In a second aspect, the present application provides a user equipment, comprising:
the processing module is used for determining a measurement time window of a frequency point to be measured in a measurement period according to the measurement timing configuration corresponding to the first cell acquired in advance;
the processing module is further configured to measure the frequency point to be measured of the first cell in the measurement time window of the frequency point to be measured of the first cell and measure the frequency point to be measured of the second cell at a time other than the measurement time window of the frequency point to be measured of the first cell in the measurement period;
a sending module, configured to report the measurement result of the first cell and the measurement result of the second cell to a network device;
the first cell and the second cell adopt different wireless access technologies, or the first cell and the second cell are different frequency points in the same access technology; the first cell is a cell needing measurement timing configuration, and the second cell is a cell without measurement timing configuration.
Optionally, the measurement timing configuration corresponding to the first cell includes a measurement period, an offset position, and a duration.
In a specific implementation manner, the user equipment further includes:
a receiving module, configured to receive system information sent by the network device, where the system information carries the measurement timing configuration corresponding to the first cell;
alternatively, the first and second liquid crystal display panels may be,
the processing module is further configured to obtain the measurement timing configuration corresponding to the first cell specified in a protocol;
alternatively, the first and second electrodes may be,
the processing module is further configured to select the measurement timing configuration according to a preset rule.
Optionally, if the UE is in a connected state scenario, the processing module is specifically configured to:
and in the measurement period, if the measurement time window of the frequency point to be measured of the first cell falls into a measurement groove, the measurement groove is used for measuring the frequency point to be measured, otherwise, the measurement groove is used for measuring the frequency point to be measured of the second cell.
Optionally, the connected state scenario includes a discontinuous reception CDRX scenario or a CDRX active period scenario that is not configured.
Optionally, if the UE is in a non-active period scenario, the processing module is specifically configured to:
and in the measurement period, selecting a measurement time window of the frequency point to be measured of the first cell, reserving the measurement time window for measuring the frequency point to be measured of the first cell, and measuring the frequency point to be measured of the second cell at the time of a non-activation period except the measurement time window of the measurement frequency point of the first cell.
Optionally, the inactive period scenario includes a CDRX inactive period scenario or an idle inactive period scenario.
Optionally, after the processing module completes measurement on the frequency point to be measured of the first cell and reports the measurement result to the network device through the sending module, the processing module marks the frequency point to be measured as a measured frequency point;
alternatively, the first and second electrodes may be,
and the processing module finishes the measurement of the frequency point to be measured of the second cell, and marks the frequency point to be measured as the measured frequency point after the transmission module reports the measurement result to the network equipment.
In a third aspect, the present application provides a user equipment, comprising: a memory, a processor, a transmitter, and a computer program, the computer program being stored in the memory, the processor running the computer program to perform the method for cell measurement in any of the implementations of the first aspect.
In a fourth aspect, the present application provides a storage medium comprising: a readable storage medium and a computer program for implementing the method for measuring a cell in any implementation manner of the first aspect.
In a fifth aspect, the present application provides a program product comprising a computer program stored in a readable storage medium, the computer program being readable from the readable storage medium by at least one processor of a user equipment, execution of the computer program by the at least one processor causing the user equipment to perform the method of:
determining a measurement time window of a frequency point to be measured in a measurement period according to a pre-acquired measurement timing configuration corresponding to a first cell;
in the measurement period, measuring the frequency point to be measured of the first cell in the measurement time window of the frequency point to be measured of the first cell, and measuring the frequency point to be measured of the second cell at the time except the measurement time window of the frequency point to be measured of the first cell;
reporting the measurement result of the first cell and the measurement result of the second cell to network equipment;
the first cell and the second cell adopt different wireless access technologies, or the first cell and the second cell are different frequency points in the same access technology; the first cell is a cell needing measurement timing configuration, and the second cell is a cell without measurement timing configuration.
The program product is further capable of implementing the cell measurement method provided in any of the specific implementations of the first aspect when executed by a processor.
In a sixth aspect, the present application provides a chip, where the chip is applicable to a user equipment, and the chip includes: at least one communication interface, at least one processor, at least one memory, the communication interface, the memory and the processor interconnected by a bus, the processor calling a computer program stored in the memory to perform:
determining a measurement time window of a frequency point to be measured in a measurement period according to a pre-acquired measurement timing configuration corresponding to a first cell;
in the measurement period, measuring the frequency point to be measured of the first cell in the measurement time window of the frequency point to be measured of the first cell, and measuring the frequency point to be measured of the second cell at the time except the measurement time window of the frequency point to be measured of the first cell;
reporting the measurement result of the first cell and the measurement result of the second cell to network equipment;
the first cell and the second cell adopt different wireless access technologies, or the first cell and the second cell are different frequency points in the same access technology; the first cell is a cell needing measurement timing configuration, and the second cell is a cell without measurement timing configuration.
When the chip is applied to the user equipment, the cell measurement method provided by any specific implementation manner of the first aspect can also be implemented.
According to the measurement method, the measurement equipment and the storage medium, when the UE measures the cells of different systems or different frequencies, the UE firstly obtains the measurement timing configuration of a first cell needing timing measurement, determines the measurement time window of a frequency point to be measured in a measurement period, then measures in the measurement time window of the frequency point to be measured of the first cell in the measurement period, measures the frequency points to be measured of other second cells which do not need timing measurement outside the measurement time window, reports the measurement result obtained by measurement, does not waste measurement time, improves the measurement efficiency of the cells, and improves the performance of cell reselection and handover.
Drawings
Fig. 1 is a schematic structural diagram of a user equipment provided in the present application;
fig. 2 is a schematic view of a specific application scenario of the cell measurement method provided in the present application;
fig. 3 is a flowchart of a first embodiment of a method for measuring a cell provided in the present application;
fig. 4 is a schematic diagram illustrating frequency point measurement according to an example of a cell measurement method provided in the present application;
fig. 5 is a schematic diagram of frequency point measurement of another example of a cell measurement method provided in the present application;
fig. 6 is a schematic structural diagram of a first embodiment of a user equipment provided in the present application;
fig. 7 is a schematic structural diagram of a second embodiment of a user equipment provided in the present application;
fig. 8 is a schematic structural diagram of a user equipment provided in the present application.
Detailed Description
As can be seen from the background, there is no specific description in the prior art on how to perform the measurement of the 5G cell, if according to the scheduling policy of the existing 4G measurement, 2G or 3G cell: each frequency point is measured in a fixed time period, and when 5G is measured, the whole continuous time period is divided into 5G mode measurement, so that the time which is not in the measurement time window is wasted. In view of the above problem, the present application provides a cell measurement method, which can measure a cell including a pilot frequency or a pilot system of a 5G cell, reduce measurement time, and reduce power consumption of a terminal, and the following describes the scheme with specific embodiments.
The network element involved in the method for measuring the cell provided by the body comprises network equipment and a terminal of a user, namely user equipment. The network device refers to a device with radio resource management function, which can communicate with the user equipment or act as a central controller to assist the user equipment in direct communication, for example: and a base station.
It should be understood that the network device in the present embodiment may be a Base Transceiver Station (BTS) in Global System for Mobile communications (GSM) or Code Division Multiple Access (CDMA), a Base Station (NodeB, NB) in Wideband Code Division Multiple Access (WCDMA), an evolved Node B (evolved Node B, eNB or eNodeB) in LTE, a relay Station or Access point, a Base Station in 5G network, a Base Station in other future network systems, and the like, and is not limited herein.
The user equipment may be a wireless terminal or a wired terminal, and a wireless terminal may refer to a device that provides voice and/or other traffic data connectivity to a user, a handheld device having wireless connection capability, or other processing device connected to a wireless modem. A wireless terminal, which may be a mobile terminal such as a mobile phone (or called a "cellular" phone) and a computer having a mobile terminal, for example, a portable, pocket, hand-held, computer-included or vehicle-mounted mobile device, may communicate with one or more core networks via a Radio Access Network (RAN), and exchange languages and/or data with the RAN. For example, personal Communication Service (PCS) phones, cordless phones, session Initiation Protocol (SIP) phones, wireless Local Loop (WLL) stations, personal Digital Assistants (PDAs), and the like. A wireless Terminal may also be referred to as a system, a Subscriber Unit (Subscriber Unit), a Subscriber Station (Subscriber Station), a Mobile Station (Mobile), a Remote Station (Remote Station), a Remote Terminal (Remote Terminal), an Access Terminal (Access Terminal), a User Terminal (User Terminal), a User Agent (User Agent), and a User Equipment (User Device or User Equipment), which are not limited herein.
Fig. 1 is a schematic structural diagram of a user equipment provided in the present application, as shown in fig. 1, for convenience of understanding and illustration, in fig. 1, the user equipment is a mobile phone as an example, and the user equipment includes a processor, a memory, a radio frequency circuit, an antenna, and an input/output device. The processor is mainly used for processing communication protocols and communication data, controlling the user equipment, executing software programs, processing data of the software programs and the like. The memory is used primarily for storing software programs and data. The radio frequency circuit is mainly used for converting baseband signals and radio frequency signals and processing the radio frequency signals. The antenna is mainly used for receiving and transmitting radio frequency signals in the form of electromagnetic waves. Input and output devices, such as touch screens, display screens, keyboards, etc., are mainly used for receiving data input by users and outputting data to the users. It should be noted that some kinds of apparatuses may not have input/output devices.
When data needs to be sent, the processor carries out baseband processing on the data to be sent and then outputs baseband signals to the radio frequency circuit, and the radio frequency circuit carries out radio frequency processing on the baseband signals and then sends the radio frequency signals to the outside in an electromagnetic wave mode through the antenna. When data is sent to user equipment, the radio frequency circuit receives radio frequency signals through the antenna, converts the radio frequency signals into baseband signals and outputs the baseband signals to the processor, and the processor converts the baseband signals into the data and processes the data. For ease of illustration, only one memory and processor are shown in FIG. 1. In an actual end device product, there may be one or more processors and one or more memories. The memory may also be referred to as a storage medium or a storage device, etc. The memory may be provided independently of the processor, or may be integrated with the processor, which is not limited in this embodiment of the present application.
In the embodiment of the present application, the antenna and the radio frequency circuit with transceiving function may be regarded as a transceiving unit of the user equipment, and the processor with processing function may be regarded as a processing unit of the terminal equipment. As shown in fig. 1, the user equipment includes a transceiving unit a and a processing unit B. A transceiver unit may also be referred to as a transceiver, a transceiving device, etc. A processing unit may also be referred to as a processor, a processing board, a processing module, a processing device, or the like. Optionally, a device for implementing a receiving function in the transceiver unit a may be regarded as a receiving unit, and a device for implementing a sending function in the transceiver unit a may be regarded as a sending unit, that is, the transceiver unit a includes a receiving unit and a sending unit. A transceiver unit may also sometimes be referred to as a transceiver, transceiver circuit, or the like. A receiving unit may also be referred to as a receiver, a receiving circuit, or the like. A transmitting unit may also sometimes be referred to as a transmitter, or a transmitting circuit, etc.
Fig. 2 is a schematic diagram of a specific application scenario of the cell measurement method provided in the present application, as shown in fig. 1, the scenario relates to a UE and a base station, that is, a network device is a base station, and the following takes the scenario as an example to describe the cell measurement method provided in the present application.
In a specific implementation of the scheme, the base station knows whether the UE supports inter-frequency inter-system measurement by querying the UE capability. For UE supporting inter-frequency inter-system measurement, a base station can issue a system message (in an idle state) or a measurement request message (for example: a reconfiguration message) (in a connected state), the message issues thresholds A1 and A2, when a signal condition meets an A2 event, the UE starts the inter-frequency inter-system measurement and reports the measurement according to the requirement in the message, and when the base station judges that the signal condition meets the inter-frequency inter-system switching or redirection threshold, the base station issues a switching indication message or redirection message and starts a related process; and when the signal condition meets the A1 event, the UE stops the inter-frequency inter-system measurement.
In the connected state, when the inter-frequency or inter-system measurement is triggered, the base station issues the relevant configuration of the measurement GAP. The measurement GAP is a time period from the UE leaving the current frequency point to the measurement of other frequency points. Measuring GAP can be divided into a mode 1 and a mode 2, wherein the GAP in the mode 1 is 6ms, and the period is 40ms; GAP in mode 2 is 6ms, and the period is 80ms. When the pilot frequency is measured, the UE needs to leave the current frequency point and measure to other frequency points, so that the service of the UE cannot be normally performed in the GAP period, which results in a decrease in the mobile data rate of the UE.
Some concepts presented in this solution are introduced below, in particular as follows:
the serving cell refers to a cell in which the UE currently resides or a cell in which data transmission is being provided for the UE.
The neighbor cell refers to a cell near a service, may also be a neighbor cell, may be the same base station, or may not be the same base station. As a spare cell.
The same-frequency cell is a cell with the same frequency as the serving cell and also has a same-frequency adjacent cell.
The pilot cell is a cell having a frequency different from that of the serving cell.
The cells of the different systems are cells with different systems (or modes) from the serving cell, that is, cells using different radio access technologies. The standards herein refer to 2G, 3G, 4G, and 5G. Say 2G and 4G cells under a mobile operator.
Under the measurement scene containing the timing configuration frequency point and the non-timing configuration frequency point, the scheme provides a method for the terminal to preferentially measure the cell in the time window according to the timing configuration of the measurement.
The terminal may be in 2G, 3G, 4G, 5G mode, and measurements are made on cells having measurement timing configurations like the 5G mode. The method specifically comprises the following scenes:
1) In a connection state of a terminal device, a terminal is configured to continuously receive a scene (namely a non-DRX scene), if a measurement time window (namely measurement opportunity) of measurement timing configuration falls in a Gap, the Gap preferentially schedules a measurement timing configuration frequency point; otherwise, scheduling the pilot frequency/inter-system frequency point without measurement timing configuration.
2) In the connected state of the terminal device, the terminal is configured to receive Discontinuous Reception (DRX) in the active period scenario, the process is the same as above.
3) In a connected state of a terminal device, under an inactive period scenario in which the terminal is configured as DRX, a measurement time window (measurement opportunity) of measurement timing configuration is reserved preferentially in the inactive period for measuring a cell of the measurement timing configuration, and the remaining inactive period time is used for scheduling an inter-frequency/inter-system without the measurement timing configuration.
4) In the idle state (i.e., idle state) of the terminal device, the terminal is configured to be in the inactive period scenario, as in 3).
The technical scheme of the application is not only suitable for measuring the cell scene under another 5G system by the cell under the 2G, 3G and 4G systems; the method is also used for the scenes of inter-frequency cell measurement in a 5G mode and inter-system cell measurement in 2G, 3G and 4G modes; the method is also suitable for measurement scenes of timing configuration cells and non-timing configuration cells under all systems (2G, 3G, 4G and 5G); the method is also suitable for measuring the timing configuration cell of a new standard in the future and the current non-customized configuration cell, and the method is not limited.
On the basis of the above scenario, the following is a method for measuring a cell provided by the present application through several specific embodiments.
Fig. 3 is a flowchart of a first embodiment of a cell measurement method provided in the present application. As shown in fig. 3, this embodiment takes two cells as an example, namely a first cell and a second cell, where the first cell needs to perform measurement timing configuration; the second cell is a cell which needs to be configured with measurement timing, that is, a cell without measurement timing configuration. The first cell and the second cell are different system cells or different frequency cells, and the different systems refer to that the first cell and the second cell adopt different wireless access technologies, namely different types of networks; the pilot frequency means that the first cell and the second cell are different frequency points in the same access technology. Accordingly, the method for measuring a cell provided in this embodiment specifically includes the following steps:
s101: and determining a measurement time window of the frequency point to be measured in the measurement period according to the measurement timing configuration corresponding to the first cell acquired in advance.
In this step, a mode in which a 5G or other measurement signal does not exist all the time but exists periodically may be referred to as an SSB Measurement Timing Configuration (SMTC). The SMTC includes a period, a length, and an offset of a measurement time window of the SMTC. The UE only needs to make the measurement of the SSB within this time window. The SSB period has various configurations from 5ms to 160 ms. For the same-frequency measurement, the network side may be configured with at most two SMTCs, the two SMTCs use the same length and time offset, and the periods may be different. For pilot frequency measurement, the network side only configures one SMTC for each frequency point. When measuring cells of 5G and non-5G mode (2G, 3G, 4G), 5G cells need to be measured within a certain measurement time window due to the periodicity of the 5G cell signals; if the 5G cell is measured outside the time window, the 5G cell is not measured, wasting measurement time.
Accordingly, when performing inter-frequency or inter-system cell measurement in this solution, the UE first needs to obtain a measurement timing configuration of the first cell requiring measurement timing, where the measurement timing configuration includes a measurement period, an offset position, and a duration, and these parameters are the period, the offset, and the length of the measurement time window.
The method for the UE to obtain the measurement timing configuration of the first cell at least includes the following steps:
in a first manner, the UE receives system information sent by the network device, where the system information carries the measurement timing configuration corresponding to the first cell.
The meaning of the scheme is that a network side configures measurement timing of a first cell through system information or other high-level signaling, specifically, a message carrying the measurement timing configuration may be a system message, or a reconfiguration message, and the scheme is not limited.
A second mode, acquiring the measurement timing configuration corresponding to the first cell specified in a protocol;
the meaning of the scheme is that the measurement timing configuration corresponding to the first cell is specified in the protocol, that is, written in the protocol, and the UE only needs to read the measurement timing configuration from the protocol in the using process.
In a third mode, the measurement timing configuration is selected according to a preset rule.
In the scheme, the UE selects a proper measurement period, an offset position and a duration time for optimizing the scheme to obtain the measurement timing configuration, and then performs cell measurement according to the measurement timing configuration.
After obtaining the measurement timing configuration for the first cell, the UE needs to obtain a measurement time window, also called a measurement opportunity, for measuring the frequency point to be measured of the first cell. That is, the UE needs to calculate a measurement time window (i.e., a measurement opportunity) of the frequency point to be measured of the first cell in the measurement period of this round according to the measurement period and the offset position in the measurement timing configuration.
S102: in the measurement period, the frequency point to be measured of the first cell is measured in the measurement time window of the frequency point to be measured of the first cell, and the frequency point to be measured of the second cell is measured at a time except the measurement time window of the frequency point to be measured of the first cell.
S103: and reporting the measurement result of the first cell and the measurement result of the second cell to the network equipment.
When the inter-frequency or inter-system measurement is triggered, the network side issues the relevant configuration of the measurement GAP (GAP). The measurement GAP is a time period from the UE leaving the current frequency point to the measurement of other frequency points. Measuring GAP (GAP measurement) into a mode 1 and a mode 2, wherein the GAP in the mode 1 is 6ms, and the period is 40ms; GAP in mode 2 is 6ms, and the period is 80ms. When the pilot frequency is measured, the UE needs to leave the current frequency point and measure to other frequency points, so that the service of the UE cannot be normally performed in the GAP period, which results in a decrease in the mobile data rate of the UE.
In the above steps, the UE obtains a measurement time window of a measurement frequency point of a first cell, after entering a measurement period, if the measurement time window of a certain frequency point to be measured of the first cell falls within a GAP, the GAP is used to measure the frequency point to be measured of the first cell, and after the measurement of the frequency point to be measured is completed, the UE may report a measurement result to the network device.
If the measurement time window of the frequency point to be measured of the first cell does not fall within the GAP, the inter-frequency/inter-system of the cell without measurement timing can be measured, for example, in the scheme, the frequency point to be measured of the second cell can be measured, and then the corresponding measurement result is reported to the network device.
In this solution, it should be understood that, assuming that multiple frequency points need to be measured for measurement of the first cell, the UE may report the measurement result to the network device after measuring one frequency point to be measured each time, or report the total measurement result of the first cell to the network device after completing measurement of all frequency points to be measured of the first cell, which is not limited in this solution. For the frequency point measurement of the second cell, the same reasoning applies, and the UE may report the measurement result to the network device after measuring one frequency point to be measured each time, or report the total measurement result of the second cell to the network device after measuring all the frequency points to be measured of the second cell.
When the UE specifically performs cell measurement, the UE may perform measurement reporting on the serving cell and the neighboring cell, or may shorten the measurement time according to the measurement method, and report measurement results of different cells after completing the measurement of the serving cell and the neighboring cell.
Optionally, in a specific implementation of the scheme, after the UE completes measurement on the frequency point to be measured in the first cell and reports the measurement result to the network device, the frequency point to be measured is marked as a measured frequency point.
Or after the frequency point to be measured of the second cell is measured and the measurement result is reported to the network equipment, the frequency point to be measured is marked as the measured frequency point.
After reporting the measurement result of the frequency point which has finished measurement, the UE may mark the measured frequency point as a measured frequency point.
In the cell measurement method provided in this embodiment, the UE preferentially measures the cell in the time window according to the obtained measurement timing configuration of the cell requiring measurement timing, so that the cell requiring measurement timing configuration can be reported quickly, the cell requiring measurement timing is measured at a time outside the time window, the measurement time is not wasted, the measurement efficiency of the cell is improved, and the cell reselection and handover performance is improved.
On the basis of the above embodiment, in a specific application process of the scheme, the UE is in different scenarios, the specific measurement modes are different, the UE states include a connected state and an idle state, the UE also includes a scenario in which the DRX characteristic is configured and a scenario in which the DRX is not configured in the connected state, and the UE also includes an active period and an inactive period in the scenario in which the DRX characteristic is configured in the connected state; the UE includes an active period and an inactive period scenario in an idle state.
The specific implementation of step S102 of the UE in different scenarios of the connected state and the idle state is slightly different, and the following describes the UE through two specific examples.
When the UE is in a connected state and does not configure the DRX scenario or configures a scenario of the DRX scenario in an active period, the step S102 is specifically implemented as:
and in the measurement period, if the measurement time window of the frequency point to be measured of the first cell falls into a measurement groove, the measurement groove is used for measuring the frequency point to be measured, otherwise, the measurement groove is used for measuring the frequency point to be measured of the second cell.
The meaning of the scheme is that in a measurement period, if a measurement time window of a frequency point to be measured of a first cell falls in a measurement GAP (GAP), the measurement GAP is used for measuring the frequency point to be measured of the first cell, otherwise, the measurement GAP is used for measuring the frequency point to be measured of a second cell. And respectively measuring the frequency point to be measured of the first cell and the frequency point to be measured of the second cell according to the mode to obtain respective measurement results, and reporting the measurement results.
If the measurement opportunity of the frequency point to be measured of the first cell falls in the Gap, the Gap preferentially schedules and measures the frequency point to be measured configured at the measurement timing; otherwise, scheduling the measurement of the different frequency/different system without measurement timing configuration, which comprises the following steps:
1) At a certain scheduling point (for example, 10ms ahead of the Gap position), the UE calculates a measurement time window (measurement timing) of the frequency point to be measured of the first cell in the measurement period of this round according to the measurement period and the offset position in the measurement timing configuration of the first cell, and if the measurement timing of the frequency point to be measured of the first cell falls within the Gap, the Gap is used for measuring the frequency point to be measured.
2) And if the measurement opportunity of the frequency point to be measured of the first cell does not fall in the Gap, scheduling the measurement of the cell of the pilot frequency/pilot system without measurement timing configuration, and in the scheme, scheduling the frequency point of the second cell for measurement.
3) After the frequency point to be measured is measured, the measurement result is reported to the network equipment, and the frequency point can be set as the measured frequency point.
Based on the above scheme, a specific implementation of the embodiment shown in fig. 3 is described below by taking a specific example as an example.
Fig. 4 is a schematic diagram of frequency point measurement according to an example of a cell measurement method provided by the present application, and as shown in fig. 4, taking an example that a DRX scene is not configured when a UE is in a connected state, in the scheme, a GAP period is a schedule of 40ms, and a square in a time sequence in the diagram respectively represents different GAP periods that can measure frequency points to be measured of different cells, where in each GAP period of 40ms, a GAP duration is 6ms, and a time at which the frequency points of a cell can be measured in a GAP period falls within the GAP. The figure shows a measurement schematic of three different cells. In the measurement timing configuration of the cell 1, the measurement period is 160ms, that is, four GAP periods are included, the cell 1 needs 3 measurements to be completed, and the measurement of the cell 1 in the GAP period is represented by 1 in the block in the figure; in the measurement timing configuration of the cell 2, the measurement period is 80ms, that is, two GAP periods are included, the cell 2 needs 6 measurements to be measured, and 2 is used in a block in the figure to measure the cell 2 in the GAP period; cell 3 is a cell without measurement timing configuration, and needs to perform measurement for 12 times, and the measurement performed on cell 3 in the GAP period is represented by 3 in the block in the figure. Of these several cells, the first cell involved in the foregoing scheme may be cell 1 or cell 2 in this example, and the second cell may be cell 3.
According to the measurement scheme of the cell provided in the above embodiment, after the measurement timing configurations of the cell 1 and the cell 2 are obtained, at a certain scheduling point, the UE determines the measurement time window of the cell 1 and the measurement time window of the cell 2 according to the respective measurement timing configurations, and determines whether the measurement time window of the cell 1 or the cell 2 falls within a GAP in the GAP period when the first GAP period (i.e., #0 in the figure) is performed, and as shown in fig. 4, the measurement time windows of the cell 1 and the cell 2 do not fall within the GAP in the GAP period, and the GAP is used to measure the frequency to be measured of the cell 3, and so on, in the next GAP period, which cell to perform measurement is also determined according to the method.
According to the scheme, the frequency points to be measured of the cell 1 and the cell 2 which are configured at regular time are preferentially measured, taking the cell 1 as an example, the time required for the 3 frequency points to finish the measurement and report is as follows: (3 +6+ 12) = 40=840ms, where cell 1 needs three GAP periods to be measured, cell 2 needs six GAP periods to be measured, and cell 3 needs twelve GAP periods to be measured, and the total is twenty-one GAP period, that is, 840ms.
Compared with the original scheme of measuring the cells of the 4G network, the time period for measuring each cell for measuring 12 GAPs is 3 × 12 × 40=1440ms after the measurement of the three cells and the report completion time of the three cells is shortened by 1440-840=600 (ms).
The UE is in a connected inactive period scenario configured with DRX or an idle inactive period scenario (which may be collectively referred to as an inactive period scenario), where step S102 is specifically implemented as:
and in the entering of the measurement period, selecting a measurement time window of the frequency point to be measured of the first cell, reserving the measurement time window for measuring the frequency point to be measured of the first cell, and measuring the frequency point to be measured of the second cell at the time of a non-activation period except the measurement time window of the measurement frequency point of the first cell.
In a specific implementation manner, in a measurement period, at a certain scheduling point, the UE selects a measurement time window of a frequency point to be measured of a first cell closest to a current time, reserves the time of the measurement time window for measuring the frequency point to be measured of the first cell, and measures the frequency point to be measured of a second cell at a time of an inactive period before the measurement time window. And then reporting the respective measurement results obtained by measurement.
The method includes the steps that after a measurement time window of a frequency point to be measured of a first cell is determined, UE selects a measurement time window closest to the current time according to the measurement time window, the frequency point to be measured of the first cell is reserved and measured, the frequency point to be measured of a second cell is measured in the time before the measurement time window, after the measurement of the frequency point to be measured in the measurement time window is completed, the next measurement time window for measuring the frequency point to be measured of the first cell is reserved continuously, the frequency point to be measured of the second cell is measured in the time before the measurement time window, and the steps are repeated until the measurement of the first cell and the measurement of the second cell are completed.
In a non-active period scenario or an Idle state non-active period scenario in which DRX is configured in a connected state, the UE preferentially reserves a measurement time window (measurement time) of measurement timing configuration (that is, the frequency point to be measured of the first cell) for measuring the measurement of the cell configured at the timing, and the remaining non-active period time is used for scheduling the measurement of the cell of the different frequency/different system without the measurement timing configuration. The method comprises the following specific steps:
1) At a certain scheduling point (for example, the first slot (slot) entering the active period), the UE calculates a measurement time window (measurement opportunity) of the frequency point to be measured in the measurement period of the current round according to the measurement period and the offset position in the measurement timing configuration.
2) A nearest measurement time window is selected, and the time window is reserved for measuring the frequency point to be measured of the cell with the timing configuration (i.e. the first cell in the foregoing scheme), and the time of the inactive period in front of the measurement time window can be used for scheduling the measurement of the cell of the inter-frequency/inter-system without the timing configuration (i.e. the measurement of the second cell can be scheduled).
3) And after the frequency point to be measured is measured, reporting the measurement result to the network equipment. The frequency point may be set to the measured frequency point. And when the frequency point measurement is completed, as a new scheduling point, repeating the steps 1 and 2 until the measurement of each cell is completed.
Based on the above scheme, a specific implementation of the embodiment shown in fig. 3 is described below by taking a specific example as an example.
Fig. 5 is a schematic diagram of frequency point measurement according to another example of the cell measurement method provided in the present application, and as shown in fig. 5, a scheduling example in which the UE is in an idle DRX scene and a DRX cycle is 640ms is used.
In fig. 5, P denotes the timing of paging for receiving paging, and the following inactive period time is used for measurement. If the first iso-frequency/iso-system frequency point is the frequency point of a cell (i.e. the aforementioned second cell) which is not configured in a timing manner, the measurement time needs 90ms. The frequency point of the cell of the second iso-frequency/iso-system (i.e. the aforementioned first cell) is a timing configuration frequency point, and when the measurement period indicated in the measurement timing configuration is 80ms, the offset is 20ms, and it takes 3 measurements to complete the measurement, and the cell is indicated by 2 in the block in the figure.
After the UE finishes paging, it starts measurement, and preferentially reserves a measurement time window (20-30, 100-110, 180-190) (i.e. a position indicated by 2 on the time axis in the figure) for measuring the cell configured with timing. The remaining time is used for measuring the first frequency point, and the measuring time duration of the two frequency points is 190ms, which saves (250-190 = 60) 60ms compared with the previously adopted 4G technical scheme. Therefore, the power consumption is reduced by 60ms of wake-up current, and the reporting time is advanced by 60ms.
In the prior art, a fixed measurement time period is allocated to each frequency point, and if a cell (for example, a 5G cell) configured at a fixed time exists in the time period, when a measurement opportunity (for example, a GAP) is measured, since a signal transmitted by a base station does not exist, the cell cannot be measured, and thus measurement time is wasted.
In the above scheme provided by the present application, the UE preferentially measures the cell in the time window according to the measurement timing configuration, so that the cell configured at the measurement timing can be reported quickly, the measurement is accelerated, the measurement time is not wasted, and the reselection and handover performance is improved. In an actual product, due to the fact that discontinuous reception exists, measurement time is effectively shortened, therefore, the awakening time and the radio frequency working time of the terminal are shortened, and power consumption of the terminal is reduced.
Fig. 6 is a schematic structural diagram of a first embodiment of a user equipment provided in the present application; as shown in fig. 6, the user equipment 10 may measure cells of different systems or different frequencies, where the cells include a first cell requiring measurement timing configuration and a second cell without measurement timing configuration, and the first cell and the second cell employ different radio access technologies, or the first cell and the second cell are different frequency points in the same access technology, and the user equipment 10 includes:
the processing module 11 is configured to determine a measurement time window of a frequency point to be measured in a measurement period according to a measurement timing configuration corresponding to the first cell acquired in advance;
the processing module 11 is further configured to measure, in the measurement period, the frequency point to be measured of the first cell in the measurement time window of the frequency point to be measured of the first cell, and measure the frequency point to be measured of the second cell at a time other than the measurement time window of the frequency point to be measured of the first cell;
a sending module 12, configured to report the measurement result of the first cell and the measurement result of the second cell to a network device.
The user equipment provided in this embodiment is configured to implement the technical scheme of any one of the foregoing method embodiments, and the implementation principle and technical effect are similar, and when a cell of an inter-system or inter-frequency is measured, the measurement timing configuration of a first cell that needs to be measured at a fixed time is obtained, a measurement time window of a frequency point to be measured in a measurement period is determined, then, in the measurement period, measurement is performed in the measurement time window of the frequency point to be measured of the first cell, measurement is performed outside the measurement time window on other frequency points to be measured of a second cell that does not need to be measured at a fixed time, and a measurement result obtained by measurement is reported.
In a specific implementation of the user equipment, the measurement timing configuration corresponding to the first cell includes a measurement period, an offset position, and a duration.
Fig. 7 is a schematic structural diagram of a second embodiment of a user equipment provided in the present application; as shown in fig. 7, on the basis of the above embodiment, the user equipment 10 further includes:
a receiving module 13, configured to receive system information sent by the network device, where the system information carries the measurement timing configuration corresponding to the first cell;
alternatively, the first and second liquid crystal display panels may be,
the processing module 11 is further configured to obtain the measurement timing configuration corresponding to the first cell specified in a protocol;
alternatively, the first and second electrodes may be,
the processing module 11 is further configured to select the measurement timing configuration according to a preset rule.
Optionally, if the UE is in a connected state scene, the processing module 11 is specifically configured to:
and in the measurement period, if the measurement time window of the frequency point to be measured of the first cell falls into a measurement groove, the measurement groove is used for measuring the frequency point to be measured, otherwise, the measurement groove is used for measuring the frequency point to be measured of the second cell.
Further, the connected state scene includes a CDRX not configured scene or a CDRX active period scene.
Optionally, if the UE is in an inactive period scenario, the processing module 11 is specifically configured to:
and in the entering of the measurement period, selecting a measurement time window of the frequency point to be measured of the first cell, reserving the measurement time window for measuring the frequency point to be measured of the first cell, and measuring the frequency point to be measured of the second cell at the time of a non-activation period except the measurement time window of the measurement frequency point of the first cell.
Further, the inactive period scenario includes a CDRX inactive period scenario or an idle inactive period scenario.
Optionally, after the processing module 11 completes measurement on the frequency point to be measured of the first cell and reports the measurement result to the network device through the sending module, the frequency point to be measured is marked as a measured frequency point;
alternatively, the first and second electrodes may be,
the processing module 11 completes measurement of the frequency point to be measured of the second cell, and after the transmission module 12 reports the measurement result to the network device, marks the frequency point to be measured as a measured cell.
The user equipment provided by any implementation manner is used for implementing the technical scheme of any method embodiment, and the implementation principle and the technical effect are similar, which are not described herein again.
Fig. 8 is a schematic structural diagram of a user equipment provided in the present application. As shown in fig. 8, the user equipment includes:
memory, a processor, a transmitter and a computer program, the computer program being stored in the memory, the processor running the computer program to perform the method of measuring a cell as provided in any of the preceding embodiments.
In a specific implementation of the user equipment described above, the memory may be integrated within the processor. The number of processors is at least one, and is used to execute execution instructions stored in the memory, i.e., the computer program.
The present application also provides a storage medium comprising: a readable storage medium and a computer program for implementing the method for measuring a cell provided in any of the above method embodiments.
The present application further provides a program product, which includes a computer program stored in a readable storage medium, from which the computer program can be read by at least one processor of a user equipment, and the computer program is executed by the at least one processor to enable the user equipment to implement the method for measuring a cell provided in any one of the method embodiments described above.
The application provides a chip, the chip can be applied to user equipment, the chip includes: at least one communication interface, at least one processor coupled with a memory via the communication interface, the processor invoking a computer program stored in the memory to perform a method of measuring a cell provided by any of the method embodiments described above. Wherein, the memory can be arranged outside the chip or integrated in the chip. The communication interface may be various interfaces that enable the processor to access the memory, such as an input interface, a processing device, an output interface, a Universal Flash Storage (UFS) interface, a peripheral component interconnect express (PCIe) interface, and the like.
In a Specific implementation of the ue, it should be understood that the Processor may be a Central Processing Unit (CPU), other general purpose processors, a Digital Signal Processor (DSP), an Application Specific Integrated Circuit (ASIC), etc. A general purpose processor may be a microprocessor or the processor may be any conventional processor or the like. The steps of a method disclosed in connection with the present application may be embodied directly in a hardware processor, or in a combination of the hardware and software modules in the processor.
All or a portion of the steps of implementing the above-described method embodiments may be performed by hardware associated with program instructions. The aforementioned program may be stored in a readable memory. When executed, the program performs steps comprising the method embodiments described above; and the aforementioned memory (storage medium) includes: read-only memory (ROM), RAM, flash memory, hard disk, solid state disk, magnetic tape, floppy disk, optical disk, and any combination thereof.

Claims (11)

1. A method for measuring cells is applied to measure cells of different systems or different frequencies, wherein the cells include a first cell requiring measurement timing configuration and a second cell without measurement timing configuration, the first cell and the second cell use different radio access technologies, or the first cell and the second cell are different frequency points in the same access technology, and the method comprises:
determining a measurement time window of a frequency point to be measured in a measurement period according to the measurement timing configuration corresponding to the first cell acquired in advance;
in the measurement period, measuring the frequency point to be measured of the first cell in the measurement time window of the frequency point to be measured of the first cell, and measuring the frequency point to be measured of the second cell at a time except the measurement time window of the frequency point to be measured of the first cell;
reporting the measurement result of the first cell and the measurement result of the second cell to network equipment;
if the UE is in a connected state scene, in the measurement period, measuring the frequency point to be measured of the first cell in the measurement time window of the frequency point to be measured of the first cell, and measuring the frequency point to be measured of the second cell in a time except the measurement time window of the frequency point to be measured of the first cell, including:
and in the measurement period, if the measurement time window of the frequency point to be measured of the first cell falls into a measurement groove, the measurement groove is used for measuring the frequency point to be measured, otherwise, the measurement groove is used for measuring the frequency point to be measured of the second cell.
2. The method of claim 1, wherein the measurement timing configuration corresponding to the first cell comprises a measurement period, an offset location, and a duration.
3. The method according to claim 1 or 2, characterized in that the method further comprises:
and receiving system information sent by the network equipment, wherein the system information carries the measurement timing configuration corresponding to the first cell.
4. The method according to claim 1 or 2, wherein if the UE is in an inactive period scenario, then in the measurement period, measuring the frequency point to be measured of the first cell in the measurement time window of the frequency point to be measured of the first cell, and measuring the frequency point to be measured of the second cell in a time other than the measurement time window of the frequency point to be measured of the first cell, includes:
and in the entering of the measurement period, selecting a measurement time window of the frequency point to be measured of the first cell, reserving the measurement time window for measuring the frequency point to be measured of the first cell, and measuring the frequency point to be measured of the second cell at the time of a non-activation period except the measurement time window of the measurement frequency point of the first cell.
5. A user device, comprising:
the processing module is used for determining a measurement time window of a frequency point to be measured in a measurement period according to the measurement timing configuration corresponding to the first cell acquired in advance;
the processing module is further configured to measure the frequency point to be measured of the first cell in the measurement time window of the frequency point to be measured of the first cell and measure the frequency point to be measured of the second cell at a time other than the measurement time window of the frequency point to be measured of the first cell in the measurement period;
a sending module, configured to report the measurement result of the first cell and the measurement result of the second cell to a network device;
the first cell and the second cell adopt different wireless access technologies, or the first cell and the second cell are different frequency points in the same access technology; the first cell is a cell needing measurement timing configuration, and the second cell is a cell without measurement timing configuration;
if the user equipment is in a connected state scene, the processing module is specifically configured to:
and in the measurement period, if the measurement time window of the frequency point to be measured of the first cell falls into a measurement groove, the measurement groove is used for measuring the frequency point to be measured, otherwise, the measurement groove is used for measuring the frequency point to be measured of the second cell.
6. The UE of claim 5, wherein the measurement timing configuration corresponding to the first cell comprises a measurement period, an offset location, and a duration.
7. The user equipment according to claim 5 or 6, wherein the user equipment further comprises:
a receiving module, configured to receive system information sent by the network device, where the system information carries the measurement timing configuration corresponding to the first cell.
8. The ue of claim 5 or 6, wherein the ue is in an inactive period scenario, the processing module is specifically configured to:
and in the entering of the measurement period, selecting a measurement time window of the frequency point to be measured of the first cell, reserving the measurement time window for measuring the frequency point to be measured of the first cell, and measuring the frequency point to be measured of the second cell at the time of a non-activation period except the measurement time window of the measurement frequency point of the first cell.
9. A user device, comprising: memory, processor, transmitter and computer program, the computer program being stored in the memory, the processor running the computer program to perform the method of measurement of a cell of any of claims 1 to 4.
10. A computer-readable storage medium, in which a computer program is stored, the computer program comprising at least one code section, which is executable by a processor, and which implements the method for measuring a cell according to any one of claims 1 to 4.
11. A chip, wherein the chip is applicable to a user equipment, the chip comprising: at least one communication interface, at least one processor coupled with a memory via the communication interface, the processor invoking a computer program stored in the memory to perform the method of measuring a cell of any of claims 1 to 4.
CN201880098497.1A 2018-10-26 2018-10-26 Cell measurement method, device and storage medium Active CN112840692B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2018/112211 WO2020082368A1 (en) 2018-10-26 2018-10-26 Cell measurement method, and device and storage medium

Publications (2)

Publication Number Publication Date
CN112840692A CN112840692A (en) 2021-05-25
CN112840692B true CN112840692B (en) 2023-02-10

Family

ID=70331218

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201880098497.1A Active CN112840692B (en) 2018-10-26 2018-10-26 Cell measurement method, device and storage medium

Country Status (2)

Country Link
CN (1) CN112840692B (en)
WO (1) WO2020082368A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114339867B (en) * 2021-12-31 2024-03-19 哲库科技(北京)有限公司 Cell measurement method, device, terminal equipment and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104754660A (en) * 2013-12-30 2015-07-01 联芯科技有限公司 GSM neighbor measuring method and system in LTE mode
CN105657730A (en) * 2014-12-04 2016-06-08 中国移动通信集团公司 Cell measurement method and apparatus
CN105744481A (en) * 2016-03-31 2016-07-06 北京邮电大学 Inter-system mobility management method
CN107624253A (en) * 2015-05-13 2018-01-23 高通股份有限公司 RRM measurements and report to the access of license assist type

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102905303B (en) * 2011-07-27 2017-12-19 中兴通讯股份有限公司 Different-frequency measuring method and device
US20150282080A1 (en) * 2014-03-28 2015-10-01 Broadcom Corporation System, device, and method for configuring dual drx cycles
CN106535223B (en) * 2015-09-15 2019-12-27 展讯通信(上海)有限公司 Cell measurement method and mobile terminal
CN107295558B (en) * 2017-08-10 2019-09-20 Oppo广东移动通信有限公司 Cell measuring method, device and storage medium

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104754660A (en) * 2013-12-30 2015-07-01 联芯科技有限公司 GSM neighbor measuring method and system in LTE mode
CN105657730A (en) * 2014-12-04 2016-06-08 中国移动通信集团公司 Cell measurement method and apparatus
CN107624253A (en) * 2015-05-13 2018-01-23 高通股份有限公司 RRM measurements and report to the access of license assist type
CN105744481A (en) * 2016-03-31 2016-07-06 北京邮电大学 Inter-system mobility management method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"R4-1707488 Measurement Gap".《3GPP tsg_ran\WG4_Radio》.2017, *

Also Published As

Publication number Publication date
WO2020082368A1 (en) 2020-04-30
CN112840692A (en) 2021-05-25

Similar Documents

Publication Publication Date Title
EP3657838B1 (en) Measurement gap parameter configuration and reference signal measurement methods and devices
EP3487204A1 (en) Early measurement reporting for cell access
US20200137602A1 (en) Cell Measurements Using Configured Reference Signals while in RRC Inactive Mode
US11375573B2 (en) Data transmission method and apparatus for discontinuous reception
CN112911654B (en) Capability information sending method, capability information receiving method and capability information sending device
WO2021197241A1 (en) Measurement relax method, and communication apparatus
US11510159B2 (en) Signal transmission method, network device, and terminal device
CN111277974B (en) Carrier selection method and communication equipment
US11317418B2 (en) Communication method and communication apparatus
CN113543193B (en) Relaxation measurement method and communication device
EP3799485A1 (en) Method for transmitting signal, network apparatus, and terminal apparatus
US20210014786A1 (en) Signal transmission method and device
US11419111B2 (en) Data transmission method, terminal device, and network device
CN109391955B (en) Method and device for converting measurement mode
WO2018053770A1 (en) Method and apparatus used to manage links
US20230034121A1 (en) Communication method and apparatus to optimze a measurment policy
CN107872819B (en) Resource management indication method and device
CN113302975B (en) Cell switching method, device, equipment and storage medium
EP3565368A1 (en) Signal transmission method for discontinuous reception, terminal device and network device
CN108810953B (en) Processing method for measurement report, network side equipment and user equipment
CN112840692B (en) Cell measurement method, device and storage medium
CN112968755B (en) Resource allocation method, network device and computer storage medium
CN111148144B (en) RRM measurement method and device
US20220386161A1 (en) Measurement method and apparatus
WO2021031004A1 (en) Carrier measurement method and apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant