CN112836966A - Power grid planning data management and conflict processing system - Google Patents

Power grid planning data management and conflict processing system Download PDF

Info

Publication number
CN112836966A
CN112836966A CN202110146254.4A CN202110146254A CN112836966A CN 112836966 A CN112836966 A CN 112836966A CN 202110146254 A CN202110146254 A CN 202110146254A CN 112836966 A CN112836966 A CN 112836966A
Authority
CN
China
Prior art keywords
unit
street lamp
weather
monitoring
output
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110146254.4A
Other languages
Chinese (zh)
Inventor
刘志松
邓晨成
肖重金
王涛
陈世强
冯艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Power Supply Design Institute Co ltd
State Grid Corp of China SGCC
Wuhan Power Supply Co of State Grid Hubei Electric Power Co Ltd
Original Assignee
Wuhan Power Supply Design Institute Co ltd
State Grid Corp of China SGCC
Wuhan Power Supply Co of State Grid Hubei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Power Supply Design Institute Co ltd, State Grid Corp of China SGCC, Wuhan Power Supply Co of State Grid Hubei Electric Power Co Ltd filed Critical Wuhan Power Supply Design Institute Co ltd
Priority to CN202110146254.4A priority Critical patent/CN112836966A/en
Publication of CN112836966A publication Critical patent/CN112836966A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2458Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
    • G06F16/2462Approximate or statistical queries
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/29Geographical information databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Abstract

The invention discloses a power grid planning data management and conflict processing system, relates to the technical field of urban street lamp power grid planning, and particularly relates to a meteorological station and an urban street lamp power grid. This electric wire netting planning data management and conflict processing system, thereby the weather acquisition unit can gather the city weather condition and confirm the on-off time of the bright condition of light adjustment city street lamp electric wire netting, thereby be favorable to avoiding opening too early or closing too late the city street lamp electric wire netting and lead to the extravagant condition of electric power to produce, and through natural light acquisition unit, the light brightness and the environmental aspect in this region can be gathered to the monitoring image acquisition unit, and data transfer to the weather data processing unit that will gather, subdivide the on-off time of each regional street lamp electric wire netting unit, be favorable to adapting to the actual conditions in each region of city.

Description

Power grid planning data management and conflict processing system
Technical Field
The invention relates to the technical field of urban street lamp power grid planning, in particular to a power grid planning data management and conflict processing system.
Background
Urban road street lamp sets up to provide the lighting fixtures of visibility for vehicle and pedestrian night on the road, ensures the safety of passing of driving at night and pedestrian, and it produces light through electric drive and illuminates the road mainly, is the important component part of urban power grid.
The existing urban street lamps are simple and crude in management and are only in a simple on-point opening-on-point closing mode, so that the street lamps can still be lit under the condition of bright road light or still do not work under the condition of bad weather and dim light in the daytime, and the conflict between the management mode and the actual condition often can cause electric power waste and potential safety hazards.
Disclosure of Invention
Aiming at the defects of the prior art, the invention provides a power grid planning data management and conflict processing system, which solves the problems that the existing urban street lamps proposed in the background art are simple and crude in management and are only in a simple mode of turning on to turning off from point to point, so that the street lamps still can be on under the condition of bright road light or still cannot work under the condition of bad weather and dim light in the daytime, and the conflict between the management mode and the actual condition often causes power waste and potential safety hazard.
In order to achieve the purpose, the invention is realized by the following technical scheme: power grid planning data management and conflict processing system, including weather station and city street lamp electric wire netting, the output electric connection of weather station has central control center, city street lamp electric wire netting electric connection is in central control center's output, and central control center's output still is connected with the electric wire netting monitoring instrument.
Optionally, the weather station includes that weather acquisition unit, weather compare unit, weather analysis unit, comparison have the mistake to store the unit and compare the correct storage unit, and weather acquisition unit's output electric connection has central control center, weather compares the input of unit and is connected with city street lamp electric wire netting, and weather compares the output electric connection of unit and has weather analysis unit, weather analysis unit's output electric connection has the comparison and has the mistake to store the unit, weather analysis unit's output still electric connection has the comparison correct storage unit.
Optionally, the weather comparison unit and the weather analysis unit are electrically connected in series, and the weather analysis unit, the comparison error storage unit, the comparison correct storage unit and the city street lamp power grid are electrically connected in parallel.
Optionally, the central control center includes meteorological data processing unit, electric power data analysis unit, electric power data storage unit and street lamp trouble suggestion unit, and meteorological data processing unit's output electric connection has city street lamp electric wire netting, electric power data processing unit's input is connected with electric wire netting monitoring instrument, and electric power data processing unit's output electric connection has electric power data analysis unit, electric power data analysis unit's output electric connection has electric power data storage unit, street lamp trouble suggestion unit's input is connected with electric wire netting monitoring instrument.
Optionally, the electric power data processing unit, the electric power data analysis unit, the electric power data storage unit and the power grid monitoring instrument are electrically connected in series.
Optionally, the city street lamp electric wire netting includes regional street lamp electric wire netting unit, natural light collection unit, monitoring image collection unit, supervisory equipment detecting element and the suggestion unit of giving an police dispatch newspaper, and regional street lamp electric wire netting unit's output electric connection has electric wire netting monitoring instrument, the equal electric connection of natural light collection unit, monitoring image collection unit's output has the weather station, the output of monitoring image collection unit is electric connection still has supervisory equipment detecting element, and supervisory equipment detecting element's output electric connection has the suggestion unit of giving an police dispatch newspaper.
Optionally, be electric connection in series between monitoring image acquisition unit, supervisory equipment detecting element and the suggestion unit of giving an alarm, and be electric connection in parallel between monitoring image acquisition unit, the natural light acquisition unit and the meteorological station.
Optionally, the power grid monitoring instrument includes a power consumption monitoring unit and a street lamp circuit monitoring unit, an output end of the power consumption monitoring unit is electrically connected to the street lamp circuit monitoring unit, and an output end of the street lamp circuit monitoring unit is electrically connected to the central control center.
Optionally, the power consumption monitoring unit, the street lamp circuit monitoring unit and the central control center are electrically connected in series.
The invention provides a power grid planning data management and conflict processing system, which has the following beneficial effects:
1. this electric wire netting planning data management and conflict processing system, weather acquisition unit can gather the city weather condition and transmit weather data to weather data processing unit, thereby confirm the on-off time of the bright condition of light adjustment city street lamp electric wire netting according to weather data processing unit to the analysis of weather, thereby be favorable to avoiding opening too early or closing too late the condition that the city street lamp electric wire netting leads to electric power waste and producing, be favorable to the rational use of electric power resource, thereby indirect play saves the effect of electric power resource.
2. According to the power grid planning data management and conflict processing system, the street lamps of the whole city can be divided according to the regional levels through the regional street lamp power grid units, the light brightness and the environmental conditions in the region can be collected through the natural light collecting unit and the monitoring image collecting unit, and the collected data are transmitted to the meteorological data processing unit, so that the switching time of each regional street lamp power grid unit can be further subdivided, and the system is suitable for the actual conditions of each region of the city.
3. This electric wire netting planning data management and conflict processing system, monitoring image acquisition unit can directly use road monitoring equipment to make it insert meteorological data processing unit, and can real-time supervision monitoring image acquisition unit's in service behavior through monitoring equipment detecting element to in the very first time of its trouble through the suggestion unit of calling out an police and remind the traffic police department in time to rush to the scene and replace mechanical coaching vehicle normal current, thereby avoid taking place road blocking or occurence of failure.
4. This power grid planning data management and conflict processing system, the power consumption monitoring unit can monitor the power consumption condition of every street lamp in the general area, and compare its data transmission to power data processing unit and standard power consumption data of time such as standard street lamp, and cooperate the power data analysis unit to carry out the analysis and exceed the power consumptive reason of standard, make things convenient for the later stage to adjust or change the street lamp that exceeds standard, in order to reach the effect of saving electric power, and can store the power consumption data of each street lamp through the power data storage unit, make things convenient for the later stage to do the comparison analysis as the data benchmark, and cooperate the circuit condition that street lamp circuit monitoring unit can monitor every street lamp and send the serial number of trouble street lamp to street lamp trouble suggestion unit in the very first time of trouble, make things convenient for the accurate target street lamp of seeking of later stage maintainer to maintain.
5. This electric wire netting planning data management and conflict processing system, natural light acquisition unit, the image and the light data that monitoring image acquisition unit gathered are passed to the weather station, compare the unit through the weather, the weather analysis unit compares the analysis back classified storage to comparing have the mistake to store the unit or compare the correct storage unit inside, the data accuracy rate that is favorable to detecting weather acquisition unit collection is compared to the data of actual weather data and weather acquisition unit collection, and can adjust the improvement to weather acquisition unit's mode according to actual weather data, thereby improve and detect the accuracy.
Drawings
FIG. 1 is a schematic overall flow diagram of the present invention;
FIG. 2 is a schematic view of the internal flow of the weather station according to the present invention;
FIG. 3 is a schematic view of the internal flow of the central control center according to the present invention;
FIG. 4 is a schematic view of the internal flow of the city street lamp power grid according to the present invention;
fig. 5 is a schematic view of the internal process of the power grid monitoring instrument of the present invention.
In the figure: 1. a weather station; 101. a weather collection unit; 102. a weather comparison unit; 103. a weather analysis unit; 104. comparing the error storage units; 105. comparing the correct storage units; 2. a central control center; 201. a meteorological data processing unit; 202. a power data processing unit; 203. a power data analysis unit; 204. a power data storage unit; 205. a street lamp fault prompting unit; 3. an urban street lamp power grid; 301. a regional street lamp power grid unit; 302. a natural light collection unit; 303. a monitoring image acquisition unit; 304. a monitoring device detection unit; 305. a warning prompt unit; 4. a grid monitoring instrument; 401. a power consumption monitoring unit; 402. and a street lamp circuit monitoring unit.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
In the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are only for convenience in describing and simplifying the description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed in a particular orientation, and be operated, and thus, should not be construed as limiting the invention. Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "connected" and "connected" are to be interpreted broadly, e.g., as being fixed or detachable or integrally connected; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1 to 5, the present invention provides a technical solution: power grid planning data management and conflict processing system, including weather station 1 and city street lamp electric wire netting 3, the output electric connection of weather station 1 has central control center 2, weather station 1 includes weather acquisition unit 101, weather compares unit 102, weather analysis unit 103, compare wrong storage unit 104 and compare correct storage unit 105, and the output electric connection of weather acquisition unit 101 has central control center 2, weather compares the input of unit 102 and is connected with city street lamp electric wire netting 3, and the output electric connection of weather comparison unit 102 has weather analysis unit 103, the output electric connection of weather analysis unit 103 has compares wrong storage unit 104, the output of weather analysis unit 103 still electric connection has compares correct storage unit 105, weather comparison unit 102 is electric series connection with weather analysis unit 103, and weather analysis unit 103, The comparison error storage unit 104, the comparison correct storage unit 105 and the city street lamp power grid 3 are electrically connected in parallel, the central control center 2 comprises a meteorological data processing unit 201, an electric power data processing unit 202, an electric power data analysis unit 203, an electric power data storage unit 204 and a street lamp fault prompting unit 205, the output end of the meteorological data processing unit 201 is electrically connected with the city street lamp power grid 3, the input end of the electric power data processing unit 202 is connected with the power grid monitoring instrument 4, the output end of the electric power data processing unit 202 is electrically connected with the electric power data analysis unit 203, the output end of the electric power data analysis unit 203 is electrically connected with the electric power data storage unit 204, the input end of the street lamp fault prompting unit 205 is connected with the power grid monitoring instrument 4, the electric power data processing unit 202, the electric power data analysis unit 203, the electric power data storage unit 204 and the power grid monitoring instrument, the weather data which takes the size of a city as an area is collected by the weather collection unit 101 as a reference, and the weather data processing unit 201 adjusts the on-off time of the urban street lamp power grid 3 based on the reference, thereby being beneficial to avoiding the situation of power waste caused by the early opening or the late closing of the urban street lamp power grid 3 and being beneficial to reasonably using power resources, therefore, the effect of saving power resources is indirectly achieved, the actual weather data is classified and stored in the comparison error storage unit 104 or the comparison correct storage unit 105 after being compared and analyzed by the weather comparison unit 102 and the weather analysis unit 103, the comparison of the actual weather data and the data collected by the weather collection unit 101 is favorable for detecting the accuracy of the data collected by the weather collection unit 101, the mode of the meteorological acquisition unit 101 can be adjusted and improved according to the actual meteorological data, so that the detection accuracy is improved;
the city street lamp power grid 3 is electrically connected with the output end of the central control center 2, and the output end of the central control center 2 is further connected with the power grid monitoring instrument 4, the city street lamp power grid 3 comprises a regional street lamp power grid unit 301, a natural light collecting unit 302, a monitoring image collecting unit 303, a monitoring device detecting unit 304 and an alarm prompting unit 305, and the output end of the regional street lamp power grid unit 301 is electrically connected with the power grid monitoring instrument 4, the output ends of the natural light collecting unit 302 and the monitoring image collecting unit 303 are both electrically connected with the weather station 1, the output end of the monitoring image collecting unit 303 is further electrically connected with a monitoring device detecting unit 304, and the output end of the monitoring device detecting unit 304 is electrically connected with the alarm prompting unit 305, and the monitoring image collecting unit 303, the monitoring device detecting unit 304 and the alarm prompting unit 305 are electrically connected, the monitoring image acquisition unit 303, the natural light acquisition unit 302 and the weather station 1 are electrically connected in parallel, the power grid monitoring instrument 4 comprises a power consumption monitoring unit 401 and a street lamp circuit monitoring unit 402, the output end of the power consumption monitoring unit 401 is electrically connected with the street lamp circuit monitoring unit 402, the output end of the street lamp circuit monitoring unit 402 is electrically connected with the central control center 2, the power consumption monitoring unit 401, the street lamp circuit monitoring unit 402 and the central control center 2 are electrically connected in series, the street lamps of the whole city can be regionally divided according to the district level by the regional street lamp power grid unit 301, the natural light acquisition unit 302 and the monitoring image acquisition unit 303 can acquire the brightness and the environmental condition of the light in the region and transmit the acquired data to the weather data processing unit 201, the switching time of the regional street lamp power grid unit 301 in the region is adjusted by taking the actually acquired weather data as the reference, therefore, the switching time of the street lamp power grid unit 301 in each area can be further subdivided, the real-time monitoring of the use condition of the monitoring image acquisition unit 303 can be realized by directly using the road monitoring equipment to be connected to the meteorological data processing unit 201, the use condition of the monitoring image acquisition unit 303 can be monitored in real time by the monitoring equipment detection unit 304, the traffic police department can be prompted to arrive at the site in time through the alarm prompting unit 305 at the first time of the fault, the normal passing of mechanical coaching vehicles is replaced, the road blockage or the accident is avoided, the power consumption monitoring unit 401 can monitor the power consumption condition of each street lamp in the passing area, the data is transmitted to the power data processing unit 202 to be compared with the standard power consumption data of the standard street lamps in equal time, and the standard power consumption data of the street lamps are stored in the power consumption data processing unit 202 for convenient comparison, and cooperate electric power data analysis unit 203 to carry out the analysis and exceed the power consumptive reason of standard, make things convenient for the later stage to adjust or change the street lamp that exceeds standard, in order to reach the effect of saving electric power, and can store the power consumption data of each street lamp through electric power data storage unit 204, make things convenient for the later stage to do comparison analysis as the data benchmark, and cooperate street lamp circuit monitoring unit 402 can monitor the circuit condition of every street lamp and send the serial number of trouble street lamp to street lamp trouble suggestion unit 205 in the very first time of trouble, make things convenient for the accurate target street lamp of looking for of later stage maintainer to maintain.
In summary, when the power grid planning data management and conflict processing system is used, firstly, weather data with the size of a city as a region is collected by the weather collection unit 101 as a reference, then the weather data processing unit 201 adjusts the on-off time of the urban street lamp power grid 3 based on the reference, then the street lamps of the whole city can be divided into regions by the regional street lamp power grid unit 301 according to the regional level, the light brightness and the environmental condition in the region can be collected by the natural light collection unit 302 and the monitoring image collection unit 303, the collected data is transmitted to the weather data processing unit 201, the on-off time of the regional street lamp power grid unit 301 in the region is adjusted by taking the actually collected weather data as the reference, thereby being beneficial to further subdividing the on-off time of each regional street lamp power grid unit 301, and then the power consumption monitoring unit 401 can monitor the power consumption condition of each street lamp in the pass region, the data is transmitted to the electric power data processing unit 202 to be compared with standard electricity consumption data of standard street lamps in equal time, the reason exceeding the standard electricity consumption is analyzed by the electric power data analyzing unit 203, the standard exceeding street lamps can be conveniently adjusted or replaced in the later period, then the electric power data of each street lamp can be stored by the electric power data storing unit 204, the comparison and analysis are conveniently carried out by taking the electric power data as a data reference in the later period, the circuit condition of each street lamp can be monitored by the street lamp circuit monitoring unit 402, the number of the fault street lamp is sent to the street lamp fault prompting unit 205 in the first time of the fault, maintenance personnel can accurately find a target street lamp for maintenance in the later period, the use condition of the image collecting unit 303 can be monitored in real time by the monitoring equipment detecting unit 304, and the traffic police department can be prompted to timely rush to the site to replace mechanical auxiliary vehicles to normally pass through the alarm prompting unit 305 in the, therefore, road blockage or accidents are avoided, images and light data collected by the natural light collection unit 302 and the monitoring image collection unit 303 are transmitted to the weather station 1, the images and the light data are classified and stored in the comparison error storage unit 104 or the comparison correct storage unit 105 after being compared and analyzed by the weather comparison unit 102 and the weather analysis unit 103, and the data collected by the actual weather data and the weather collection unit 101 are compared to facilitate detection of the data accuracy rate collected by the weather collection unit 101.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be able to cover the technical scope of the present invention and the equivalent alternatives or modifications according to the technical solution and the inventive concept of the present invention within the technical scope of the present invention.

Claims (9)

1. Power grid planning data management and conflict processing system, including weather station (1) and city street lamp electric wire netting (3), its characterized in that: the output electric connection of weather station (1) has central control center (2), city street lamp electric wire netting (3) electric connection is in the output of central control center (2), and the output of central control center (2) still is connected with electric wire netting monitoring instrument (4).
2. The grid planning data management and conflict handling system according to claim 1, wherein: weather station (1) including weather acquisition unit (101), weather comparison unit (102), weather analysis unit (103), compare have the mistake to store unit (104) and compare correct storage unit (105), and the output electric connection of weather acquisition unit (101) has central control center (2), weather compares the input of unit (102) and is connected with city street lamp electric wire netting (3), and weather compares the output electric connection of unit (102) and has weather analysis unit (103), the output electric connection of weather analysis unit (103) has the mistake to store unit (104) of comparison, the output of weather analysis unit (103) still electric connection has correct storage unit (105) of comparison.
3. The grid planning data management and conflict handling system according to claim 2, wherein: the weather comparison unit (102) and the weather analysis unit (103) are electrically connected in series, and the weather analysis unit (103), the comparison error storage unit (104), the comparison correct storage unit (105) and the urban street lamp power grid (3) are electrically connected in parallel.
4. The grid planning data management and conflict handling system according to claim 1, wherein: the central control center (2) comprises a meteorological data processing unit (201), an electric power data processing unit (202), an electric power data analysis unit (203), an electric power data storage unit (204) and a street lamp fault prompting unit (205), wherein the output end of the meteorological data processing unit (201) is electrically connected with an urban street lamp power grid (3), the input end of the electric power data processing unit (202) is connected with a power grid monitoring instrument (4), the output end of the electric power data processing unit (202) is electrically connected with the electric power data analysis unit (203), the output end of the electric power data analysis unit (203) is electrically connected with the electric power data storage unit (204), and the input end of the street lamp fault prompting unit (205) is connected with the power grid monitoring instrument (4).
5. The grid planning data management and conflict handling system according to claim 4, wherein: the electric power data processing unit (202), the electric power data analysis unit (203), the electric power data storage unit (204) and the power grid monitoring instrument (4) are electrically connected in series.
6. The grid planning data management and conflict handling system according to claim 1, wherein: city street lamp electric wire netting (3) are including regional street lamp electric wire netting unit (301), natural light collection unit (302), monitoring image collection unit (303), supervisory equipment detecting element (304) and warning suggestion unit (305), and the output electric connection of regional street lamp electric wire netting unit (301) has electric wire netting monitoring instrument (4), the equal electric connection of output of natural light collection unit (302), supervisory image collection unit (303) has meteorological station (1), the output of monitoring image collection unit (303) still electric connection has supervisory equipment detecting element (304), and the output electric connection of supervisory equipment detecting element (304) has warning suggestion unit (305).
7. The grid planning data management and conflict handling system according to claim 6, wherein: the monitoring image acquisition unit (303), the monitoring equipment detection unit (304) and the alarm prompt unit (305) are electrically connected in series, and the monitoring image acquisition unit (303), the natural light acquisition unit (302) and the weather station (1) are electrically connected in parallel.
8. The grid planning data management and conflict handling system according to claim 1, wherein: the power grid monitoring instrument (4) comprises a power consumption monitoring unit (401) and a street lamp circuit monitoring unit (402), the output end of the power consumption monitoring unit (401) is electrically connected with the street lamp circuit monitoring unit (402), and the output end of the street lamp circuit monitoring unit (402) is electrically connected with the central control center (2).
9. The grid planning data management and conflict handling system according to claim 8, wherein: the power consumption monitoring unit (401), the street lamp circuit monitoring unit (402) and the central control center (2) are connected in series in power.
CN202110146254.4A 2021-02-03 2021-02-03 Power grid planning data management and conflict processing system Pending CN112836966A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110146254.4A CN112836966A (en) 2021-02-03 2021-02-03 Power grid planning data management and conflict processing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110146254.4A CN112836966A (en) 2021-02-03 2021-02-03 Power grid planning data management and conflict processing system

Publications (1)

Publication Number Publication Date
CN112836966A true CN112836966A (en) 2021-05-25

Family

ID=75931621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110146254.4A Pending CN112836966A (en) 2021-02-03 2021-02-03 Power grid planning data management and conflict processing system

Country Status (1)

Country Link
CN (1) CN112836966A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106211518A (en) * 2016-08-26 2016-12-07 特斯联(北京)科技有限公司 A kind of intelligent city's means of illumination and system
CN108112142A (en) * 2017-11-24 2018-06-01 南京南邮信息产业技术研究院有限公司 City street lamp long-range control method and system based on Internet of Things
CN108200709A (en) * 2018-02-09 2018-06-22 张家港江苏科技大学产业技术研究院 Intelligent streetlamp monitoring system
CN109640473A (en) * 2018-12-07 2019-04-16 四川华体照明科技股份有限公司 A kind of intelligent city management based on street lamp
CN111163572A (en) * 2020-01-07 2020-05-15 国电智能科技(深圳)有限公司 Street lamp illumination energy-saving management method and system based on big data

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106211518A (en) * 2016-08-26 2016-12-07 特斯联(北京)科技有限公司 A kind of intelligent city's means of illumination and system
CN108112142A (en) * 2017-11-24 2018-06-01 南京南邮信息产业技术研究院有限公司 City street lamp long-range control method and system based on Internet of Things
CN108200709A (en) * 2018-02-09 2018-06-22 张家港江苏科技大学产业技术研究院 Intelligent streetlamp monitoring system
CN109640473A (en) * 2018-12-07 2019-04-16 四川华体照明科技股份有限公司 A kind of intelligent city management based on street lamp
CN111163572A (en) * 2020-01-07 2020-05-15 国电智能科技(深圳)有限公司 Street lamp illumination energy-saving management method and system based on big data

Similar Documents

Publication Publication Date Title
CN111770621A (en) Integrated intelligent street lamp control management system based on Internet of things and method thereof
CN202818741U (en) LED (light emitting diode) street lamp and remote intelligent monitoring system thereof
CN206704212U (en) The identification device and its system of railway switch state
CN106051601A (en) Solar street lamp fault monitoring alarm device based on internet of things
CN102201170A (en) Highway full-section in-time prompt system
CN209265704U (en) Intelligent traffic signal lamp control system
CN110290625B (en) Public lighting system
CN110060495A (en) Traffic signal light condition monitors system and method
CN110728854A (en) Traffic signal machine network monitoring system
CN115884473A (en) Intelligent street lamp system and intelligent street lamp comprising same
CN106864485A (en) The identifying device and its system of railway switch state
CN106327860A (en) Safety traffic intelligent voice prompt system
CN111697705B (en) Power distribution integrated device based on multi-source information control
CN211826410U (en) LED street lamp state monitoring and fault positioning system
CN112836966A (en) Power grid planning data management and conflict processing system
CN117042269A (en) Smart city road lighting system
CN208353652U (en) A kind of LED street lamp remote intelligent control system based on Internet of Things
CN207820291U (en) Intelligent monitor system of street lamps based on NB-IOT
CN202455585U (en) Street lamp remote controller
CN205249585U (en) City road lamp illumination system intelligent monitor terminal that leaks electricity
CN114495493A (en) Highway tunnel vehicle abnormal driving warning and lighting control system
CN207783236U (en) A kind of Internet of Things solar street light intelligence control system
KR20130063158A (en) Apparrutus and method to inspect obstruction light for flight, and system using thereof
CN111010783A (en) Wisdom street lamp management system
CN218547652U (en) Grading sound and light alarm device suitable for slope deformation monitoring

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210525

RJ01 Rejection of invention patent application after publication