CN112832417A - Honeycomb hollow-out type grid tubular double-steel-plate concrete combined shear wall and preparation method thereof - Google Patents

Honeycomb hollow-out type grid tubular double-steel-plate concrete combined shear wall and preparation method thereof Download PDF

Info

Publication number
CN112832417A
CN112832417A CN202110258009.2A CN202110258009A CN112832417A CN 112832417 A CN112832417 A CN 112832417A CN 202110258009 A CN202110258009 A CN 202110258009A CN 112832417 A CN112832417 A CN 112832417A
Authority
CN
China
Prior art keywords
honeycomb
steel
hollowed
concrete
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110258009.2A
Other languages
Chinese (zh)
Inventor
沙振方
司心池
蒋凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhangjiagang Free Trade Zone Jingang Construction Engineering Quality Inspection Co ltd
Original Assignee
Zhangjiagang Free Trade Zone Jingang Construction Engineering Quality Inspection Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhangjiagang Free Trade Zone Jingang Construction Engineering Quality Inspection Co ltd filed Critical Zhangjiagang Free Trade Zone Jingang Construction Engineering Quality Inspection Co ltd
Priority to CN202110258009.2A priority Critical patent/CN112832417A/en
Publication of CN112832417A publication Critical patent/CN112832417A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/58Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal
    • E04B2/60Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal characterised by special cross-section of the elongated members
    • E04B2/62Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal characterised by special cross-section of the elongated members the members being formed of two or more elements in side-by-side relationship
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model provides a two steel sheet concrete combination shear wall of honeycomb fretwork formula grid tubulose, including the steel pipe concrete end post, honeycomb fretwork steel sheet, honeycomb hole drawknot steel sheet, honeycomb fretwork steel sheet is the thin steel sheet that is provided with the hole of orthogonal array range, control two steel pipe concrete end posts around set up two honeycomb fretwork steel sheets, set up a plurality of honeycomb hole drawknot steel sheets between two honeycomb fretwork steel sheets, the three welds and forms honeycomb fretwork formula grid tubulose wallboard, the welding of multi-disc wallboard is assembled and is formed L shape, T shape and cross shear force wall, pour intraductal concrete, constitute two steel sheet concrete combination shear wall systems of honeycomb fretwork formula grid tubulose. The honeycomb hollow steel plate is adopted, a large amount of steel is saved, the hoisting weight is reduced, the problem of difficulty in welding construction of the internal steel plate is solved, the steel bar truss floor bearing plate is placed in the holes of the honeycomb hollow steel plate, the problem of supporting connection of a reinforced concrete floor is also solved, the honeycomb hollow grid tubular wall plate is used as a vertical temporary support, a plurality of floors are constructed simultaneously, and a super high-rise building can be built quickly.

Description

Honeycomb hollow-out type grid tubular double-steel-plate concrete combined shear wall and preparation method thereof
Technical Field
The invention belongs to the field of civil engineering, relates to a combined shear wall structure, and particularly relates to a honeycomb hollow-out type grid tubular double-steel-plate concrete combined shear wall and a preparation method thereof.
Background
Super high-rise buildings are used as crystals of modern building technologies, and urban and national images are improved. As the height of a building increases, the horizontal earthquake action increases greatly, and a lateral force resisting shear wall structure system must be arranged to resist strong earthquakes.
The lateral rigidity and the seismic ductility of the shear wall structure are very key factors for the structural design of the super high-rise building, and the concrete shear wall has the advantage of high lateral force rigidity resistance but has poor seismic ductility; the pure steel plate shear wall has the advantage of good earthquake-resistant ductility, but the lateral force resistant rigidity is low; the double-steel-plate concrete combined shear wall can exert the combination advantages of two structural materials, namely the steel plate and the concrete, and has the advantages of high lateral force rigidity and good earthquake resistance and ductility, so that the double-steel-plate concrete combined shear wall is the key research direction of the shear wall structure technology of the super high-rise building.
At present, the double-steel-plate concrete combined shear wall has some problems in popularization and application of super high-rise buildings, and the structure construction technology is not mature enough. The traditional double-steel-plate concrete combined shear wall has the advantages of large steel consumption, high manufacturing cost, poor economic index and large hoisting weight; in the traditional double-steel-plate concrete combined shear wall, in order to avoid buckling of the outer steel plates under stress, an internal tie steel plate needs to be arranged between the double steel plates, but the shear wall is thick, thin and has a narrow internal space, and the tie steel plate is very difficult to weld, so that a large amount of studs have to be welded inside the steel plates, and labor and time are wasted; traditional two steel sheet concrete composite shear wall structure and reinforced concrete floor structure both connect the construction difficulty, and two steel sheet concrete composite shear wall outside adopt the monoblock steel sheet, and in floor department, the atress reinforcing bar of reinforced concrete floor structure can not pierce through two steel sheet concrete composite shear wall, leads to reinforced concrete floor structure atress reinforcing bar anchor construction difficulty.
Aiming at the defects of the existing double-steel-plate concrete combined shear wall structure technology, the technical advantages of the honeycomb beam are used for reference, the double-steel-plate concrete combined shear wall is improved, the whole outer side steel plate of the traditional double-steel-plate concrete combined shear wall is changed into a honeycomb hollowed-out steel plate, the inner bonding steel plate is changed into a honeycomb type bonding steel plate, steel pipe concrete end columns are arranged at two ends of the combined shear wall, and the honeycomb hollowed-out grid tubular double-steel-plate concrete combined shear wall is formed. The novel double-steel-plate concrete combined shear wall saves a large amount of steel, reduces the hoisting weight, improves the welding quality of the internal tie steel plates, solves the problem of the integrity of the supporting connection between the reinforced concrete floor and the double-steel-plate concrete combined shear wall, can be constructed in a multi-layer crossing mode, and greatly shortens the construction period of a building.
Disclosure of Invention
The technical problem is as follows: aiming at the defects of the existing double-steel-plate concrete combined shear wall technology, the honeycomb hollowed-out type grid tubular double-steel-plate concrete combined shear wall is provided, the outer double steel plates adopt honeycomb hollowed-out steel plates, the inner tie steel plates adopt honeycomb hole tie steel plates, rectangular steel pipe end posts are arranged at two ends of each steel pipe end post, high-performance concrete is poured inside a cavity, the welding quality of the inner tie steel plates is ensured through holes of the honeycomb hollowed-out steel plates, and the problem of supporting connection integrity of a reinforced concrete floor slab and the double-steel-plate concrete combined shear wall is solved.
The technical scheme is as follows: the invention discloses a honeycomb hollowed-out type grid tubular double-steel-plate concrete combined shear wall which comprises steel pipe concrete end columns, honeycomb hollowed-out steel plates, honeycomb hole tie steel plates, in-pipe concrete, wall body hole sealing oppositely-pulled small templates and reinforced concrete floors, and is characterized in that: the concrete-filled steel tube end column is characterized in that two honeycomb hollowed-out steel plates are arranged around two rectangular steel tube concrete end columns on the left and right, the honeycomb hollowed-out steel plates are thin steel plates provided with orthogonal array arrangement holes, a plurality of honeycomb hole drawknot steel plates are uniformly arranged between the two honeycomb hollowed-out steel plates in the front and the back, the concrete-filled steel tube end columns, the honeycomb hollowed-out steel plates and the honeycomb hole drawknot steel plates are welded and connected into a whole to form a honeycomb hollowed-out grid tubular wallboard, a plurality of wall body hole sealing opposite-drawing small templates cover the holes of the honeycomb hollowed-out steel plates, the concrete in the pipe is filled in the inner cavity of the honeycomb hollowed-out grid tubular wallboard, upper and lower stressed reinforcing steel bar nets of a reinforced concrete floor slab penetrate through the holes of the honeycomb hollowed-out steel plates at a floor, concrete of the floor slab is.
Preferably, the orthogonal array arrangement holes of the honeycomb hollowed-out steel plate can be hexagonal, octagonal, circular or elliptical, and the manufacturing process of the honeycomb hollowed-out steel plate can be formed by laser cutting or punching.
Preferably, the honeycomb hole drawknot steel plate is provided with the steel sheet of single row hexagon, octagon, circular or oval hole, the preparation technology of honeycomb hole drawknot steel sheet can be on the steel sheet according to certain broken line cutting back transposition welding combination again and form, through the hole of honeycomb fretwork steel sheet, with honeycomb hole drawknot steel sheet and the firm welding of honeycomb fretwork steel sheet.
Preferably, the honeycomb hollowed-out grid tubular wall plate is formed by welding and connecting a steel pipe concrete end column, a honeycomb hollowed-out steel plate and a honeycomb hole tie steel plate, a plurality of honeycomb hollowed-out grid tubular wall plates are welded and assembled to form an L-shaped shear wall, a T-shaped shear wall and a cross-shaped shear wall, and concrete in the pipe is poured to form the honeycomb hollowed-out grid tubular double-steel-plate concrete combined shear wall.
The preparation method of the honeycomb hollow-out type grid tubular double-steel-plate concrete combined shear wall comprises the following steps:
the method comprises the following steps: the method comprises the following steps of blanking rectangular steel pipes of concrete filled steel tube end columns in a steel structure processing factory according to design requirements, processing and manufacturing honeycomb hollowed steel plates and honeycomb hole bonding steel plates in the factory, and firmly welding the rectangular steel pipes of the left concrete filled steel tube end column and the right concrete filled steel tube end column, the front honeycomb hollowed steel plate, the rear honeycomb hollowed steel plate and a plurality of honeycomb hole bonding steel plates in the middle by utilizing holes of the honeycomb hollowed steel plates to form the honeycomb hollowed grid tubular wallboard;
step two: conveying the honeycomb hollowed-out grid tubular wall boards to a construction site of a super high-rise building, hoisting the honeycomb hollowed-out grid tubular wall boards in place, welding and assembling a plurality of honeycomb hollowed-out grid tubular wall boards to form an L-shaped shear wall, a T-shaped shear wall and a cross-shaped shear wall, installing wall hole sealing opposite-pulling small templates to cover holes of the honeycomb hollowed-out steel plates, and pouring in-pipe concrete in cavities of the honeycomb hollowed-out grid tubular wall boards to form a honeycomb hollowed-out grid tubular double-steel-plate concrete combined shear wall system;
step three: placing the steel bar truss floor bearing plate in the hole of the honeycomb hollow steel plate, binding a floor slab reinforcing mesh, and pouring floor slab concrete to form a reinforced concrete floor slab;
step four: on the construction site of the super high-rise building, a plurality of floor structures are simultaneously and alternately operated for construction, the honeycomb hollowed-out type grid tubular wall plate is hoisted and welded in place on the upper floor, the steel bar truss floor bearing plate is placed in the hole of the honeycomb hollowed-out steel plate on the floor, the floor reinforcing mesh is bound, the concrete in the pipe is poured on the lower floor, and the floor concrete is poured, so that the super high-rise building structure can be quickly built until the roof of the building structure is sealed.
Has the advantages that: compared with the prior art, the invention has the following advantages:
borrow the advantage of reference honeycomb beam structure, to the weak point of current two steel sheet concrete combination shear wall structure techniques, change the outside steel sheet of two steel sheet concrete combination shear walls into honeycomb fretwork steel sheet, inside drawknot steel sheet improves to honeycomb holes drawknot steel sheet, both ends set up rectangle steel pipe end post, the three welds firmly and forms honeycomb fretwork formula grid tubular wallboard, high performance concrete is pour to inside cavity, form a two steel sheet concrete combination shear wall of honeycomb fretwork formula grid tubular.
Compared with a reinforced concrete shear wall, the honeycomb hollowed-out type grid tubular double-steel-plate concrete combined shear wall has the advantages that the honeycomb hollowed-out steel plates on the outer side replace distributed reinforcing steel bar net pieces, the honeycomb hole tie steel plates replace tie reinforcing steel bars, the steel pipe concrete end columns at two ends replace reinforced concrete embedded columns, and the structural mechanics principles of the honeycomb hollowed-out type grid tubular double-steel-plate concrete combined shear wall and the reinforced concrete embedded columns are basically the same.
Compared with the traditional double-steel-plate concrete combined shear wall, the honeycomb hollowed-out type grid tubular double-steel-plate concrete combined shear wall adopts the honeycomb hollowed-out steel plate as the outer steel plate, and the honeycomb tied steel plate is improved to the honeycomb tied steel plate, so that a large amount of steel plate materials are saved, the hoisting weight is reduced, and the reasonable economic index is achieved.
Traditional two steel sheet concrete composite shear wall need set up multichannel drawknot steel sheet in order to prevent outer two steel sheet buckling deformation, but, because two steel sheet concrete composite shear wall structure thickness is thinner, its inner space distance is less, drawknot steel sheet welding preparation difficulty, therefore, often can only adopt to weld intensive peg in advance at two steel sheet inboards and handle, take a lot of work and hard.
Compare with traditional two steel sheet concrete composite shear wall, the honeycomb fretwork steel sheet in trompil hole is adopted in the outside of two steel sheet concrete composite shear wall of honeycomb fretwork formula grid tubulose, through the hole of outside honeycomb fretwork steel sheet, can conveniently weld inside drawknot steel sheet, and the preparation is convenient.
The traditional double-steel-plate concrete combined shear wall structure and the reinforced concrete floor structure are difficult to support and connect, special construction treatment is needed, and the structure is complex.
The honeycomb hollowed-out type grid tubular double-steel-plate concrete combined shear wall is characterized in that the outer double steel plates of the honeycomb hollowed-out type grid tubular double-steel-plate concrete combined shear wall are honeycomb hollowed-out steel plates, the steel bar truss floor bearing plate can be placed in the holes of the honeycomb hollowed-out steel plates, the floor stressed steel bar net piece can conveniently penetrate through the holes of the honeycomb hollowed-out steel plates, and the reinforced concrete floor structure and the honeycomb hollowed-out type grid tubular double-steel-plate concrete combined shear wall are integrally formed.
Similar honeycomb beam structure, the outside honeycomb fretwork steel sheet of two steel sheet concrete composite shear wall of honeycomb fretwork formula grid tubulose has good shear resistance, can avoid two steel sheet concrete composite shear wall structures to appear the crack to one side, can realize the anti-seismic requirement of the strong shear weak bending of shear wall structure.
Set up honeycomb holes drawknot steel sheet, can strengthen resisting of outside honeycomb hole fretwork steel sheet and take place the ability of outer bucking destruction, honeycomb holes drawknot steel sheet has increased the inside permeability of combination shear wall, and the packed concrete can flow between a plurality of cavitys, has improved concreting's efficiency of construction.
The small hole sealing split formworks are the same and can be produced in a large scale in a factory, and all floors can be recycled, so that the construction speed can be improved, and a large number of wall formworks can be saved.
Two tip of honeycomb fretwork formula grid tubulose two steel sheet concrete combination shear wall set up the steel pipe concrete end post of rectangle form, because intraductal concrete three-dimensional pressurized, intraductal concrete strength and ductility improve by a wide margin, can increase substantially the bearing capacity and the structural rigidity of honeycomb fretwork formula grid tubulose two steel sheet concrete combination shear wall, set up the antidetonation ductility that steel pipe concrete end post also can improve the shear wall by a wide margin.
Two steel sheet concrete combination shear walls of honeycomb fretwork formula grid tubulose are by controlling two rectangle form steel pipe concrete end posts, two honeycomb fretwork steel sheets and inside a plurality of honeycomb holes drawknot steel sheet are constituteed around, form the honeycomb fretwork formula grid tubulose wallboard of steel construction, the preparation is convenient, both collaborative work of the honeycomb fretwork formula grid tubulose wallboard of steel construction and intraductal high performance concrete, the advantage is complementary, intraductal high performance concrete mainly bears vertical load, improve resistance to compression bearing capacity, horizontal load is born to the honeycomb fretwork formula grid tubulose wallboard of steel construction, improve the bending resistance bearing capacity that shears.
The honeycomb hollowed-out grid tubular double-steel-plate concrete combined shear wall has good anti-seismic performance, can meet the design requirements of high ductility, high axial compression ratio and thin wall thickness of super high-rise buildings, reduces the thickness of the wall body, increases the effective use area of a building, reduces the self-weight of the structure, and reduces the effect of seismic load.
The honeycomb hollow-out type grid tubular wall plate with the steel structure can be prefabricated in a factory for mass production, transported to a site and hoisted in place, a plurality of pieces of grid tubular wall plates with the steel structure can be assembled through welding to form L-shaped, T-shaped and cross-shaped shear walls, and concrete in the pipe is poured to form a honeycomb hollow-out type grid tubular double-steel-plate concrete combined shear wall system so as to quickly build a super high-rise building.
The honeycomb hollowed steel plate has many advantages, the water heating and electricity pre-buried pipeline can be very conveniently arranged, the inner tie steel plate can be conveniently welded through the holes of the outer honeycomb hollowed steel plate, the steel plate material is saved, the hoisting weight is reduced, in addition, the stress steel bars of the reinforced concrete floor slab can also penetrate through the holes of the honeycomb hollowed steel plate through the holes of the outer honeycomb hollowed steel plate, the concrete construction operation in the grid tubular wall slab pipe can also be performed on the side surface of the shear wall, the construction feasibility is provided for the multilayer cross operation construction of the super high-rise building, and the construction period can be greatly shortened.
In the process of constructing the super high-rise building, the double-layer honeycomb hollowed steel plate can be used as vertical temporary construction support, the steel bar truss floor bearing plate can be supported in the holes of the honeycomb hollowed steel plate, industrial assembly type construction can be completely realized, a large amount of scaffold construction operation can be avoided on a construction site, the construction speed of the super high-rise building is greatly accelerated, a large amount of manpower and material resources can be saved, and a large amount of construction funds can be saved.
Last floor, when the honeycomb fretwork formula grid tubulose wallboard hoist and mount welding of steel construction connects high construction, this floor can hoist steel bar truss building carrier plate and floor ligature reinforcing bar construction, and at next floor, pour shear force wall intraductal concrete and floor concrete construction operation, can be three floor structure alternately operation construction simultaneously, and super high-rise building structure's construction speed improves greatly, can shorten construction period greatly.
In order to further shorten the construction time and deliver the building as soon as possible, the outer side of the honeycomb hollow-out type grid tubular wall plate of the steel structure can be used for preparing an outer wall heat-insulating layer and an inner wall heat-insulating layer in a prefabrication factory, a large number of small wall hole sealing opposite-pulling templates can be omitted, and the construction speed is further accelerated.
The honeycomb hollowed-out type grid tubular double-steel-plate concrete combined shear wall overcomes the defects of the existing double-steel-plate concrete combined shear wall structure technology, solves the three problems of large steel consumption, difficult welding construction of internal tie steel plates, connection and support of reinforced concrete floors and the like of the existing double-steel-plate shear wall, can realize multi-floor cross construction operation, and can greatly shorten the construction period of a super high-rise building structure.
Drawings
FIG. 1 is a three-dimensional schematic view of a single piece cellular open grid tubular double steel plate concrete composite shear wall;
FIG. 2 is a schematic plan view of FIG. 1;
FIG. 3 is a schematic plan view of an oval hole honeycomb pierced steel plate and a honeycomb hole drawknot steel plate;
FIG. 4 is a schematic plan view of an octagonal-hole honeycomb hollowed-out steel plate and a honeycomb-hole drawknot steel plate;
FIG. 5 is a schematic elevation view of a honeycomb hollow grid tubular double steel plate concrete composite shear wall;
FIG. 6 is a three-dimensional schematic view of an L-shaped honeycomb hollowed-out grid tubular double steel plate concrete composite shear wall system;
FIG. 7 is a schematic plan view of a honeycomb hollow grid tubular double steel plate concrete composite shear wall core tube structure;
FIG. 8 is a schematic cross-sectional view of FIG. 1;
fig. 9 is a three-dimensional schematic view of a multi-layer honeycomb hollowed-out grid tubular double steel plate concrete composite shear wall system.
The figure shows that: a concrete filled steel tube end column 1; a honeycomb hollowed-out steel plate 2; honeycomb hole drawknot steel plate 3; a honeycomb hollowed-out grid tubular wallboard A; concrete 4 in the tube; a small wall hole sealing opposite-pulling template 5; a reinforced concrete floor 6.
Detailed Description
The invention is further described below with reference to the accompanying drawings.
Example 1
The invention discloses a honeycomb hollowed-out grid tubular double-steel-plate concrete combined shear wall, which comprises a steel pipe concrete end column 1, a honeycomb hollowed-out steel plate 2, a honeycomb hole tie steel plate 3, in-pipe concrete 4, a wall body hole sealing counter-drawing small template 5 and a reinforced concrete floor 6, and is characterized in that: two honeycomb hollow steel plates 2 are arranged in front of and behind two rectangular steel pipe concrete end columns 1 on the left and right, the honeycomb hollow steel plates 2 are thin steel plates provided with holes arranged in an orthogonal array, a plurality of honeycomb hole drawknot steel plates 3 are evenly arranged between a front honeycomb hollowed-out steel plate 2 and a rear honeycomb hollowed-out steel plate 2, the concrete filled steel tube end column 1, the honeycomb hollowed-out steel plates 2 and the honeycomb hole drawknot steel plates 3 are welded and connected into a whole to form a honeycomb hollowed-out grid tubular wallboard A, a plurality of wall body hole sealing opposite-drawing small templates 5 cover holes of the honeycomb hollowed-out steel plates 2, the concrete 4 in the pipe fills the inner cavity of the honeycomb hollowed-out grid tubular wallboard A, at the floor, the upper and lower stressed reinforcing meshes of the reinforced concrete floor 6 penetrate through the holes of the honeycomb hollowed steel plates 2, the floor concrete is poured, and the reinforced concrete floor 6 and the honeycomb hollowed grid tubular wall plate A are integrated.
The orthogonal array arrangement holes of the honeycomb hollowed steel plate 2 can be hexagonal, octagonal, circular or elliptical, and the manufacturing process of the honeycomb hollowed steel plate 2 can be formed by laser cutting or punching.
Honeycomb holes drawknot steel sheet 3 be the steel sheet that is provided with single row hexagon, octagon, circular or oval hole, honeycomb holes drawknot steel sheet 3's manufacturing technology can be on the steel sheet according to certain broken line cutting back transposition welding combination form again, through the hole of honeycomb fretwork steel sheet 2, with honeycomb holes drawknot steel sheet 3 and the firm welding of honeycomb holes fretwork steel sheet 2.
The honeycomb hollowed-out type grid tubular wallboard A is formed by welding and connecting a steel pipe concrete end column 1, a honeycomb hollowed-out steel plate 2 and a honeycomb hole tie steel plate 3, a plurality of honeycomb hollowed-out type grid tubular wallboards A are welded and assembled to form an L-shaped shear wall, a T-shaped shear wall and a cross-shaped shear wall, and concrete 4 in the pipe is poured to form the honeycomb hollowed-out type grid tubular double-steel-plate concrete combined shear wall.
Example 2
A preparation method of a honeycomb hollow-out type grid tubular double-steel-plate concrete combined shear wall comprises the following steps:
the method comprises the following steps: blanking rectangular steel pipes of concrete filled steel tube end posts 1 in a steel structure processing factory according to design requirements, processing and manufacturing honeycomb hollowed steel plates 2 and honeycomb hole bonding steel plates 3 in the factory, and firmly welding the rectangular steel pipes of the left concrete filled steel tube end post 1, the rectangular steel pipes of the front concrete filled steel tube end post, the rectangular steel pipes of the right concrete filled steel tube end post, the front concrete filled steel tube end post, the rear concrete filled steel tube end post and a plurality of honeycomb hole bonding steel plates 3 in the middle by using holes of the honeycomb hollowed steel plates 2 to form a honeycomb hollowed grid tubular wallboard A;
step two: conveying the honeycomb hollowed-out grid tubular wall board A to a construction site of a super high-rise building, hoisting the honeycomb hollowed-out grid tubular wall board A in place, welding and assembling a plurality of honeycomb hollowed-out grid tubular wall boards A to form an L-shaped shear wall, a T-shaped shear wall and a cross-shaped shear wall, installing a wall hole sealing counter-pulling small template 5 to cover holes of a honeycomb hollowed-out steel plate 2, and pouring in-pipe concrete 4 in a cavity of the honeycomb hollowed-out grid tubular wall board A to form a honeycomb hollowed-out grid tubular double-steel-plate concrete combined shear wall system;
step three: placing the steel bar truss floor bearing plate in the hole of the honeycomb hollowed steel plate 2, binding a floor reinforcing mesh, and pouring floor concrete to form a reinforced concrete floor 6;
step four: on the construction site of the super high-rise building, a plurality of floor structures are simultaneously and alternately operated for construction, the honeycomb hollowed-out type grid tubular wallboard A is hoisted and welded in place on the upper floor, the steel bar truss floor bearing plate is placed in the hole of the honeycomb hollowed-out steel plate 2 on the floor, the floor reinforcing mesh is bound, the concrete 4 in the pipe is poured on the lower floor, and the floor concrete is poured, so that the super high-rise building structure can be quickly built until the building structure is closed.
Example 3
In the building of a 100-meter super high-rise residential building, the seismic intensity of the building is 8 degrees, a honeycomb hollowed-out grid tubular double-steel-plate concrete combined shear wall system is adopted for the reasons of increasing the building speed and the like, the number of the floors of the building is 33, and the thickness of the shear wall of the building is 360-180 mm.
The honeycomb hollowed-out type grid tubular double-steel-plate concrete combined shear wall is composed of left and right rectangular steel pipe concrete end columns, a front honeycomb hollowed-out steel plate, a rear honeycomb hollowed-out steel plate and a plurality of honeycomb hole tie steel plates, a steel structure honeycomb hollowed-out type grid tubular wallboard is formed, a plurality of grid steel structure grid tubular wallboards are welded to form an L-shaped shear wall, a T-shaped shear wall and a cross-shaped shear wall, high-performance concrete is poured into the honeycomb hollowed-out type grid tubular wallboard, and a honeycomb hollowed-out type grid tubular double-steel-plate concrete combined shear wall system is formed.
The size of the concrete-filled steel tube end column adopts a rectangular steel tube with the thickness of 360 multiplied by 440-180 multiplied by 220mm, the wall thickness of the steel tube is 12 mm-5 mm, and the concrete of the concrete-filled steel tube end column adopts C60-C30.
The outer honeycomb hollow steel plate is made of thin steel plates with holes arranged in an orthogonal array, the shape of the holes is elliptical, the manufacturing process is to cut the holes by laser, the wall thickness of the honeycomb hollow steel plate is 10-4 mm, the size of the elliptical holes is 200mm of a short shaft and 250mm of a long shaft, the transverse center distance of the holes is 300mm, the vertical center distance of the holes is 350mm, and the opening rate of the honeycomb hollow steel plate is 37.4%.
The honeycomb hole drawknot steel plate can be formed by changing positions and welding again after cutting according to a certain folding line on a steel plate, the shape of a vertical single-row cavity is elliptical, the wall thickness of the honeycomb hole drawknot steel plate is 6-3 mm, when the thickness of a wall body is 250mm, the size of the elliptical cavity is 190mm of a short shaft, 270mm of a long shaft, the vertical central distance of the cavity is 350mm, and the aperture ratio of the honeycomb hole drawknot steel plate is 46%.
Pouring high-performance concrete into the honeycomb hollow-out type grid tubular wall plate, wherein the concrete in the tube adopts C50-C30. The small wall hole sealing split templates are plastic oval split templates, the building can be in a uniform type, and the small wall hole sealing split templates can be repeatedly used.
The floor of the building adopts a reinforced concrete floor, the steel bar truss floor bearing plate is placed in the holes of the honeycomb hollowed steel plate, a floor reinforcing mesh is bound, and floor concrete is poured to form the reinforced concrete floor.
A plurality of floor structures are alternately constructed simultaneously, three floors are in a group, at the upper floor, the honeycomb hollowed-out type grid tubular wall plate is hoisted and welded in place, one layer of grid tubular wall plate can be hoisted in 3 days, at the floor, the steel bar truss floor bearing plate is placed in the hole of the honeycomb hollowed-out steel plate, the floor reinforcing mesh is bound, the floor reinforcing mesh can be laid in 3 days, concrete in the pipe is poured in the next floor, the floor concrete is poured, and the concrete can be demolded in 3 days in early stage.
The building can construct one structural floor in 3 days, the construction period of the building is 99 days, and the building speed is very high.
In the mill, the outside of the honeycomb fretwork formula grid tubulose wallboard of steel construction can just prepare outer wall heat preservation and interior wall heat preservation at prefabricated mill, can remove a large amount of wall body hole sealing from to drawing little template, has further accelerated construction speed.
Because the honeycomb hollow-out type grid tubular wall plate is adopted, the plastic sleeve of the pipeline of the water heating power can be embedded and fixed inside the wall body in advance, and the factory construction is realized.
The above description is only of the preferred embodiments of the present invention, and it should be noted that: it will be apparent to those skilled in the art that various modifications and improvements can be made without departing from the scope of the invention as defined in the appended claims.

Claims (5)

1. The utility model provides a two steel sheet concrete combination shear walls of honeycomb fretwork formula grid tubulose, includes steel core concrete end post (1), honeycomb fretwork steel sheet (2), honeycomb hole drawknot steel sheet (3), its characterized in that: the concrete-filled steel tube wall is characterized in that two honeycomb hollowed steel plates (2) are arranged in front of and behind two rectangular steel tube concrete end columns (1) on the left and right, the honeycomb hollowed steel plates (2) are thin steel plates with holes arranged in an orthogonal array, a plurality of honeycomb hole tie steel plates (3) are uniformly arranged between the front and rear honeycomb hollowed steel plates (2), the steel tube concrete end columns (1), the honeycomb hollowed steel plates (2) and the honeycomb hole tie steel plates (3) are welded and connected into a whole to form a honeycomb hollowed-out grid tubular wall plate (A), a plurality of wall body hole sealing opposite-drawing small templates (5) cover the holes of the honeycomb hollowed-out steel plates (2), the inner concrete (4) is filled in an inner cavity of the honeycomb hollowed-out grid tubular wall plate (A), upper and lower stress reinforcing steel meshes of a reinforced concrete floor (6) penetrate through the holes of the honeycomb hollowed-out steel plates (2) at a floor, and the floor concrete is poured, the reinforced concrete floor (6) and the honeycomb hollow grid tubular wall plate (A) form a whole.
2. The honeycomb hollowed-out grid tubular double-steel-plate concrete composite shear wall according to claim 1, characterized in that: the orthogonal array arrangement holes of the honeycomb hollowed steel plate (2) can be hexagonal, octagonal, circular or elliptical, and the manufacturing process of the honeycomb hollowed steel plate (2) can be formed by laser cutting or punching.
3. The honeycomb hollowed-out grid tubular double-steel-plate concrete composite shear wall according to claim 1, characterized in that: honeycomb holes drawknot steel sheet (3) be provided with the steel sheet of single row hexagon, octagon, circular or oval hole, honeycomb holes drawknot steel sheet (3)'s preparation technology can be based on certain broken line cutting back transposition welding combination on the steel sheet and form again, through the hole of honeycomb fretwork steel sheet (2), with honeycomb holes drawknot steel sheet (3) and honeycomb fretwork steel sheet (2) firm welding.
4. The honeycomb hollowed-out grid tubular double-steel-plate concrete composite shear wall according to claim 1, characterized in that: the honeycomb hollowed-out type grid tubular wallboard (A) is formed by welding and connecting a steel pipe concrete end column (1), a honeycomb hollowed-out steel plate (2) and a honeycomb hole tie steel plate (3), a plurality of honeycomb hollowed-out type grid tubular wallboards (A) are assembled in a welding mode to form an L-shaped shear wall, a T-shaped shear wall and a cross-shaped shear wall, and concrete (4) in a pipe is poured to form the honeycomb hollowed-out type grid tubular double-steel-plate concrete combined shear wall.
5. A method for preparing the honeycomb hollow-out grid tubular double-steel-plate concrete composite shear wall of claim 1, wherein the method comprises the following steps: the method comprises the following steps:
the method comprises the following steps: blanking rectangular steel pipes of concrete filled steel pipe end columns (1) in a steel structure processing factory according to design requirements, processing and manufacturing honeycomb hollowed steel plates (2) and honeycomb hole tie steel plates (3) in the factory, and firmly welding the rectangular steel pipes of the left concrete filled steel pipe end column (1) and the right concrete filled steel pipe end column (1), the front honeycomb hollowed steel plate (2) and the rear honeycomb hole tie steel plates (3) by using holes of the honeycomb hollowed steel plates (2) to form a honeycomb hollowed grid tubular wallboard (A);
step two: conveying the honeycomb hollowed-out grid tubular wall board (A) to a construction site of a super high-rise building, hoisting the honeycomb hollowed-out grid tubular wall board (A) in place, welding and assembling a plurality of honeycomb hollowed-out grid tubular wall boards (A) to form an L-shaped shear wall, a T-shaped shear wall and a cross-shaped shear wall, installing a wall hole sealing counter-pulling small template (5) to cover holes of a honeycomb hollowed-out steel plate (2), and pouring in-pipe concrete (4) in a cavity of the honeycomb hollowed-out grid tubular wall board (A) to form a honeycomb hollowed-out grid tubular double-steel plate concrete combined shear wall system;
step three: placing the steel bar truss floor bearing plate in the hole of the honeycomb hollowed steel plate (2), binding a floor slab steel bar mesh, and pouring floor slab concrete to form a reinforced concrete floor slab (6);
step four: on the construction site of a super high-rise building, a plurality of floor structures are simultaneously and alternately operated for construction, a honeycomb hollowed-out type grid tubular wallboard (A) is hoisted and welded in place on the upper floor, a steel bar truss floor bearing plate is placed in a hole of a honeycomb hollowed-out steel plate (2) on the floor, a floor reinforcing mesh is bound, concrete (4) in a pipe is poured on the lower floor, and the floor concrete is poured, so that the super high-rise building structure can be quickly built until the roof of the building structure is sealed.
CN202110258009.2A 2021-03-12 2021-03-12 Honeycomb hollow-out type grid tubular double-steel-plate concrete combined shear wall and preparation method thereof Pending CN112832417A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110258009.2A CN112832417A (en) 2021-03-12 2021-03-12 Honeycomb hollow-out type grid tubular double-steel-plate concrete combined shear wall and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110258009.2A CN112832417A (en) 2021-03-12 2021-03-12 Honeycomb hollow-out type grid tubular double-steel-plate concrete combined shear wall and preparation method thereof

Publications (1)

Publication Number Publication Date
CN112832417A true CN112832417A (en) 2021-05-25

Family

ID=75929955

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110258009.2A Pending CN112832417A (en) 2021-03-12 2021-03-12 Honeycomb hollow-out type grid tubular double-steel-plate concrete combined shear wall and preparation method thereof

Country Status (1)

Country Link
CN (1) CN112832417A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114086686A (en) * 2021-11-04 2022-02-25 东南大学 Welded light steel frame foamed concrete self-insulation shear wall system and construction method
CN114319655A (en) * 2022-01-26 2022-04-12 嵊州一元环保技术有限公司 Interior template wall system
CN115853165A (en) * 2023-01-06 2023-03-28 中建八局第二建设有限公司 Steel and concrete combined shear wall and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114086686A (en) * 2021-11-04 2022-02-25 东南大学 Welded light steel frame foamed concrete self-insulation shear wall system and construction method
CN114319655A (en) * 2022-01-26 2022-04-12 嵊州一元环保技术有限公司 Interior template wall system
CN115853165A (en) * 2023-01-06 2023-03-28 中建八局第二建设有限公司 Steel and concrete combined shear wall and construction method

Similar Documents

Publication Publication Date Title
CN112832417A (en) Honeycomb hollow-out type grid tubular double-steel-plate concrete combined shear wall and preparation method thereof
CN107060067B (en) Superimposed precast reinforced concrete structure system and construction method thereof
CN100416010C (en) Joint construction method of prefabricated composite bearing wall structure
CN108086693A (en) A kind of assembled steel reinforced concrete frame structure system method of construction of low multilayer
CN108005304B (en) Assembled prestressed concrete frame system and construction method thereof
CN102877646B (en) Grouted overlapping assembly type reinforced concrete shear wall structure and method for building grouted overlapping assembly type reinforced concrete shear wall structure
CN206053131U (en) Precast floor slab steel reinforcement cage component and floor
CN107605038A (en) A kind of assembled steel and concrete frame space modular structure and system and construction method
CN202125104U (en) Residential building system formed by cast-in-place beam columns and prefabricated sandwich concrete wall slabs
CN202202412U (en) Rectangular steel pipe concrete special-shaped column-steel beam framework middle node
CN202530614U (en) Cast-in-situ steel mesh concrete slab
CN210086489U (en) Dry-type connected low-rise assembly type building structure system
CN214696251U (en) Honeycomb hollowed-out type grid tubular double-steel-plate concrete combined shear wall
CN114753524A (en) Built-in densely-distributed column type double-layer corrugated steel plate composite shear wall
CN213978596U (en) Thin-wall steel box concrete combined bridge tower
CN107965053B (en) Anti-seismic frame structure formed by combining upright columns and connecting beams and construction method thereof
CN212104521U (en) Girdle truss and super high-rise building giant frame
CN112411844A (en) Assembled modularization coincide floor structural system
CN107780564A (en) A kind of assembled ribbing steel plate shear force wall
CN109680833B (en) Self-supporting prefabricated steel reinforced concrete wall plate component, wall, structural system and manufacturing method
CN107313551A (en) A kind of concrete prefabricated wallboard of steel bar girder and structural system and its construction method
CN111021532A (en) Assembly type combined structure system and implementation method thereof
CN110528734A (en) A kind of steel-concrete combination shear wall with short piers
CN114876262B (en) Superimposed shear wall and building
CN202202415U (en) Side node of rectangular steel pipe concrete special-shaped column and steel beam framework

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination