CN112832130A - Be applied to steel pull rod structure of bridge installation - Google Patents

Be applied to steel pull rod structure of bridge installation Download PDF

Info

Publication number
CN112832130A
CN112832130A CN201911163281.1A CN201911163281A CN112832130A CN 112832130 A CN112832130 A CN 112832130A CN 201911163281 A CN201911163281 A CN 201911163281A CN 112832130 A CN112832130 A CN 112832130A
Authority
CN
China
Prior art keywords
blind hole
connecting piece
pull rod
rod structure
steel pull
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201911163281.1A
Other languages
Chinese (zh)
Inventor
黄辉
张军
樊彪
刘建国
钟军
张艳春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Zhongnan Bridge Equipment Manufacturing Co ltd
Original Assignee
Hunan Zhongnan Bridge Installation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Zhongnan Bridge Installation Engineering Co ltd filed Critical Hunan Zhongnan Bridge Installation Engineering Co ltd
Priority to CN201911163281.1A priority Critical patent/CN112832130A/en
Publication of CN112832130A publication Critical patent/CN112832130A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges

Abstract

The utility model provides a be applied to steel pull rod structure of bridge installation, includes base rod and an at least branch, and the base rod passes through the connecting piece with branch and is connected, connecting piece one end with base rod fixed connection, the other end that the connecting piece corresponds sets up the spacing blind hole that corresponds with branch's number, spacing blind hole opening towards the extending direction of base rod, and spacing blind hole bottom sets up into the internal hole of sphere form, and this internal hole form part internal diameter of sphere is greater than the internal diameter of other parts of spacing blind hole on the spacing blind hole, and this internal hole form part of sphere still is provided with the commentaries on classics ball of big or small adaptation on the spacing blind hole, changes the ball and connects the pivot, and the pivot passes spacing blind hole. The invention has unique structure, convenient and fast installation and maintenance and adjustable installation angle, and is suitable for more complicated bridge installation.

Description

Be applied to steel pull rod structure of bridge installation
Technical Field
The invention relates to the technical field of bridge installation, in particular to a steel pull rod structure applied to bridge installation.
Background
The steel pull rod is an indispensable component in the installation process of buildings such as bridges and the like, the steel pull rod can play a role of pre-tightening and stretching, in the prior art, the Chinese patent with the authorization publication number of 205907900U discloses a steel pull rod, which comprises two rod bodies, a sleeve arranged at the middle end of the two rod bodies and a U-shaped joint respectively arranged at the top ends of the two rod bodies, the U-shaped joint is provided with a pin shaft, the surface of the steel pull rod is provided with a paint coating or a zinc coating, the paint coating comprises a primer layer, an intermediate paint layer and a finish paint layer, the steel pull rod has high tensile strength and strong bearing capacity, can realize large-span connection, has a simple structure and is easy to lift and install, the patent document with the authorization publication number of CN206346498U discloses a steel pull rod structure for buildings, spring sections and threaded columns are arranged at two sides of a pull rod body of the steel pull rod structure for buildings, and a plurality, pass the installation hole with the screw thread post to install a plurality of mounting nuts on two screw thread posts respectively, thereby pull mounting nut through the spanner and stimulate pull rod body and spring section, can provide the pretightning force after the extension of spring section, this steel pull rod for building structural design is simple, simple to operate. The two types of steel pull rods are widely applied in the installation process of the existing small-sized building, however, the installation angle is not constant in the installation process of the bridge, and the steel pull rods of the types cannot well meet the installation requirement under special conditions, so that the invention aims to develop a brand-new steel pull rod to better meet the requirement of bridge installation.
Disclosure of Invention
The invention aims to provide a steel pull rod structure which is more flexible in assembly mode and more stable in assembled structure and is applied to bridge installation.
The technical problem solved by the invention is realized by adopting the following technical scheme:
the utility model provides a be applied to steel pull rod structure of bridge installation, includes base rod and an at least branch, and the base rod passes through the connecting piece with branch and is connected, connecting piece one end with base rod fixed connection, the other end that the connecting piece corresponds sets up the spacing blind hole that corresponds with branch's number, spacing blind hole opening towards the extending direction of base rod, and spacing blind hole bottom sets up into the internal hole of sphere form, and this internal hole form part internal diameter of sphere is greater than the internal diameter of other parts of spacing blind hole on the spacing blind hole, and this internal hole form part of sphere still is provided with the commentaries on classics ball of big or small adaptation on the spacing blind hole, changes the ball and connects the pivot, and the pivot passes spacing blind hole.
Further, the opening of the limiting blind hole is arranged to be horn-shaped and expanded towards the outside, and the rotating shaft can rotate 360 degrees while the offset amplitude of the rotating shaft is +/-8 degrees.
Furthermore, the Y-shaped steel pull rod comprises a base rod and two support rods, wherein the base rod and the two support rods form a Y-shaped steel pull rod structure.
Furthermore, two limiting blind holes are formed in the end face of the connecting piece, and the two limiting blind holes are arranged on the end face of the connecting piece in parallel.
Furthermore, the device comprises a base rod and three supporting rods, wherein the base rod and the three supporting rods form a conical steel pull rod structure.
Furthermore, three spherical inner holes are formed in the end face of the connecting piece, and the three spherical inner holes are uniformly arranged on the end face of the connecting piece in the circumferential direction.
Furthermore, the other end of the base rod opposite to the connecting piece is provided with a U-shaped joint, and the U-shaped joint is provided with a mounting hole.
Furthermore, the other end of the support rod opposite to the connecting piece is provided with a U-shaped joint, and the U-shaped joint is provided with a mounting hole.
Has the advantages that: the steel pull rod structure applied to bridge installation can form a Y-shaped structure, is suitable for requirements of multi-party installation, is particularly suitable for the condition of angle adjustment frequency, can perform self-adjustment of a certain angle under the condition of stress change of the steel pull rod to play a certain buffering role, and is higher in safety. The invention has the advantages of convenient and fast installation, high construction precision, safety and reliability.
Drawings
Fig. 1 is a schematic structural diagram of a preferred embodiment of the present invention.
Fig. 2 is a schematic structural view of fig. 1 when the installation angle is changed.
Wherein: 1. a base shaft; 2. a connecting member; 3. a strut; 4. a limiting blind hole; 5. rotating the ball; 6. a rotating shaft; 7. a bolt assembly; 8. a U-shaped joint.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the invention easy to understand, the invention is further explained below by combining the specific drawings.
As shown in figure 1, the steel pull rod structure applied to bridge installation comprises a base rod 1 and two supporting rods 3, wherein the base rod 1 and the supporting rods 3 are connected through a connecting piece 2 to form a Y-shaped structure, in the embodiment, one end of the connecting piece 2 is integrally formed or welded with the base rod 1, the other end corresponding to the connecting piece 2 is provided with two limiting blind holes 4, the two limiting blind holes 4 are arranged side by side on the end face of the connecting piece, the opening of each limiting blind hole 4 faces the extending direction of the base rod 1, the bottom of each limiting blind hole 4 is arranged to be in a spherical inner hole shape, the inner diameter of the spherical inner hole shape part on each limiting blind hole 4 is larger than that of the other part of each limiting blind hole 4, the spherical inner hole shape part on each limiting blind hole 4 is also provided with a rotating ball 5 with adaptive size, the rotating ball rotates in the limiting blind hole 4 but cannot be separated from the limiting blind hole 4, the rotating ball 5 is connected, and, the opening of spacing blind hole 4 sets up to the loudspeaker form of outside expansion, and the internal diameter of pivot 6 is less than spacing blind hole 4 opening part internal diameter simultaneously, therefore, its range of skew is 8 when the pivot can 360 rotations. During the bridge installation, when the suitable locus of three distance tractive simultaneously of needs, the implementation installation that this embodiment can be fine, wherein base rod 1 is connected relative other end with connecting piece 2 and is provided with U type joint 8, set up the mounting hole on the U type joint 8, bolt assembly passes the mounting hole on the U type joint 8 and is fixed in the bridge locus with base rod 1 one end on, then be fixed in pivot 6 respectively with two spinal branch poles 3 on, and then adjust the terminal position of 3 spinal branch poles, be fixed in the other two loci of bridge through bolt assembly respectively with the other end of taking U type joint 8 of two spinal branch poles 3, can accomplish the installation, convenient and fast. As shown in figure 2, the installation and maintenance are more flexible because the end position of the supporting rod 3 can be adjusted to a certain degree
As the extension of this embodiment, three branch 3 can be connected simultaneously through connecting piece 2 to base pole 1, and a base pole 1 constitutes toper steel pull rod structure with three branch 3 to be fit for the tractive in the cubical space, it has the installation equally and maintains portably, convenient and fast, and the bearing capacity is good, and installation angle can be in the advantage of certain within range adjustment.
As an extension of this embodiment, the base rod 1 may be connected to four or more than four supporting rods 3 through the connecting pieces 2, and these modifications are within the protection scope of the present invention and will not be described herein.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (8)

1. The utility model provides a be applied to steel pull rod structure of bridge installation, its characterized in that includes base rod and an at least branch, and the base rod passes through the connecting piece with branch and is connected, connecting piece one end with base rod fixed connection, the other end that the connecting piece corresponds is seted up the spacing blind hole that corresponds with branch's quantity, and spacing blind hole opening is towards the extending direction of base rod, and spacing blind hole bottom sets up into the downthehole form of sphere, and this downthehole form part internal diameter of sphere is greater than the internal diameter of other parts of spacing blind hole on the spacing blind hole, and this downthehole form part of sphere still is provided with the commentaries on classics ball of size adaptation on the spacing blind hole, changes the ball and connects the pivot, and the pivot.
2. The steel pull rod structure applied to bridge installation according to claim 1, wherein the opening of the limiting blind hole is formed in a flared shape expanding outwards, and the rotating shaft can rotate 360 degrees while the offset amplitude is +/-8 degrees.
3. The steel pull rod structure applied to bridge installation according to claim 1, wherein the steel pull rod structure comprises a base rod and two support rods, and the base rod and the two support rods form a Y-shaped steel pull rod structure.
4. The steel pull rod structure applied to bridge installation according to claim 3, wherein two blind limiting holes are formed in the end face of the connecting piece, and the two blind limiting holes are arranged in parallel on the end face of the connecting piece.
5. The steel tie rod structure applied to bridge installation according to claim 1, wherein the steel tie rod structure comprises a base rod and three supporting rods, and the base rod and the three supporting rods form a conical steel tie rod structure.
6. The steel pull rod structure applied to bridge installation according to claim 5, wherein three spherical inner holes are formed in the end face of the connecting piece, and the three spherical inner holes are uniformly arranged on the end face of the connecting piece in the circumferential direction.
7. The steel pull rod structure applied to bridge installation according to any one of claims 1 to 6, wherein a U-shaped joint is arranged at the other end of the base rod opposite to the connecting piece, and a mounting hole is formed in the U-shaped joint.
8. The steel pull rod structure applied to bridge installation according to claim 7, wherein the other end of the support rod opposite to the connecting piece is provided with a U-shaped joint, and the U-shaped joint is provided with an installation hole.
CN201911163281.1A 2019-11-25 2019-11-25 Be applied to steel pull rod structure of bridge installation Withdrawn CN112832130A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911163281.1A CN112832130A (en) 2019-11-25 2019-11-25 Be applied to steel pull rod structure of bridge installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911163281.1A CN112832130A (en) 2019-11-25 2019-11-25 Be applied to steel pull rod structure of bridge installation

Publications (1)

Publication Number Publication Date
CN112832130A true CN112832130A (en) 2021-05-25

Family

ID=75922020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911163281.1A Withdrawn CN112832130A (en) 2019-11-25 2019-11-25 Be applied to steel pull rod structure of bridge installation

Country Status (1)

Country Link
CN (1) CN112832130A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2825783Y (en) * 2005-09-13 2006-10-11 巨力集团有限公司 Steel pull-rod
CN102337724A (en) * 2011-08-02 2012-02-01 巨力索具股份有限公司 Steel pull rod
CN102797219A (en) * 2012-08-10 2012-11-28 柳州欧维姆机械股份有限公司 Arch bridge suspender convenient to replace and method for replacing the same
CN207484271U (en) * 2017-09-19 2018-06-12 江苏华信预应力制品有限公司 A kind of bridge pull rod attachment device
CN208396116U (en) * 2018-04-03 2019-01-18 北京市市政四建设工程有限责任公司 A kind of antidetonation suspension and support
CN209443670U (en) * 2018-12-03 2019-09-27 霍文营 A kind of flexural pivot reinforcing bar connector

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2825783Y (en) * 2005-09-13 2006-10-11 巨力集团有限公司 Steel pull-rod
CN102337724A (en) * 2011-08-02 2012-02-01 巨力索具股份有限公司 Steel pull rod
CN102797219A (en) * 2012-08-10 2012-11-28 柳州欧维姆机械股份有限公司 Arch bridge suspender convenient to replace and method for replacing the same
CN207484271U (en) * 2017-09-19 2018-06-12 江苏华信预应力制品有限公司 A kind of bridge pull rod attachment device
CN208396116U (en) * 2018-04-03 2019-01-18 北京市市政四建设工程有限责任公司 A kind of antidetonation suspension and support
CN209443670U (en) * 2018-12-03 2019-09-27 霍文营 A kind of flexural pivot reinforcing bar connector

Similar Documents

Publication Publication Date Title
US8641343B2 (en) Threaded connector for pole, machinery and structural elements
US9644385B2 (en) Adjustable umbrella base
CN214941066U (en) Angle-adjustable support of building roof steel truss
CN106285042A (en) Adjustable reinforcing member
CN112832130A (en) Be applied to steel pull rod structure of bridge installation
CN1851184A (en) Prestress steel structure brace rod adjustable nodal connection device
CN211590029U (en) Cone fixing and rotating device
CN207177051U (en) A kind of adjustable plasterboard is fast constructed suspender member device
CN112301879A (en) Horizontal omnidirectional displacement amplification type SMA energy dissipation and shock absorption device
CN201027352Y (en) Self-reset hyperelastic shape memory alloy deoscillator
CN109629444A (en) Anchor connection structure after a kind of municipal administration bridge construction Hanging Basket
WO2004061357A3 (en) Adjustable foot for setting up equipment in alignment
CN108358080B (en) Wind-proof fixing mechanism of tower crane for building
CN213709154U (en) Horizontal omnidirectional displacement amplification type SMA energy dissipation and shock absorption device
CN201433921Y (en) Blowing pitch angle-adjustable upright electric fan
CN107035035A (en) Curtain wall is found outside a kind of lightweight
CN209703359U (en) A kind of novel traffic warning post
CN113195929B (en) Elastic hinge with torsion stop and use thereof in a shock absorber
CN207552986U (en) A kind of column and the hinged steel profile railing of transverse tube
CN113691205A (en) Wind-resistant reinforcing system of flat unipolar photovoltaic mounting system
CN2524793Y (en) Golf club regulator
CN201170255Y (en) Soft shaft fine adjustment self-locking apparatus
CN207876020U (en) A kind of unmanned aerial vehicle onboard camera Quick Connect Kit
CN207012516U (en) Sandbag support base and sandbag
CN209305240U (en) A kind of Universal adjustable elasticity abrasionproof castor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210817

Address after: Hunan business culture and Technology Industrial Park Management Committee

Applicant after: HUNAN ZHONGNAN BRIDGE EQUIPMENT MANUFACTURING Co.,Ltd.

Address before: 418000 room 406, 4th floor, management committee of Xiangshang culture and Technology Industrial Park, Huaihua (Chinese side), Huaihua City, Hunan Province

Applicant before: HUNAN ZHONGNAN BRIDGE INSTALLATION ENGINEERING Co.,Ltd.

TA01 Transfer of patent application right
WW01 Invention patent application withdrawn after publication

Application publication date: 20210525

WW01 Invention patent application withdrawn after publication