CN112766665A - Risk level-based electric charge recycling risk prevention and control method - Google Patents

Risk level-based electric charge recycling risk prevention and control method Download PDF

Info

Publication number
CN112766665A
CN112766665A CN202110002956.5A CN202110002956A CN112766665A CN 112766665 A CN112766665 A CN 112766665A CN 202110002956 A CN202110002956 A CN 202110002956A CN 112766665 A CN112766665 A CN 112766665A
Authority
CN
China
Prior art keywords
electric quantity
risk
user
payment
risk level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110002956.5A
Other languages
Chinese (zh)
Inventor
瞿青
任文龙
黄露
丁骎
朱蒂羽
张宏
曲知音
董玉琦
徐清秀
耿然
申文
姚以妙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Co Ltd
Original Assignee
State Grid Shanghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shanghai Electric Power Co Ltd filed Critical State Grid Shanghai Electric Power Co Ltd
Priority to CN202110002956.5A priority Critical patent/CN112766665A/en
Publication of CN112766665A publication Critical patent/CN112766665A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0201Market modelling; Market analysis; Collecting market data
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention discloses an electric charge recovery risk prevention and control method based on risk levels, which comprises the steps of determining the risk levels of a user according to preset rules, wherein the risk levels comprise a high risk level, a medium risk level and a low risk level; and monitoring the electric quantity of the user with low risk level. The method comprises the steps of establishing an electric charge risk assessment model and an application function based on data such as direct customer electricity utilization behaviors and associated behaviors, developing work such as customer credit analysis, electricity utilization trend analysis, industry prospect information evaluation and emergency assessment by using methods such as service personnel research, basic interview, rule induction and the like, and calculating and outputting actual risk customers and potential risk customers by using a data mining algorithm.

Description

Risk level-based electric charge recycling risk prevention and control method
Technical Field
The invention relates to the field of power supply systems, in particular to an electric charge recycling risk prevention and control method based on risk levels.
Background
The electricity charge recycling service is a key service for marketing of power supply enterprises. The business mode of first power utilization and then payment directly influences the economic benefits of enterprises for a plurality of potential risks caused by electric charge recycling. With the development of market economy, the electricity demand of customers is increasing day by day, and the prevention and control work of the risk of recovering the electricity charges faces more challenges.
The electric power enterprise adopts reinforced electric charge recovery measures such as: the propaganda strength is increased, and the power consumption payment consciousness is improved; perfecting and promoting payment modes and payment channels; establishing a special electric charge payment hastening team group; and establishing a scientific internal charging management mechanism, and giving important attention to key enterprises by distributor and the like. The methods improve the enterprise electricity charge recovery situation to a great extent, but the work is mainly started from the management aspect, and the effect depends on the management strength of the enterprise and the working experience of electric power practitioners and other factors.
The identification of the electric charge recycling risk of the client mainly depends on the experience judgment of business personnel, which can not only avoid the influence of subjective factors, but also lack the objectivity and standardized evaluation and analysis tool and means based on data; the electric charge hastens the limitation of the staff of the group, and the working efficiency is influenced because the individual experience is still the leading factor in the face of a large number of customers to be hastens the charge without scientific and uniform customer distinguishing arrangement and working plan. This mode seriously affects further promotion and optimization of the electricity charge recovery work.
Disclosure of Invention
The invention aims to provide a method for avoiding earth-atmosphere interference of an agile small satellite star sensor, which can realize stable attitude measurement of the star sensor under various target pointing tasks and is used for attitude control.
In order to achieve the purpose, the technical scheme adopted by the invention is as follows:
a risk prevention and control method for electric charge recovery based on risk level comprises the following steps:
s1, determining the risk level of the user according to preset rules, wherein the risk level comprises a high risk level, a medium risk level and a low risk level;
and S2, carrying out electric quantity monitoring on the users with low risk levels.
Further, the preset rule is specifically as follows: and determining the risk grade of the user through the electric charge model, wherein the predicted value of the electric charge model is a high risk grade above 0.6, the predicted value of the electric charge model is a medium risk grade within the range of 0.4-0.6, and the predicted value of the electric charge model is a low risk grade within the range of 0.25-0.4.
Further, the electric quantity monitoring specifically includes:
s201, judging whether the electricity utilization type of a user is a continuous sudden increase type, if so, performing S202, wherein the electricity utilization type comprises an electric quantity sudden increase type, an electric quantity continuous sudden increase type, an electric quantity sudden decrease type and an electric quantity continuous sudden decrease type;
s202, recommending the value-added service to the continuously and suddenly increased user.
Further, the electric quantity monitoring specifically further includes:
s203, judging whether the power consumption type of the user is a sudden increase type, and if so, performing a step S204;
and S204, recommending the value-added service to the suddenly increased user.
Further, the electric quantity sudden increase type is that the electric quantity of the current month is increased by 50% compared with the electric quantity of the previous month and the electricity consumption per month is required to be more than 50 degrees, the electric quantity continuous sudden increase type is that the increase of the electric quantity of the current month is more than or equal to 30% compared with the electric quantity of the previous month and the electricity consumption per month is required to be more than 50 degrees, the electric quantity sudden decrease type is that the electric quantity of the current month is reduced by 50% compared with the electric quantity of the previous month and the electricity consumption per month is required to be more than 50 degrees, and the electric quantity continuous sudden decrease type is that the decrease of the electric quantity.
Further, step S1 is preceded by: all clients are divided according to the division rule, and the users divided into the white list preferentially perform the steps S1 and S2.
Further, still include:
and S3, carrying out fee urging processing on the users with high risk levels according to the payment characteristics.
Further, the step S3 specifically includes:
s301, determining payment preferences of users with high risk levels, and determining the use frequency of each payment preference;
s302, the user is charged according to the payment channel corresponding to the payment frequency.
Further, the step S3 specifically includes:
s303, urging the user according to a payment channel corresponding to another payment frequency, wherein the payment frequency is lower than the previous payment frequency;
s304, repeating the step S303 until the charging urging steps of all channels are carried out.
Further, the risk level also comprises the arrearage power failure, wherein the system records the information of the user of the arrearage power failure, and the staff makes corresponding instructions according to the information.
Compared with the prior art, the invention has at least one of the following advantages:
the method comprises the steps of utilizing big data mining analysis modeling, constructing an electric charge risk assessment model and an application function based on data such as direct customer electricity utilization behaviors and correlation behaviors, utilizing methods such as service personnel investigation, basic interview, rule induction and the like, carrying out work such as customer credit analysis, electricity utilization trend analysis, industry prospect information evaluation, emergency assessment and the like, simultaneously adopting a data mining algorithm, calculating and outputting fact risk customers and potential risk customers, and respectively giving three-level electric charge risk identification labels of high risk, medium risk and low risk.
Drawings
Fig. 1 is a block diagram of a risk prevention and control method for recovering electricity charges based on risk level according to an embodiment of the present invention;
FIG. 2 is a block diagram of a method for monitoring power consumption according to an embodiment of the present invention;
FIG. 3 is a block diagram of a method for partitioning and post-partitioning a client according to an embodiment of the invention.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings 1 to 3 and the detailed description thereof. The advantages and features of the present invention will become more apparent from the following description. It is to be noted that the drawings are in a very simplified form and are all used in a non-precise scale for the purpose of facilitating and distinctly aiding in the description of the embodiments of the present invention. To make the objects, features and advantages of the present invention comprehensible, reference is made to the accompanying drawings. It should be understood that the structures, ratios, sizes, and the like shown in the drawings and described in the specification are only used for matching with the disclosure of the specification, so as to be understood and read by those skilled in the art, and are not used to limit the implementation conditions of the present invention, so that the present invention has no technical significance, and any structural modification, ratio relationship change or size adjustment should still fall within the scope of the present invention without affecting the efficacy and the achievable purpose of the present invention.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or field device that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or field device. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other like elements in a process, method, article, or field device that comprises the element.
Referring to fig. 1 to 3, the method for risk prevention and control of electric charge recycling based on risk level according to the present embodiment includes:
s1, determining the risk level of the user according to preset rules, wherein the risk level comprises a high risk level, a medium risk level and a low risk level;
and S2, carrying out electric quantity monitoring on the users with low risk levels.
In this embodiment, the preset rule specifically includes: and determining the risk grade of the user through the electric charge model, wherein the predicted value of the electric charge model is a high risk grade above 0.6, the predicted value of the electric charge model is a medium risk grade within the range of 0.4-0.6, and the predicted value of the electric charge model is a low risk grade within the range of 0.25-0.4.
In this embodiment, the electric quantity monitoring specifically includes:
s201, judging whether the electricity utilization type of a user is a continuous sudden increase type, if so, performing S202, wherein the electricity utilization type comprises an electric quantity sudden increase type, an electric quantity continuous sudden increase type, an electric quantity sudden decrease type and an electric quantity continuous sudden decrease type;
s202, recommending the value-added service to the continuously and suddenly increased user.
In this embodiment, the electric quantity monitoring specifically further includes:
s203, judging whether the power consumption type of the user is a sudden increase type, and if so, performing a step S204;
and S204, recommending the value-added service to the suddenly increased user.
In this embodiment, the sudden increase of electric quantity is specifically that the electric quantity in this month is increased by 50% compared with the electric quantity in last month and the electric quantity in single month needs to be greater than 50 degrees, the continuous sudden increase of electric quantity is that the increase of the electric quantity in last month cycle is greater than or equal to 30% and the electric quantity in single month needs to be greater than 50 degrees, the sudden decrease of electric quantity is that the electric quantity in this month is decreased by 50% compared with the electric quantity in last month and the electric quantity in single month needs to be greater than 50 degrees, and the continuous sudden decrease of electric quantity is that the decrease of the electric quantity in last month cycle is greater than or equal.
In this embodiment, before the step S1, the method further includes: all clients are divided according to the division rule, and the users divided into the white list preferentially perform the steps S1 and S2.
In this embodiment, the method further includes:
and S3, carrying out fee urging processing on the users with high risk levels according to the payment characteristics.
In this embodiment, the step S3 specifically includes:
s301, determining payment preferences of users with high risk levels, and determining the use frequency of each payment preference;
s302, the user is charged according to the payment channel corresponding to the payment frequency.
In this embodiment, the step S3 specifically further includes:
s303, urging the user according to a payment channel corresponding to another payment frequency, wherein the payment frequency is lower than the previous payment frequency;
s304, repeating the step S303 until the charging urging steps of all channels are carried out.
In this embodiment, the risk level further includes a defaulting power outage, where the system records information of a user of the defaulting power outage, and the staff makes a corresponding instruction according to the information.
The construction of the electric charge risk prevention and control system needs to be carried out through the processes of data mining analysis, strategy design, service system function development, service flow optimization and the like. 1) Modeling is conducted by utilizing big data mining analysis. The method comprises the steps that an electric charge risk assessment model and an application function are built on the basis of data such as direct customer electricity utilization behaviors and associated behaviors, the work such as customer credit analysis, electricity utilization trend analysis, industry prospect information evaluation, emergency assessment and the like is carried out by using methods such as service personnel investigation, basic interview, rule induction and the like, meanwhile, a data mining algorithm is adopted, a factual risk customer and a potential risk customer are calculated and output, and three-level electric charge risk identification labels such as high risk, middle risk and low risk are given respectively; 2) and developing a practical functional application module. The marketing business application system is used as a carrier, a practical functional application module is developed by combining a theme label and a business strategy, seamless fusion of the label, the strategy and the business is realized through post pushing and other modes, and the electricity charge risk prevention and control closed-loop management and differentiated underpayment collection prompting measures are supported and developed.
The electric charge recycling risk prevention and control model is mainly used for evaluating the tendency of the electric charge recycling risk in the future according to the historical payment behavior characteristics of the user and other information. Through approaches such as service research, basic interview, rule induction and the like, the marketing mechanism and the service condition of the electric charge recovery are deeply understood, and finally, the characteristic dimension for inspecting the electric charge recovery risk of a user is determined to have five main aspects:
user attributes: the attributes comprise the industry, the region, the electricity utilization type, the voltage grade, the capacity and the like of a user;
and (4) fee payment behavior: the method comprises the following steps of including indexes such as payment channels and changes, money return duration and changes, cash proportion and the like of a user;
overdue behavior: the method comprises the indexes of overdue frequency, overdue duration, default fund, adjustment and the like of a user;
the electricity utilization action comprises the following steps: the method comprises the following steps of (1) indexes such as electricity consumption and change, proportion, ring ratio and the like;
and (3) interactive behavior: including electricity-rate related service changes such as changes, passing of house, etc.
After the processes of data preparation, data inspection, data processing and the like, an electric charge recovery risk prevention and control model is built. And index screening is performed through the IV value, so that index redundancy is reduced, and the accuracy of model training is improved.
And selecting logistic regression to perform modeling prediction, and performing cross comparison through algorithms such as random forests, SVM, decision trees, boosting and the like to ensure that the model is optimally selected. The result shows that the logistic regression is simple and efficient compared with other algorithms, the parallel processing speed is high, and the output result is easy to explain. The evaluation of the model prediction effect takes the accuracy and the coverage rate of the prediction result of the risk sample in the sample as main references.
And the prediction model takes recent historical data as input parameters and outputs the risk degree and the risk grade of the overdue risk prediction of the electric charge of the user. Meanwhile, different user groups are formed by combining basic labels and inter-derivative labels generated in the model construction process, such as client types, channel preference, overdue behaviors, electric charge amount levels and the like, and data support is provided for implementation of differential charge promotion strategies.
While the present invention has been described in detail with reference to the preferred embodiments, it should be understood that the above description should not be taken as limiting the invention. Various modifications and alterations to this invention will become apparent to those skilled in the art upon reading the foregoing description. Accordingly, the scope of the invention should be determined from the following claims.

Claims (10)

1. A risk control method for recovering electric charge based on risk level is characterized by comprising the following steps:
s1, determining the risk level of the user according to preset rules, wherein the risk level comprises a high risk level, a medium risk level and a low risk level;
and S2, carrying out electric quantity monitoring on the users with low risk levels.
2. The method according to claim 1, wherein the preset rule is specifically: and determining the risk grade of the user through the electric charge model, wherein the predicted value of the electric charge model is a high risk grade above 0.6, the predicted value of the electric charge model is a medium risk grade within the range of 0.4-0.6, and the predicted value of the electric charge model is a low risk grade within the range of 0.25-0.4.
3. The method of claim 1, wherein the electrical quantity monitoring specifically comprises:
s201, judging whether the electricity utilization type of a user is a continuous sudden increase type, if so, performing S202, wherein the electricity utilization type comprises an electric quantity sudden increase type, an electric quantity continuous sudden increase type, an electric quantity sudden decrease type and an electric quantity continuous sudden decrease type;
s202, recommending the value-added service to the continuously and suddenly increased user.
4. The method of claim 3, wherein the power monitoring specifically further comprises:
s203, judging whether the power consumption type of the user is a sudden increase type, and if so, performing a step S204;
and S204, recommending the value-added service to the suddenly increased user.
5. The method as claimed in any one of claims 2 to 4, wherein the sudden increase of electric quantity is specifically that the electric quantity in this month increases by 50% compared to the electric quantity in last month and the electric quantity per month needs to be more than 50 degrees, the continuous sudden increase of electric quantity is that the electric quantity in last month increases by 30% or more and the electric quantity per month needs to be more than 50 degrees, the sudden decrease of electric quantity is that the electric quantity in this month decreases by 50% compared to the electric quantity in last month and the electric quantity per month needs to be more than 50 degrees, and the continuous sudden decrease of electric quantity is that the electric quantity in last month decreases by 30% or more.
6. The method of claim 1, wherein the step S1 is preceded by: all clients are divided according to the division rule, and the users divided into the white list preferentially perform the steps S1 and S2.
7. The method of claim 1, further comprising:
and S3, carrying out fee urging processing on the users with high risk levels according to the payment characteristics.
8. The method according to claim 7, wherein the step S3 specifically includes:
s301, determining payment preferences of users with high risk levels, and determining the use frequency of each payment preference;
s302, the user is charged according to the payment channel corresponding to the payment frequency.
9. The method according to claim 8, wherein the step S3 further includes:
s303, urging the user according to a payment channel corresponding to another payment frequency, wherein the payment frequency is lower than the previous payment frequency;
s304, repeating the step S303 until the charging urging steps of all channels are carried out.
10. The method of claim 1, wherein the risk level further comprises an arrearage outage, and wherein the system records information about the user of the arrearage outage, and the staff member makes a corresponding instruction based on the information.
CN202110002956.5A 2021-01-04 2021-01-04 Risk level-based electric charge recycling risk prevention and control method Pending CN112766665A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110002956.5A CN112766665A (en) 2021-01-04 2021-01-04 Risk level-based electric charge recycling risk prevention and control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110002956.5A CN112766665A (en) 2021-01-04 2021-01-04 Risk level-based electric charge recycling risk prevention and control method

Publications (1)

Publication Number Publication Date
CN112766665A true CN112766665A (en) 2021-05-07

Family

ID=75698900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110002956.5A Pending CN112766665A (en) 2021-01-04 2021-01-04 Risk level-based electric charge recycling risk prevention and control method

Country Status (1)

Country Link
CN (1) CN112766665A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113256008A (en) * 2021-05-31 2021-08-13 国家电网有限公司大数据中心 Arrearage risk level determination method, device, equipment and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109741071A (en) * 2019-01-03 2019-05-10 江苏方天电力技术有限公司 A kind of large power customers tariff recovery methods of risk assessment based on Information Entropy
CN110348727A (en) * 2019-07-02 2019-10-18 北京淇瑀信息科技有限公司 A kind of marketing strategy formulating method, device and electronic equipment moving branch wish based on consumer's risk grade and user
CN111080367A (en) * 2019-12-20 2020-04-28 深圳市国电科技通信有限公司 Power consumption behavior analysis method for sensing power consumption state of low-voltage user
CN111612228A (en) * 2020-05-12 2020-09-01 国网河北省电力有限公司电力科学研究院 User electricity consumption behavior analysis method based on electricity consumption information
CN111639883A (en) * 2020-06-15 2020-09-08 江苏电力信息技术有限公司 Electricity charge recycling risk prediction method based on machine learning

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109741071A (en) * 2019-01-03 2019-05-10 江苏方天电力技术有限公司 A kind of large power customers tariff recovery methods of risk assessment based on Information Entropy
CN110348727A (en) * 2019-07-02 2019-10-18 北京淇瑀信息科技有限公司 A kind of marketing strategy formulating method, device and electronic equipment moving branch wish based on consumer's risk grade and user
CN111080367A (en) * 2019-12-20 2020-04-28 深圳市国电科技通信有限公司 Power consumption behavior analysis method for sensing power consumption state of low-voltage user
CN111612228A (en) * 2020-05-12 2020-09-01 国网河北省电力有限公司电力科学研究院 User electricity consumption behavior analysis method based on electricity consumption information
CN111639883A (en) * 2020-06-15 2020-09-08 江苏电力信息技术有限公司 Electricity charge recycling risk prediction method based on machine learning

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113256008A (en) * 2021-05-31 2021-08-13 国家电网有限公司大数据中心 Arrearage risk level determination method, device, equipment and storage medium

Similar Documents

Publication Publication Date Title
Coma-Puig et al. Fraud detection in energy consumption: A supervised approach
Gao et al. Moment-based rental prediction for bicycle-sharing transportation systems using a hybrid genetic algorithm and machine learning
Yan et al. Mid-term electricity market clearing price forecasting: A multiple SVM approach
Soltani et al. Integration of smart grid technologies in stochastic multi-objective unit commitment: An economic emission analysis
CN111126776A (en) Electricity charge risk prevention and control model construction method based on logistic regression algorithm
Kontou et al. Socially optimal replacement of conventional with electric vehicles for the US household fleet
CN105809277A (en) Big data based prediction method for the refining and managing of electric power marketing inspection
AU2011235983B2 (en) Eco score analytics system
Shao et al. Modeling and forecasting the electricity clearing price: A novel BELM based pattern classification framework and a comparative analytic study on multi-layer BELM and LSTM
Zhou et al. Smart energy management
Bagheri et al. Stochastic optimization and scenario generation for peak load shaving in Smart District microgrid: sizing and operation
CN112766665A (en) Risk level-based electric charge recycling risk prevention and control method
Zhang et al. Relocation-related problems in vehicle sharing systems: A literature review
Keynia et al. A new financial loss/gain wind power forecasting method based on deep machine learning algorithm by using energy storage system
CN112541662B (en) Prediction method and system for electric charge recycling risk
Xu et al. Perception and decision-making for demand response based on dynamic classification of consumers
Peng et al. Development of rail transit network over multiple time periods
Yu et al. An interval-possibilistic basic-flexible programming method for air quality management of municipal energy system through introducing electric vehicles
Deng et al. Power Supply Mode Planning of Electric Vehicle Participating in Logistics Distribution Based on Battery Charging and Swapping Station
Fathabad et al. Data-Driven Optimization for E-Scooter System Design
Hua et al. Data-driven prosumer-centric energy scheduling using convolutional neural networks
Yang et al. Precise marketing strategy optimization of E-commerce platform based on KNN clustering
Shekari et al. Recognition of electric vehicles charging patterns with machine learning techniques
KR102610942B1 (en) Method for financial service based on electric energy in EV(electric vehicle) echo system and apparatus for performing the method
Morgoev et al. Algorithm for Operational Detection of Abnormally Low Electricity Consumption in Distribution

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination