CN112761039A - Road shoulder pile plate wall large-deformation reinforcing structure and construction method - Google Patents

Road shoulder pile plate wall large-deformation reinforcing structure and construction method Download PDF

Info

Publication number
CN112761039A
CN112761039A CN201911062715.9A CN201911062715A CN112761039A CN 112761039 A CN112761039 A CN 112761039A CN 201911062715 A CN201911062715 A CN 201911062715A CN 112761039 A CN112761039 A CN 112761039A
Authority
CN
China
Prior art keywords
reinforcing
existing
foundation
anchor cable
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911062715.9A
Other languages
Chinese (zh)
Inventor
姚裕春
李安洪
封志军
陈伟志
肖朝乾
周波
袁报
胡会星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201911062715.9A priority Critical patent/CN112761039A/en
Publication of CN112761039A publication Critical patent/CN112761039A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/08Improving by compacting by inserting stones or lost bodies, e.g. compaction piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

A large-deformation reinforcing structure for a road shoulder pile plate wall and a construction method are provided, so that deformation of reinforcing piles is effectively controlled, construction is convenient, and economical efficiency is good. The road embankment filling structure comprises existing reinforcing piles, an embankment filling body and existing soil retaining plates, wherein the existing reinforcing piles are arranged at intervals along the road direction, the lower portions of the existing reinforcing piles are embedded into a foundation, the existing soil retaining plates are arranged between adjacent existing reinforcing piles, and the embankment filling body is filled on the foundation on the inner sides of the existing reinforcing piles and the existing soil retaining plates in a layered mode. The reinforced concrete stress beam abutting against each existing reinforcing pile is arranged on the foundation on the outer side of each existing reinforcing pile, a supporting body is filled in a gap between the rear wall of each reinforced concrete stress beam and the front wall of each existing retaining plate between every two adjacent existing reinforcing piles, reinforcing anchor cables with the axes inclined downwards are arranged among the reinforcing piles at intervals, the inner ends of the reinforcing anchor cables penetrate through the supporting bodies and the retaining plates to be anchored in the foundation, and the outer ends of the reinforcing anchor cables are anchored on the reinforced concrete stress beams after prestress is applied.

Description

Road shoulder pile plate wall large-deformation reinforcing structure and construction method
Technical Field
The invention relates to geotechnical engineering, in particular to a large-deformation reinforcing structure for a road shoulder pile plate wall and a construction method.
Background
The application of the road shoulder pile plate wall in the slope contraction and reinforcement of the embankment is very wide, but some problems also occur in the engineering practice: (1) when the method is applied to a soil foundation, the overconsolidation pile generates large deformation due to the non-uniformity and uncertainty of the foundation, the deterioration of the surrounding environment, or the problem of construction quality and the like; (2) the soil foundation can sink due to the weight of the embankment filling body, and the foundation outside the reinforcing pile does not sink, so that concave deformation can be formed on the foundation inside the reinforcing pile, water is accumulated in the concave foundation and the foundation can be softened, and as a result, the foundation is rich in water and the reinforcing pile deforms greatly; (5) when the pile is applied to a steep slope roadbed, the steep slope is affected by external disturbance to cause that the protective front edge of the reinforcing pile is not enough, so that the reinforcing pile generates large deformation. When the deformation of the reinforcing pile cannot tend to be stable and the condition of earth filling back pressure is not available, an effective road shoulder pile plate wall large deformation reinforcing structure and a construction method must be provided, and the application has the characteristics of convenience in construction, capability of effectively controlling deformation, economy, environmental protection, contribution to popularization and the like.
Disclosure of Invention
The invention aims to provide a large-deformation reinforcing structure for a road shoulder pile plate wall, so that the deformation of a reinforcing pile is effectively controlled, the construction is convenient, and the economical efficiency is good.
The technical scheme adopted by the invention for solving the technical problems is as follows:
the invention relates to a large-deformation reinforcing structure of a road shoulder pile plate wall, which comprises existing reinforcing piles, a road embankment filling body and existing soil retaining plates, wherein the existing reinforcing piles are arranged at intervals along the road direction, the lower parts of the existing reinforcing piles are embedded into a foundation, the existing soil retaining plates are arranged between the adjacent existing reinforcing piles, and the road embankment filling body is filled on the foundation on the inner sides of the existing reinforcing piles and the existing soil retaining plates in a layered mode, and the large-deformation reinforcing structure is characterized in that: the reinforced concrete stress beam abutting against each existing reinforcing pile is arranged on the foundation on the outer side of each existing reinforcing pile, a supporting body is filled in a gap between the rear wall of each reinforced concrete stress beam and the front wall of each existing retaining plate between every two adjacent existing reinforcing piles, reinforcing anchor cables with the axes inclined downwards are transversely arranged among the reinforcing piles at intervals, the inner ends of the reinforcing anchor cables penetrate through the supporting bodies and the retaining plates to be anchored in the foundation, and the outer ends of the reinforcing anchor cables are anchored on the reinforced concrete stress beams after prestress is applied.
The reinforcing anchor cable penetrates through a water drainage hole of the existing soil retaining plate at the lower layer, the front part of the reinforcing anchor cable is sleeved into a steel pipe with the axes coincident with each other, and the steel pipe extends to the back of the water drainage hole from the front side wall of the reinforced concrete stress beam.
Another technical problem to be solved by the present invention is to provide a method for constructing a large deformation reinforcing structure of a road shoulder pile plate wall, which includes the following steps:
firstly, reaming machinery is adopted to ream the drain holes of the first row of existing retaining plates on the foundation, so that the aperture of the drain holes meets the design requirement;
secondly, drilling an anchor cable into the foundation according to a certain downward inclination angle by a geological drilling machine after penetrating through the water drainage hole after reaming, and drilling while following the anchor cable until the anchor cable reaches a design position if the foundation is easy to collapse;
thirdly, placing the reinforced anchor cable in the anchor cable drill hole to the bottom of the hole, and grouting the anchor cable drill hole with pressure;
fourthly, sleeving the exposed section of the reinforced anchor cable into a steel pipe, and inserting the rear end of the steel pipe into the water drainage hole;
binding a reinforced concrete stress beam reinforcement cage on the foundation outside the existing reinforcing pile, and fixedly connecting a steel pipe with the reinforcement cage, wherein the axis of the steel pipe is coincident with the axis of the reinforcing anchor cable;
sixthly, pouring concrete of the reinforced concrete stress beam;
seventhly, backfilling gaps between the reinforced concrete stress beam and the existing retaining plates by using concrete or mortar rubbles to form a support body;
and stretching the reinforcing anchor cable to apply prestress after the strength of the reinforced concrete stressed beam, the support body and the reinforcing anchor cable grouting body reaches 90% of the design strength, and performing locking and anchoring on the reinforced concrete stressed beam.
The reinforced concrete stress beam is arranged on the foundation outside the existing reinforcing pile and is abutted against the existing reinforcing pile, the reinforced concrete stress beam has inward horizontal tension under the action of the reinforcing anchor cable, the reinforced concrete stress beam is effectively contacted with the existing reinforcing pile so as to effectively transfer the tension to the existing reinforcing pile, and the existing reinforcing pile is subjected to inward constraint force so as to effectively control the outward unfavorable deformation; the construction is convenient, the deformation control effect is good, and the method has the characteristics of economy and environmental protection.
Drawings
The specification includes the following three drawings:
FIG. 1 is a schematic cross-sectional view of a large deformation reinforcing structure for a road shoulder pile sheet wall according to the present invention;
FIG. 2 is a schematic plan view of a large deformation reinforcing structure for a road shoulder pile sheet wall according to the present invention;
fig. 3 is an enlarged schematic view of a portion a of fig. 2.
The component names and corresponding labels are shown in the figure: the concrete foundation comprises existing reinforcing piles 1, an embankment filling body 2, existing soil retaining plates 3, reinforcing anchor cables 4, a supporting structure 5, a stress beam 6, steel pipes 7, water drainage holes 8 and a foundation A.
Detailed Description
The invention is further described with reference to the following figures and examples:
referring to fig. 1 and 2, the large deformation reinforcing structure for the road shoulder pile plate wall of the invention comprises existing reinforcing piles 1, embankment filling bodies 2 and existing retaining plates 3, wherein the existing reinforcing piles 1 are arranged at intervals along the road direction, the lower parts of the existing reinforcing piles are buried in a foundation a, the existing retaining plates 3 are arranged between the adjacent existing reinforcing piles 1, and the embankment filling bodies 2 are filled on the foundation a on the inner sides of the existing reinforcing piles 1 and the existing retaining plates 3 in layers. The reinforced concrete stress beam 6 abutting against each existing reinforcing pile 1 is arranged on the foundation A on the outer side of each existing reinforcing pile 1, a supporting body 5 is filled in a gap between the rear wall of each reinforced concrete stress beam 6 and the front wall of each existing soil retaining plate 3 between every two adjacent existing reinforcing piles 1, reinforcing anchor cables 4 with the axes inclined downwards are transversely arranged among the reinforcing piles 1 at intervals, the inner ends of the reinforcing anchor cables 4 penetrate through the supporting bodies 5 and the soil retaining plates 3 and are anchored in the foundation A, and the outer ends of the reinforcing anchor cables 4 are anchored on the reinforced concrete stress beams 6 after prestress is applied. The reinforced concrete stress beam 6 has inward horizontal tension under the action of the reinforcing anchor cables 4, the reinforced concrete stress beam 6 is effectively contacted with the existing reinforcing pile 1, so that the tension can be effectively transmitted to the existing reinforcing pile 1, the existing reinforcing pile 1 is subjected to inward constraint force, the outward unfavorable deformation can be effectively controlled, and the deformation control effect is good.
Referring to fig. 3, the reinforcing anchor lines 4 pass through the drain holes 8 of the lower existing soil guard plate 3. In order to keep the reinforced anchor cable 4 straight, the front part of the reinforced anchor cable 4 is sleeved into a steel pipe 7 with the axes coincident with each other, and the steel pipe 7 extends from the front side wall of the reinforced concrete stress beam 6 to the back of the water drainage hole 8. The support body 5 may be formed of backfilled concrete or grouted rubble.
Referring to fig. 1 to 3, the construction method of the large deformation reinforcing structure of the road shoulder pile plate wall of the invention comprises the following steps:
firstly, a hole expanding machine is adopted to expand the drain holes 8 of the first row of the existing retaining plates 3 on the foundation A, so that the hole diameter of the drain holes meets the design requirement;
secondly, drilling an anchor cable into the foundation A according to a certain downward inclination angle by a geological drilling machine after penetrating through the water drainage hole after reaming, and drilling while following the anchor cable until the anchor cable reaches a design position if the foundation is easy to collapse;
thirdly, placing the reinforced anchor cable 4 in the anchor cable drill hole to the bottom of the hole, and grouting the anchor cable drill hole with pressure;
fourthly, the exposed section of the reinforced anchor cable 4 is sleeved into the steel pipe 7, and the rear end of the steel pipe 7 is inserted into the water drainage hole 8;
binding a reinforcement cage of a reinforced concrete stress beam 6 on the foundation A outside the existing reinforcing pile 1, fixedly connecting a steel pipe 7 with the reinforcement cage, and enabling the axis of the steel pipe 7 to coincide with the axis of the reinforcing anchor cable 4;
sixthly, pouring concrete of the reinforced concrete stress beam 6;
seventhly, backfilling a gap between the reinforced concrete stress beam 6 and the existing retaining plate 3 by using concrete or mortar rubbles to form a support body 5;
eighthly, after the strength of the reinforced concrete stressed beam 6, the support body 5 and the reinforcing anchor cable 4 grouting body reaches 90% of the design strength, tensioning the reinforcing anchor cable 4 to apply prestress, and locking and anchoring on the reinforced concrete stressed beam 6.
The foregoing is only illustrative of the principles of the present invention, and is not intended to limit the invention to the specific constructions and construction methods shown and described, and accordingly all modifications and equivalents may be resorted to, falling within the scope of the invention.

Claims (4)

1. The utility model provides a big reinforced structure that warp of curb pilework, curb pilework (2) and existing fender native board (3) are drawn together to existing reinforcement stake (1), embankment filler (2), existing reinforcement stake (1) sets up along the line direction interval, its lower part is buried in ground (A), existing fender native board (3) are established between adjacent existing reinforcement stake (1), embankment filler (2) are filled in the existing reinforcement stake (1), on the inboard ground (A) of existing fender native board (3) in layers, characterized by: the reinforced concrete bearing beam (6) abutting against each existing reinforcing pile (1) is arranged on the foundation (A) on the outer side of each existing reinforcing pile (1), supporting bodies (5) are filled in gaps between the rear wall of each reinforced concrete bearing beam (6) and the front wall of each existing soil retaining plate (3) between every two adjacent existing reinforcing piles (1), reinforcing anchor cables (4) with the axes inclined downwards are transversely arranged among the reinforcing piles (1), the inner ends of the reinforcing anchor cables (4) penetrate through the supporting bodies (5) and the soil retaining plates (3) and are anchored in the foundation (A), and the outer ends of the reinforcing anchor cables (4) are anchored on the reinforced concrete bearing beams (6) after prestress is applied.
2. The large-deformation reinforcing structure for the road shoulder pile plate wall as claimed in claim 1, wherein: the reinforcing anchor cable (4) penetrates through a water drainage hole (8) of the existing soil retaining plate (3) at the lower layer, the front part of the reinforcing anchor cable (4) is sleeved into a steel pipe (7) with the axes coincident with each other, and the steel pipe (7) extends to the back of the water drainage hole (8) from the front side wall of the reinforced concrete stress beam (6).
3. The large-deformation reinforcing structure for the road shoulder pile plate wall as claimed in claim 1, wherein: the support body (5) is formed by backfilled concrete or grouted rubble.
4. A construction method of a road shoulder pile plate wall large deformation reinforcing structure as claimed in any one of claims 1 to 3, comprising the following steps:
firstly, a hole expanding machine is adopted to expand the drain holes (8) of the first row of existing retaining plates (3) on the foundation (A) so that the hole diameter of the drain holes meets the design requirement;
secondly, drilling an anchor cable into the foundation (A) according to a certain downward inclination angle by penetrating a drainage hole after reaming by a geological drilling machine, and drilling while following the anchor cable until the anchor cable reaches a design position if the foundation is easy to collapse;
thirdly, placing a reinforced anchor cable (4) in the anchor cable drill hole to the bottom of the hole, and grouting the anchor cable drill hole with pressure;
fourthly, the exposed section of the reinforced anchor cable (4) is sleeved into the steel pipe (7), and the rear end of the steel pipe (7) is inserted into the water drainage hole (8);
binding a reinforcement cage of a reinforced concrete stressed beam (6) on the foundation (A) outside the existing reinforcing pile (1), fixedly connecting a steel pipe (7) with the reinforcement cage, and enabling the axis of the steel pipe (7) to coincide with the axis of a reinforcing anchor cable (4);
sixthly, pouring concrete of the reinforced concrete stress beam (6);
seventhly, backfilling a gap between the reinforced concrete stress beam (6) and the existing retaining plate (3) by adopting concrete or mortar rubbles to form a support body (5);
and eighthly, after the strength of the reinforced concrete stressed beam (6), the support body (5) and the grouting body of the reinforcing anchor cable (4) reaches 90% of the design strength, tensioning the reinforcing anchor cable (4) to apply prestress, and locking and anchoring on the reinforced concrete stressed beam (6).
CN201911062715.9A 2019-11-03 2019-11-03 Road shoulder pile plate wall large-deformation reinforcing structure and construction method Pending CN112761039A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911062715.9A CN112761039A (en) 2019-11-03 2019-11-03 Road shoulder pile plate wall large-deformation reinforcing structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911062715.9A CN112761039A (en) 2019-11-03 2019-11-03 Road shoulder pile plate wall large-deformation reinforcing structure and construction method

Publications (1)

Publication Number Publication Date
CN112761039A true CN112761039A (en) 2021-05-07

Family

ID=75692067

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911062715.9A Pending CN112761039A (en) 2019-11-03 2019-11-03 Road shoulder pile plate wall large-deformation reinforcing structure and construction method

Country Status (1)

Country Link
CN (1) CN112761039A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2796971A1 (en) * 1999-07-30 2001-02-02 Joseph Golcheh Method for reinforcing retaining wall involves reinforcing elements having tractive working part with attaching part linked to module of wall, and mobilizing part placed inside resistant zone
JP2003089103A (en) * 2001-09-19 2003-03-25 Free Kogyo Kk Wooden panel and its using method
CN102828518A (en) * 2012-09-17 2012-12-19 中国建筑第二工程局有限公司 Manual hole digging support pile prestress anchor cable anchoring structure and construction method of anchoring structure
CN202830942U (en) * 2012-08-27 2013-03-27 中铁二院工程集团有限责任公司 Combined supporting structure with anchor cables and cast-in-situ bored piles
CN103334421A (en) * 2013-07-05 2013-10-02 郭红标 Pre-stressed anchor cable slab-pile wall
CN103343532A (en) * 2013-07-05 2013-10-09 郭红标 Pre-stressed anchor cable pile-slab wall
CN205742228U (en) * 2016-06-24 2016-11-30 中国电建集团华东勘测设计研究院有限公司 A kind of prestressing force reinforcement structure of slight slope sash beam
CN106759376A (en) * 2016-12-21 2017-05-31 大连交通大学 Anchored Sheet Pile Wall for Excavation system and its construction method for closing on existing underground structure
CN109457710A (en) * 2018-12-26 2019-03-12 中铁二十五局集团第五工程有限公司 A kind of plain fill deep basal pit combined type soil nail wall and construction method for supporting
CN211395213U (en) * 2019-11-03 2020-09-01 中铁二院工程集团有限责任公司 Road shoulder sheet wall large deformation reinforcing structure

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2796971A1 (en) * 1999-07-30 2001-02-02 Joseph Golcheh Method for reinforcing retaining wall involves reinforcing elements having tractive working part with attaching part linked to module of wall, and mobilizing part placed inside resistant zone
JP2003089103A (en) * 2001-09-19 2003-03-25 Free Kogyo Kk Wooden panel and its using method
CN202830942U (en) * 2012-08-27 2013-03-27 中铁二院工程集团有限责任公司 Combined supporting structure with anchor cables and cast-in-situ bored piles
CN102828518A (en) * 2012-09-17 2012-12-19 中国建筑第二工程局有限公司 Manual hole digging support pile prestress anchor cable anchoring structure and construction method of anchoring structure
CN103334421A (en) * 2013-07-05 2013-10-02 郭红标 Pre-stressed anchor cable slab-pile wall
CN103343532A (en) * 2013-07-05 2013-10-09 郭红标 Pre-stressed anchor cable pile-slab wall
CN205742228U (en) * 2016-06-24 2016-11-30 中国电建集团华东勘测设计研究院有限公司 A kind of prestressing force reinforcement structure of slight slope sash beam
CN106759376A (en) * 2016-12-21 2017-05-31 大连交通大学 Anchored Sheet Pile Wall for Excavation system and its construction method for closing on existing underground structure
CN109457710A (en) * 2018-12-26 2019-03-12 中铁二十五局集团第五工程有限公司 A kind of plain fill deep basal pit combined type soil nail wall and construction method for supporting
CN211395213U (en) * 2019-11-03 2020-09-01 中铁二院工程集团有限责任公司 Road shoulder sheet wall large deformation reinforcing structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王春明;: "糯扎渡水电站锚索桩板墙施工技术应用", 东北水利水电, no. 06, 15 June 2013 (2013-06-15) *

Similar Documents

Publication Publication Date Title
US7600948B2 (en) Micropile retaining wall
KR20190036591A (en) Thrust pile with prestress and self-supporting type pile construction using it
CN108343068B (en) Composite soil nailing wall and pile anchor supporting composite supporting structure and construction method
US11149395B2 (en) Cellular sheet pile retaining systems with unconnected tail walls, and associated methods of use
CN211773698U (en) Pile anchor supporting construction
CN109183809B (en) Construction method for replacing support of composite support of muddy clay deep foundation pit engineering
CN102720196A (en) Anticorrosive anchor rod capable of preventing slurry from leaking
CN105672323A (en) Compound soil nail wall supporting structure system with steel pipe piles and construction method of compound soil nail wall supporting structure system
CN111980038B (en) Landslide prevention structure and construction method thereof
JP3789127B1 (en) Seismic structure
CN211898463U (en) Reinforcing device combining micro-steel pipe pile and anchor rod
CN106193071A (en) The multiple structure Ecological Slope protection system of a kind of band diaphragm plate and construction method thereof
JP4663541B2 (en) Seismic reinforcement method for existing concrete pier
KR101253678B1 (en) Pile foundation and method for constucting the same
CN211395213U (en) Road shoulder sheet wall large deformation reinforcing structure
KR100926300B1 (en) Foundation structure reinfoeced by pile and the construction method for the same
CN105040707A (en) Combined densely-arrayed pile deep foundation pit supporting and enclosure structure used as basement external wall
CN113389220A (en) Rock slope non-excavation road shoulder retaining wall and construction method thereof
CN101368388B (en) Anchor pipe skeleton support method
CN101748735A (en) Foundation ditch excavation method for reducing pile deflection in soft soil area
CN112761039A (en) Road shoulder pile plate wall large-deformation reinforcing structure and construction method
CN110939142A (en) Roadbed structure for side slope
KR19990014608A (en) Design Method of Composite Basement Retaining Wall Using Temporary Block Structures
Lelli et al. Innovative reinforced soil structures for high walls and slopes combining polymeric and metallic reinforcements
CN213571956U (en) Combined construction method pile supporting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination