Prior art keywords
fixedly connected
rod
pressure relief
storage tank
gas storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011545777.8A
Other languages
Chinese (zh)
Inventor
李孔鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangmen Hongshun Wire Drawing Products Co Ltd
Original Assignee
Jiangmen Hongshun Wire Drawing Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangmen Hongshun Wire Drawing Products Co Ltd filed Critical Jiangmen Hongshun Wire Drawing Products Co Ltd
Priority to CN202011545777.8A priority Critical patent/CN112728404A/en
Publication of CN112728404A publication Critical patent/CN112728404A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C13/00Details of vessels or of the filling or discharging of vessels
    • F17C13/02Special adaptations of indicating, measuring, or monitoring equipment
    • F17C13/025Special adaptations of indicating, measuring, or monitoring equipment having the pressure as the parameter
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C1/00Pressure vessels, e.g. gas cylinder, gas tank, replaceable cartridge
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C13/00Details of vessels or of the filling or discharging of vessels
    • F17C13/04Arrangement or mounting of valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2205/00Vessel construction, in particular mounting arrangements, attachments or identifications means
    • F17C2205/03Fluid connections, filters, valves, closure means or other attachments
    • F17C2205/0302Fittings, valves, filters, or components in connection with the gas storage device
    • F17C2205/0323Valves
    • F17C2205/0332Safety valves or pressure relief valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2205/00Vessel construction, in particular mounting arrangements, attachments or identifications means
    • F17C2205/03Fluid connections, filters, valves, closure means or other attachments
    • F17C2205/0302Fittings, valves, filters, or components in connection with the gas storage device
    • F17C2205/0338Pressure regulators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2250/00Accessories; Control means; Indicating, measuring or monitoring of parameters
    • F17C2250/04Indicating or measuring of parameters as input values
    • F17C2250/0404Parameters indicated or measured
    • F17C2250/043Pressure

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses an industrial gas storage tank for detecting pressure of chemical products, and relates to the technical field of gas storage tanks. This including the holding vessel, the bottom fixedly connected with release storehouse of holding vessel, the inner wall fixedly connected with gas storage storehouse of release storehouse the top of holding vessel is run through by gas transmission pipeline and holding vessel and gas transmission pipeline fixed connection, the top inner wall of holding vessel and the top sliding connection of pressure monitoring board, the pressure monitoring board passes baffle and pressure monitoring board and baffle sliding connection, the left side fixedly connected with spring of pressure monitoring board, the left side of spring and the right side fixed connection of baffle, the left side of pressure monitoring board and the right side fixed connection of a hydraulic stem, the device can reach through alarm device when inside pressure is too big, can drive alarm device through hydraulic means and make alarm device can whistle, reminds the workman to stop or reduce the effect to the gas transportation of holding vessel inside.

Description

Industrial gas storage tank for detecting pressure intensity of chemical products
Technical Field
The invention relates to the technical field of gas storage tanks, in particular to an industrial gas storage tank for detecting pressure of chemical products.
Background
The gas storage tank is a device specially used for storing gas, plays a role in stabilizing the pressure of the system, and can be divided into a high-pressure gas storage tank, a low-pressure gas storage tank and a normal-pressure gas storage tank according to different bearing pressures of the gas storage tank. The air storage tank can be divided into the following parts according to different materials: a carbon steel gas storage tank, a low alloy steel gas storage tank and a stainless steel gas storage tank. The gas storage tank (pressure container) is generally composed of parts and components such as a cylinder body, a seal head, a flange, a connecting pipe, a sealing element, a support and the like. In addition, it is also equipped with safety device, meter and internal components for implementing different production processes.
When testing whether the pressure is too high, the ordinary industrial gas storage tank can not reduce the gas pressure inside the storage tank in time, and the gas storage tank can be damaged after being filled.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides an industrial gas storage tank for detecting pressure of chemical products, which solves the problem that the pressure inside the gas storage tank cannot be reduced.
(II) technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme: an industrial gas storage tank for detecting pressure intensity of chemical products comprises a storage tank, wherein the bottom of the storage tank is fixedly connected with a pressure relief chamber, the inner wall of the pressure relief chamber is fixedly connected with a gas storage chamber, the top of the storage tank is penetrated through by a gas transmission pipeline and is fixedly connected with the gas transmission pipeline, the inner wall of the top of the storage tank is in sliding connection with the top of a pressure intensity monitoring plate, the pressure intensity monitoring plate penetrates through a baffle plate and is in sliding connection with the baffle plate, the left side of the pressure intensity monitoring plate is fixedly connected with a first spring, the left side of the first spring is fixedly connected with the right side of the baffle plate, the left side of the pressure intensity monitoring plate is fixedly connected with the right side of a first hydraulic rod, the left side of the first hydraulic rod is fixedly connected with a first hydraulic piston, the first hydraulic piston is connected with a hydraulic chamber piston, the hydraulic chamber is connected with a second hydraulic piston, and the bottom of the second hydraulic piston is fixedly connected, the hydraulic rod II penetrates through the storage tank, the pressure relief bin and the hydraulic rod II is in sliding connection with the storage tank and the pressure relief bin, the hydraulic rod II is hinged to a transmission device, the transmission device is fixedly connected with the alarm device, the transmission device is hinged to the transmission device II, the transmission device II is fixedly connected with the pressure relief device, and the pressure relief device penetrates through the gas storage bin and the pressure relief device is in sliding connection with the gas storage bin.
Preferably, a transmission includes the support No. one, the top of support is articulated with the surface of No. two hydraulic stems, the bottom of support is articulated with the surface of a rectangular block No. one, a rectangular block passes fixed plate and a rectangular block and fixed plate sliding connection No. one, the left side of fixed plate and the left side inner wall fixed connection in release storehouse, the top of a rectangular block and the bottom fixed connection of movable rod, the arc spout sliding connection that sets up on movable rod and the cylinder, the bottom of a rectangular block and the top fixed connection of a telescopic link, the left side of a telescopic link and the left side inner wall fixed connection in release storehouse.
Preferably, alarm device includes the sloping block, sloping block and transmission post fixed connection No. one, fixedly connected with cylinder on the transmission post, the cylinder is connected with the sloping block transmission, the sloping block and support rod swing joint, the quantity of support rod is two, the bottom of support rod and the top fixed connection of No. two telescopic links, the right side and the release storehouse fixed connection of No. two telescopic links, the bottom of No. two telescopic links and the top fixed connection of gag lever posts, the right side and the left side fixed connection in release storehouse of gag lever posts, the surface of No. two telescopic links articulates there is No. two supports, No. two supports articulate with the surface of No. two rectangular blocks, the right side and the left side sliding connection in release storehouse of No. two rectangular blocks, the bottom and the alarm swing joint of No. two rectangular blocks.
Preferably, the second transmission device comprises a third support, the third support is hinged to the surface of a first telescopic rod, the right side of the third support is hinged to the surface of a sliding block, the sliding block is penetrated through by the sliding rod and is in sliding connection with the sliding rod, the top of the sliding rod is fixedly connected with the inner wall of the top of the pressure relief bin, the number of the third support and the number of the sliding block are two, the third support and the sliding block are symmetrical by taking the central line of the first telescopic rod as a symmetry axis, the bottom of the sliding block at the top is fixedly connected with the top of a second spring, and the bottom of the second spring is fixedly connected with the top of the sliding block at the bottom.
Preferably, the pressure relief device comprises a first rack, the first rack is fixedly connected with the top sliding block, the first rack is meshed with a first gear, the first gear is in transmission connection with a second gear, the second gear is meshed with the second rack, the right side of the second rack is fixedly connected with the left side of the gate, the gate penetrates through the pressure relief bin and the gas storage bin, the gate is in sliding connection with the pressure relief bin and the gas storage bin, and the first gear is in rotating connection with the second gear.
Preferably, the number of the pressure monitoring plates, the first spring, the baffle, the hydraulic bin, the second hydraulic rod, the second hydraulic piston, the first hydraulic rod, the first hydraulic piston, the first transmission device, the pressure relief device and the second transmission device is two, and the pressure monitoring plates, the first spring, the baffle, the hydraulic bin, the second hydraulic rod, the second hydraulic piston, the first hydraulic rod, the first hydraulic piston, the first transmission device, the pressure relief device and the second transmission device are symmetrical by taking the central line of the gas storage tank as a symmetry axis.
Preferably, the bottom of holding vessel is provided with the through-hole, the top of gas storage storehouse is provided with the through-hole, and the through-hole that the top of gas storage storehouse set up is parallel with the through-hole that the holding vessel bottom set up.
(III) advantageous effects
The invention provides an industrial gas storage tank for detecting pressure intensity of chemical products. The method has the following beneficial effects:
(1) the device can reach through alarm device when inside pressure is too big, can drive alarm device through hydraulic means and make alarm device can whistle, reminds the workman to stop or reduce the effect of carrying the inside gas of holding vessel.
(2) The device can be realized through the pressure relief device, when the pressure in the storage tank is too high, the pressure in the storage tank can be discharged into the gas storage bin through the pressure relief capacity of the pressure relief device, the pressure in the storage tank is reduced, and therefore the effect of protecting the storage tank is achieved.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is an enlarged schematic view of the alarm device of the present invention;
FIG. 3 is an enlarged view of the first embodiment of the present invention;
FIG. 4 is an enlarged view of the second embodiment of the present invention;
fig. 5 is an enlarged schematic view of the pressure relief device of the present invention.
In the figure: 1 storage tank, 2 gas transmission pipelines, 3 pressure detection plates, 4 first springs, 5 baffles, 6 first hydraulic rods, 7 first hydraulic pistons, 8 hydraulic bins, 9 second hydraulic pistons, 10 second hydraulic rods, 11 alarm devices, 111 inclined blocks, 112 first transmission columns, 113 abutting rods, 114 second telescopic rods, 115 second supports, 116 second rectangular blocks, 117 alarm devices, 12 first transmission devices, 121 first supports, 122 cylinders, 123 movable rods, 124 first rectangular blocks, 125 first telescopic rods, 126 fixing plates, 13 second transmission devices, 131 third supports, 132 sliding blocks, 133 sliding rods, 134 second springs, 14 pressure relief devices, 141 first racks, 142 first gears, 143 second gears, 144 gates, 145 second racks, 15 pressure relief bins and 16 gas storage bins.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: an industrial gas storage tank for detecting pressure of chemical products comprises a storage tank 1, wherein the bottom of the storage tank 1 is fixedly connected with a pressure relief bin 15, the bottom of the storage tank 1 is provided with a through hole, the top of a gas storage bin 16 is provided with a through hole, the through hole arranged at the top of the gas storage bin 16 is parallel to the through hole arranged at the bottom of the storage tank 1, the inner wall of the pressure relief bin 15 is fixedly connected with the top of the storage tank 1 of the gas storage bin 16, the gas transmission pipeline 2 penetrates through the top of the storage tank 1 and is fixedly connected with the gas transmission pipeline 2, the inner wall of the top of the storage tank 1 is slidably connected with the top of a pressure monitoring plate 3, the pressure monitoring plate 3 penetrates through a baffle plate 5 and is slidably connected with the baffle plate 5, the left side of the pressure monitoring plate 3 is fixedly connected with a first spring 4, the left side of the first spring 4 is fixedly connected with the right side of, the left side of the first hydraulic rod 6 is fixedly connected with a first hydraulic piston 7, the first hydraulic piston 7 is connected with a hydraulic bin 8 piston, the hydraulic bin 8 is connected with a second hydraulic piston 9 piston, the bottom of the second hydraulic piston 9 is fixedly connected with a second hydraulic rod 10, the second hydraulic rod 10 penetrates through the storage tank 1, the pressure relief bin 15 and the second hydraulic rod 10 is in sliding connection with the storage tank 1 and the pressure relief bin 15, the second hydraulic rod 10 is hinged with the first transmission device 12, the first transmission device 12 comprises a first support 121, the top of the first support 121 is hinged with the surface of the second hydraulic rod 10, the bottom of the first support 121 is hinged with the surface of a first rectangular block 124, the first rectangular block 124 penetrates through a fixing plate 126 and the first rectangular block 124 is in sliding connection with the fixing plate 126, the left side of the fixing plate 126 is fixedly connected with the left inner wall of the pressure relief bin 15, the top of the first rectangular block 124 is fixedly connected with the bottom of a movable rod 123, the movable rod 123 is connected with an arc chute arranged on the cylinder 122 in a sliding manner, the bottom of the first rectangular block 124 is fixedly connected with the top of the first telescopic rod 125, the left side of the first telescopic rod 125 is fixedly connected with the inner wall of the left side of the pressure relief bin 15, the first transmission device 12 is fixedly connected with the alarm device 11, the alarm device 11 comprises an inclined block 111, the inclined block 111 is fixedly connected with the first transmission column 112, the cylinder 122 is connected with the inclined block 111 in a transmission manner, the inclined block 111 is movably connected with the abutting rod 113, the number of the abutting rod 113 is two, the bottom of the abutting rod 113 is fixedly connected with the top of the second telescopic rod 114, the right side of the second telescopic rod 114 is fixedly connected with the pressure relief bin 15, the bottom of the second telescopic rod 114 is fixedly connected with the top of the limiting rod 118, the right side of the limiting rod 118 is fixedly connected with the left side of the pressure relief bin 15, the second bracket 115 is hinged with the surface of the second rectangular block 116, the right side of the second rectangular block 116 is slidably connected with the left side of the pressure relief bin 15, the bottom of the second rectangular block 116 is movably connected with the alarm 117, the first transmission device 12 is hinged with the second transmission device 13, the second transmission device 13 comprises a third bracket 131, the third bracket 131 is hinged with the surface of a first telescopic rod 125, the right side of the third bracket 131 is hinged with the surface of a sliding block 132, the sliding block 132 is penetrated by a sliding rod 133, the sliding block 132 is slidably connected with the sliding rod 133, the top of the sliding rod 133 is fixedly connected with the inner wall of the top of the pressure relief bin 15, the number of the third brackets 131 and the sliding block 132 is two, the third brackets 131 and the sliding block 132 are symmetrical by taking the central line of the first telescopic rod 125 as a symmetry axis, the bottom of the top sliding block 132 is fixedly connected with the top of the second spring 134, and the bottom of the second spring 134 is, the second transmission device 13 is fixedly connected with the pressure relief device 14, the pressure relief device 14 comprises a first rack 141, the first rack 141 is fixedly connected with the top sliding block 132, the first rack 141 is meshed with a first gear 142, the first gear 142 is in transmission connection with a second gear 143, the second gear 143 is meshed with a second rack 145, the right side of the second rack 145 is fixedly connected with the left side of the gate 144, the gate 144 penetrates through the pressure relief bin 15 and the gas storage bin 16, the gate 144 is in sliding connection with the pressure relief bin 15 and the gas storage bin 16, the first gear 142 is in rotation connection with the second gear 143, the pressure relief device 14 penetrates through the gas storage bin 16, the pressure relief device 14 is in sliding connection with the gas storage bin 16, the pressure monitoring plate 3, the first spring 4, the baffle plate 5, the hydraulic bin 8, the second hydraulic rod 10, the second hydraulic piston 9, the first hydraulic rod 6, the first hydraulic piston 7, the first transmission device 12, the pressure relief device 14 and the second transmission device 13 are two, and the pressure monitoring plate 3, the first spring 4, the baffle 5, the hydraulic chamber 8, the second hydraulic rod 10, the second hydraulic piston 9, the first hydraulic rod 6, the first hydraulic piston 7, the first transmission device 12, the pressure relief device 14 and the second transmission device 13 are symmetrical by taking the central line of the gas storage tank 1 as a symmetry axis.
When the internal pressure of the gas storage tank 1 is too high, the pressure monitoring plates 3 are extruded, the pressure monitoring plates 3 are in sliding connection with the baffle 5, so that the two pressure monitoring plates 3 are separated towards two sides, when the pressure monitoring plate 3 on the left side moves towards the left, the first hydraulic rod 6 is fixedly connected to the left side of the pressure monitoring plate 3, the first hydraulic rod 6 enables the second hydraulic rod 10 to move downwards through the hydraulic chamber, the second hydraulic rod 10 moves downwards, the first support 121 hinged with the first hydraulic rod drives the first rectangular block 124 to move towards the right, when the first rectangular block 124 moves towards the right, the movable rod 123 fixed at the top of the first rectangular block 124 is in sliding connection with the arc-shaped chute on the cylinder 122, so that when the first rectangular block 124 moves towards the right, the cylinder 122 is driven to rotate clockwise, the cylinder 122 is in transmission connection with the inclined block 111 through the first transmission column 112, when the inclined block 111 rotates clockwise, the pushing rod 113 is pushed to enable the pushing rod 113 to drive the second telescopic rod 114 to reciprocate left and right, the surface of the second telescopic rod 114 is hinged with the second bracket 115, the second bracket 115 is hinged with the second rectangular block 116, therefore, when the second telescopic rod 114 moves left and right, the second rectangular block 116 can be driven to move up and down, the second rectangular block 116 continuously triggers an alarm to remind workers of solving the problem that the gas input in the gas storage tank 1 is too large in time, when the first rectangular block 124 moves rightwards, the first telescopic rod 125 fixedly connected with the first rectangular block 125 is driven to move rightwards at the same time, when the first telescopic rod 125 moves rightwards, the third bracket 131 can drive the two sliding blocks 132 to separate, when the top sliding block 132 moves upwards, the first rack 141 is fixedly connected to the right side of the top sliding block 132, the first rack 141 drives the first gear 142 to rotate, and the first gear 142 is in transmission connection with the second gear 143 anticlockwise, the second gear 143 drives the second rack 145 to move leftward, and since the right side of the second rack 145 is fixedly connected to the gate 144, the second rack 145 moves leftward and then drives the gate 144 to open the gas storage bin 16, thereby achieving the pressure relief effect.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a chemical products detects industrial gas holding vessel of pressure, includes holding vessel (1), its characterized in that: the pressure relief device is characterized in that a pressure relief bin (15) is fixedly connected to the bottom of the storage tank (1), a gas storage bin (16) is fixedly connected to the inner wall of the pressure relief bin (15), the top of the storage tank (1) is penetrated through by a gas transmission pipeline (2), the storage tank (1) is fixedly connected with the gas transmission pipeline (2), the inner wall of the top of the storage tank (1) is in sliding connection with the top of a pressure monitoring plate (3), the pressure monitoring plate (3) penetrates through a baffle plate (5), the pressure monitoring plate (3) is in sliding connection with the baffle plate (5), a first spring (4) is fixedly connected to the left side of the pressure monitoring plate (3), the left side of the first spring (4) is fixedly connected with the right side of the baffle plate (5), the left side of the pressure monitoring plate (3) is fixedly connected with the right side of a first hydraulic rod (6), a first hydraulic piston (7) is fixedly connected to the left side of the first hydraulic rod, the first hydraulic piston (7) is connected with a hydraulic chamber (8) by a piston, the hydraulic chamber (8) is connected with a second hydraulic piston (9) by a piston, the bottom of the second hydraulic piston (9) is fixedly connected with a second hydraulic rod (10), the second hydraulic rod (10) penetrates through the storage tank (1) and the pressure relief bin (15), the second hydraulic rod (10) is connected with the storage tank (1) and the pressure relief bin (15) in a sliding mode, the second hydraulic rod (10) is hinged with the first transmission device (12), the first transmission device (12) is fixedly connected with the alarm device (11), the first transmission device (12) is hinged with the second transmission device (13), the second transmission device (13) is fixedly connected with the pressure relief device (14), the pressure relief device (14) penetrates through the gas storage bin (16), and the pressure relief device (14) is connected with the gas storage bin (16) in a sliding mode.
2. The industrial gas storage tank for chemical products to detect pressure according to claim 1, wherein: the first transmission device (12) comprises a first bracket (121), the top of the first bracket (121) is hinged with the surface of the second hydraulic rod (10), the bottom of the first bracket (121) is hinged with the surface of the first rectangular block (124), the first rectangular block (124) penetrates through the fixing plate (126) and the first rectangular block (124) is connected with the fixing plate (126) in a sliding manner, the left side of the fixing plate (126) is fixedly connected with the inner wall of the left side of the pressure relief bin (15), the top of the first rectangular block (124) is fixedly connected with the bottom of the movable rod (123), the movable rod (123) is connected with an arc chute arranged on the column (122) in a sliding way, the bottom of the first rectangular block (124) is fixedly connected with the top of the first telescopic rod (125), the left side of the first telescopic rod (125) is fixedly connected with the inner wall of the left side of the pressure relief bin (15).
3. The industrial gas storage tank for chemical products to detect pressure according to claim 1, wherein: the alarm device (11) comprises an inclined block (111), the inclined block (111) is fixedly connected with a first transmission column (112), a cylinder (122) is fixedly connected to the first transmission column (112), the cylinder (122) is in transmission connection with the inclined block (111), the inclined block (111) is movably connected with a supporting rod (113), the number of the supporting rods (113) is two, the bottom of the supporting rod (113) is fixedly connected with the top of a second telescopic rod (114), the right side of the second telescopic rod (114) is fixedly connected with a pressure relief bin (15), the bottom of the second telescopic rod (114) is fixedly connected with the top of a limiting rod (118), the right side of the limiting rod (118) is fixedly connected with the left side of the pressure relief bin (15), a second bracket (115) is hinged to the surface of the second telescopic rod (114), and the second bracket (115) is hinged to the surface of the second rectangular block (116), the right side of the second rectangular block (116) is in sliding connection with the left side of the pressure relief bin (15), and the bottom of the second rectangular block (116) is movably connected with the alarm (117).
4. The industrial gas storage tank for chemical products to detect pressure according to claim 1, wherein: the second transmission device (13) comprises a third support (131), the third support (131) is hinged to the surface of a first telescopic rod (125), the right side of the third support (131) is hinged to the surface of a sliding block (132), the sliding block (132) is penetrated by the sliding rod (133), the sliding block (132) is in sliding connection with the sliding rod (133), the top of the sliding rod (133) is fixedly connected with the inner wall of the top of the pressure relief bin (15), the number of the third support (131) and the number of the sliding block (132) are two, the third support (131) and the sliding block (132) are symmetrical by taking the center line of the first telescopic rod (125) as a symmetry axis, the bottom of the sliding block (132) is fixedly connected with the top of a second spring (134), and the bottom of the second spring (134) is fixedly connected with the top of the bottom sliding block (132).
5. The industrial gas storage tank for chemical products to detect pressure according to claim 1, wherein: the pressure relief device (14) comprises a first rack (141), the first rack (141) is fixedly connected with the top sliding block (132), the first rack (141) is meshed with a first gear (142), the first gear (142) is in transmission connection with a second gear (143), the second gear (143) is meshed with a second rack (145), the right side of the second rack (145) is fixedly connected with the left side of a gate (144), the gate (144) penetrates through the pressure relief bin (15) and the gas storage bin (16), the gate (144) is in sliding connection with the pressure relief bin (15) and the gas storage bin (16), and the first gear (142) is in rotating connection with the second gear (143).
6. The industrial gas storage tank for chemical products to detect pressure according to claim 1, wherein: the pressure monitoring device is characterized in that the pressure monitoring plate (3), the first spring (4), the baffle (5), the hydraulic bin (8), the second hydraulic rod (10), the second hydraulic piston (9), the first hydraulic rod (6), the first hydraulic piston (7), the first transmission device (12), the pressure relief device (14) and the second transmission device (13) are two in number, and the pressure monitoring plate (3), the first spring (4), the baffle (5), the hydraulic bin (8), the second hydraulic rod (10), the second hydraulic piston (9), the first hydraulic rod (6), the first hydraulic piston (7), the first transmission device (12), the pressure relief device (14) and the second transmission device (13) are symmetrical about a central line of the gas storage tank (1).
7. The industrial gas storage tank for chemical products to detect pressure according to claim 1, wherein: the bottom of holding vessel (1) is provided with the through-hole, the top of gas storage storehouse (16) is provided with the through-hole, and the through-hole that gas storage storehouse (16) top set up is parallel with the through-hole that holding vessel (1) bottom set up.
CN202011545777.8A 2020-12-23 2020-12-23 Industrial gas storage tank for detecting pressure intensity of chemical products Pending CN112728404A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011545777.8A CN112728404A (en) 2020-12-23 2020-12-23 Industrial gas storage tank for detecting pressure intensity of chemical products

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011545777.8A CN112728404A (en) 2020-12-23 2020-12-23 Industrial gas storage tank for detecting pressure intensity of chemical products

Publications (1)

Publication Number Publication Date
CN112728404A true CN112728404A (en) 2021-04-30

Family

ID=75605053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011545777.8A Pending CN112728404A (en) 2020-12-23 2020-12-23 Industrial gas storage tank for detecting pressure intensity of chemical products

Country Status (1)

Country Link
CN (1) CN112728404A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114135789A (en) * 2021-09-18 2022-03-04 西安洛科电子科技股份有限公司 Oil pressure alarm device for intelligent block chain of oil and gas field and use method of oil pressure alarm device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009115126A (en) * 2007-11-02 2009-05-28 Toyota Motor Corp Gas tank
CN206469065U (en) * 2017-02-20 2017-09-05 中国神华能源股份有限公司 A kind of air accumulator safety valve warning system
CN107489882A (en) * 2017-10-13 2017-12-19 钦州学院 A kind of LNG tank cars unload hydraulic coupling security system
CN109268690A (en) * 2018-10-29 2019-01-25 张�浩 One kind being used for gas pipeline leakage detection device
CN209569134U (en) * 2019-01-26 2019-11-01 青岛四维流体设备有限公司 A kind of air supply system air compressor
CN210179334U (en) * 2019-06-22 2020-03-24 马海龙 Chemical gas pipeline with safety cover
CN210344417U (en) * 2019-05-29 2020-04-17 万能阀门有限公司 Safety valve protection device
CN210601020U (en) * 2019-06-27 2020-05-22 江苏宝祥气体有限公司 Gas storage tank with gas recovery device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009115126A (en) * 2007-11-02 2009-05-28 Toyota Motor Corp Gas tank
CN206469065U (en) * 2017-02-20 2017-09-05 中国神华能源股份有限公司 A kind of air accumulator safety valve warning system
CN107489882A (en) * 2017-10-13 2017-12-19 钦州学院 A kind of LNG tank cars unload hydraulic coupling security system
CN109268690A (en) * 2018-10-29 2019-01-25 张�浩 One kind being used for gas pipeline leakage detection device
CN209569134U (en) * 2019-01-26 2019-11-01 青岛四维流体设备有限公司 A kind of air supply system air compressor
CN210344417U (en) * 2019-05-29 2020-04-17 万能阀门有限公司 Safety valve protection device
CN210179334U (en) * 2019-06-22 2020-03-24 马海龙 Chemical gas pipeline with safety cover
CN210601020U (en) * 2019-06-27 2020-05-22 江苏宝祥气体有限公司 Gas storage tank with gas recovery device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114135789A (en) * 2021-09-18 2022-03-04 西安洛科电子科技股份有限公司 Oil pressure alarm device for intelligent block chain of oil and gas field and use method of oil pressure alarm device

Similar Documents

Publication Publication Date Title
CN204384479U (en) A kind of acid pouring device
CN112728404A (en) Industrial gas storage tank for detecting pressure intensity of chemical products
CN204255583U (en) A kind of can the withstand voltage and tightness test system of the industrial gas cylinder of telemonitoring
CN113125080A (en) Pressure pipeline detection device
CN1827201A (en) Apparatus for continuous extracting and sterilizing solid materials under high and ultrahigh pressure
CN202900304U (en) Self-balance type water seal anti-explosion device
CN206439617U (en) It is a kind of can be with the environment-friendly type air accumulator of pressure buffer
CN212291271U (en) Inner membrane type storage tank
CN202880170U (en) Chemical product storage tank
CN213736803U (en) Explosion-proof storage tank for chemical industry
CN220949488U (en) Movable chemical storage tank
CN209245697U (en) Sump oil fast and safely recvery facility
CN205175833U (en) Detecting instrument pressure resistance test installation in submarine pipeline
CN113958881A (en) Natural gas pipeline safety evaluation method, system and method
CN207242525U (en) A kind of safe chemical production raw material storage tanks
CN219057329U (en) Roller type chemical product storage tank
CN210235989U (en) Protective packaging device for boiler compression element
CN220583681U (en) Leakage-proof detection device for methane tank
CN112678569A (en) Efficient liquid oxygen holding vessel transportation dispensing device
CN218510680U (en) Full-automatic gas cylinder frame with acousto-optic alarm lamp
CN205989926U (en) A kind of Fuel Tanking Unit
CN201216912Y (en) Apparatus for recycling natural gas residual after pollution discharge
CN207618343U (en) A kind of novel oil sample valve leads to fuel tank substructure
CN201622160U (en) Device for detecting vacuum degree of beer valve of beer filling machine
CN220925157U (en) Volatile liquid storage and transfer device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20210430

WD01 Invention patent application deemed withdrawn after publication