CN112727087A - Building template locking equipment for pouring reinforced concrete - Google Patents

Building template locking equipment for pouring reinforced concrete Download PDF

Info

Publication number
CN112727087A
CN112727087A CN202110142148.9A CN202110142148A CN112727087A CN 112727087 A CN112727087 A CN 112727087A CN 202110142148 A CN202110142148 A CN 202110142148A CN 112727087 A CN112727087 A CN 112727087A
Authority
CN
China
Prior art keywords
building template
threaded
limiting plate
rod
threaded rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110142148.9A
Other languages
Chinese (zh)
Inventor
朱建华
宇伟峰
侯懿葳
刘湘兰
廖文
吴海波
刁承焕
周昊堃
钟惠翰
蒋放
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN202110142148.9A priority Critical patent/CN112727087A/en
Publication of CN112727087A publication Critical patent/CN112727087A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/001Corner fastening or connecting means for forming or stiffening elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
    • E04G17/0655Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts
    • E04G17/0657Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts fully recoverable

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention relates to the technical field of buildings, in particular to building template locking equipment for pouring reinforced concrete, wherein a limit threaded rod is used for limiting and fixing a prestress fixing nut, the prestress fixing nut is arranged at one side of a second building template, a handle is rotated to fix a first building template and the second building template, the elasticity of a pretightening spring column is utilized, when the first building template and the second building template are loosened, namely the prestress fixing nut is loosened, the pretightening spring column is extended, whether the prestress fixing nut is loosened or not can be judged from the appearance, the accident rate is reduced, a graduated scale on a guide rod can intuitively judge the fastening degree between the first building template and the second building template, and through arranging the prestress fixing nut, when the torque force is overlarge, a prestress support rod is firstly broken in one step to separate a hexagon sleeve from a common fixing nut, prevent building templates's connection locking device from damaging, rotate the handle and can adjust the length of first threaded rod, facilitate the use.

Description

Building template locking equipment for pouring reinforced concrete
Technical Field
The invention relates to the technical field of buildings, and particularly discloses a building template locking device for pouring reinforced concrete.
Background
The building template is a common tool in the building industry, is a template plate used when reinforced concrete and building wastes are cast in situ, and comprises a combined steel mould, a plastic combined template, a steel-wood combined template, a wood template and the like; the panel of the combined steel die is made of a Q235 steel plate, the thickness of the panel is 2.3-2.5mm, and the panel is also called a combined type small sizing steel die or a small steel die plate. The plastic combined template consists of a plastic template and a connecting piece. The steel-wood combined building template is a shaped building template which takes angle steel as a frame and takes a wood building template as a panel.
The construction process quality of the building template directly influences the quality of cast-in-place concrete, so the importance of the building template locking device is self-evident, the existing template reinforcement usually adopts reinforcement modes such as a pair-pulling screw rod, step tightening, square and round buckles and the like, the reinforcement locking degree of the building template cannot be accurately controlled, the phenomena of template loosening caused by artificial factors such as collision, shaking and the like in the subsequent construction process, whether the template expands or not in the concrete pouring process and the like cannot be accurately estimated, and the corresponding adjustment and maintenance are also troublesome.
Disclosure of Invention
The invention provides a building template locking device for pouring reinforced concrete, which is designed for overcoming the defects of the prior art.
The technical scheme adopted by the invention for solving the problems is as follows:
the invention provides building template locking equipment for pouring reinforced concrete, which comprises a threaded roller, wherein two ends of the threaded roller are provided with first threaded rods, the threaded rods are provided with rotating handles far away from two ends of the threaded roller, one end of the threaded roller is provided with a first connecting rod, one end of the first connecting rod far away from the threaded roller is provided with a sleeve, the inner cavity of the sleeve is sleeved with a second connecting rod, the second connecting rod is detachably connected with the sleeve, one end of the second connecting rod far away from the sleeve is fixedly connected with a second threaded rod, the outer side of the second threaded rod is sleeved with a first limiting plate, the first limiting plate is fixedly connected with the second threaded rod through a rotating shaft, the second threaded rod is fixedly connected with the first limiting plate through the rotating shaft, first guide holes are arranged at equal intervals on the first limiting plate, guide rods are arranged in the first guide holes, a second limiting plate is connected to one side of the guide rod, an early warning spring post is arranged between the first limiting plate and the second limiting plate, the early warning spring post is arranged on the periphery of the guide rod, the second limiting plate is movably sleeved outside the second threaded rod, an anti-friction rubber pad is arranged on one side of the second limiting plate, a first building template is arranged on one side of the anti-friction rubber pad, a second building template is arranged on one side of the first building template, the second threaded rod penetrates through the first building template and the second building template, limit threaded rods are fixedly connected to one side of the second building template at equal intervals, pre-stress fixing nuts are fixedly connected to the limit threaded rods, the pre-stress fixing threads comprise common fixing nuts, six groups of pre-stress supporting rods are arranged on the periphery of the common fixing nuts at equal intervals, and a hexagonal sleeve is fixedly connected to one end, far away from the common fixing nuts, of the, hexagonal sleeve outside equidistance is equipped with six sets of spacing blocks, be equipped with spacing hole on the stopper, the second limiting plate and antifriction rubber pad middle part is equipped with the second guiding hole, just the diameter of second guiding hole is greater than the cross section diameter of second threaded rod, the shape of cross section of guide bar is the square, just the top surface of guide bar is equipped with the scale, the guide bar is kept away from the one end of second limiting plate is equipped with the baffle, threaded connection has fixing bolt through threaded connection at telescopic top, the cross section of second connecting rod with telescopic inside cavity shape is the square, just inside cavity diameter is greater than the cross section diameter of second connecting rod.
Furthermore, the rotating handle is in an I shape, and rubber sleeves are sleeved on the fixing bolt and the outer side of the rotating handle.
Furthermore, the number of the limit threaded rods is six, and the limit threaded rods are welded on the surface of one side of the second building template at equal intervals.
Further, the baffle is square, and the diameter of the baffle is larger than that of the first guide hole.
Furthermore, the connection mode of the rotating handle and the first threaded rod is welding, the connection mode of the threaded roller and the first connecting rod is welding, and the connection mode of the second building board and the limiting threaded rod is welding.
The invention has the beneficial effects that: the technical scheme provides a building template locking device for pouring reinforced concrete, which is convenient for checking the fastening degree between a first building template and a second building template, has high safety performance, can limit and fix a pre-stressed fixing nut by arranging a limit threaded rod, can install the pre-stressed fixing nut at one side of the second building template in advance, can fix the first building template and the second building template by rotating a handle, can directly judge whether the pre-stressed fixing nut is loosened from the appearance by arranging a pre-stressed spring column and utilizing the elasticity of the pre-stressed spring column when the first building template and the second building template are loosened, namely the pre-stressed fixing nut is loosened, the pre-stressed spring column extends, so as to directly judge whether the pre-stressed fixing nut is loosened from the appearance and reduce the accident rate, and can judge the fastening degree between the first building template and the second building template more visually by embedding and installing a graduated scale on the top surface of a guide rod, make first limiting plate can't remove through pivot fixed connection and remove and can only rotate between second threaded rod and the first limiting plate, it can prevent that the second limiting plate from rocking to set up first guiding hole through the equidistance on first limiting plate, prevent to damage the pretension spring post because of the second limiting plate is rotatory, through setting up prestressing force fixation nut when the torque force is too big prestressing force bracing piece one-step break make separation between hexagon sleeve and the ordinary fixation nut, prevent building templates's connection locking device from damaging, can adjust the length of first threaded rod through setting up the rotatory handle that rotates of threaded roll, facilitate the use, it is convenient to dismantle between messenger's sleeve and the second connecting rod through setting up fixing bolt, and is convenient to carry.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the structures shown in the drawings without creative efforts.
FIG. 1 is a schematic structural view of a building formwork locking apparatus for casting reinforced concrete according to the present invention;
FIG. 2 is a schematic structural view of a pre-stressed fixing nut in the locking device of a building template for pouring reinforced concrete according to the present invention;
FIG. 3 is a schematic diagram of a first stop plate structure of the locking device for a construction form for pouring reinforced concrete according to the present invention;
FIG. 4 is a schematic diagram of a second stop plate of the locking apparatus for a construction form for pouring reinforced concrete according to the present invention;
fig. 5 is a schematic structural view of a guide rod in the locking device for a construction template for pouring reinforced concrete according to the present invention.
In the drawings are labeled: 1. a threaded roller; 2. a first threaded rod; 3. rotating the handle; 4. a first connecting rod; 5. A sleeve; 6. a second connecting rod; 7. a second threaded rod; 8. a first limit plate; 9. a first guide hole; 10. a guide bar; 11. a second limiting plate; 12. antifriction rubber pads; 13. a first building template; 14. a second building template; 15. a limit threaded rod; 16. a pre-stressed securing nut; 17. a common fixing nut; 18. a prestressed support bar; 19. a hexagonal sleeve; 20. a limiting block; 21. a limiting hole; 22. a second guide hole; 23. a graduated scale; 24. a baffle plate; 25. pre-tightening the spring columns; 26. and (5) fixing the bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that all the directional indicators (such as up, down, left, right, front, and rear … …) in the embodiment of the present invention are only used to explain the relative position relationship between the components, the movement situation, etc. in a specific posture (as shown in the drawing), and if the specific posture is changed, the directional indicator is changed accordingly.
In addition, the descriptions related to "first", "second", etc. in the present invention are for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In addition, technical solutions between various embodiments may be combined with each other, but must be realized by a person skilled in the art, and when the technical solutions are contradictory or cannot be realized, such a combination should not be considered to exist, and is not within the protection scope of the present invention.
Referring to fig. 1 to 5, a building template locking device for pouring reinforced concrete comprises a threaded roller 1, wherein the upper end and the lower end of the threaded roller 1 are both connected with a first threaded rod 2 through threads, a rotating handle 3 is rotated to adjust the length of the first threaded rod 2, the use is convenient, one end of the first threaded rod 2, which is far away from the threaded roller 1, is fixedly welded with the rotating handle 3, the second threaded rod 7 is conveniently fixed with a pre-stressed fixed nut 16, one side of the threaded roller 1 is fixedly welded with a first connecting rod 4, one end of the first connecting rod 4, which is far away from the threaded roller 1, is fixedly provided with a sleeve 5, the inner cavity of the sleeve 5 is sleeved with a second connecting rod 6, the sleeve 5 and the second connecting rod 6 are conveniently disassembled and conveniently carried, one end of the second connecting rod 6, which is far away from the sleeve 5, is fixedly welded with the second threaded rod, the first limiting plate 8 is fixedly connected with the second threaded rod 7 through a rotating shaft, the second threaded rod 7 is fixedly connected with the first limiting plate 8 through the rotating shaft, the first limiting plate 8 cannot move leftwards and rightwards but only rotates, first guide holes 9 are dug in the first limiting plate 8 at equal intervals, the second limiting plate 11 can be prevented from shaking by arranging the first guide holes 9, the pre-tightening spring column 25 is prevented from being damaged due to the rotation of the second limiting plate 11, guide rods 10 are inserted into the inner cavities of the first guide holes 9, one ends of the guide rods 10 are fixedly connected with the second limiting plate 11, the second limiting plate 11 is movably sleeved outside the second threaded rod 7, an anti-friction rubber pad 12 is adhered to one side of the second limiting plate 11 through an adhesive, a first building template 13 is arranged on one side of the anti-friction rubber pad 12, a second building template 14 is arranged on one side of the first building template 13, and the first building template 13 and the second building, the limiting threaded rods 15 are fixedly welded on one side of the second building template 14 at equal intervals, the limiting threaded rods 15 are fixedly connected with prestressed fixing nuts 16 through nuts, and the prestressed supporting rods 18 are firstly broken off when the torque force is too large through the arrangement of the prestressed fixing nuts 16, so that the hexagonal sleeves 19 are separated from the common fixing nuts 17, and the damage of a connecting and locking device of the building template is prevented.
As a preferred embodiment of this embodiment, the prestressed fixing nut 16 includes a common fixing nut 17, six groups of prestressed supporting rods 18 are equidistantly arranged outside the common fixing nut 17, one end of each prestressed supporting rod 18 far away from the common fixing nut 17 is fixedly connected with a hexagonal sleeve 19, six groups of limiting blocks 20 are equidistantly arranged outside the hexagonal sleeve 19, limiting holes 21 are dug on the limiting blocks 20, so that the prestressed fixing nut 16 is conveniently installed on one side of the second building template 14, second guiding holes 22 are dug in the middle of the second limiting plate 11 and the antifriction rubber pad 12, the diameter of each second guiding hole 22 is larger than the diameter of the cross section of the second threaded rod 7, the cross section of the guiding rod 10 is of a square structure, and a scale 23 is embedded on the top surface of the guiding rod 10, the fastening degree between the first building template 13 and the second building template 14 can be judged more intuitively by setting the scale 23, a baffle 24 is fixedly arranged at one end of the guide rod 10 far away from the second limiting plate 11, the baffle 24 is of a square structure, the diameter of the baffle 24 is larger than that of the first guiding hole 9, the baffle 24 is arranged to prevent the guide rod 10 from being separated from the first guiding hole 9, a pre-tightening spring column 25 is sleeved between the first limiting plate 8 and the second limiting plate 11 at the outer side of the guide rod 10, the pre-tightening spring column 25 is arranged to utilize the elasticity of the pre-tightening spring column 25 to judge whether the pre-tightening fixing nut 16 is loosened or not directly from the appearance by extending the pre-tightening spring column 25 when the first building template 13 and the second building template 14 are loosened, namely the pre-tightening fixing nut 16 is loosened, so that the accident rate is reduced, the top of the sleeve 5 is connected with a fixing bolt 26 through threads, a rubber sleeve is sleeved at the outer side of the fixing bolt 26, and the sleeve 5 and the second connecting rod, the cross section of second connecting rod 6 and the inside cavity of sleeve 5 are square structure, and the inside cavity diameter of sleeve 5 is slightly more than the cross section diameter of second connecting rod 6, rotates handle 3 and establishes to I shape structure, and rotates the 3 outsides of handle and cup jointed the rubber sleeve, prevents that the hand is smooth, and limit threaded rod 15 is equipped with six groups, and limit threaded rod 15 is the fixed welding of circular equidistance on 14 side surfaces of second building templates.
The working principle of the invention patent is as follows: the prestress fixing nut 16 can be limited and fixed by arranging the limiting threaded rod 15, the prestress fixing nut 16 can be arranged on one side of the second building template 14 in advance, the first building template 13 and the second building template 14 can be fixed by rotating the handle, when the first building template 13 and the second building template 14 are loosened, namely the prestress fixing nut 16 is loosened, the prestress spring column 25 is extended by utilizing the elasticity of the prestress spring column 25, so that whether the prestress fixing nut 16 is loosened or not can be directly judged from the appearance, the accident rate is reduced, the fastening degree between the first building template 13 and the second building template 14 can be judged more visually by embedding the graduated scale 23 on the top surface of the guide rod 10, the hexagon sleeve 19 is separated from the common fixing nut 17 by arranging the prestress fixing nut 16 and further breaking the prestress supporting rod 18 when the torque force is too large, prevent that building templates's connection locking device from damaging, rotate handle 3 through setting up 1 rotation of threaded drum and can adjust the length of first threaded rod 4, facilitate the use.
The invention adopts the mode of combining the prestressed nut, the limit threaded rod and the handle, so that the building template is more convenient and accurate to reinforce, and the later adjustment is more convenient; a spring column is added, and when the prestressed nut is loosened, the judgment can be carried out from the appearance; the fastening degree between the templates can be visually judged by adopting the graduated scale; the prestressed supporting rod is added, so that a certain protection effect can be achieved on the device, and unnecessary loss is reduced.
The technical scheme provides a building template locking device for pouring reinforced concrete, which is convenient for checking the fastening degree between a first building template and a second building template, has high safety performance, can limit and fix a pre-stressed fixing nut by arranging a limit threaded rod, can install the pre-stressed fixing nut at one side of the second building template in advance, can fix the first building template and the second building template by rotating a handle, can directly judge whether the pre-stressed fixing nut is loosened from the appearance by arranging a pre-stressed spring column and utilizing the elasticity of the pre-stressed spring column when the first building template and the second building template are loosened, namely the pre-stressed fixing nut is loosened, the pre-stressed spring column extends, so as to directly judge whether the pre-stressed fixing nut is loosened from the appearance and reduce the accident rate, and can judge the fastening degree between the first building template and the second building template more visually by embedding and installing a graduated scale on the top surface of a guide rod, make first limiting plate can't remove through pivot fixed connection and remove and can only rotate between second threaded rod and the first limiting plate, it can prevent that the second limiting plate from rocking to set up first guiding hole through the equidistance on first limiting plate, prevent to damage the pretension spring post because of the second limiting plate is rotatory, through setting up prestressing force fixation nut when the torque force is too big prestressing force bracing piece one-step break make separation between hexagon sleeve and the ordinary fixation nut, prevent building templates's connection locking device from damaging, can adjust the length of first threaded rod through setting up the rotatory handle that rotates of threaded roll, facilitate the use, it is convenient to dismantle between messenger's sleeve and the second connecting rod through setting up fixing bolt, and is convenient to carry.
The above embodiments are preferred embodiments of the present invention, but the present invention is not limited to the above embodiments, and any other changes, modifications, substitutions, combinations, and simplifications which do not depart from the spirit and principle of the present invention should be construed as equivalents thereof, and all such changes, modifications, substitutions, combinations, and simplifications are intended to be included in the scope of the present invention.

Claims (5)

1. The utility model provides a building templates locking equipment for concreting which characterized in that: comprises a threaded roller, wherein first threaded rods are arranged at two ends of the threaded roller, rotating handles are arranged at two ends of the threaded rod far away from the threaded roller, a first connecting rod is arranged at one end of the threaded roller, a sleeve is arranged at one end of the first connecting rod far away from the threaded roller, a second connecting rod is sleeved in the sleeve cavity and detachably connected with the sleeve, a second threaded rod is fixedly connected with one end of the second connecting rod far away from the sleeve, a first limiting plate is sleeved outside the second threaded rod, the first limiting plate is fixedly connected with the second threaded rod through a rotating shaft, the second threaded rod is fixedly connected between the first limiting plates through a rotating shaft, first guide holes are arranged at equal distances on the first limiting plates, guide rods are arranged in the first guide holes, and one side of each guide rod is connected with a second limiting plate, an early warning spring post is arranged between the first limiting plate and the second limiting plate, the early warning spring post is arranged on the periphery of the guide rod, the second limiting plate is movably sleeved outside the second threaded rod, one side of the second limiting plate is provided with an anti-friction rubber pad, one side of the anti-friction rubber pad is provided with a first building template, one side of the first building template is provided with a second building template, the second threaded rod penetrates through the first building template and the second building template, one side of the second building template is fixedly connected with limiting threaded rods at equal intervals, the limiting threaded rods are fixedly connected with pre-stress fixing nuts, the pre-stress fixing threads comprise common fixing nuts, six groups of pre-stress supporting rods are arranged on the periphery of the common fixing nuts at equal intervals, one end of each pre-stress supporting rod, which is far away from the common fixing nuts, is fixedly connected with a hexagonal, hexagonal sleeve outside equidistance is equipped with six sets of spacing blocks, be equipped with spacing hole on the stopper, the second limiting plate and antifriction rubber pad middle part is equipped with the second guiding hole, just the diameter of second guiding hole is greater than the cross section diameter of second threaded rod, the shape of cross section of guide bar is the square, just the top surface of guide bar is equipped with the scale, the guide bar is kept away from the one end of second limiting plate is equipped with the baffle, threaded connection has fixing bolt through threaded connection at telescopic top, the cross section of second connecting rod with telescopic inside cavity shape is the square, just inside cavity diameter is greater than the cross section diameter of second connecting rod.
2. The apparatus of claim 1, wherein the locking mechanism comprises: the rotary handle is in an I shape, and the rubber sleeve is sleeved on the outer side of the fixed bolt and the outer side of the rotary handle.
3. The apparatus of claim 1, wherein the locking mechanism comprises: the number of the limit threaded rods is six, and the limit threaded rods are welded on the surface of one side of the second building template at equal intervals.
4. The apparatus of claim 1, wherein the locking mechanism comprises: the baffle is square, and the diameter of baffle is greater than the diameter of first guiding hole.
5. The apparatus of claim 1, wherein the locking mechanism comprises: the handle is rotated with the connected mode of first threaded rod is the welding, the threaded roller with the connected mode of first connecting rod is the welding, the second building board with the connected mode between the limiting threaded rod is the welding.
CN202110142148.9A 2021-02-02 2021-02-02 Building template locking equipment for pouring reinforced concrete Pending CN112727087A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110142148.9A CN112727087A (en) 2021-02-02 2021-02-02 Building template locking equipment for pouring reinforced concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110142148.9A CN112727087A (en) 2021-02-02 2021-02-02 Building template locking equipment for pouring reinforced concrete

Publications (1)

Publication Number Publication Date
CN112727087A true CN112727087A (en) 2021-04-30

Family

ID=75595489

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110142148.9A Pending CN112727087A (en) 2021-02-02 2021-02-02 Building template locking equipment for pouring reinforced concrete

Country Status (1)

Country Link
CN (1) CN112727087A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113404294A (en) * 2021-06-28 2021-09-17 安徽恒聚精密机械有限公司 Screw anchoring piece adjustable lock and using method thereof
CN114541752A (en) * 2022-02-24 2022-05-27 赖唯瑾 Be used for building templates to connect locking device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012012812A (en) * 2010-06-30 2012-01-19 Asahi Kasei Homes Co Construction method of nut
CN208363625U (en) * 2018-07-02 2019-01-11 中核华辰建筑工程有限公司 A kind of connection locking device of building template
CN211396629U (en) * 2019-09-22 2020-09-01 洪作成 Connecting and locking device for building template
CN112227709A (en) * 2020-09-03 2021-01-15 泉州市伯奈特建筑材料科技有限公司 Connecting and locking device for building template

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012012812A (en) * 2010-06-30 2012-01-19 Asahi Kasei Homes Co Construction method of nut
CN208363625U (en) * 2018-07-02 2019-01-11 中核华辰建筑工程有限公司 A kind of connection locking device of building template
CN211396629U (en) * 2019-09-22 2020-09-01 洪作成 Connecting and locking device for building template
CN112227709A (en) * 2020-09-03 2021-01-15 泉州市伯奈特建筑材料科技有限公司 Connecting and locking device for building template

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113404294A (en) * 2021-06-28 2021-09-17 安徽恒聚精密机械有限公司 Screw anchoring piece adjustable lock and using method thereof
CN114541752A (en) * 2022-02-24 2022-05-27 赖唯瑾 Be used for building templates to connect locking device
CN114541752B (en) * 2022-02-24 2023-09-05 义乌建投巨匠建设有限公司 Locking device for building template connection

Similar Documents

Publication Publication Date Title
CN112727087A (en) Building template locking equipment for pouring reinforced concrete
KR200437568Y1 (en) A maintain distance device of concrete mold using one piece type bolt
CN202913420U (en) Reusable positioning device for installing foundation bolts
CN206220489U (en) Concrete post formwork for placing tightening device
CN203247842U (en) Reinforcing device of concrete structure expansion joint formwork
CN212865603U (en) Bridge beam slab centre form fixed support device
CN220599197U (en) Building templates reinforcing apparatus
CN112227709A (en) Connecting and locking device for building template
CN217205333U (en) Clamp for large concrete beam formwork
CN208363625U (en) A kind of connection locking device of building template
CN212927030U (en) Embrace frame post template reinforcing apparatus
CN214195574U (en) Screw anchoring adjusting lock
CN112538969A (en) Screw anchoring adjusting lock
CN210342445U (en) But reuse's reinforcing bar split heads for building floor
CN210190139U (en) Bridge roof embedded steel bar limiting device
CN202810179U (en) Overhanging element anchoring tool for overhanging scaffold
CN207582978U (en) A kind of floorslab thickness control device
CN112392279A (en) Stabilize effectual cast in situ concrete wall body strutting arrangement
CN204000617U (en) Bolt bracket
CN210421927U (en) Cast-in-place linkage segment template strutting arrangement of instrument formula concrete superimposed sheet
CN219241806U (en) Safe hanging ladder for building construction
CN214089362U (en) Novel highway engineering template supports device
CN219993166U (en) Positioning device for side wall reinforcement cage
CN219509287U (en) Building engineering frame roof beam reinforcing apparatus convenient to dismantle
CN217076777U (en) Tower crane attachment system for frame structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination