CN112669055A - Power transmission and transformation project exploitable estimation simulation group price method and device - Google Patents

Power transmission and transformation project exploitable estimation simulation group price method and device Download PDF

Info

Publication number
CN112669055A
CN112669055A CN202011474408.4A CN202011474408A CN112669055A CN 112669055 A CN112669055 A CN 112669055A CN 202011474408 A CN202011474408 A CN 202011474408A CN 112669055 A CN112669055 A CN 112669055A
Authority
CN
China
Prior art keywords
project
power transmission
estimated
transformation
projects
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011474408.4A
Other languages
Chinese (zh)
Inventor
周忠强
刘波
牛爱梅
李晓良
尹朋
韩鹏
公凡奎
闫先海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Luneng Software Technology Co Ltd
Original Assignee
Shandong Luneng Software Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Luneng Software Technology Co Ltd filed Critical Shandong Luneng Software Technology Co Ltd
Priority to CN202011474408.4A priority Critical patent/CN112669055A/en
Publication of CN112669055A publication Critical patent/CN112669055A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/14Marketing, i.e. market research and analysis, surveying, promotions, advertising, buyer profiling, customer management or rewards

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a method and a device for an electric transmission and transformation project capable of researching, estimating and simulating group price, which are used for acquiring historical data of the electric transmission and transformation project; dividing a plurality of types of projects according to historical data based on standard specifications, and storing the various projects, project technical parameters corresponding to the various projects and historical manufacturing cost in a database; dividing the power transmission and transformation project to be estimated into a plurality of sub-projects based on standard specifications; matching the item types in the database for each sub-item based on the item technical parameters by adopting a neural network algorithm; and obtaining the estimated cost of each sub-project according to the matching result, and further summing to obtain an exploratable estimated simulation group price of the power transmission and transformation project to be estimated. The invention does not need manual quota, greatly improves the working efficiency, is beneficial to the effective accumulation of the project cost data, enriches the historical project sample library of the estimation table and provides more accurate simulation group price generation standard; the simulated expectable estimation group price can be scanned and compared with historical data, abnormal points are positioned, and estimation accuracy is improved.

Description

Power transmission and transformation project exploitable estimation simulation group price method and device
Technical Field
The invention relates to the field of evaluation of unit price of power transmission and transformation projects, in particular to a method and a device for evaluating a simulation unit price of a power transmission and transformation project.
Background
At present, the construction cost method of the electric power project is mainly based on the construction cost method of the estimated quota, the workload is calculated by using the quota, the calculation is carried out in a manual calculation and manual report mode, the workload is huge, data is easy to make mistakes, the traditional construction cost technology of the power transmission and transformation project established on the quota is not good at the novel construction cost management, and the data utilization efficiency is low due to the fact that engineering data relate to various influence factors and the comparable project in the same period is limited.
Disclosure of Invention
In order to solve the problems, the invention provides a method and a device for simulating the researched and estimated group price of the power transmission and transformation project, which can automatically simulate the researched and estimated group price of the power transmission and transformation project based on historical data and improve the working efficiency.
The technical scheme of the invention is as follows: a power transmission and transformation project expectable estimation simulation group price method comprises the following steps:
acquiring historical data of a power transmission and transformation project;
dividing a plurality of types of projects according to historical data based on standard specifications, and storing the various projects, project technical parameters corresponding to the various projects and historical manufacturing cost in a database;
dividing the power transmission and transformation project to be estimated into a plurality of sub-projects based on standard specifications;
matching the item types in the database for each sub-item based on the item technical parameters by adopting a neural network algorithm;
and obtaining the estimated cost of each sub-project according to the matching result, and further summing to obtain an exploratable estimated simulation group price of the power transmission and transformation project to be estimated.
Further, the adopted neural network algorithm is a particle swarm algorithm.
Furthermore, the estimated cost of the target function of the particle swarm algorithm as the sub item is the lowest; the constraint conditions of the particle swarm optimization comprise: the estimated cost does not exceed the preset limit, and each project technical parameter is controlled in a preset variation interval.
Further, if the sub-items are not matched successfully, matching is performed manually.
Further, the method may further comprise,
and filling the obtained estimated cost details of each sub-item into a preset table to obtain an estimable simulated group price table.
Further, the method may further comprise,
the deviation between the estimated cost and the preset limit is displayed in different colors in the table of the estimated group price.
Further, the method may further comprise,
storing the historical power transmission and transformation project exploratable estimation simulation group price in a database;
searching historical power transmission and transformation projects in a database to be matched with the power transmission and transformation projects to be estimated, and obtaining the similarity between the power transmission and transformation projects to be estimated and each historical power transmission and transformation project;
extracting an exploratable estimation simulation group price of the corresponding historical power transmission and transformation project with the similarity exceeding the preset similarity;
and comparing and displaying the extracted grindable estimation simulation group price of the historical power transmission and transformation project with the grindable estimation simulation group price of the power transmission and transformation project to be estimated.
And further, searching the historical power transmission and transformation project and the power transmission and transformation project to be estimated in the database according to the engineering technical parameters for matching.
The technical scheme of the invention also comprises a device for researching and estimating the simulation group price in the power transmission and transformation project, which comprises,
a historical data acquisition module: acquiring historical data of a power transmission and transformation project;
a parameter storage module: dividing a plurality of types of projects according to historical data based on standard specifications, and storing the various projects, project technical parameters corresponding to the various projects and historical manufacturing cost in a database;
a project partitioning module: dividing the power transmission and transformation project to be estimated into a plurality of sub-projects based on standard specifications;
an item matching module: matching the item types in the database for each sub-item based on the item technical parameters by adopting a neural network algorithm;
a group price obtaining module: and obtaining the estimated cost of each sub-project according to the matching result, and further summing to obtain an exploratable estimated simulation group price of the power transmission and transformation project to be estimated.
Further, a neural network algorithm adopted by the project matching module is a particle swarm algorithm;
the estimated cost of the target function of the particle swarm algorithm as a sub item is the lowest; the constraint conditions of the particle swarm optimization comprise: the estimated cost does not exceed the preset limit, and each project technical parameter is controlled in a preset variation interval.
According to the method and the device for the power transmission and transformation project researched and estimated simulation group price, project item division is carried out according to standard specifications, similar projects of power transmission and transformation project items to be estimated are searched and matched in a database through project corresponding technologies, the best similar projects are obtained, corresponding historical construction cost is extracted to serve as estimated construction cost of the projects to be estimated, finally, the researched and estimated simulation group price of the power transmission and transformation project to be estimated is obtained automatically through estimated construction cost of each sub-project, manual quota is not needed, and working efficiency is greatly improved. In addition, the standard engineering project is divided to realize the standardized import of engineering data, which is beneficial to the effective accumulation of engineering cost data, enriches the historical engineering sample library of an estimation table and provides more accurate simulation group price generation standard; the simulated expectable estimation group price can be scanned and compared with historical data, abnormal points are positioned, and estimation accuracy is improved.
Drawings
FIG. 1 is a schematic flow chart of a method according to an embodiment of the present invention;
fig. 2 is a schematic block diagram of a second structure according to an embodiment of the present invention.
Detailed Description
The present invention will be described in detail below with reference to the accompanying drawings by way of specific examples, which are illustrative of the present invention and are not limited to the following embodiments.
Example one
As shown in fig. 1, the present embodiment provides a method for generating a simulated group price for power transmission and transformation engineering, which includes the following steps:
s1, acquiring historical data of the power transmission and transformation project;
s2, dividing a plurality of types of projects according to historical data based on standard specifications, and storing the various projects, project technical parameters corresponding to the projects and historical manufacturing cost in a database;
s3, dividing the power transmission and transformation project to be estimated into a plurality of sub-projects based on standard specifications;
s4, matching the project types in the database for each sub-project based on the project technical parameters by adopting a neural network algorithm;
and S5, obtaining the estimated cost of each sub item according to the matching result, and further summing to obtain the simulative evaluation group price of the power transmission and transformation project to be estimated.
According to the method, a plurality of historical data of the power transmission and transformation project are obtained, a plurality of project types are divided and stored in a database, and follow-up projects are matched and correspond to each other.
In this embodiment, a standard specification is preset to perform project division, and the standard specification is set according to project requirements, for example, a project is divided into a main production project (for example, a communication and telemechanical system), an auxiliary production project, a single project related to a station address, and the like. And finally, dividing a plurality of project types, wherein each project type corresponds to project technical parameters (such as voltage level, length of used cable, project complexity, project scale and the like) and corresponding historical construction cost. And the project type, the project technical parameters and the historical construction cost form a mapping relation and are stored in a database for subsequent extraction and use.
When a new power transmission and transformation project needs to be researched and estimated, dividing the power transmission and transformation project to be estimated into a plurality of sub-projects based on standard standardization, wherein each sub-project has corresponding project technical parameters.
The method adopts a neural network algorithm, matches the project types in the sub-project matching database to the optimal project type based on project technical parameters, further extracts the historical cost of the optimal project type as the estimated cost of the sub-project to be estimated, and sums the estimated cost of each sub-project to obtain the estimated simulation group price of the power transmission and transformation project to be estimated.
Specifically, the neural network algorithm adopted in this embodiment is a particle swarm algorithm, a target function of the particle swarm algorithm is that the estimated cost of the subentry is the lowest, and meanwhile, constraint conditions of the particle swarm algorithm include: the estimated cost does not exceed the preset limit, and each project technical parameter is controlled in a preset variation interval. Based on these settings, the best item type is matched.
If the sub-items are not successfully matched, the matching is performed manually.
The embodiment also fills the obtained estimated cost details of each sub-item into a preset table to obtain an estimated simulation group price table. Meanwhile, the deviation condition between the estimated manufacturing cost and the preset limit is displayed in different colors in the table of the estimated simulation group price, so that the difference points can be conveniently positioned.
It should be noted that, after the exploratable estimation simulation group price of the power transmission and transformation project to be estimated is obtained, the obtained value is also stored in the database as historical data, so that a historical data sample base is enriched.
Preferably, data storage is performed in a database by taking different electric transmission and transformation projects as units, that is, data of a plurality of electric transmission and transformation projects are stored, and project technical parameters (such as project profiles, installation project information, building project information and the like) of the electric transmission and transformation projects are also extracted as identifiers of the electric transmission and transformation projects. After the simulation of the exploitable estimation group price of the estimated power transmission and transformation project is completed, similar historical power transmission and transformation projects can be searched from the database for comparison. The method specifically comprises the following steps:
step one, storing historical power transmission and transformation project exploratable estimation simulation group price in a database;
step two, searching historical power transmission and transformation projects in a database to be matched with the power transmission and transformation projects to be estimated, and obtaining the similarity between the power transmission and transformation projects to be estimated and each historical power transmission and transformation project;
extracting an exploratable estimation simulation group price of the corresponding historical power transmission and transformation project with the similarity exceeding the preset similarity;
and step four, comparing and displaying the extracted grindable estimation simulation group price of the historical power transmission and transformation project with the grindable estimation simulation group price of the power transmission and transformation project to be estimated.
And searching historical power transmission and transformation projects in a database according to the engineering technical parameters to match with the power transmission and transformation projects to be estimated, wherein the higher the similarity of the engineering technical parameters is, the higher the similarity between the projects is.
Through the comparison and display of the project group price, the abnormal point can be quickly positioned, and the estimation accuracy is improved.
Example two
As shown in fig. 2, the present embodiment provides a device for generating a simulated group price for power transmission and transformation engineering, which can be used to implement the technical solution of the first embodiment of the present invention.
The history data acquisition module 101: acquiring historical data of a power transmission and transformation project;
the parameter saving module 102: dividing a plurality of types of projects according to historical data based on standard specifications, and storing the various projects, project technical parameters corresponding to the various projects and historical manufacturing cost in a database;
the item division module 103: dividing the power transmission and transformation project to be estimated into a plurality of sub-projects based on standard specifications;
the item matching module 104: matching the item types in the database for each sub-item based on the item technical parameters by adopting a neural network algorithm;
group price acquisition module 105: and obtaining the estimated cost of each sub-project according to the matching result, and further summing to obtain an exploratable estimated simulation group price of the power transmission and transformation project to be estimated.
The neural network algorithm adopted by the item matching module 104 is a particle swarm algorithm. The estimated cost of the target function of the particle swarm algorithm as a sub item is the lowest; the constraint conditions of the particle swarm optimization comprise: the estimated cost does not exceed the preset limit, and each project technical parameter is controlled in a preset variation interval.
The above embodiments may be implemented in whole or in part by software, hardware, firmware, or any combination thereof. When implemented in software, the above-described embodiments may be implemented in whole or in part in the form of a computer program product. The computer program product comprises one or more computer instructions or computer programs. The procedures or functions according to the embodiments of the present application are wholly or partially generated when the computer instructions or the computer program are loaded or executed on a computer. The computer may be a general purpose computer, a special purpose computer, a network of computers, or other programmable device. The computer instructions may be stored in a computer readable storage medium or transmitted from one computer readable storage medium to another computer readable storage medium, for example, the computer instructions may be transmitted from one website, computer, server, or data center to another website, computer, server, or data center by wire or wirelessly. The computer-readable storage medium can be any available medium that can be accessed by a computer or a data storage device such as a server, data center, etc. that contains one or more collections of available media. The usable medium may be a magnetic medium (e.g., floppy disk, hard disk, magnetic tape), an optical medium (e.g., DVD), or a semiconductor medium. The semiconductor medium may be a solid state disk.
It should be understood that, in the various embodiments of the present application, the sequence numbers of the above-mentioned processes do not mean the execution sequence, and the execution sequence of each process should be determined by its function and inherent logic, and should not constitute any limitation to the implementation process of the embodiments of the present application.
The above disclosure is only for the preferred embodiments of the present invention, but the present invention is not limited thereto, and any non-inventive changes that can be made by those skilled in the art and several modifications and amendments made without departing from the principle of the present invention shall fall within the protection scope of the present invention.

Claims (10)

1. A power transmission and transformation project researched estimation simulation group price method is characterized by comprising the following steps:
acquiring historical data of a power transmission and transformation project;
dividing a plurality of types of projects according to historical data based on standard specifications, and storing the various projects, project technical parameters corresponding to the various projects and historical manufacturing cost in a database;
dividing the power transmission and transformation project to be estimated into a plurality of sub-projects based on standard specifications;
matching the item types in the database for each sub-item based on the item technical parameters by adopting a neural network algorithm;
and obtaining the estimated cost of each sub-project according to the matching result, and further summing to obtain an exploratable estimated simulation group price of the power transmission and transformation project to be estimated.
2. The power transmission and transformation project exploitable estimation simulation pricing method of claim 1, wherein the neural network algorithm is a particle swarm algorithm.
3. The power transmission and transformation project researched estimation simulation group price method according to claim 2, wherein the objective function of the particle swarm algorithm is the lowest estimated cost of the sub-project; the constraint conditions of the particle swarm optimization comprise: the estimated cost does not exceed the preset limit, and each project technical parameter is controlled in a preset variation interval.
4. The power transmission and transformation project exploratable estimation simulation pricing method according to claim 1, 2 or 3, characterized in that matching is performed manually if sub-project matching is not successful.
5. The method of claim 4, further comprising the step of,
and filling the obtained estimated cost details of each sub-item into a preset table to obtain an estimable simulated group price table.
6. The method of claim 5, further comprising the step of,
the deviation between the estimated cost and the preset limit is displayed in different colors in the table of the estimated group price.
7. The method of claim 1, 2, 3, 5 or 6, further comprising,
storing the historical power transmission and transformation project exploratable estimation simulation group price in a database;
searching historical power transmission and transformation projects in a database to be matched with the power transmission and transformation projects to be estimated, and obtaining the similarity between the power transmission and transformation projects to be estimated and each historical power transmission and transformation project;
extracting an exploratable estimation simulation group price of the corresponding historical power transmission and transformation project with the similarity exceeding the preset similarity;
and comparing and displaying the extracted grindable estimation simulation group price of the historical power transmission and transformation project with the grindable estimation simulation group price of the power transmission and transformation project to be estimated.
8. The method of claim 7, wherein the historical transmission and transformation project is searched in a database according to the project technical parameters and matched with the transmission and transformation project to be estimated.
9. A simulation pricing device for power transmission and transformation project capable of being researched and estimated is characterized by comprising,
a historical data acquisition module: acquiring historical data of a power transmission and transformation project;
a parameter storage module: dividing a plurality of types of projects according to historical data based on standard specifications, and storing the various projects, project technical parameters corresponding to the various projects and historical manufacturing cost in a database;
a project partitioning module: dividing the power transmission and transformation project to be estimated into a plurality of sub-projects based on standard specifications;
an item matching module: matching the item types in the database for each sub-item based on the item technical parameters by adopting a neural network algorithm;
a group price obtaining module: and obtaining the estimated cost of each sub-project according to the matching result, and further summing to obtain an exploratable estimated simulation group price of the power transmission and transformation project to be estimated.
10. The power transmission and transformation project researched estimation simulation team price apparatus according to claim 9, wherein the project matching module adopts a neural network algorithm as a particle swarm algorithm;
the estimated cost of the target function of the particle swarm algorithm as a sub item is the lowest; the constraint conditions of the particle swarm optimization comprise: the estimated cost does not exceed the preset limit, and each project technical parameter is controlled in a preset variation interval.
CN202011474408.4A 2020-12-15 2020-12-15 Power transmission and transformation project exploitable estimation simulation group price method and device Pending CN112669055A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011474408.4A CN112669055A (en) 2020-12-15 2020-12-15 Power transmission and transformation project exploitable estimation simulation group price method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011474408.4A CN112669055A (en) 2020-12-15 2020-12-15 Power transmission and transformation project exploitable estimation simulation group price method and device

Publications (1)

Publication Number Publication Date
CN112669055A true CN112669055A (en) 2021-04-16

Family

ID=75404460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011474408.4A Pending CN112669055A (en) 2020-12-15 2020-12-15 Power transmission and transformation project exploitable estimation simulation group price method and device

Country Status (1)

Country Link
CN (1) CN112669055A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113505942A (en) * 2021-07-30 2021-10-15 永道科技有限公司 Project engineering cost estimation method and device, electronic equipment and storage medium
CN114418611A (en) * 2021-12-15 2022-04-29 北京北咨信息工程咨询有限公司 Weak current construction cost calculation method and device, electronic equipment and storage medium
CN115169808A (en) * 2022-06-08 2022-10-11 中国电力科学研究院有限公司 Method, device and storage medium for calculating charge of digital project in power industry
CN115796972A (en) * 2022-11-24 2023-03-14 中核华纬工程设计研究有限公司 BIM technology-based quantity and price fusion implementation method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103793785A (en) * 2014-01-17 2014-05-14 国家电网公司 Method for transmission and transformation project cost review
CN106845847A (en) * 2017-02-03 2017-06-13 国家电网公司 Project of transmitting and converting electricity analysis of prices data intelligent extraction mechanism and method
CN107067164A (en) * 2017-03-30 2017-08-18 广东华联建设投资管理股份有限公司 A kind of index Method of fast estimating and system
US20170308966A1 (en) * 2016-04-22 2017-10-26 Economy Research Institute of State Grid Zhejiang Electric Power Post-evaluation and risk management and control method of power transmission engineering cost
CN109301820A (en) * 2018-10-22 2019-02-01 华润智慧能源有限公司 A kind of enterprise's electrical control method and system
CN111950920A (en) * 2020-08-20 2020-11-17 武汉华莱士工程造价咨询管理有限公司 Rapid building cost estimation method and system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103793785A (en) * 2014-01-17 2014-05-14 国家电网公司 Method for transmission and transformation project cost review
US20170308966A1 (en) * 2016-04-22 2017-10-26 Economy Research Institute of State Grid Zhejiang Electric Power Post-evaluation and risk management and control method of power transmission engineering cost
CN106845847A (en) * 2017-02-03 2017-06-13 国家电网公司 Project of transmitting and converting electricity analysis of prices data intelligent extraction mechanism and method
CN107067164A (en) * 2017-03-30 2017-08-18 广东华联建设投资管理股份有限公司 A kind of index Method of fast estimating and system
CN109301820A (en) * 2018-10-22 2019-02-01 华润智慧能源有限公司 A kind of enterprise's electrical control method and system
CN111950920A (en) * 2020-08-20 2020-11-17 武汉华莱士工程造价咨询管理有限公司 Rapid building cost estimation method and system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
丘凌等: "输变电工程造价管理的智能评审工具开发与应用研究", 《企业管理》 *
张新等: "基于改进杂交粒子群算法的农村微能网多能流优化调度", 《农业工程学报》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113505942A (en) * 2021-07-30 2021-10-15 永道科技有限公司 Project engineering cost estimation method and device, electronic equipment and storage medium
CN114418611A (en) * 2021-12-15 2022-04-29 北京北咨信息工程咨询有限公司 Weak current construction cost calculation method and device, electronic equipment and storage medium
CN114418611B (en) * 2021-12-15 2022-09-30 北京北咨信息工程咨询有限公司 Weak current construction cost calculation method and device, electronic equipment and storage medium
CN115169808A (en) * 2022-06-08 2022-10-11 中国电力科学研究院有限公司 Method, device and storage medium for calculating charge of digital project in power industry
CN115796972A (en) * 2022-11-24 2023-03-14 中核华纬工程设计研究有限公司 BIM technology-based quantity and price fusion implementation method
CN115796972B (en) * 2022-11-24 2024-05-07 中核华纬工程设计研究有限公司 BIM technology-based quantitative price fusion implementation method

Similar Documents

Publication Publication Date Title
CN112669055A (en) Power transmission and transformation project exploitable estimation simulation group price method and device
JP6758274B2 (en) Automatic process control hardware engineering with schema-represented requirements
CN109146090A (en) A kind of components life cycle management method based on the twin body management platform of apparatus figure
CN112149329B (en) Method, system, equipment and storage medium for previewing state of key equipment of nuclear power plant
CN113410813A (en) Digital twin distribution network fault-based diagnosis method and related device
CN114416855A (en) Visualization platform and method based on electric power big data
CN113723810A (en) Graph database-based power grid modeling method
CN112905805B (en) Knowledge graph construction method and device, computer equipment and storage medium
CN104657387A (en) Data query method and device
CN104756022B (en) For the method for the energy requirement management in production line
CN113807062A (en) Online drawing method and device for combined density map and electronic equipment
CN112949003A (en) Part measuring method, device, equipment and storage medium
CN105373446B (en) It is a kind of based on the system self-repairing method drilled automatically and device
CN112116322A (en) Three-dimensional design-based method and system for quickly and accurately compiling construction cost of power transformation project
CN113987102B (en) Interactive power data visualization method and system
CN103164760A (en) Power grid increment planning method and system
CN111381161A (en) Remote online health state diagnosis method for generator set
CN115481084A (en) BIM model resource management system
CN115344495A (en) Data analysis method and device for batch task test, computer equipment and medium
CN115328736A (en) Probe deployment method, device, equipment and storage medium
CN115239514A (en) Preparation circulation method, device, equipment and storage medium of insulating fiber sleeve
CN115269713A (en) Data visualization method, system, computer equipment and medium
CN115203281A (en) Information searching method and device, electronic equipment and storage medium
CN114282029A (en) Primitive management method and device, electronic equipment and storage medium
CN114860851A (en) Data processing method, device, equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210416