CN112653024A - Communication construction is with supplementary laying device of communication cable - Google Patents

Communication construction is with supplementary laying device of communication cable Download PDF

Info

Publication number
CN112653024A
CN112653024A CN202110064949.8A CN202110064949A CN112653024A CN 112653024 A CN112653024 A CN 112653024A CN 202110064949 A CN202110064949 A CN 202110064949A CN 112653024 A CN112653024 A CN 112653024A
Authority
CN
China
Prior art keywords
plate
chucking
groups
communication
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110064949.8A
Other languages
Chinese (zh)
Other versions
CN112653024B (en
Inventor
熊涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Super High Voltage Co Of State Grid Gansu Electric Power Co
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202110064949.8A priority Critical patent/CN112653024B/en
Publication of CN112653024A publication Critical patent/CN112653024A/en
Application granted granted Critical
Publication of CN112653024B publication Critical patent/CN112653024B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G9/00Installations of electric cables or lines in or on the ground or water

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The invention discloses a communication cable auxiliary laying device for communication construction, and relates to the field of communication construction. This supplementary laying device of communication cable for communication construction, including bottom plate and support column, the lower surface four corners department of bottom plate all is equipped with the gyro wheel, the last fixed surface of bottom plate is connected with the fixed plate, first arc wall has been seted up to the upper surface of fixed plate, the first chucking plate of three groups of last fixed surface of fixed plate is connected with, the bottom fixedly connected with base of support column, base and ground fixed connection, the second arc wall has been seted up to the upper surface of support column, the upper surface joint of support column has the second chucking plate, the second chucking plate passes through the chucking mechanism and connects fixedly with the upper surface joint of support column. This supplementary laying device of communication cable for communication construction has practiced thrift manpower resources, has reduced the laying cost of communication cable, has reduced workman's working strength and the work degree of difficulty, has improved the life of communication cable.

Description

Communication construction is with supplementary laying device of communication cable
Technical Field
The invention relates to the technical field of communication construction, in particular to a communication cable auxiliary laying device for communication construction.
Background
Communication cable is the general name of various wire of transmission electrical signal or light signal, along with the continuous improvement of people's life, the continuous development of communication equipment, and communication construction is more frequent more nowadays, and in communication construction process, often need lay communication cable underground to make communication cable play the effect of information transfer.
At present, when laying communication cables, a deep groove is generally dug on the ground, then a plurality of workers pull the cables to advance along the deep groove, so that the communication cables extend from a cable roller, and finally the cables are convenient to lay by the workers, however, because the workers pull the cables to advance by force at the same time, the cables are heavy in quality, the workers are easy to fall down under the condition that the coordination of the workers is not coordinated, personal injury is brought to the workers, meanwhile, the cables are pulled by a plurality of people to advance, manpower resources are greatly wasted, the laying cost of the communication cables is improved, the labor intensity of the workers is also improved, the working difficulty of the workers is improved, when the cables are extended to a certain length, the middle section of the cables is in contact with the ground, so that the cables are frequently rubbed with the ground, the insulating layers of the cables are damaged, and the service life of the cables is finally reduced, therefore, we disclose a communication cable laying aid for communication construction to solve the above problems.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention discloses a communication cable auxiliary laying device for communication construction, which aims to solve the problems in the background technology.
(II) technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme: the utility model provides a supplementary laying device of communication cable for communication construction, includes bottom plate and support column, the lower surface four corners department of bottom plate all is equipped with the gyro wheel, the last fixed surface of bottom plate is connected with the fixed plate, first arc wall has been seted up to the upper surface of fixed plate, the first chucking plate of three groups of last fixed surface of fixed plate is connected with, the bottom fixedly connected with base of support column, base and ground fixed connection, the second arc wall has been seted up to the upper surface of support column, the upper surface joint of support column has the second chucking plate, the second chucking plate passes through the chucking mechanism and connects fixedly with the upper surface joint of support column.
Preferably, the upper surface of fixed plate rotates the seat with three groups of fixedly connected with on the same side, three groups the joint is rotated on three groups of rotation seats respectively to the one end of first chucking plate, three groups the equal fixedly connected with mounting plate of the other end of first chucking plate, three groups the through-hole has all been seted up to the upper surface of mounting plate, three groups fastening bolt, three groups have all been cup jointed in the downthehole activity of through-hole fastening bolt all with the upper surface threaded connection of fixed plate.
Preferably, all seted up the rotation groove on the relative cell wall of roating seat, the equal fixedly connected with dwang in both sides that first chucking board carried on the back mutually is two sets of the joint is rotated in the inslot in two sets of rotation grooves in dwang adaptation respectively.
Preferably, two groups of through grooves are formed in the upper surface of the base, the ground drilling parts are movably sleeved in the grooves of the two groups of through grooves, the bottom ends of the ground drilling parts are conical, and the bottom ends of the ground drilling parts are tightly inserted in soil.
Preferably, two sets of chutes are formed in the upper surface of the support column, the sliding plates are fixedly connected to the lower surfaces of the second clamping plate and the two sets of chutes respectively and are matched with the sliding plates in the grooves of the two sets of chutes in a sliding and clamping mode, the sliding plates are arranged in a T shape, and the chutes are arranged in a T shape matched with the sliding plates.
Preferably, the clamping mechanism comprises a clamping rod and a clamping spring, a groove is formed in the bottom wall of the sliding groove, the clamping rod is movably sleeved in the groove of the groove, the clamping spring is arranged in the groove of the groove, a clamping groove is formed in the lower surface of the sliding plate, and the top end of the clamping rod is adaptive to the clamping groove in a clamped mode.
Preferably, the kelly is located the one end fixedly connected with limiting plate of recess inslot, the limiting plate is established to circularly, the diameter of limiting plate is greater than groove opening part groove footpath, the lateral wall fixedly connected with of limiting plate presses the pressure board, the spread groove has been seted up to the lateral wall of support column, press the pressure board to pass the spread groove and extend, chucking spring's top offsets with the lower surface of limiting plate, chucking spring's bottom offsets with the tank bottom wall of recess.
Preferably, a plurality of groups of rolling grooves are formed in the inner side walls of the second arc-shaped groove and the second clamping plate, balls are sleeved in the grooves of the rolling grooves in a rolling mode, the diameter of each ball is larger than the groove diameter of the opening of each rolling groove, and the first clamping plate and the second clamping plate are both arranged into arc-shaped plates.
Preferably, the lateral wall fixedly connected with fixed block of bottom plate, one side fixedly connected with traction ring that the fixed block kept away from the bottom plate, the go-between has been cup jointed in traction ring's the intra-annular, the lateral wall fixedly connected with traction lever of go-between, the lateral wall fixedly connected with two sets of holding rods of traction lever, it is two sets of the holding rod uses the axis of holding rod as the lateral wall of symmetry axis fixed connection at the traction lever respectively.
The invention discloses a communication cable auxiliary laying device for communication construction, which has the following beneficial effects:
1. the communication cable auxiliary laying device for communication construction is characterized in that the extending end of a communication cable is tightly clamped in a first arc-shaped groove of a fixing plate through the arrangement of a bottom plate, the fixing plate, a first clamping plate, a supporting column, a base and a second clamping plate, under the cooperation of the four groups of rollers on the lower surface of the bottom plate, a user only needs to move the bottom plate, the extension of the communication cable driven by the bottom plate can be realized, so that the extension of the cable can be realized by few workers, the human resource is greatly saved, the laying cost of the communication cable is reduced, the working intensity and the working difficulty of the workers are reduced, and simultaneously, under the cooperation of the supporting column, the base and the second clamping plate, the communication cable can not contact with the ground, thereby the condition that the communication cable frequently rubs with ground contact and damages the insulating layer has been prevented, communication cable's life has been improved, user's demand is satisfied.
2. This supplementary laying device of communication cable for communication construction, through set up the multiunit roll groove on second arc wall and second chucking inboard wall, the roll joint has the ball in the roll groove, when the cable is when passing through second arc wall and second chucking board, the ball rolls, thereby greatly reduced the degree of difficulty that the user pulling cable extends, it is comparatively laborsaving when making the user pulling cable extend, and simultaneously, the ball contacts with the insulating layer of cable, the damage of insulating layer has also been prevented, user's demand is satisfied.
3. This supplementary laying device of communication cable for communication construction through the setting of fixed block, pull ring, go-between, traction lever and holding rod for the user only need stimulate two sets of holding rods, under the cooperation of four group's gyro wheels, can realize the removal of bottom plate, and convenient to use person drives the extension of communication cable through two sets of holding rods of pulling, and this device easy operation is convenient, and labour saving and time saving satisfies user's demand.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of a first chuck plate structure according to the present invention;
FIG. 3 is a schematic diagram of a structure of a support pillar and a second clamping plate according to the present invention;
FIG. 4 is an enlarged view of A of FIG. 3 according to the present invention;
FIG. 5 is a cross-sectional view of the connection of the support post and the second clamping plate of the present invention;
FIG. 6 is an enlarged view of B of FIG. 5 in accordance with the present invention;
FIG. 7 is an enlarged view of C of FIG. 5 according to the present invention.
In the figure: 1. a base plate; 101. a roller; 2. a fixing plate; 201. a first arc-shaped slot; 202. a rotating seat; 203. a rotating groove; 3. a first chucking plate; 301. rotating the rod; 302. a fastening plate; 303. a through hole; 304. fastening a bolt; 4. a support pillar; 401. a second arc-shaped slot; 402. a chute; 403. a groove; 404. connecting grooves; 5. a base; 501. a through groove; 502. drilling an earth part; 6. a second chucking plate; 601. a slider; 602. a card slot; 603. a rolling groove; 7. a clamping rod; 701. a limiting plate; 702. a pressing plate; 8. a chucking spring; 9. a ball bearing; 10. a fixed block; 11. a traction ring; 12. a connecting ring; 13. a draw bar; 14. a holding rod.
Detailed Description
The embodiment of the invention discloses a communication cable auxiliary laying device for communication construction, which comprises a bottom plate 1 and support columns 4, wherein the four corners of the lower surface of the bottom plate 1 are respectively provided with a roller 101, the upper surface of the bottom plate 1 is fixedly connected with a fixed plate 2, the upper surface of the fixed plate 2 is provided with a first arc-shaped groove 201, the upper surface of the fixed plate 2 is fixedly connected with three groups of first clamping plates 3, the bottom ends of the support columns 4 are fixedly connected with a base 5, the base 5 is fixedly connected with the ground, the upper surface of the support columns 4 is provided with a second arc-shaped groove 401, the upper surface of the support columns 4 is clamped with a second clamping plate 6, the second clamping plate 6 is clamped and fixed with the upper surface of the support columns 4 through a clamping mechanism, and through the arrangement of the bottom plate 1, the fixed plate 2, the first clamping plates 3, the support columns 4, the base 5 and the second clamping plate 6, the extension ends of the communication cables are, under the cooperation of four groups of gyro wheels 101 of bottom plate 1 lower surface, the user only need make bottom plate 1 move, can realize the extension that bottom plate 1 drove the communication cable, thereby make the extension that needs few workman can realize the cable, manpower resources have been practiced thrift greatly, the laying cost of communication cable has been reduced, workman's working strength and the work degree of difficulty have been reduced, and simultaneously, at support column 4, under the cooperation of base 5 and second chucking board 6, make the communication cable unable and ground contact, thereby the condition that the communication cable frequently rubs and damages the insulating layer with ground contact has been prevented, the life of communication cable has been improved, user's demand is satisfied.
The seat 202 is rotated with three groups of fixedly connected with to the same side of the upper surface of fixed plate 2, the joint is rotated respectively on three groups of seats 202 to the one end of three groups of first chucking plate 3, the equal fixedly connected with mounting plate 302 of the other end of three groups of first chucking plate 3, through-hole 303 has all been seted up to the upper surface of three groups of mounting plate 302, fastening bolt 304 has been cup jointed in the downthehole equal activity of three groups of through-hole 303, three groups of fastening bolt 304 all with fixed plate 2's upper surface threaded connection, make first chucking plate 3 can be inseparable fix the in-groove at first arc 201 with the communication cable, and when the communication cable lengthens the length that needs, the person of facilitating the use takes out the inslot of first arc 201 that the communication.
All seted up on the cell wall that rotates the seat 202 relative and rotated groove 203, the equal fixedly connected with dwang 301 in both sides that first chucking plate 3 carried on the back mutually, two sets of dwang 301 adaptation rotation joint is at the inslot of two sets of rotation grooves 203 respectively for two sets of dwangs 301 of drive that first chucking plate 3 can be stable rotate along two sets of rotation grooves 203, have improved the stability of first chucking plate 3 with the communication cable chucking in first arc wall 201 inslot greatly.
Two sets of logical grooves 501 have been seted up to base 5's upper surface, and the equal activity of inslot that two sets of logical grooves 501 has cup jointed and has bored ground piece 502, and the bottom of boring ground piece 502 is established to the taper shape, and the bottom of boring ground piece 502 closely pegs graft in soil, has realized boring inside ground piece 502 stable brill soil for base 5 is in the same place with ground stable linking, has improved the stability of device greatly.
Two sets of spouts 402 have been seted up to support column 4's upper surface, the equal fixedly connected with slide 601 of lower surface that second chucking plate 6 and two sets of spouts 402 are relative, two sets of slides 601 adaptation sliding clamping respectively in the inslot of two sets of spouts 402, slide 601 establishes to "T" shape, spout 402 establishes to "T" shape with slide 601 looks adaptation to make slide 601 can' T upwards break away from the inslot of spout 402, the compactness of being connected of second chucking plate 6 and support column 4 has been improved greatly.
Chucking mechanism includes kelly 7 and chucking spring 8, seted up recess 403 on the wall of the groove diapire of spout 402, kelly 7 activity is cup jointed at the inslot of recess 403, chucking spring 8 is established at the inslot of recess 403, draw-in groove 602 has been seted up to the lower surface of slide 601, the top adaptation joint of kelly 7 is at the inslot of draw-in groove 602, thereby make the stable joint of two sets of slides 601 at the inslot of two sets of spouts 402, thereby realized that second chucking plate 6 breaks away from the inslot of spout 402 from the horizontal direction, the stability of device has been improved.
Card lever 7 is located the one end fixedly connected with limiting plate 701 of recess 403 inslot, limiting plate 701 establishes to circular, limiting plate 701's diameter is greater than recess 403 opening part groove footpath, make limiting plate 701 can't break away from the inslot of recess 403, the stability of device has been improved, limiting plate 701's lateral wall fixedly connected with presses the pressure board 702, spread groove 404 has been seted up to the lateral wall of support column 4, press the pressure board 702 to pass spread groove 404 and extend, chucking spring 8's top offsets with limiting plate 701's lower surface, chucking spring 8's bottom offsets with the tank bottom wall of recess 403, make the stable work of chucking spring 8 at the inslot of recess 403.
The multiunit roll groove 603 has all been seted up on the inside wall of second arc wall 401 and second chucking plate 6, roll the inslot roll of groove 603 and cup jointed ball 9, the diameter of ball 9 is greater than roll groove 603 opening part groove footpath, make ball 9 roll at the inslot of roll groove 603 all the time, first chucking plate 3 and second chucking plate 6 are all established to the arc, through set up multiunit roll groove 603 on second arc wall 401 and 6 inner walls of second chucking plate, roll the joint has ball 9 in the roll groove 603, when the cable is in process second arc wall 401 and second chucking plate 6, ball 9 rolls, thereby greatly reduced the degree of difficulty that the user pulling cable extends, make the user pulling cable comparatively laborsaving when extending, and simultaneously, ball 9 contacts with the insulating layer of cable, the damage of insulating layer has also been prevented, user's demand is satisfied.
The side wall fixedly connected with fixed block 10 of bottom plate 1, one side fixedly connected with pull ring 11 that bottom plate 1 was kept away from to fixed block 10, go-between 12 has been cup jointed in the ring of pull ring 11, the side wall fixedly connected with traction lever 13 of go-between 12, the side wall fixedly connected with two sets of holding rods 14 of traction lever 13, two sets of holding rods 14 use the axis of holding rod 14 respectively as the lateral wall of symmetry axis fixed connection at traction lever 13, through fixed block 10, pull ring 11, go-between 12, the setting of traction lever 13 and holding rod 14, make the user only need stimulate two sets of holding rods 14, under the cooperation of four groups of gyro wheels 101, can realize the removal of bottom plate 1, convenient to use person drives the extension of communication cable through two sets of holding rods 14 of pulling, the device is simple in operation convenient, and.
The working principle is as follows: when the fixing device is used by a user, firstly, the cable extending end on the cable roller is placed in the first arc-shaped groove 201 on the upper surface of the fixing plate 2, the first clamping plate 3 is rotated, the first clamping plate 3 drives the two groups of rotating rods 301 to rotate along the two groups of rotating grooves 203 on the rotating seat 202, so that the fastening plate 302 at the other end of the first clamping plate 3 is attached to the upper surface of the fixing plate 2, the fastening bolt 304 is taken up to penetrate through the through hole 303 and be in threaded connection with the upper surface of the fixing plate 2, and therefore the fixing connection between the fixing plate 2 and the first clamping plate 3 is realized.
Further, a user can pull the two groups of holding rods 14, and under the cooperation of the four groups of rollers 101, the holding rods 14 drive the bottom plate 1 to move through the traction rods 13, the connecting rings 12, the traction rings 11 and the fixing blocks 10, and the bottom plate 1 drives the cable to continuously extend along the cable roller through the fixing plate 2.
Further, when the cable extends to a certain length and contacts with the ground, the user can take the base 5, place the base 5 on the ground, take the two sets of ground drilling members 502 to penetrate through the two sets of through grooves 501 and tightly drill into the soil, thereby realizing the stable fixation of the base 5 and the ground, place the cable in the second arc-shaped groove 401 at the top end of the supporting column 4, take the second clamping plate 6, make the two sets of sliding plates 601 at the lower surface of the second clamping plate 6 respectively correspond to the two sets of sliding grooves 402, press the two sets of pressing plates 702 downwards, the pressing plates 702 drive the limiting plate 701 to move towards the bottom of the groove 403 along the connecting grooves 404, the limiting plate 701 presses the clamping spring 8 to do compression movement towards the bottom of the groove, the limiting plate 701 drives the clamping rod 7 to move into the groove of the groove 403, push the second clamping plate 6 towards the direction of the two sets of sliding grooves 402, the second clamping plate 6 drives the two sets of sliding plates 601 to slide, two groups of pressing plates 702 are loosened, and when two groups of clamping grooves 602 on the lower surfaces of the two groups of sliding plates 601 correspond to the two groups of clamping rods 7, the two groups of clamping rods 7 are respectively adaptive to and clamped in the grooves of the two groups of clamping grooves 602 under the elastic action of the two groups of clamping springs 8, so that the stable connection of the second clamping plates 6 and the supporting columns 4 is realized.
Further, user's accessible multi-unit support column 4's use has realized cable and ground contactless, and the user can continue to stimulate two sets of holding rods 14, and the cable drives multiunit ball 9 and rolls along multiunit roll groove 603 respectively when second arc wall 401 and second chucking plate 6 to reach the effect of province, what the convenient to use person lasted extends the cable.
In summary, the following steps: the extension end of the communication cable is tightly clamped in the first arc-shaped groove 201 of the fixing plate 2, a user only needs to pull the two groups of holding rods 14, the movement of the bottom plate 1 can be realized under the cooperation of the four groups of rollers 101, the user can conveniently drive the extension of the communication cable by pulling the two groups of holding rods 14, so that the extension of the cable can be realized by very few workers, the manpower resource is greatly saved, the laying cost of the communication cable is reduced, the working strength and the working difficulty of the workers are reduced, meanwhile, the communication cable cannot be contacted with the ground under the cooperation of the supporting column 4, the base 5 and the second clamping plate 6, the condition that the insulating layer is damaged due to frequent contact and friction between the communication cable and the ground is prevented, the service life of the communication cable is prolonged, when the cable passes through the second arc-shaped groove 401 and the second clamping plate 6, the rolling balls 9 roll, and the difficulty of pulling the cable to extend by the user is greatly, make the user comparatively laborsaving when pulling the cable extension, simultaneously, ball 9 contacts with the insulating layer of cable, has also prevented the damage of insulating layer, satisfies user's demand.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (9)

1. The utility model provides a supplementary laying device of communication cable for communication construction, includes bottom plate (1) and support column (4), its characterized in that: the lower surface four corners department of bottom plate (1) all is equipped with gyro wheel (101), the last fixed surface of bottom plate (1) is connected with fixed plate (2), first arc wall (201) have been seted up to the upper surface of fixed plate (2), the first chucking plate (3) of three groups of last fixed surface of fixed plate (2), the bottom fixedly connected with base (5) of support column (4), base (5) and ground fixed connection, second arc wall (401) have been seted up to the upper surface of support column (4), the upper surface joint of support column (4) has second chucking plate (6), second chucking plate (6) are fixed through the upper surface joint of chucking mechanism and support column (4).
2. The auxiliary laying device of the communication cable for communication construction according to claim 1, wherein: the upper surface of fixed plate (2) rotates seat (202), three groups with three groups of fixedly connected with the same side the one end of first chucking plate (3) rotates the joint respectively and rotates on seat (202) is rotated to three groups, three groups equal fixedly connected with mounting plate (302), three groups of the other end of first chucking plate (3) through-hole (303), three groups have all been seted up to the upper surface of mounting plate (302) fastening bolt (304), three groups have been cup jointed in the downthehole equal activity of through-hole (303) fastening bolt (304), three groups fastening bolt (304) all with the upper surface threaded connection of fixed plate (2).
3. The auxiliary laying device of the communication cable for communication construction according to claim 2, wherein: rotate and all seted up rotation groove (203) on the relative cell wall of seat (202), the equal fixedly connected with dwang (301) in both sides that first chucking board (3) carried on the back mutually is two sets of dwang (301) adaptation respectively rotates the joint at the inslot in two sets of rotation grooves (203).
4. The auxiliary laying device of the communication cable for communication construction according to claim 1, wherein: the upper surface of the base (5) is provided with two groups of through grooves (501), the grooves of the two groups of through grooves (501) are movably sleeved with a ground drilling part (502), the bottom end of the ground drilling part (502) is conical, and the bottom end of the ground drilling part (502) is tightly inserted in soil.
5. The auxiliary laying device of the communication cable for communication construction according to claim 1, wherein: two sets of spout (402) have been seted up to the upper surface of support column (4), the equal fixedly connected with slide (601) of lower surface that second chucking board (6) and two sets of spout (402) are relative, and two sets of slide (601) adaptation slip joint is in the inslot of two sets of spout (402) respectively, slide (601) are established to "T" shape, spout (402) are established to "T" shape with slide (601) looks adaptation.
6. The auxiliary laying device of the communication cable for communication construction according to claim 5, wherein: chucking mechanism includes kelly (7) and chucking spring (8), set up on the wall of the groove diapire of spout (402) recess (403), kelly (7) activity is cup jointed at the inslot of recess (403), chucking spring (8) are established in the inslot of recess (403), draw-in groove (602) have been seted up to the lower surface of slide (601), the top adaptation joint of kelly (7) is at the inslot of draw-in groove (602).
7. The auxiliary laying device of the communication cable for communication construction according to claim 6, wherein: card pole (7) are located one end fixedly connected with limiting plate (701) of recess (403) inslot, establish to circular in limiting plate (701), the diameter of limiting plate (701) is greater than recess (403) opening part groove footpath, lateral wall fixedly connected with of limiting plate (701) presses clamp plate (702), spread groove (404) have been seted up to the lateral wall of support column (4), press clamp plate (702) to pass spread groove (404) and extend, the top of chucking spring (8) offsets with the lower surface of limiting plate (701), the bottom of chucking spring (8) offsets with the tank bottom wall of recess (403).
8. The auxiliary laying device of the communication cable for communication construction according to claim 1, wherein: the multi-group rolling groove (603) is formed in the inner side walls of the second arc-shaped groove (401) and the second clamping plate (6), balls (9) are sleeved in the grooves of the rolling grooves (603) in a rolling mode, the diameter of each ball (9) is larger than the groove diameter of the opening of the corresponding rolling groove (603), and the first clamping plate (3) and the second clamping plate (6) are both arranged into arc-shaped plates.
9. The auxiliary laying device of the communication cable for communication construction according to claim 1, wherein: the utility model discloses a traction device, including bottom plate (1), lateral wall fixedly connected with fixed block (10) of bottom plate (1), one side fixedly connected with of bottom plate (1) is kept away from in fixed block (10) pulls ring (11), it has go-between (12) to cup joint in the ring of pulling ring (11), the lateral wall fixedly connected with traction lever (13) of go-between (12), two sets of holding rod (14) of lateral wall fixedly connected with of traction lever (13), two sets of holding rod (14) use the axis of holding rod (14) respectively as the lateral wall of symmetry axis fixed connection at traction lever (13).
CN202110064949.8A 2021-01-18 2021-01-18 Communication construction is with supplementary laying device of communication cable Active CN112653024B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110064949.8A CN112653024B (en) 2021-01-18 2021-01-18 Communication construction is with supplementary laying device of communication cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110064949.8A CN112653024B (en) 2021-01-18 2021-01-18 Communication construction is with supplementary laying device of communication cable

Publications (2)

Publication Number Publication Date
CN112653024A true CN112653024A (en) 2021-04-13
CN112653024B CN112653024B (en) 2022-11-25

Family

ID=75368428

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110064949.8A Active CN112653024B (en) 2021-01-18 2021-01-18 Communication construction is with supplementary laying device of communication cable

Country Status (1)

Country Link
CN (1) CN112653024B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113471882A (en) * 2021-08-12 2021-10-01 中国通信建设第一工程局有限公司 Auxiliary device is laid fast with cable in pit to communication construction
CN114594560A (en) * 2022-04-23 2022-06-07 扬州恒通通讯光缆有限公司 Optical cable construction device and construction method
CN115459158A (en) * 2022-08-30 2022-12-09 福建省邮电工程有限公司 Auxiliary device is laid fast with cable in pit to communication construction
CN118336598A (en) * 2024-06-13 2024-07-12 山东星合能源科技有限公司 Auxiliary fixture for laying communication cable

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203747355U (en) * 2014-03-03 2014-07-30 南通中铁华宇电气有限公司 Tunnel cable hook
CN107508199A (en) * 2017-08-04 2017-12-22 国网甘肃省电力公司经济技术研究院 Box support frame is connect during a kind of power cable laying construction
WO2018033122A1 (en) * 2016-08-18 2018-02-22 国网湖南省电力公司带电作业中心 Mobile wiring cable car used for construction of rural power distribution network line bypass, and application method thereof
CN207459577U (en) * 2017-11-30 2018-06-05 河北乐企软件开发有限公司 A kind of communication cable installs ancillary equipment in order
CN208078559U (en) * 2018-05-10 2018-11-09 黄小利 A kind of grid wiring auxiliary clamp
CN210806593U (en) * 2019-12-24 2020-06-19 郑州祥龙电力股份有限公司 A kind of electric power construction cable laying traction equipment
CN211151446U (en) * 2020-02-28 2020-07-31 王金星 Electric power transmission engineering erects and uses line box
CN211183157U (en) * 2020-02-26 2020-08-04 李道广 Auxiliary fixing device for communication cable
CN211908337U (en) * 2020-05-28 2020-11-10 周振国 Optical cable communication wire connector for transformer substation
CN112067027A (en) * 2020-09-16 2020-12-11 刘海萍 Water source environment monitoring device based on big data and use method thereof
CN212277797U (en) * 2020-07-08 2021-01-01 中国建筑土木建设有限公司 Cable laying draw gear
CN212342133U (en) * 2020-08-05 2021-01-12 山西农业大学信息学院 Auxiliary device for university's physics experiments of circuit conveniently arranges

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203747355U (en) * 2014-03-03 2014-07-30 南通中铁华宇电气有限公司 Tunnel cable hook
WO2018033122A1 (en) * 2016-08-18 2018-02-22 国网湖南省电力公司带电作业中心 Mobile wiring cable car used for construction of rural power distribution network line bypass, and application method thereof
CN107508199A (en) * 2017-08-04 2017-12-22 国网甘肃省电力公司经济技术研究院 Box support frame is connect during a kind of power cable laying construction
CN207459577U (en) * 2017-11-30 2018-06-05 河北乐企软件开发有限公司 A kind of communication cable installs ancillary equipment in order
CN208078559U (en) * 2018-05-10 2018-11-09 黄小利 A kind of grid wiring auxiliary clamp
CN210806593U (en) * 2019-12-24 2020-06-19 郑州祥龙电力股份有限公司 A kind of electric power construction cable laying traction equipment
CN211183157U (en) * 2020-02-26 2020-08-04 李道广 Auxiliary fixing device for communication cable
CN211151446U (en) * 2020-02-28 2020-07-31 王金星 Electric power transmission engineering erects and uses line box
CN211908337U (en) * 2020-05-28 2020-11-10 周振国 Optical cable communication wire connector for transformer substation
CN212277797U (en) * 2020-07-08 2021-01-01 中国建筑土木建设有限公司 Cable laying draw gear
CN212342133U (en) * 2020-08-05 2021-01-12 山西农业大学信息学院 Auxiliary device for university's physics experiments of circuit conveniently arranges
CN112067027A (en) * 2020-09-16 2020-12-11 刘海萍 Water source environment monitoring device based on big data and use method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113471882A (en) * 2021-08-12 2021-10-01 中国通信建设第一工程局有限公司 Auxiliary device is laid fast with cable in pit to communication construction
CN113471882B (en) * 2021-08-12 2022-08-12 中国通信建设第一工程局有限公司 Auxiliary device is laid fast with cable in pit to communication construction
CN114594560A (en) * 2022-04-23 2022-06-07 扬州恒通通讯光缆有限公司 Optical cable construction device and construction method
CN114594560B (en) * 2022-04-23 2022-12-27 扬州恒通通讯光缆有限公司 Optical cable construction device and construction method
CN115459158A (en) * 2022-08-30 2022-12-09 福建省邮电工程有限公司 Auxiliary device is laid fast with cable in pit to communication construction
CN115459158B (en) * 2022-08-30 2024-11-19 福建省邮电工程有限公司 A quick laying auxiliary device for underground cables for communication construction
CN118336598A (en) * 2024-06-13 2024-07-12 山东星合能源科技有限公司 Auxiliary fixture for laying communication cable

Also Published As

Publication number Publication date
CN112653024B (en) 2022-11-25

Similar Documents

Publication Publication Date Title
CN112653024B (en) Communication construction is with supplementary laying device of communication cable
CN111270634A (en) Variable sweeping brush assembly
CN112031649A (en) Guiding mechanism of rotary drilling rig for ultra-long piles in soft soil area
CN212054025U (en) Electric power transmission pole that steadiness is good
CN115961822A (en) Telegraph pole base with high safety and method thereof
CN216355703U (en) Electric threading device for building construction
CN216741374U (en) Prevent drilling rig for geotechnical survey of skew
CN215519856U (en) Scaffold frame of joint formula supports base
CN212044198U (en) Support arrangement is used in bearing processing
CN208396707U (en) A kind of field sampling device for geological prospecting
CN211508536U (en) Cable overhead device for communication base station
CN217462000U (en) Support frame and storage structure
CN114809781A (en) Anti-toppling device for transformer substation capital construction
CN216166010U (en) Workbench for geotechnical engineering
CN114321506A (en) Pipeline fixing device for hydraulic engineering
CN218493199U (en) Supporting structure for assembling steel structure building
CN207368600U (en) A kind of paired cable laying frame with turning function
CN207157380U (en) A kind of scooter
CN215378305U (en) Electric wire support frame for construction site
CN218725489U (en) Highway detects core machine of getting convenient to change drill bit
CN222141805U (en) Cage assembly
CN218324740U (en) Foundation pit piling equipment
CN212721440U (en) Survey and drawing sighting rod support
CN216379513U (en) Ground anchor device for geotechnical engineering
CN212803096U (en) Double-jack drill rod lifting and pulling device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20221103

Address after: No. 1, Fuxing Road, Liujiabao Street, Anning District, Lanzhou, Gansu 730000

Applicant after: Super high voltage company of State Grid Gansu Electric Power Co.

Address before: Room 2007, 601 Tianhe North Road, Tianhe District, Guangzhou, Guangdong 510630

Applicant before: Xiong Tao

GR01 Patent grant
GR01 Patent grant