CN112633894A - Method, device, equipment and computer storage medium for pressure testing of repayment capacity - Google Patents
Method, device, equipment and computer storage medium for pressure testing of repayment capacity Download PDFInfo
- Publication number
- CN112633894A CN112633894A CN202011606509.2A CN202011606509A CN112633894A CN 112633894 A CN112633894 A CN 112633894A CN 202011606509 A CN202011606509 A CN 202011606509A CN 112633894 A CN112633894 A CN 112633894A
- Authority
- CN
- China
- Prior art keywords
- formula
- calculation formula
- calculation
- target
- target calculation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q20/00—Payment architectures, schemes or protocols
- G06Q20/38—Payment protocols; Details thereof
- G06Q20/40—Authorisation, e.g. identification of payer or payee, verification of customer or shop credentials; Review and approval of payers, e.g. check credit lines or negative lists
- G06Q20/403—Solvency checks
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/08—Insurance
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Physics & Mathematics (AREA)
- Strategic Management (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computer Security & Cryptography (AREA)
- Development Economics (AREA)
- Economics (AREA)
- Marketing (AREA)
- Technology Law (AREA)
- Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
Abstract
The invention relates to the technical field of computers, and discloses a method, a device and equipment for testing pressure of repayment capacity and a computer storage medium. The method comprises the following steps: receiving a pressure test request of the repayment capacity, and acquiring a field identification set corresponding to the pressure test request; searching a target calculation formula corresponding to the field identification in the field identification set, and analyzing the target calculation formula to obtain a calculation logic parameter; determining the dependency relationship among all the calculation logic parameters in the target calculation formula according to the target calculation formula, and importing the target calculation formula, the calculation logic parameters and the dependency relationship into a preset temporary operation table; and starting a plurality of threads to call the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table to execute a test task, and obtaining a pressure test result. The invention improves the efficiency of the pressure test of the repayment capacity.
Description
Technical Field
The invention relates to the technical field of financial technology (Fintech), in particular to a method, a device, equipment and a computer storage medium for testing the pressure of repayment capacity.
Background
At present, the pressure test of the repayment capacity of an insurance company is completed through an Excel table, namely, original data related to the pressure test to be executed are firstly stored in the Excel table, and then, a formula corresponding to the pressure test is configured on the Excel table, so that a final pressure test target is realized.
In order to meet the requirements of complicated and variable pressure tests, a large number of calculation formulas usually exist in Excel, the Excel is not easy to maintain, complex association relations are built among part of formulas, huge workload is generated once formula change is involved, and therefore formula maintenance is difficult, once a certain calculation sequence is in problem, maintenance cost is high, a large amount of time is needed to adjust the calculation sequence of other formulas, time marks are arranged in each test table, expansion is inconvenient, the quoted test data are more in source, multi-layer judgment is needed during testing, and pressure testing efficiency is low.
Disclosure of Invention
The invention mainly aims to provide a method, a device, equipment and a computer storage medium for pressure test of repayment capacity, and aims to solve the technical problems that in the current pressure test of the repayment capacity, the quoted test data have more sources, multi-layer judgment is needed during the test, and the pressure test efficiency is low.
In order to achieve the above object, the present invention provides a method for pressure testing of a repayment ability, comprising the steps of:
receiving a pressure test request of the repayment capacity, and acquiring a field identification set corresponding to the pressure test request;
searching a target calculation formula corresponding to the field identification in the field identification set, and analyzing the target calculation formula to obtain a calculation logic parameter;
determining the dependency relationship among all the calculation logic parameters in the target calculation formula according to the target calculation formula, and importing the target calculation formula, the calculation logic parameters and the dependency relationship into a preset temporary operation table;
and starting a plurality of threads to call the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table to execute a test task, and obtaining a pressure test result.
Optionally, the step of searching for a target calculation formula corresponding to the field identifier in the field identifier set, and analyzing the target calculation formula to obtain the calculation logic parameter includes:
searching a target calculation formula corresponding to the field identification in the field identification set, and acquiring a formula type of the target calculation formula, wherein the formula type comprises four operation formulas and a logic operation method;
if the formula type of the target calculation formula is a four-rule operation formula, analyzing the target calculation formula according to a preset four-rule operation analysis rule to obtain a calculation logic parameter;
and if the formula type of the target calculation formula is a logical operation method, analyzing the target calculation formula according to a preset logical operation analysis rule to obtain a calculation logical parameter.
Optionally, the step of determining a dependency relationship between each of the calculation logic parameters in the target calculation formula according to the target calculation formula, and importing the target calculation formula, the calculation logic parameters, and the dependency relationship into a preset temporary operation table includes:
acquiring independent variables and dependent variables of the target calculation formula, and establishing a mapping relation between the calculation logic parameters and the independent variables and/or the dependent variables;
determining the dependency relationship among the calculation logic parameters according to the mapping relationship and the formula operation sequence of the target calculation formula, associating the target calculation formula, the calculation logic parameters and the dependency relationship, and then importing the association into a preset temporary operation table.
Optionally, the step of enabling the multiple threads to call the target calculation formula, the calculation logic parameters, and the dependency relationship in the preset temporary operation table to execute a test task to obtain a stress test result includes:
starting a plurality of threads to call the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table to execute a test task, and obtaining a formula calculation result of the target calculation formula;
counting the task execution time of the test task, comparing the formula calculation result with a preset standard result, and comparing the task execution time with a preset standard time;
when the formula calculation result is matched with the preset standard result and the task execution time length is shorter than the preset standard time length, outputting the pressure test result of the repayment capacity as normal;
and when the formula calculation result is not matched with the preset standard result or the task execution time length is greater than or equal to the preset standard time length, outputting the pressure test result of the repayment capacity as an abnormal result.
Optionally, after the step of enabling the multiple threads to call the target calculation formula, the calculation logic parameters, and the dependency relationship in the preset temporary operation table to execute a test task and obtain a stress test result, the method includes:
when the pressure test result of the repayment capacity is normal, acquiring a formula calculation result related to the pressure test result, and judging whether a data label corresponding to the formula calculation result exists in a preset original data table or not;
and if the data label corresponding to the formula calculation result exists in the preset original data table, inputting the formula calculation result into the preset original data table according to the data label.
Optionally, after the step of enabling the multiple threads to call the target calculation formula, the calculation logic parameters, and the dependency relationship in the preset temporary operation table to execute a test task and obtain a stress test result, the method includes:
when the pressure test result of the repayment capacity is abnormal, acquiring an abnormal field identifier associated with the pressure test result;
searching a target calculation formula corresponding to the abnormal field identification from a preset field information table, analyzing the target calculation formula corresponding to the abnormal field identification, and obtaining an updated calculation formula;
and replacing the abnormal calculation formula in the preset temporary calculation table with the updated calculation formula, and triggering a pressure test request of the repayment capacity to perform a secondary pressure test.
Optionally, after the step of determining a dependency relationship between each of the calculation logic parameters in the target calculation formula according to the target calculation formula and importing the target calculation formula, the calculation logic parameters, and the dependency relationship into a preset temporary operation table, the method further includes:
judging whether the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table are complete or not;
if the target calculation formula, the calculation logic parameter and the dependency relationship in the preset temporary operation table are complete, judging whether the target calculation formula, the calculation logic parameter and the dependency relationship in the preset temporary operation table conflict;
and if the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table have no conflict, executing a step of starting a plurality of threads to call the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table to execute a test task to obtain a pressure test result.
In addition, in order to achieve the above object, the present invention also provides a repayment ability pressure test apparatus including:
the request receiving module is used for receiving a pressure test request of the repayment capacity and acquiring a field identification set corresponding to the pressure test request;
the search analysis module is used for searching a target calculation formula corresponding to the field identification in the field identification set and analyzing the target calculation formula to obtain a calculation logic parameter;
the data import module is used for determining the dependency relationship among all the calculation logic parameters in the target calculation formula according to the target calculation formula and importing the target calculation formula, the calculation logic parameters and the dependency relationship into a preset temporary operation table;
and the pressure testing module is used for starting a plurality of threads to call the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table to execute a testing task to obtain a pressure testing result.
Further, to achieve the above object, the present invention also provides a repayment ability pressure test apparatus including: the computer program is used for realizing the steps of the repayment capability pressure test method when the computer program is executed by the processor.
Further, in order to achieve the above object, the present invention also provides a computer storage medium having stored thereon a computer program corresponding to a pressure test of a repayment ability, which when executed by a processor, implements the steps of the method for pressure testing of a repayment ability as described above.
The invention provides a method, a device, equipment and a computer storage medium for testing pressure of repayment capacity, wherein in the embodiment of the invention, a pressure test request of the repayment capacity is received, and a field identification set corresponding to the pressure test request is obtained; searching a target calculation formula corresponding to the field identification in the field identification set, and analyzing the target calculation formula to obtain a calculation logic parameter; determining the dependency relationship among all the calculation logic parameters in the target calculation formula according to the target calculation formula, and importing the target calculation formula, the calculation logic parameters and the dependency relationship into a preset temporary operation table; and starting a plurality of threads to call the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table to execute a test task, and obtaining a pressure test result. In the embodiment, the field identification corresponding to the pressure test request is determined, then the target calculation formula corresponding to the field identification is obtained, the calculation logic parameters and the dependency relationship corresponding to the target calculation formula are determined and are led into the preset temporary operation table, and the information in the preset temporary operation table is called through a plurality of threads to perform the pressure test, so that data query and acquisition from different data sources are not needed, and the efficiency of the pressure test is improved; in addition, the test problem can be quickly positioned by analyzing the preset temporary operation table in the test process.
Drawings
FIG. 1 is a schematic diagram of an apparatus architecture of a hardware operating environment according to an embodiment of the present invention;
FIG. 2 is a schematic flow chart illustrating a first embodiment of the repayment ability pressure testing method according to the present invention;
FIG. 3 is a diagram illustrating a detailed scenario of a first embodiment of a repayment ability pressure testing method according to the present invention;
FIG. 4 is a functional block diagram of an embodiment of a repayment capacity pressure testing apparatus according to the present invention.
The implementation, functional features and advantages of the objects of the present invention will be further explained with reference to the accompanying drawings.
Detailed Description
It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
As shown in fig. 1, fig. 1 is a schematic device structure diagram of a hardware operating environment according to an embodiment of the present invention.
The pressure testing device for the repayment ability of the embodiment of the present invention may be a server device, as shown in fig. 1, and the pressure testing device for the repayment ability may include: a processor 1001, such as a CPU, a network interface 1004, a user interface 1003, a memory 1005, a communication bus 1002. Wherein a communication bus 1002 is used to enable connective communication between these components. The user interface 1003 may include a Display screen (Display), an input unit such as a Keyboard (Keyboard), and the optional user interface 1003 may also include a standard wired interface, a wireless interface. The network interface 1004 may optionally include a standard wired interface, a wireless interface (e.g., WI-FI interface). The memory 1005 may be a high-speed RAM memory or a non-volatile memory (e.g., a magnetic disk memory). The memory 1005 may alternatively be a storage device separate from the processor 1001.
Those skilled in the art will appreciate that the configuration of the apparatus shown in fig. 1 is not intended to be limiting of the apparatus and may include more or fewer components than those shown, or some components may be combined, or a different arrangement of components.
As shown in fig. 1, a computer program corresponding to a stress test for operating a network communication module, a user interface module, and a repayment ability may be included in a memory 1005, which is a kind of computer storage medium.
In the device shown in fig. 1, the network interface 1004 is mainly used for connecting to a backend server and performing data communication with the backend server; the user interface 1003 is mainly used for connecting a client (user side) and performing data communication with the client; and the processor 1001 may be configured to call a computer program corresponding to the repayment ability stress test stored in the memory 1005 and perform the operations in the repayment ability stress test method described below.
Based on the hardware structure, the embodiment of the pressure test method for the repayment capacity is provided.
Referring to fig. 2, fig. 2 is a schematic flow chart of a first embodiment of a method for stress testing of a repayment ability according to the present invention, in which the method for stress testing of the repayment ability includes:
step S10, receiving a stress test request of the reimbursement capability, and acquiring a field identifier set corresponding to the stress test request.
The pressure test method of the repayment capacity in the embodiment is applied to the pressure test equipment of the repayment capacity in financial institutions (banking institutions, insurance institutions, security institutions and the like) in the financial industry.
The pressure test equipment for the repayment capacity of the embodiment of the invention can access database systems such as Oracle, SQL Server, Mysql and the like, the pressure test equipment for the repayment capacity receives the pressure test request for the repayment capacity, and the triggering mode of the pressure test request for the repayment capacity is not particularly limited, namely, the pressure test request for the repayment capacity can be actively triggered by a user, for example, the user clicks a 'pressure test' key on a display page of the pressure test equipment for the repayment capacity to actively trigger the pressure test request for the repayment capacity; furthermore, the reimbursement capability stress test request may also be triggered automatically, for example, the reimbursement capability stress test device may be preset to automatically trigger the reimbursement capability stress test request upon receipt of a change in funds.
The method comprises the steps that when a pressure test device receives a pressure test request of the repayment capacity, a request parameter of the pressure test request of the repayment capacity is read, field identification information is carried in the request parameter, a field identification contained in the request parameter is obtained according to a defined field identification rule, a set of one or more field identification combinations obtained by the pressure test device of the repayment capacity from database systems of Oracle, SQL Server, Mysql and the like is a field identification set corresponding to the pressure test request of the repayment capacity, wherein the field identification carried in the request parameter of each pressure test request of the repayment capacity is pre-established by a user according to actual calculation requirements, and the request parameter of each pressure test request of the repayment capacity can carry one field identification or a plurality of field identifications without limitation.
Before acquiring the field identifier corresponding to the pressure test request of the repayment capacity according to the defined field identifier rule, the pressure test device of the repayment capacity needs to define the field identifier rule, and when the field identifier rule is defined, specifically, the field serial number and the parent class of the field can be respectively defined, and an association mode between the field serial number and the field parent class is established, so that the defined field identifier can establish a corresponding relationship with the target field.
Step S20, searching a target calculation formula corresponding to the field identification in the field identification set, and analyzing the target calculation formula to obtain the calculation logic parameter.
The field information table is pre-established in the pressure testing equipment for repayment capacity, and the field information table contains a calculation formula corresponding to each field identifier and a calculation logic parameter corresponding to the calculation formula, where the calculation logic parameter refers to a parameter of a target calculation formula, for example, the target calculation formula is y ═ ax + b, the calculation logic parameter includes a first order coefficient a, a value corresponding to an independent variable x, a value corresponding to a dependent variable y, and a value corresponding to a constant term b, the calculation logic parameter may be one or multiple, the logic parameter at least includes a calculation priority of the target calculation formula, and of course, the logic parameter may include information other than the calculation priority, and the like.
It can be understood that the data in the field information table is fixed, the data volume is large, the data are not fixed in dependency relationship, and if the target calculation formula is in problem, the problem cannot be quickly traced and found; and when the calculation logic parameters in the field information table change, the calculation result of the target calculation formula cannot be updated synchronously, in addition, the calculation logic parameters related to the target calculation formula may be stored in different field information tables, if the calculation logic parameters are directly obtained from different field information tables during the direct recalculation, the calculation parameters are obtained for calculation, and the calculation efficiency is low. The problem is improved in the embodiment of the application, so that the computing efficiency and the traceability are improved.
When searching a calculation method corresponding to a field identifier from an established field information table, specifically, splitting the field identifier according to a defined incidence relation between the field parent class and the field sequence number to obtain the field parent class identifier and the field sequence number, searching a set matched with the field parent class identifier from the field information table, positioning an item matched with the field sequence number in the searched set containing the field parent class identifier according to the field sequence number to obtain a calculation formula corresponding to the item and a calculation priority, such as a priority, of the calculation formula, wherein the calculation formula is a target calculation formula, the priority of the calculation formula is a calculation logic parameter of the target calculation formula, that is, the corresponding calculation formula is determined according to each field identifier, and one field can correspond to one calculation formula or multiple calculation formulas, if a plurality of calculation formulas are corresponded, there is a relationship between these calculation formulas, and the pressure testing device determines the priority according to the field corresponding to the calculation formula, for example, in this embodiment, it is described by taking the example of calculating the benefit of the financial product, the formula of calculating the benefit of the financial product is y ═ ax1, a is the principal quantity, x1 represents the interest rate, x1 is not a fixed value, the calculation formula corresponding to x1 is x1 ═ k ═ b, k is a time factor, and b is a constant, so that it can be determined that x1 ═ k ═ b has a higher priority than y ═ ax 1.
Specifically, this embodiment provides a specific implementation manner for searching for a target calculation formula corresponding to a field identifier in the field identifier set, and analyzing the target calculation formula to obtain a calculation logic parameter, including:
a1, searching a target calculation formula corresponding to the field identifier in the field identifier set, and obtaining a formula type of the target calculation formula, wherein the formula type comprises a four-fundamental operation formula and a logical operation method;
a2, if the formula type of the target calculation formula is a four-fundamental operation formula, analyzing the target calculation formula according to a preset four-fundamental operation analysis rule to obtain a calculation logic parameter;
step a3, if the formula type of the target calculation formula is a logical operation method, analyzing the target calculation formula according to a preset logical operation analysis rule to obtain a calculation logical parameter.
The pressure test equipment searches for a target calculation formula corresponding to the field identifier in the field identifier set, and obtains a formula type of the target calculation formula, wherein the formula type comprises four operation formulas and a logic operation method; if the formula type of the target calculation formula is a four-fundamental operation formula, the pressure test equipment analyzes the target calculation formula according to a preset four-fundamental operation analysis rule (the four-fundamental operation analysis rule refers to an analysis rule corresponding to an operation sequence, for example, a number before reduction is a reduced number, and a number before reduction is a reduced number), and a calculation logic parameter is obtained; the calculation logic parameters refer to parameters of a target calculation formula, for example, the target calculation formula is y ═ ax + b, and the calculation logic parameters include a first-order term coefficient a, an independent variable x, a dependent variable y and a constant term b; IF the formula type of the target calculation formula is a logical operation method, the target calculation formula is analyzed according to a preset logical operation analysis rule (the logical operation analysis rule refers to a preset logical analysis rule, for example, IF is a condition judgment), so as to obtain a calculation logical parameter, and the pressure test equipment can determine each parameter in the formula according to the operation rule in the formula.
Step S30, determining a dependency relationship between the calculation logic parameters in the target calculation formula according to the target calculation formula, and importing the target calculation formula, the calculation logic parameters, and the dependency relationship into a preset temporary operation table.
The pressure test equipment analyzes the target calculation formula, obtains calculation logic parameters contained in the target calculation formula and divides the calculation logic parameters into independent variables and dependent variables, determines the dependency relationship among the calculation logic parameters according to the independent variables and the dependent variables, and imports the target calculation formula, the calculation logic parameters and the dependency relationship into a data temporary table; specifically, the method comprises the following steps:
b1, acquiring independent variables and dependent variables of the target calculation formula, and establishing a mapping relation between the calculation logic parameters and the independent variables and/or the dependent variables; the calculation logic parameters refer to parameters of a target calculation formula, and the pressure test equipment determines whether each calculation logic parameter is an independent variable or a dependent variable;
step b2, determining the dependency relationship between the calculation logic parameters according to the mapping relationship and the formula operation sequence of the target calculation formula, associating the target calculation formula, the calculation logic parameters and the dependency relationship, and then importing the associated calculation formula, calculation logic parameters and the dependency relationship into a preset temporary operation table, which is described by taking a formula as an example, where the dependency relationship between the calculation logic parameters may be y ═ ax, and then x depends on y.
That is, the pressure test equipment acquires the independent variable and the dependent variable of the target calculation formula, establishes the mapping relation between the calculation logic parameter and the independent variable and/or the dependent variable, determines the dependency relation between the calculation logic parameter according to the mapping relation and the formula operation sequence of the target calculation formula, and imports the target calculation formula, the calculation logic parameter and the dependency relation into a preset temporary operation table after the pressure test equipment associates the target calculation formula, the calculation logic parameter and the dependency relation, referring to fig. 3, 1, imports the dependent data into the temporary table, identifies the data as Y (representing that the data needs to be imported back to the formal table), and generates a unique calculation ID, wherein the dependent data refers to the calculation logic parameter guaranteed in the own database, namely the independent variable, the terminal imports the dependent data into the temporary table, marks the data as Y, and simultaneously generates the unique calculation ID of the data, and the unique calculation ID refers to the calculation batch of the pressure test, for example, the unique calculation ID is 0001, which refers to the data of the first annotation pressure calculation; the unique calculation ID is 0002, which refers to the data of the second annotation pressure calculation. 2. Copying data from other data sources into a temporary table, identifying the data as N (representing that the data does not need to be led back to a formal table), and updating a calculation ID column into a unique calculation ID; the terminal imports the data of other sources into a temporary table, marks the data as N, and generates a unique calculation ID of the data, wherein the unique calculation ID refers to a calculation batch of the pressure test. 3. Copying a formula to be calculated, and updating a calculation ID column into a unique calculation ID; and copying a formula needing to be calculated by the terminal, and updating the unique calculation ID, wherein the unique calculation ID refers to the calculation batch of the pressure test. 4. Updating the time column and the time identifier cur of the data time to be the current year, updating the data time in the temporary table by the terminal, acquiring the calculation dependent data corresponding to the time identifier when the terminal performs testing, starting a plurality of thread data by the terminal, and acquiring and calculating the data according to the updated data in the temporary table.
It can be understood that: the independent variable is a data dimension, and the logic parameter is calculated to be a specific numerical value; for example, the target calculation formula is: y-ax-b. Wherein, a represents the number of repayment months, x represents the monthly supply amount, b represents the loan principal, and y represents the total interest; the number of repayment months, monthly quota, loan principal are independent variables; total interest is a dependent variable; the calculation logic parameters are 12 months, 4000 yuan is provided for each month, 50 million loan principal funds are provided, the pressure test equipment associates different target calculation formulas, calculation logic parameters and dependency relations and then introduces the associated calculation formulas, the calculation logic parameters and the dependency relations into a preset temporary operation table for data logic operation, the data processing efficiency can be improved, and overtime caused by data acquisition delay in the pressure test process is avoided.
Step S40, a plurality of threads are started to call the target calculation formula, the calculation logic parameters, and the dependency relationship in the preset temporary operation table to execute a test task, so as to obtain a pressure test result.
The pressure testing equipment starts a plurality of threads, each thread in the plurality of threads corresponds to a target calculation formula, each thread acquires calculation logic parameters according to operation rules in the target calculation formula, after the calculation logic parameters are acquired, the pressure testing equipment calculates the calculation logic parameters according to the dependency relationship to acquire calculation results, the calculation results can be used as pressure testing results, the pressure testing equipment extracts the calculation logic parameters with the dependency relationship and calculates the calculation logic parameters with the dependency relationship according to the target calculation formula, namely, the terminal acquires calculation logic data required by calculation according to the unique calculation ID in the data temporary table, and the terminal calculates according to the target calculation formula, the calculation logic parameters and the dependency relationship in the data temporary table to acquire the pressure testing results of the repayment capacity.
Referring to fig. 3, formula calculation with dependency relationship containing only Y or only (Y and comma), in this example, the formula of B is taken for the first time, and when B calculation is completed, data identified by 201903_ B in the dependency relationship field in C, D, E is updated to be Y; c is obtained for the second time, and after C is calculated, data identified by 201903_ C in the dependency relationship field in D, E are updated; when the calculation formula is taken next time, D and E can be calculated simultaneously; and obtaining a calculation result and calculation time until the calculation is completed. In addition, after the calculation is finished, the terminal returns the data in the temporary table to the original data table according to the data identifier, namely the data with the data identifier of Y is fed back to the original data table, and the data with the data identifier of N is not stored.
In the embodiment, the field identification corresponding to the pressure test request is determined, then the target calculation formula corresponding to the field identification is obtained, the calculation logic parameters and the dependency relationship corresponding to the target calculation formula are determined and are led into the preset temporary operation table, and the information in the preset temporary operation table is called through a plurality of threads to perform the pressure test, so that data query and acquisition from different data sources are not needed, and the efficiency of the pressure test is improved; in addition, the test problem can be quickly positioned by analyzing the preset temporary operation table in the test process.
Further, based on the first embodiment of the repayment ability pressure test method of the present invention, a second embodiment of the repayment ability pressure test method of the present invention is proposed.
This embodiment is a refinement of step S40 in the first embodiment, and is different from the above embodiments in that:
starting a plurality of threads to call the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table to execute a test task, and obtaining a formula calculation result of the target calculation formula;
counting the task execution time of the test task, comparing the formula calculation result with a preset standard result, and comparing the task execution time with a preset standard time;
when the formula calculation result is matched with the preset standard result and the task execution time length is shorter than the preset standard time length, outputting the pressure test result of the repayment capacity as normal;
and when the formula calculation result is not matched with the preset standard result or the task execution time length is greater than or equal to the preset standard time length, outputting the pressure test result of the repayment capacity as an abnormal result.
The pressure test equipment starts a plurality of threads to call the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table to execute a test task, and a formula calculation result of the target calculation formula is obtained; the pressure testing equipment counts the task execution time of the testing task, compares the formula calculation result with a preset standard result (the preset standard result is a preset correct result), and compares the task execution time with a preset standard time (the preset standard time is preset running time meeting the user requirement); when the formula calculation result of the pressure test equipment is matched with the preset standard result and the task execution time length is shorter than the preset standard time length, outputting the pressure test result of the repayment capacity as normal; and when the formula calculation result is not matched with the preset standard result or the task execution time length is greater than or equal to the preset standard time length, outputting the pressure test result of the repayment capacity as an abnormal result.
In the embodiment, the running result obtained in the test process is compared with the task execution time length by setting the preset standard result and the preset standard time length, so that the test result is accurately determined.
Further, based on the above-described embodiment of the repayment ability pressure test method of the present invention, a third embodiment of the repayment ability pressure test method of the present invention is proposed.
This embodiment is a step subsequent to step S40 in the third embodiment, and differs from the above-described embodiments in that:
when the pressure test result of the repayment capacity is normal, acquiring a formula calculation result related to the pressure test result, and judging whether a data label corresponding to the formula calculation result exists in a preset original data table or not;
and if the data label corresponding to the formula calculation result exists in the preset original data table, inputting the formula calculation result into the preset original data table according to the data label.
When the pressure test equipment is used for testing the pressure of the repayment capacity normally, the pressure test equipment obtains a formula calculation result associated with the pressure test result, wherein the formula calculation result refers to a formula calculation result, each calculation result in the embodiment has a storage position, a data tag is added to a position corresponding to the calculation result needing to be returned in advance in the pressure test equipment, information in the data tag is not specifically limited, the pressure test equipment judges whether a preset original data table (the original data table refers to a preset data table for storing a final calculation result of a target calculation formula, the original data table records the data tag, and when the pressure test equipment obtains a plurality of formula calculation results, not all the formula calculation results need to be stored in the original data table, and only the formula calculation result with the data tag in the original data table needs to be stored in the original data table) or not A label; in this embodiment, a calculation logic parameter is extracted from the original data table, and then calculation is performed, where the calculation includes multiple steps, a formula calculation intermediate value may be obtained (a data tag corresponding to the calculation intermediate value does not exist in the original data table), and then the formula calculation intermediate value is processed to obtain a final formula calculation result, and if a pressure test result is normal, it indicates that a final formula calculation result obtained by the target calculation formula is correct, and at this time, the final formula calculation result needs to be added to the original data table according to the data tag.
Namely, adding a data tag to a formula calculation result in the pressure test equipment, and if the data tag corresponding to the formula calculation result exists in a preset original data table, inputting the formula calculation result into the preset original data table according to the data tag; and if the data label corresponding to the formula calculation result does not exist in the preset original data table, deleting the formula calculation result according to the data label so as to perform secondary test.
In this embodiment, the formula calculation result associated with the pressure test result is input into the preset original data table in the test, so that the original data table can be updated, and the new formula calculation result is conveniently used as a calculation logic parameter. That is, in the formula calculation result obtained by calculation in this embodiment, the pressure test result may be replaced by selecting the initial data corresponding to the data tag according to the type of the formula calculation result, or may be added to the original data tag, and in addition, the updated calculation logic parameter may be used as a technical logic parameter of another technical formula.
Further, based on the above-described embodiment of the repayment ability pressure test method of the present invention, a fourth embodiment of the repayment ability pressure test method of the present invention is proposed.
This embodiment is a step subsequent to step S40 in the fourth embodiment, and differs from the above-described embodiments in that:
when the pressure test result of the repayment capacity is abnormal, acquiring an abnormal field identifier associated with the pressure test result;
searching a target calculation formula corresponding to the abnormal field identification from a preset field information table, analyzing the target calculation formula corresponding to the abnormal field identification, and obtaining an updated calculation formula;
and replacing the abnormal calculation formula in the preset temporary calculation table with the updated calculation formula, and triggering a pressure test request of the repayment capacity to perform a secondary pressure test.
When the pressure test result of the repayment capacity is abnormal, the pressure test equipment acquires an abnormal field identifier associated with the pressure test result; the abnormal pressure test result can be a calculation result error or calculation time overtime, when the test result of the pressure test equipment is abnormal, the pressure test equipment queries a preset mapping table of the pressure test result and an abnormal field identifier, the pressure test equipment finally determines the reason of the abnormal pressure test result, then the pressure test equipment searches a target calculation formula corresponding to the abnormal field identifier from a preset field information table, analyzes the target calculation formula corresponding to the abnormal field identifier, and obtains an updated calculation formula; and the pressure test equipment replaces the abnormal calculation formula in the preset temporary calculation table with the updated calculation formula and triggers a pressure test request of repayment capacity so as to carry out secondary pressure test.
In the embodiment, the target calculation formula corresponding to the abnormal field identifier can be quickly searched, and the updated calculation formula is obtained by updating the target calculation formula corresponding to the abnormal field identifier; the pressure test equipment replaces the abnormal calculation formula in the preset temporary calculation table with the updated calculation formula and triggers a pressure test request of the repayment capacity to carry out secondary pressure test, thereby facilitating abnormal positioning and secondary query.
Further, based on the above-described embodiment of the repayment ability pressure test method of the present invention, a fifth embodiment of the repayment ability pressure test method of the present invention is proposed.
This embodiment is a step subsequent to step S30 in the fifth embodiment, and differs from the above-described embodiments in that:
judging whether the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table are complete or not;
if the target calculation formula, the calculation logic parameter and the dependency relationship in the preset temporary operation table are complete, judging whether the target calculation formula, the calculation logic parameter and the dependency relationship in the preset temporary operation table conflict;
and if the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table have no conflict, executing a step of starting a plurality of threads to call the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table to execute a test task to obtain a pressure test result.
The pressure test equipment judges whether the target calculation formula, the calculation logic parameters and the dependency relationship in the temporary operation table are complete or not; that is, the pressure test device determines whether the placeholders corresponding to the target calculation formula, the calculation logic parameter and the dependency in the temporary operation table contain information, if so, determines that the target calculation formula, the calculation logic parameter and the dependency in the temporary operation table are complete, otherwise, if the target calculation formula, the calculation logic parameter and the dependency in the temporary operation table are complete, determines whether conflicts exist among the target calculation formula, the calculation logic parameter and the dependency in the temporary operation table; that is, the conflict between the target calculation formula, the calculation logic parameters, and the dependency relationship means that the dependency relationship between the calculation logic parameters in the target calculation formula is incorrect, for example, the target calculation formula is y ═ x1+ x2-3, y ═ x2, y is a dependent variable according to formula one, and x2 is an independent variable, but y is an assigned relationship with x2 according to formula two, and is not a relationship between the independent variable and the dependent variable; and if the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table do not have a conflict, and the conflict does not exist in the target calculation formula, the calculation logic parameters and the dependency relationship, namely the dependency relationship among the calculation logic parameters in the target calculation formula is correct, the pressure test equipment executes the step of enabling a plurality of threads to call the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table to execute a test task to obtain a pressure test result.
In this embodiment, after the preset temporary operation table is imported, the data integrity of the preset temporary operation table is detected and whether a conflict exists is detected, so that a problem in the test process can be avoided.
Referring to fig. 4, the present invention also provides a repayment ability pressure test apparatus, including:
a request receiving module 10, configured to receive a pressure test request for reimbursement capability, and obtain a field identifier set corresponding to the pressure test request;
the search and analysis module 20 is configured to search a target calculation formula corresponding to the field identifier in the field identifier set, and analyze the target calculation formula to obtain a calculation logic parameter;
the data importing module 30 is configured to determine a dependency relationship between each of the calculation logic parameters in the target calculation formula according to the target calculation formula, and import the target calculation formula, the calculation logic parameters, and the dependency relationship into a preset temporary operation table;
and the pressure testing module 40 is configured to enable multiple threads to call the target calculation formula, the calculation logic parameters, and the dependency relationship in the preset temporary operation table to execute a testing task, so as to obtain a pressure testing result.
In an embodiment, the lookup parsing module 20 includes:
the search acquisition unit is used for searching a target calculation formula corresponding to the field identifier in the field identifier set and acquiring a formula type of the target calculation formula, wherein the formula type comprises four arithmetic operation formulas and a logical operation method;
the first analysis unit is used for analyzing the target calculation formula according to a preset four-rule operation analysis rule to obtain a calculation logic parameter if the formula type of the target calculation formula is a four-rule operation formula;
and the second analysis unit is used for analyzing the target calculation formula according to a preset logic operation analysis rule to obtain a calculation logic parameter if the formula type of the target calculation formula is a logic operation method.
In an embodiment, the data import module 30 includes:
the obtaining and determining unit is used for obtaining independent variables and dependent variables of the target calculation formula and establishing the mapping relation between the calculation logic parameters and the independent variables and/or the dependent variables;
and the association leading-in unit is used for determining the dependency relationship among the calculation logic parameters according to the mapping relationship and the formula operation sequence of the target calculation formula, and leading the target calculation formula, the calculation logic parameters and the dependency relationship into a preset temporary operation table after associating.
In one embodiment, the pressure testing module 40 includes:
the starting and calling unit is used for starting a plurality of threads to call the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table to execute a test task, and a formula calculation result of the target calculation formula is obtained;
the statistical comparison unit is used for counting the task execution time of the test task, comparing the formula calculation result with a preset standard result, and comparing the task execution time with a preset standard time;
the first judgment unit is used for outputting the pressure test result of the repayment capacity to be normal when the formula calculation result is matched with the preset standard result and the task execution time length is shorter than the preset standard time length;
and the second judgment unit is used for outputting the pressure test result of the repayment capacity as an abnormal condition when the formula calculation result is not matched with the preset standard result or the task execution time length is greater than or equal to the preset standard time length.
In one embodiment, the repayment ability pressure testing device includes:
the obtaining and judging module is used for obtaining a formula calculation result related to the pressure test result when the pressure test result of the repayment capacity is normal, and judging whether a data label corresponding to the formula calculation result exists in a preset original data table or not;
and the result import module is used for inputting the formula calculation result into the preset original data table according to the data label if the data label corresponding to the formula calculation result exists in the preset original data table.
In one embodiment, the repayment ability pressure testing device includes:
the identification acquisition module is used for acquiring an abnormal field identification associated with the pressure test result when the pressure test result of the repayment capacity is abnormal;
the analysis acquisition module is used for searching a target calculation formula corresponding to the abnormal field identifier from a preset field information table, analyzing the target calculation formula corresponding to the abnormal field identifier and acquiring an updated calculation formula;
and the formula replacing module is used for replacing the abnormal calculation formula in the preset temporary calculation table with the updated calculation formula and triggering a pressure test request of the repayment capacity so as to carry out secondary pressure test.
In one embodiment, the repayment ability pressure testing device includes:
the first judgment module is used for judging whether the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table are complete or not;
the second judgment module is used for judging whether the target calculation formula, the calculation logic parameter and the dependency relationship in the preset temporary operation table have conflict or not if the target calculation formula, the calculation logic parameter and the dependency relationship in the preset temporary operation table are complete;
if the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table do not conflict, the pressure test module is used for executing the step of starting a plurality of threads to call the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table to execute a test task and obtain a pressure test result.
The method implemented when the pressure testing device for the repayment ability is executed may refer to each embodiment of the pressure testing method for the repayment ability of the present invention, and will not be described herein again.
In the embodiment, the field identification corresponding to the pressure test request is determined, then the target calculation formula corresponding to the field identification is obtained, the calculation logic parameters and the dependency relationship corresponding to the target calculation formula are determined and are led into the preset temporary operation table, and the information in the preset temporary operation table is called through a plurality of threads to perform the pressure test, so that data query and acquisition from different data sources are not needed, and the efficiency of the pressure test is improved; in addition, the test problem can be quickly positioned by analyzing the preset temporary operation table in the test process.
The invention also provides a computer storage medium.
The computer storage medium of the invention has stored thereon a computer program corresponding to a stress test of a repayment ability, which, when being executed by a processor, carries out the steps of the method for stress testing of a repayment ability as described above.
The method implemented when the computer program corresponding to the pressure test of the repayment capacity run on the processor is executed may refer to each embodiment of the pressure test method of the repayment capacity of the present invention, and will not be described herein again.
It should be noted that, in this document, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or system that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or system. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other like elements in a process, method, article, or system that comprises the element.
The above-mentioned serial numbers of the embodiments of the present invention are merely for description and do not represent the merits of the embodiments.
Through the above description of the embodiments, those skilled in the art will clearly understand that the method of the above embodiments can be implemented by software plus a necessary general hardware platform, and certainly can also be implemented by hardware, but in many cases, the former is a better implementation manner. Based on such understanding, the technical solution of the present invention may be embodied in the form of a software product, which is stored in a storage medium (such as ROM/RAM, magnetic disk, optical disk) as described above, and includes instructions for enabling a repayment capability stress testing apparatus (which may be a mobile phone, a computer, a server, an air conditioner, or a network device) to execute the method according to the embodiments of the present invention.
The above description is only a preferred embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes, which are made by using the contents of the present specification and the accompanying drawings, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.
Claims (10)
1. A repayment ability stress test method, characterized by comprising the steps of:
receiving a pressure test request of the repayment capacity, and acquiring a field identification set corresponding to the pressure test request;
searching a target calculation formula corresponding to the field identification in the field identification set, and analyzing the target calculation formula to obtain a calculation logic parameter;
determining the dependency relationship among all the calculation logic parameters in the target calculation formula according to the target calculation formula, and importing the target calculation formula, the calculation logic parameters and the dependency relationship into a preset temporary operation table;
and starting a plurality of threads to call the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table to execute a test task, and obtaining a pressure test result.
2. The repayment capacity pressure test method of claim 1, wherein the step of finding a target calculation formula corresponding to the field identifications in the set of field identifications, parsing the target calculation formula to obtain calculation logic parameters comprises:
searching a target calculation formula corresponding to the field identification in the field identification set, and acquiring a formula type of the target calculation formula, wherein the formula type comprises four operation formulas and a logic operation method;
if the formula type of the target calculation formula is a four-rule operation formula, analyzing the target calculation formula according to a preset four-rule operation analysis rule to obtain a calculation logic parameter;
and if the formula type of the target calculation formula is a logical operation method, analyzing the target calculation formula according to a preset logical operation analysis rule to obtain a calculation logical parameter.
3. The repayment capacity pressure test method as claimed in claim 1, wherein the step of determining the dependency relationship between each of the calculation logic parameters in the target calculation formula based on the target calculation formula, and importing the target calculation formula, the calculation logic parameters and the dependency relationship into a preset temporary operation table comprises:
acquiring independent variables and dependent variables of the target calculation formula, and establishing a mapping relation between the calculation logic parameters and the independent variables and/or the dependent variables;
determining the dependency relationship among the calculation logic parameters according to the mapping relationship and the formula operation sequence of the target calculation formula, associating the target calculation formula, the calculation logic parameters and the dependency relationship, and then importing the association into a preset temporary operation table.
4. The repayment capacity pressure test method of claim 1, wherein the step of enabling a plurality of threads to call the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table to execute a test task to obtain a pressure test result comprises:
starting a plurality of threads to call the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table to execute a test task, and obtaining a formula calculation result of the target calculation formula;
counting the task execution time of the test task, comparing the formula calculation result with a preset standard result, and comparing the task execution time with a preset standard time;
when the formula calculation result is matched with the preset standard result and the task execution time length is shorter than the preset standard time length, outputting the pressure test result of the repayment capacity as normal;
and when the formula calculation result is not matched with the preset standard result or the task execution time length is greater than or equal to the preset standard time length, outputting the pressure test result of the repayment capacity as an abnormal result.
5. The repayment capacity stress testing method of claim 1, wherein the step of enabling a plurality of threads to call the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table to execute a test task to obtain a stress test result is followed by the method comprising:
when the pressure test result of the repayment capacity is normal, acquiring a formula calculation result related to the pressure test result, and judging whether a data label corresponding to the formula calculation result exists in a preset original data table or not;
and if the data label corresponding to the formula calculation result exists in the preset original data table, inputting the formula calculation result into the preset original data table according to the data label.
6. The repayment capacity stress testing method of claim 1, wherein the step of enabling a plurality of threads to call the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table to execute a test task to obtain a stress test result is followed by the method comprising:
when the pressure test result of the repayment capacity is abnormal, acquiring an abnormal field identifier associated with the pressure test result;
searching a target calculation formula corresponding to the abnormal field identification from a preset field information table, analyzing the target calculation formula corresponding to the abnormal field identification, and obtaining an updated calculation formula;
and replacing the abnormal calculation formula in the preset temporary calculation table with the updated calculation formula, and triggering a pressure test request of the repayment capacity to perform a secondary pressure test.
7. The repayment ability pressure test method according to any one of claims 1 to 6, wherein the method further comprises, after the step of determining the dependency relationship between each of the calculation logic parameters in the target calculation formula based on the target calculation formula and importing the target calculation formula, the calculation logic parameters and the dependency relationship into a preset temporary operation table:
judging whether the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table are complete or not;
if the target calculation formula, the calculation logic parameter and the dependency relationship in the preset temporary operation table are complete, judging whether the target calculation formula, the calculation logic parameter and the dependency relationship in the preset temporary operation table conflict;
and if the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table have no conflict, executing a step of starting a plurality of threads to call the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table to execute a test task to obtain a pressure test result.
8. A repayment ability pressure test apparatus, comprising:
the request receiving module is used for receiving a pressure test request of the repayment capacity and acquiring a field identification set corresponding to the pressure test request;
the search analysis module is used for searching a target calculation formula corresponding to the field identification in the field identification set and analyzing the target calculation formula to obtain a calculation logic parameter;
the data import module is used for determining the dependency relationship among all the calculation logic parameters in the target calculation formula according to the target calculation formula and importing the target calculation formula, the calculation logic parameters and the dependency relationship into a preset temporary operation table;
and the pressure testing module is used for starting a plurality of threads to call the target calculation formula, the calculation logic parameters and the dependency relationship in the preset temporary operation table to execute a testing task to obtain a pressure testing result.
9. A reimbursement capability stress testing apparatus, comprising: memory, a processor and a computer program for a repayment ability stress test stored on the memory and executable on the processor, the computer program for a repayment ability stress test realizing the steps of the method for a repayment ability stress test according to any one of claims 1 to 7 when executed by the processor.
10. A computer storage medium, characterized in that the computer storage medium has stored thereon a computer program for a reimbursement capability stress test, which computer program, when being executed by a processor, carries out the steps of the method for a reimbursement capability stress test according to any one of claims 1 to 7.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011606509.2A CN112633894A (en) | 2020-12-28 | 2020-12-28 | Method, device, equipment and computer storage medium for pressure testing of repayment capacity |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011606509.2A CN112633894A (en) | 2020-12-28 | 2020-12-28 | Method, device, equipment and computer storage medium for pressure testing of repayment capacity |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112633894A true CN112633894A (en) | 2021-04-09 |
Family
ID=75286506
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011606509.2A Pending CN112633894A (en) | 2020-12-28 | 2020-12-28 | Method, device, equipment and computer storage medium for pressure testing of repayment capacity |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112633894A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116842931A (en) * | 2023-07-20 | 2023-10-03 | 浪潮通用软件有限公司 | Expression analysis method, equipment and medium of accounting document template |
-
2020
- 2020-12-28 CN CN202011606509.2A patent/CN112633894A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116842931A (en) * | 2023-07-20 | 2023-10-03 | 浪潮通用软件有限公司 | Expression analysis method, equipment and medium of accounting document template |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2020186786A1 (en) | File processing method and apparatus, computer device and storage medium | |
CN109766345B (en) | Metadata processing method and device, equipment and readable storage medium | |
CN109992601B (en) | To-do information pushing method and device and computer equipment | |
CN111722839B (en) | Code generation method and device, electronic equipment and storage medium | |
US20130166552A1 (en) | Systems and methods for merging source records in accordance with survivorship rules | |
CN110795455A (en) | Dependency relationship analysis method, electronic device, computer device and readable storage medium | |
CN103514223A (en) | Data synchronism method and system of database | |
CN110795524B (en) | Main data mapping processing method and device, computer equipment and storage medium | |
CN110222071B (en) | Data query method, device, server and storage medium | |
CN109471857A (en) | Data modification method, device and storage medium based on SQL statement | |
CN110427188B (en) | Configuration method, device, equipment and storage medium of single-test assertion program | |
CN111881183B (en) | Enterprise name matching method and device, storage medium and electronic equipment | |
US20030182296A1 (en) | Association candidate generating apparatus and method, association-establishing system, and computer-readable medium recording an association candidate generating program therein | |
CN117271481B (en) | Automatic database optimization method and equipment | |
CN112286934A (en) | Database table importing method, device, equipment and medium | |
CN110674200A (en) | Data query method based on annotation, data query equipment and storage medium | |
CN114741392A (en) | Data query method and device, electronic equipment and storage medium | |
CN115062016A (en) | Incidence relation extraction method and device and computer equipment | |
CN109656947B (en) | Data query method and device, computer equipment and storage medium | |
CN112633894A (en) | Method, device, equipment and computer storage medium for pressure testing of repayment capacity | |
CN111522881B (en) | Service data processing method, device, server and storage medium | |
CN117667884A (en) | Data migration method, device, equipment and storage medium | |
JP6695847B2 (en) | Software parts management system, computer | |
CN116383777B (en) | Data management platform and data right determining method facing data management | |
CN115826928B (en) | Program generating method, system, electronic device and computer readable storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |