CN112610293B - Wide-load peak regulation system of straight condensing unit and operation method - Google Patents

Wide-load peak regulation system of straight condensing unit and operation method Download PDF

Info

Publication number
CN112610293B
CN112610293B CN202011490221.3A CN202011490221A CN112610293B CN 112610293 B CN112610293 B CN 112610293B CN 202011490221 A CN202011490221 A CN 202011490221A CN 112610293 B CN112610293 B CN 112610293B
Authority
CN
China
Prior art keywords
pressure
steam
low
cylinder
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011490221.3A
Other languages
Chinese (zh)
Other versions
CN112610293A (en
Inventor
郭容赫
蒋翀
谭袖
王政先
王健
柳桐
骆仁达
王丽萍
王羽
徐伟轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huadian Electric Power Research Institute Co Ltd
Original Assignee
Huadian Electric Power Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huadian Electric Power Research Institute Co Ltd filed Critical Huadian Electric Power Research Institute Co Ltd
Priority to CN202011490221.3A priority Critical patent/CN112610293B/en
Publication of CN112610293A publication Critical patent/CN112610293A/en
Application granted granted Critical
Publication of CN112610293B publication Critical patent/CN112610293B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K13/00General layout or general methods of operation of complete plants
    • F01K13/02Controlling, e.g. stopping or starting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D15/00Adaptations of machines or engines for special use; Combinations of engines with devices driven thereby
    • F01D15/10Adaptations for driving, or combinations with, electric generators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D17/00Regulating or controlling by varying flow
    • F01D17/10Final actuators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K13/00General layout or general methods of operation of complete plants
    • F01K13/006Auxiliaries or details not otherwise provided for

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

The invention discloses a wide load peak regulation system and an operation method of a straight condensing unit, and the system comprises a boiler, a high-pressure cylinder of a steam turbine, a medium-pressure cylinder of the steam turbine, a low-pressure cylinder of the steam turbine, a generator, a low-pressure heater, a high-pressure heater, a deaerator and a heat storage device, wherein the low-pressure cylinder of the steam turbine adopts a cylinder with less than the same capacity, so that the safe operation problem of a small volume flow blade is solved, and the minimum technical output of the steam turbine can be reduced to 20-30% of the rated capacity of the unit by utilizing the characteristic of small output of the low-pressure cylinder during the valley of electricity consumption; the high-pressure cylinder and the intermediate pressure cylinder of the steam turbine adopt cylinders with the same capacity, the steam inlet pressure is allowed to exceed the rated pressure by 5%, the part with less output of the low-pressure cylinder is compensated by utilizing the overload capacity of the high-pressure cylinder and the intermediate pressure cylinder and the heat storage capacity of the heat storage device, and the maximum technical output of the steam turbine can reach 100% of the rated capacity of a unit at the power consumption peak. The system is simple and reliable in performance, and solves the problem that the straight condensing turbine cannot deeply regulate the peak.

Description

Wide-load peak regulation system of straight condensing unit and operation method
Technical Field
The invention belongs to the technical field of peak regulation of a straight condensing unit of a thermal power plant, and particularly relates to a wide-load peak regulation system of a straight condensing unit and an operation method thereof, which are particularly suitable for peak regulation requirements of large peak-valley difference of a power grid, and the load of the unit can be up and down.
Background
The power supply structure of China is mainly based on thermal power, the power supply structure is single, new energy represented by the wind power is rapidly increased in recent years, new energy resources are effectively consumed, the load rate of a thermal power unit is reduced, the peak regulation depth of the thermal power unit is increased, and full-load operation working conditions of partial regions are difficult to meet. Under the trend that the peak-to-valley difference of a power grid is gradually increased and new energy power generation has the characteristics of intermittence, randomness and uncontrollable performance, great difficulty is brought to peak regulation of a thermal power generating unit, and the power system has insufficient regulation capacity. For stable and reliable power supply of the frequency of a power protection network, a thermal power generating unit is required to be capable of carrying out deep peak shaving in the electricity consumption valley period, and has peak shaving capacity in the electricity consumption peak period, and the load of the unit can be up and down.
The thermal power coal-fired unit in China is designed according to the load of more than 70%, the peak regulation capacity of a domestic straight condensing unit reaches 50%, the situation causes insufficient flexibility of a power grid, when new energy is more output, the new energy is limited by the peak regulation capacity of the thermal power unit in the power grid, the new energy cannot be completely consumed, and the problems of relatively serious wind abandoning, light abandoning and water abandoning appear in partial areas. In order to promote the consumption of renewable energy, auxiliary service market operation rules are provided in various places in succession, the peak regulation compensation force is increased, the thermal power generating unit is encouraged to carry out deep peak regulation, but the unit which should bear the basic load carries out deep peak regulation, so that the economy of the unit is greatly reduced, the safe operation of the unit is influenced, the unit is seriously burdened, even equipment is damaged, and the service life of the unit is greatly shortened. The frequent occurrence of accidents in recent years, particularly the erosion and damage of the last stage blade of the low pressure cylinder, is caused by the serious accidents.
When the high-load operation is carried out, high-temperature and high-pressure steam sequentially flows through the high-pressure cylinder and the medium-pressure cylinder, is discharged through the medium-pressure cylinder and completely enters the low-pressure cylinder, when the steam reaches the next final stage and the final stage of the low-pressure cylinder, the steam pressure and the temperature are reduced very low, the specific volume of the steam is increased greatly, the volume flow of the discharged steam is very large, and in order to enable the steam to be smoothly discharged from the low-pressure cylinder, the next final stage, particularly the final stage, needs to have enough through flow area, and needs to have the final stage blades as long as possible.
During low-load operation, the last-stage blade of the low-pressure cylinder needs minimum steam to pass through so as to ensure the safe operation of the last-stage blade, otherwise, the last-stage blade can be negatively influenced: firstly, the steam does not work outwards, but consumes external work, the phenomenon of blowing occurs, the temperature of an exhaust cylinder rises, and the unit vibrates; the dynamic stress and the dynamic frequency of the blade are changed, and the operation with a large negative attack angle is easy to occur, so that the blade flutters, even the blade is broken; and thirdly, the content of water drops in the last-stage steam flow of the low-pressure cylinder is high, when backflow occurs, the water drops impact the outlet edge of the movable vane, and water erosion easily occurs on the last-stage vane.
When the length of the last stage blade of the low pressure cylinder is determined, and the last stage blade meets the requirement of a large load, the last stage blade of the low pressure cylinder cannot meet the requirement of a small load, and vice versa. The steam turbine designed according to the basic load has the advantages that the minimum technical output of the steam turbine can reach 30% of rated load theoretically, the minimum cooling steam flow of the last-stage blade of a low-pressure cylinder of the steam turbine and the minimum stable combustion of a boiler are limited in actual operation, in order to ensure the safe operation of the last-stage blade, the peak regulation capacity of a straight condensing unit is about 40%, and the peak regulation depth and width cannot meet the requirements of 'energy up and down' of the load of a power grid.
Disclosure of Invention
The invention aims to overcome the defects in the prior art, and provides a pure condensing unit wide-load peak regulation system and an operation method which are reasonable in design and reliable in operation, so that the pure condensing unit wide-load peak regulation requirement is met on the premise of ensuring the safety of the last-stage blade of a low-pressure cylinder, and the unit load can be up and down.
The technical scheme adopted by the invention for solving the problems is as follows: the utility model provides a pure wide load peak shaving system of congealing unit which characterized in that: including boiler, steam turbine high pressure jar, steam turbine intermediate pressure jar, steam turbine low pressure jar, generator, low pressure feed water heater, high pressure feed water heater and oxygen-eliminating device and heat accumulation device, steam turbine high pressure jar, steam turbine intermediate pressure jar, steam turbine low pressure jar and generator connect gradually, the steam turbine high pressure jar is connected with the boiler through main steam pipe and high pressure exhaust steam pipe respectively, the steam turbine intermediate pressure jar is connected with the boiler through reheat steam pipe, the steam turbine intermediate pressure jar still is connected with steam turbine low pressure jar through the middling pressure exhaust steam pipe, the middling pressure exhaust steam pipe is connected with middling pressure exhaust steam pipe bleeder pipe, the middling pressure exhaust steam pipe bleeder pipe is connected with heat accumulation device, steam turbine low pressure jar, low pressure feed water heater, high pressure feed water heater and oxygen-eliminating device and boiler pass through low pressure feed water heater oral siphon, condensate water pipe and boiler feed water pipe and are connected gradually, low pressure feed water heater still passes through heat accumulation device steam/water pipe and is connected with heat accumulation device, and meanwhile, the low-pressure heater is also connected with the low-pressure cylinder of the steam turbine through a steam extraction pipe of the low-pressure heater.
Furthermore, a first valve is installed on the main steam pipe, and a second valve is installed on the reheating steam pipe.
Furthermore, a valve III is arranged on the medium-pressure steam exhaust pipe, and a valve IV is arranged on the branch pipe of the medium-pressure steam exhaust pipe.
Furthermore, a fifth valve is arranged on the steam/water outlet pipe of the heat storage device, and a sixth valve is arranged on the steam extraction pipe of the low-pressure heater.
Further, the steam turbine high pressure cylinder and the steam turbine intermediate pressure cylinder adopt cylinders with the same capacity, the steam inlet pressure is allowed to exceed the rated pressure by 5%, and the steam turbine low pressure cylinder adopts a cylinder with the capacity smaller than that of the steam turbine high pressure cylinder and the steam turbine intermediate pressure cylinder; the maximum through-flow capacity of the high-pressure cylinder and the medium-pressure cylinder of the steam turbine are matched and are not matched with the maximum through-flow capacity of the low-pressure cylinder of the steam turbine. The mismatching of the maximum through-flow capacity means that steam flows through the high-pressure cylinder and the intermediate-pressure cylinder and enters the low-pressure cylinder through the intermediate-pressure steam exhaust pipe, and when the flow of the steam entering the low-pressure cylinder reaches the maximum, the steam enters the high-pressure cylinder and the intermediate-pressure cylinder and does not reach the maximum.
Further, the length of last stage blade in the steam turbine low pressure cylinder possesses maximum volume flow throughput, can be at the safe operation under little volume flow operating mode simultaneously, little volume flow operating mode is: steam flows through the high-pressure cylinder and the medium-pressure cylinder of the steam turbine and enters the low-pressure cylinder of the steam turbine, the volume flow discharged by the last-stage blade is minimum, and the work-doing capacity of the steam in each cylinder reaches the preset minimum load.
The operation method of the wide-load peak regulation system of the straight condensing unit is characterized by comprising the following steps: the operation method comprises the following steps:
1) in the load valley period, the operating condition of the boiler and the operating condition of the heat storage device are adjusted, namely the opening degree of the first valve is adjusted, the first valve is closed, the flow of main steam is reduced, the second valve, the third valve and the sixth valve are fully opened, the fourth valve and the fifth valve are closed, the share of the steam acting in a high-pressure cylinder of the steam turbine, a medium-pressure cylinder of the steam turbine and a low-pressure cylinder of the steam turbine is reduced, the power generation load is reduced, and the requirement of power grid depth peak regulation in the valley period is met;
2) during the peak load period, by adjusting the operation condition of the boiler, the operation condition of the heat storage device and the operation condition of the low-pressure heater, namely, the opening degree of the first valve is adjusted, the first valve is opened to be larger, the main steam flow is increased, the second valve and the third valve are fully opened, the share of the steam acting in a high pressure cylinder, a medium pressure cylinder and a low pressure cylinder of the steam turbine is increased, when the exhaust steam flow of the turbine intermediate pressure cylinder is larger than the maximum inlet steam flow of the turbine low pressure cylinder, opening the valve IV, sending the redundant steam into the heat storage device for heat exchange and storage, opening the valve V, introducing the heat in the heat storage device into the low pressure heater for heat release, and maintaining the balance of steam/water flow of the system, or closing the valve and cutting off the low-pressure heater or partially cutting off the high-pressure heater, so that the work-applying capacity of the steam turbine is increased, and the power grid load requirement in the peak period is met;
3) in the load balancing period, the opening of the first valve is adjusted, the flow of the main steam is adjusted, the second valve and the third valve are fully opened, the fourth valve is closed, the sixth valve is opened, the fifth valve is opened, the heat stored in the heat storage device is released to the low-pressure heater, the low-temperature water in the low-pressure heater can be introduced into the heat storage device to be stored in order to maintain the steam/water balance of the system, and the power grid load requirement in the load balancing period is met.
Compared with the prior art, the invention has the following advantages and effects: the system is simple, reliable in performance and low in manufacturing cost, and has feasibility, operability and innovativeness. After the invention is applied, the technical output of the steam turbine can be adjusted to 20-30% of the rated capacity of the unit at minimum and 100% of the rated capacity of the unit at maximum, thereby ensuring the safe operation of the last-stage blades of the unit, increasing the peak-shaving depth and width of the straight condensing unit, ensuring the load of the unit to be up and down and having higher practical value.
Drawings
FIG. 1 is a schematic diagram of the wide load peak-shaving system structure of the straight condensing unit of the present invention.
In the figure: the system comprises a boiler 1, a turbine high-pressure cylinder 2, a turbine intermediate-pressure cylinder 3, a turbine low-pressure cylinder 4, a generator 5, a low-pressure heater 6, a high-pressure heater and deaerator 7, a heat storage device 8, a main steam pipe 9, a reheating steam pipe 10, a high-pressure steam exhaust pipe 11, a medium-pressure steam exhaust pipe 12, a medium-pressure steam exhaust pipe branch pipe 13, a low-pressure heater water inlet pipe 14, a condensed water pipe 15, a boiler water supply pipe 16, a heat storage device steam/water outlet pipe 17, a low-pressure heater steam extraction pipe 18, a valve I19, a valve II 20, a valve III 21, a valve IV 22, a valve V23 and a valve VI 24.
Detailed Description
The present invention will be described in further detail below by way of examples with reference to the accompanying drawings, which are illustrative of the present invention and are not to be construed as limiting the present invention.
Examples are given.
Referring to fig. 1, in this embodiment, a straight condensing unit wide load peak regulation system includes a boiler 1, a turbine high pressure cylinder 2, a turbine intermediate pressure cylinder 3, a turbine low pressure cylinder 4, a generator 5, a low pressure heater 6, a high pressure heater, a deaerator 7, and a heat storage device 8, where the turbine high pressure cylinder 2, the turbine intermediate pressure cylinder 3, the turbine low pressure cylinder 4, and the generator 5 are sequentially connected, the turbine high pressure cylinder 2 is connected to the boiler 1 through a main steam pipe 9 and a high pressure exhaust steam pipe 11, the turbine intermediate pressure cylinder 3 is connected to the boiler 1 through a reheat steam pipe 10, the turbine intermediate pressure cylinder 3 is further connected to the turbine low pressure cylinder 4 through an intermediate pressure exhaust steam pipe 12, the intermediate pressure exhaust steam pipe branch pipe 13 is connected to the heat storage device 8, the turbine low pressure cylinder 4, the low pressure heater 6, the high pressure heater, the deaerator 7, and the boiler 1 are connected to the low pressure heater water inlet pipe 14 through a low pressure heater, The condensate pipe 15 and the boiler feed pipe 16 are connected in sequence, the low-pressure heater 6 is also connected with the heat storage device 8 through a heat storage device steam/water outlet pipe 17, and the low-pressure heater 6 is also connected with the steam turbine low-pressure cylinder 4 through a low-pressure heater steam extraction pipe 18.
Specifically, a first valve 19 is installed on the main steam pipe 9, a second valve 20 is installed on the reheat steam pipe 10, a third valve 21 is installed on the medium-pressure steam exhaust pipe 12, a fourth valve 22 is installed on the medium-pressure steam exhaust pipe branch pipe 13, a fifth valve 23 is installed on the heat storage device steam outlet/water pipe 17, and a sixth valve 24 is installed on the low-pressure heater steam extraction pipe 18.
In this embodiment, the steam turbine high pressure cylinder 2 and the steam turbine intermediate pressure cylinder 3 adopt cylinders with the same capacity, the steam inlet pressure is allowed to exceed the rated pressure by 5%, and the steam turbine low pressure cylinder 4 adopts a cylinder with a capacity smaller than that of the steam turbine high pressure cylinder 2 and the steam turbine intermediate pressure cylinder 3; the maximum through-flow capacities of the high-pressure turbine cylinder 2 and the medium-pressure turbine cylinder 3 are matched and are not matched with the maximum through-flow capacity of the low-pressure turbine cylinder 4.
In this embodiment, the length of last stage blade among the steam turbine low pressure cylinder 4 possesses the maximum volume flow ability of passing through, can be simultaneously at the safe operation under little volume flow operating mode, and little volume flow operating mode is: the steam flows through the high-pressure turbine cylinder 2 and the intermediate-pressure turbine cylinder 3 and enters the low-pressure turbine cylinder 4, the volume flow discharged by the last-stage blades is minimum, and the work capacity of the steam in each cylinder reaches a preset minimum load.
In this embodiment, the operation method of the wide-load peak regulation system of the straight condensing unit includes the following steps:
1) in the load valley period, the operating condition of the boiler 1 and the operating condition of the heat storage device 8 are adjusted, namely the opening of the first valve 19 is adjusted, the first valve 19 is closed, the flow of main steam is reduced, the second valve 20, the third valve 21 and the sixth valve 24 are fully opened, the fourth valve 22 and the fifth valve 23 are closed, the share of the steam acting in the high-pressure steam turbine cylinder 2, the medium-pressure steam turbine cylinder 3 and the low-pressure steam turbine cylinder 4 is reduced, the power generation load is reduced, and the requirement of power grid depth peak regulation in the valley period is met;
2) during the peak period of load, the operating condition of the boiler 1, the operating condition of the heat storage device 8 and the operating condition of the low-pressure heater 6 are adjusted, namely the opening of the first valve 19 is adjusted, the first valve 19 is opened to increase the flow of main steam, the second valve 20 and the third valve 21 are fully opened to increase the share of the steam doing work in the high-pressure steam turbine cylinder 2, the medium-pressure steam turbine cylinder 3 and the low-pressure steam turbine cylinder 4, when the steam exhaust flow of the medium-pressure steam turbine cylinder 3 is greater than the maximum steam inlet flow of the low-pressure steam turbine cylinder 4, the fourth valve 22 is opened to send the redundant part of the steam into the heat storage device 8 for heat exchange and storage, the fifth valve 23 is opened to introduce the heat in the heat storage device 8 into the low-pressure heater 6 for heat release to maintain the balance of the steam/water flow of the system, or the sixth valve 24 is closed to cut off the low-pressure heater 6, or partially cut off the high-pressure heater to increase the work doing capacity of the steam turbine, the power grid load requirement in the peak period is met;
3) in the load balancing period, the operation condition of the boiler 1, the operation condition of the heat storage device 8 and the operation condition of the low-pressure heater 6 are adjusted, namely the opening of the first valve 19 is adjusted, the flow of the main steam is adjusted, the second valve 20 and the third valve 21 are fully opened, the fourth valve 22 is closed, the sixth valve 24 is opened, the fifth valve 23 is opened, the heat stored in the heat storage device 8 is released to the low-pressure heater 6, in order to maintain the steam/water balance of the system, the low-temperature water in the low-pressure heater 6 can be introduced into the heat storage device 8 for storage, and the power grid load requirement in the load balancing period is met.
Those not described in detail in this specification are well within the skill of the art.
Although the present invention has been described with reference to the above embodiments, it should be understood that the scope of the present invention is not limited thereto, and that various changes and modifications can be made by those skilled in the art without departing from the spirit and scope of the present invention.

Claims (2)

1. The utility model provides a pure wide load peak shaving system of congealing unit which characterized in that: comprises a boiler (1), a high-pressure steam turbine cylinder (2), a medium-pressure steam turbine cylinder (3), a low-pressure steam turbine cylinder (4), a generator (5), a low-pressure heater (6), a high-pressure heater, a deaerator (7) and a heat storage device (8), wherein the high-pressure steam turbine cylinder (2), the medium-pressure steam turbine cylinder (3), the low-pressure steam turbine cylinder (4) and the generator (5) are sequentially connected, the high-pressure steam turbine cylinder (2) is respectively connected with the boiler (1) through a main steam pipe (9) and a high-pressure steam exhaust pipe (11), the medium-pressure steam turbine cylinder (3) is connected with the boiler (1) through a reheating steam pipe (10), the medium-pressure steam turbine cylinder (3) is also connected with the low-pressure steam turbine cylinder (4) through a medium-pressure steam exhaust pipe (12), the medium-pressure steam exhaust pipe (12) is connected with a medium-pressure steam exhaust pipe branch pipe (13), and the medium-pressure steam exhaust pipe branch pipe (13) is connected with the heat storage device (8), the low-pressure steam turbine cylinder (4), the low-pressure heater (6), the high-pressure heater and the deaerator (7) are sequentially connected with the boiler (1) through a low-pressure heater water inlet pipe (14), a condensate pipe (15) and a boiler water supply pipe (16), the low-pressure heater (6) is further connected with a heat storage device (8) through a heat storage device steam/water outlet pipe (17), and meanwhile the low-pressure heater (6) is further connected with the low-pressure steam turbine cylinder (4) through a low-pressure heater steam extraction pipe (18);
the steam turbine high-pressure cylinder (2) and the steam turbine intermediate-pressure cylinder (3) adopt cylinders with the same capacity, the steam inlet pressure is allowed to exceed the rated pressure by 5%, and the steam turbine low-pressure cylinder (4) adopts cylinders with the capacity smaller than that of the steam turbine high-pressure cylinder (2) and that of the steam turbine intermediate-pressure cylinder (3); the maximum through-flow capacities of the steam turbine high-pressure cylinder (2) and the steam turbine medium-pressure cylinder (3) are matched and are not matched with the maximum through-flow capacity of the steam turbine low-pressure cylinder (4);
the length of last stage blade in steam turbine low pressure jar (4) possesses maximum volume flow throughput, can be in the safe operation under little volume flow operating mode simultaneously, little volume flow operating mode is: steam flows through the steam turbine high pressure cylinder (2) and the steam turbine intermediate pressure cylinder (3) and enters the steam turbine low pressure cylinder (4), the volume flow discharged by the last stage blade is minimum, and the work capacity of the steam in each cylinder reaches the preset minimum load;
a first valve (19) is installed on the main steam pipe (9), and a second valve (20) is installed on the reheating steam pipe (10); a third valve (21) is arranged on the medium-pressure steam exhaust pipe (12), and a fourth valve (22) is arranged on the branch pipe (13) of the medium-pressure steam exhaust pipe; and a fifth valve (23) is installed on the steam/water outlet pipe (17) of the heat storage device, and a sixth valve (24) is installed on the steam extraction pipe (18) of the low-pressure heater.
2. A method of operating the wide load peak shaving system of the straight condensing unit as claimed in claim 1, characterized in that: the operation method comprises the following steps:
1) in the load valley period, the operation condition of the boiler (1) and the operation condition of the heat storage device (8) are adjusted, namely the opening of a valve I (19) is adjusted, the valve I (19) is closed, the flow of main steam is reduced, a valve II (20), a valve III (21) and a valve III (24) are fully opened, a valve IV (22) and a valve V (23) are closed, the share of the steam acting in a steam turbine high pressure cylinder (2), a steam turbine intermediate pressure cylinder (3) and a steam turbine low pressure cylinder (4) is reduced, the power generation load is reduced, and the requirement of power grid depth peak regulation in the valley period is met;
2) during the peak period of load, the share of steam doing work in a high-pressure turbine cylinder (2), a medium-pressure turbine cylinder (3) and a low-pressure turbine cylinder (4) is increased by adjusting the operation condition of a boiler (1), the operation condition of a heat storage device (8) and the operation condition of a low-pressure heater (6), namely adjusting the opening of a valve I (19), opening a valve I (19), increasing the flow of main steam, fully opening a valve II (20) and a valve III (21), when the steam exhaust flow of the medium-pressure turbine cylinder (3) is greater than the maximum steam inlet flow of the low-pressure turbine cylinder (4), opening a valve IV (22), sending the redundant part of steam into the heat storage device (8) for heat exchange and storage, opening a valve V (23), introducing the heat in the heat storage device (8) into the low-pressure heater (6) for heat release, and maintaining the balance of steam/water flow of the system, or closing the valve six (24) to cut off the low-pressure heater (6) or partially cut off the high-pressure heater, so that the work-applying capacity of the steam turbine is increased, and the load requirement of a power grid in a peak period is met;
3) and in the load balancing period, the operation condition of the boiler (1), the operation condition of the heat storage device (8) and the operation condition of the low-pressure heater (6) are adjusted, namely the opening degree of a valve I (19) is adjusted, the flow of the main steam is adjusted, a valve II (20) and a valve III (21) are fully opened, a valve IV (22) is closed, a valve VI (24) is opened, a valve V (23) is opened, the heat stored in the heat storage device (8) is released to the low-pressure heater (6), and in order to maintain the steam/water balance of the system, low-temperature water in the low-pressure heater (6) is introduced into the heat storage device (8) for storage, so that the power grid load requirement in the load balancing period is met.
CN202011490221.3A 2020-12-16 2020-12-16 Wide-load peak regulation system of straight condensing unit and operation method Active CN112610293B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011490221.3A CN112610293B (en) 2020-12-16 2020-12-16 Wide-load peak regulation system of straight condensing unit and operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011490221.3A CN112610293B (en) 2020-12-16 2020-12-16 Wide-load peak regulation system of straight condensing unit and operation method

Publications (2)

Publication Number Publication Date
CN112610293A CN112610293A (en) 2021-04-06
CN112610293B true CN112610293B (en) 2022-08-12

Family

ID=75239844

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011490221.3A Active CN112610293B (en) 2020-12-16 2020-12-16 Wide-load peak regulation system of straight condensing unit and operation method

Country Status (1)

Country Link
CN (1) CN112610293B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113137288B (en) * 2021-04-30 2022-12-27 上海电力大学 Thermodynamic system of multi-stage heat storage peak regulation of condensing unit
CN113339089B (en) * 2021-06-10 2022-10-21 华电电力科学研究院有限公司 Efficient peak regulation steam turbine system and working method thereof
CN114810240B (en) * 2022-04-14 2023-05-09 暨南大学 High-efficiency turbine unit with external multichannel regulating system and operation method thereof
CN114790921A (en) * 2022-04-25 2022-07-26 华电电力科学研究院有限公司 Method, device, equipment and medium for increasing output range of generator
CN115030780A (en) * 2022-06-23 2022-09-09 中国能源建设集团山西省电力勘测设计院有限公司 Method for operating a turbo-generator unit system operating efficiently in a wide load range
CN115750014A (en) * 2022-11-22 2023-03-07 东方电气集团东方汽轮机有限公司 Deep peak regulation system of steam turbine set

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107461728A (en) * 2017-08-31 2017-12-12 国网吉林省电力有限公司电力科学研究院 A kind of electric heat storage boiler heat regenerative system for peak regulation
CN108757066A (en) * 2018-06-13 2018-11-06 华电电力科学研究院有限公司 Fired power generating unit backheat hold over system and operation method for load responding
CN208982124U (en) * 2018-08-28 2019-06-14 华电电力科学研究院有限公司 The heat and power system of unit fast lifting load is realized in a kind of combination heat supply
CN111120995A (en) * 2019-12-05 2020-05-08 国网河北省电力有限公司电力科学研究院 Heat storage system for expanding peak regulation output range of unit and peak regulation effect evaluation method
CN111749740A (en) * 2019-03-28 2020-10-09 三菱日立电力系统株式会社 Power generation facility and output increase control method for power generation facility
CN214660399U (en) * 2020-12-16 2021-11-09 华电电力科学研究院有限公司 Wide-load peak regulation system of straight condensing unit

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107461728A (en) * 2017-08-31 2017-12-12 国网吉林省电力有限公司电力科学研究院 A kind of electric heat storage boiler heat regenerative system for peak regulation
CN108757066A (en) * 2018-06-13 2018-11-06 华电电力科学研究院有限公司 Fired power generating unit backheat hold over system and operation method for load responding
CN208982124U (en) * 2018-08-28 2019-06-14 华电电力科学研究院有限公司 The heat and power system of unit fast lifting load is realized in a kind of combination heat supply
CN111749740A (en) * 2019-03-28 2020-10-09 三菱日立电力系统株式会社 Power generation facility and output increase control method for power generation facility
CN111120995A (en) * 2019-12-05 2020-05-08 国网河北省电力有限公司电力科学研究院 Heat storage system for expanding peak regulation output range of unit and peak regulation effect evaluation method
CN214660399U (en) * 2020-12-16 2021-11-09 华电电力科学研究院有限公司 Wide-load peak regulation system of straight condensing unit

Also Published As

Publication number Publication date
CN112610293A (en) 2021-04-06

Similar Documents

Publication Publication Date Title
CN112610293B (en) Wide-load peak regulation system of straight condensing unit and operation method
CN108757066B (en) Thermal power generating unit regenerative heat storage system for load response and operation method
CN108049923B (en) Three-exhaust 200MW unit medium-low pressure cylinder combined zero-output heat supply system and method
CN113339089B (en) Efficient peak regulation steam turbine system and working method thereof
CN112610292A (en) Deep peak regulation power generation system
CN111365748B (en) Heat supply method and heat supply system of cogeneration unit
CN111485964B (en) Thermoelectric decoupling method for coal-fired power plant based on turboexpander
CN213631653U (en) Winter low-flow steam exhaust condensing system with uniform power source adjustment function for direct air cooling unit
CN111854462A (en) Full-working-condition cooling and anti-freezing system suitable for indirect air cooling heat supply unit
CN112611010B (en) Adjusting method of flexible adjusting system for power generation load of multi-heat-source cogeneration unit
CN107060918A (en) A kind of many low pressure (LP) cylinder steam turbine generator set system optimization device and methods
CN114233416A (en) Dynamically-reconstructed steam turbine generator unit and operation method
CN214660399U (en) Wide-load peak regulation system of straight condensing unit
CN215718991U (en) High-efficient peak regulation steam turbine system
CN216554044U (en) 600MW unit steam-heat output integrated device
CN207004588U (en) A kind of more low pressure (LP) cylinder steam turbine generator set system optimization devices
CN114508773A (en) Flexible high-back-pressure heat supply system and heat supply method thereof
CN212508456U (en) Little steam discharge flow air cooling island system of preventing frostbite based on flue gas waste heat utilization
CN112855287A (en) Low-pressure-increasing operation system and method for steam extraction temporary complementary coupling low-pressure-saving under cylinder cutting working condition
CN113091112A (en) Thermoelectric decoupling system combining low-back-pressure cutting cylinder and compression heat pump
CN112555962A (en) Multi-air cooling unit step waste heat utilization efficient heating system
CN111854461A (en) Full-working-condition cooling and anti-freezing system suitable for direct air cooling heat supply unit
CN220539696U (en) Steam turbine optimal configuration system with high-low arrangement
Zeng et al. Research on key technology and application of flexibility transformation of heating unit to improve clean energy consumption capacity
CN209244618U (en) A kind of system improving the coal-fired thermal power generation unit thermal efficiency

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant