CN112600300B - Configuration system for secondary equipment in transformer substation - Google Patents

Configuration system for secondary equipment in transformer substation Download PDF

Info

Publication number
CN112600300B
CN112600300B CN202011341201.XA CN202011341201A CN112600300B CN 112600300 B CN112600300 B CN 112600300B CN 202011341201 A CN202011341201 A CN 202011341201A CN 112600300 B CN112600300 B CN 112600300B
Authority
CN
China
Prior art keywords
configuration
target secondary
secondary device
data
configuration data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011341201.XA
Other languages
Chinese (zh)
Other versions
CN112600300A (en
Inventor
马卓斌
金冰鑫
赵通汉
辛玫
王璠
李鑫
尹文婷
马丽
田甜
马文卓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guyuan Power Supply Co Of State Grid Ningxia Electric Power Co ltd
Original Assignee
Guyuan Power Supply Co Of State Grid Ningxia Electric Power Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guyuan Power Supply Co Of State Grid Ningxia Electric Power Co ltd filed Critical Guyuan Power Supply Co Of State Grid Ningxia Electric Power Co ltd
Priority to CN202011341201.XA priority Critical patent/CN112600300B/en
Publication of CN112600300A publication Critical patent/CN112600300A/en
Application granted granted Critical
Publication of CN112600300B publication Critical patent/CN112600300B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00002Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • H02J13/00034Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving an electric power substation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Human Computer Interaction (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The application discloses a configuration system for secondary equipment in a transformer substation, which comprises a client, a configuration controller and the secondary equipment in the transformer substation, wherein a first configuration command for the target secondary equipment is generated according to identification information of the target secondary equipment and configuration data for the target secondary equipment; the configuration controller is configured to obtain the identification information of the target secondary device and the configuration data for the target secondary device from the first configuration command, fill the configuration data for the target secondary device into the configuration file template, generate a configuration file for the target secondary device, and send the first configuration file to the target secondary device; and executing configuration operation according to the configuration data aiming at the target secondary equipment. The application does not need maintenance personnel to master the requirement of the configuration command of each secondary device, and reduces the burden of the maintenance personnel on the configuration operation of the secondary devices.

Description

Configuration system for secondary equipment in transformer substation
Technical Field
The embodiment of the application relates to the technical field of power equipment, in particular to a configuration system for secondary equipment in a transformer substation.
Background
In the current power system, a plurality of devices are used, for example, a transformer substation is provided with primary devices such as a transformer and secondary devices such as a protection device.
In order to ensure the normal operation of secondary equipment in a transformer substation, the secondary equipment needs to be configured. In the prior art, maintenance personnel are generally required to grasp the requirement of a configuration command of each secondary device, so that the configuration operation can be performed on each secondary device individually. However, because the number of substations running in the power system is more, the number of secondary devices deployed by one substation is also more, the number of involved manufacturers is also often more, if maintenance personnel are required to master the configuration command corresponding to each involved manufacturer to perform configuration operation, the maintenance requirement on the maintenance personnel is higher, and the workload of the maintenance personnel can be increased.
Disclosure of Invention
The embodiment of the application provides a configuration system for secondary equipment in a transformer substation, which is used for reducing the configuration operation burden of maintenance personnel on the secondary equipment in the transformer substation.
The application provides a configuration system for secondary equipment in a transformer substation, which is characterized by comprising a client, a configuration controller and the secondary equipment in the transformer substation;
the client is used for responding to detection of triggering operation of identification information of target secondary equipment in a transformer substation and input operation of configuration data of the target secondary equipment, generating a first configuration command of the target secondary equipment according to the identification information of the target secondary equipment and the configuration data of the target secondary equipment, and sending the first configuration command to the configuration controller, wherein the configuration data of the target secondary equipment is used for configuring monitoring operation of the target secondary equipment on primary equipment in the transformer substation;
the configuration controller is configured to obtain the identification information of the target secondary device and the configuration data for the target secondary device from the first configuration command, obtain device type information corresponding to the target secondary device according to the identification information of the target secondary device, obtain configuration data type information for the target secondary device according to the configuration data for the target secondary device, obtain a configuration file template corresponding to the device type information and the configuration data type information for the target secondary device, fill the configuration data for the target secondary device into the configuration file template, generate a configuration file for the target secondary device, and send the first configuration file to the target secondary device;
the target secondary equipment is used for obtaining the configuration data aiming at the target secondary equipment from the first configuration file, and executing configuration operation according to the configuration data aiming at the target secondary equipment.
Preferably, the monitoring operation comprises monitoring electrical performance data of primary devices in the substation.
Preferably, the configuration controller is a software defined network SDN controller.
Preferably, the device type information corresponding to the target secondary device is one device type information of protection device information of primary devices in the transformer substation, an electrical performance data measurement device of the primary devices in the transformer substation, and a control device controlling the operation of the primary devices in the transformer substation.
Preferably, the configuration data type information for the target secondary device is at least one of monitoring time information for the primary device in the transformer substation and reporting condition information of a monitoring result for the primary device in the transformer substation.
Preferably, the client is further configured to generate a problem-checking command for the target secondary device in response to detecting a problem-checking operation for the target secondary device, and issue the problem-checking command to the configuration controller;
the configuration controller is configured to obtain, according to the problem checking command, problem information to be checked for the target secondary device, determine feedback data to be provided by the target secondary device for the problem information, send a data feedback command for obtaining the feedback data to the target secondary device, obtain the feedback data provided by the target secondary device, perform a checking operation for the target secondary device according to the feedback data and the problem information, obtain a checking result, and send the checking result to the client.
Preferably, the problem information to be checked against the target secondary device includes at least one of local authentication problem information, DHCP service status problem information, FTP service status problem information, TLENET service problem information, SNMP service version problem information, SNMP service status problem information, security login protocol problem information, and security timeout service problem information.
Preferably, the configuration server is further configured to compare the configuration data for the target secondary device with the previously backed up historical configuration data for the target secondary device, if the configuration data for the target secondary device is different from the historical configuration data for the target secondary device, fill the configuration data for the target secondary device into the configuration file template, generate a configuration file for the target secondary device, send the first configuration file to the target secondary device, and if the configuration data for the target secondary device is the same as the historical configuration data for the target secondary device, stop generating the configuration file for the target secondary device.
Preferably, the target secondary device is further configured to send a configuration result of performing a configuration operation to the configuration controller;
the configuration controller is further configured to send the configuration result to the client;
the client is also used for displaying the configuration result.
Preferably, the client is further configured to issue a backup command to the configuration controller for backing up the configuration data for the target secondary device;
the configuration controller is also used for backing up the configuration data aiming at the target secondary equipment according to the backup command.
Compared with the prior art, the application has the following advantages:
the application provides a configuration system for secondary equipment in a transformer substation, wherein the client is used for responding to detection of triggering operation of identification information of target secondary equipment in the transformer substation and input operation of configuration data of the target secondary equipment, generating a first configuration command for the target secondary equipment according to the identification information of the target secondary equipment and the configuration data of the target secondary equipment, and sending the first configuration command to a configuration controller, wherein the configuration data for the target secondary equipment is used for configuring monitoring operation of the target secondary equipment for primary equipment in the transformer substation; the configuration controller is configured to obtain the identification information of the target secondary device and the configuration data for the target secondary device from the first configuration command, obtain device type information corresponding to the target secondary device according to the identification information of the target secondary device, obtain configuration data type information for the target secondary device according to the configuration data for the target secondary device, obtain a configuration file template corresponding to the device type information and the configuration data type information for the target secondary device, fill the configuration data for the target secondary device into the configuration file template, generate a configuration file for the target secondary device, and send the first configuration file to the target secondary device; the target secondary equipment is used for obtaining the configuration data aiming at the target secondary equipment from the first configuration file, and executing configuration operation according to the configuration data aiming at the target secondary equipment.
In the configuration system for the secondary equipment in the transformer substation provided by the embodiment of the application, a maintainer only needs to complete the triggering operation of the identification information of the target secondary equipment in the transformer substation and the input operation of the configuration data of the target secondary equipment in the client, the client can send the configuration command of the secondary equipment to be configured in the transformer substation to the configuration controller, the configuration controller obtains the configuration file template according to the equipment type information and the configuration data type information corresponding to the secondary equipment to be configured, generates the configuration file of the secondary equipment to be configured according to the configuration file template and the configuration data, sends the configuration file to the secondary equipment to be configured, and the secondary equipment to be configured executes the configuration operation according to the configuration file. The configuration of the secondary equipment can be completed only by determining the secondary equipment to be configured in the client side by a maintainer and inputting configuration data without grasping the configuration command requirement of each secondary equipment, so that the configuration operation burden of the maintainer on the secondary equipment in the transformer substation is reduced.
Drawings
Fig. 1 is a schematic diagram of a first logic structure of a configuration system for secondary devices in a substation according to an embodiment of the present application;
fig. 2 is a second logic structure schematic diagram of a configuration system for secondary devices in a substation provided in an application embodiment;
FIG. 3 is a flow chart of configuration file generation provided by an embodiment of the present application;
fig. 4 is a flowchart of a configuration file backup provided in an embodiment of the present application.
Detailed Description
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present application. The present application may be embodied in many other forms than those herein described, and those skilled in the art will readily appreciate that the present application may be similarly embodied without departing from the spirit or essential characteristics thereof, and therefore the present application is not limited to the specific embodiments disclosed below.
The embodiment of the application provides a configuration system for secondary equipment in a transformer substation, which comprises a client, a configuration controller and the secondary equipment in the transformer substation;
the client is used for responding to detection of triggering operation of identification information of target secondary equipment in a transformer substation and input operation of configuration data of the target secondary equipment, generating a first configuration command of the target secondary equipment according to the identification information of the target secondary equipment and the configuration data of the target secondary equipment, and sending the first configuration command to the configuration controller, wherein the configuration data of the target secondary equipment is used for configuring monitoring operation of the target secondary equipment on primary equipment in the transformer substation;
the configuration controller is configured to obtain the identification information of the target secondary device and the configuration data for the target secondary device from the first configuration command, obtain device type information corresponding to the target secondary device according to the identification information of the target secondary device, obtain configuration data type information for the target secondary device according to the configuration data for the target secondary device, obtain a configuration file template corresponding to the device type information and the configuration data type information for the target secondary device, fill the configuration data for the target secondary device into the configuration file template, generate a configuration file for the target secondary device, and send the first configuration file to the target secondary device;
the target secondary equipment is used for obtaining the configuration data aiming at the target secondary equipment from the first configuration file, and executing configuration operation according to the configuration data aiming at the target secondary equipment.
The embodiment of the application provides a configuration system for secondary equipment in a transformer substation, and the embodiment of the application is described in detail below with reference to fig. 1.
As shown in fig. 1, a configuration system for secondary devices in a substation includes a client 101; the controller 102 and the secondary device 103 are configured. The client 101 has a connection relationship with the configuration controller 102, and the configuration controller 102 has a connection relationship with the secondary device 103.
The client 101 is configured to generate a first configuration command for the secondary device 103 according to the identification information of the secondary device 103 and the configuration data for the secondary device 103, send the first configuration command to the configuration controller 102, and use the configuration data for the secondary device 103 to configure a monitoring operation of the secondary device 103 for a primary device in the substation in response to detecting a triggering operation for the identification information of the secondary device 103 in the substation and an input operation for the configuration data of the secondary device 103.
The configuration data for the secondary device 103 is used to configure a monitoring operation of the secondary device 103 for a primary device in the substation, and mainly refers to monitoring of an operation state of the primary device. The monitoring operation includes monitoring electrical performance data of the primary devices in the substation, such as monitoring voltage data and current data of the primary devices in the substation.
A configuration controller 102, configured to obtain identification information of the secondary device 103 and configuration data for the secondary device 103 from the first configuration command, obtain device type information corresponding to the secondary device 103 according to the identification information of the secondary device 103, obtain configuration data type information for the secondary device 103 according to the configuration data for the secondary device 103, obtain a configuration file template corresponding to the device type information and the configuration data type information for the secondary device 103, fill the configuration data for the secondary device 103 into the configuration file template, generate a configuration file for the secondary device 103, and send the first configuration file to the secondary device 103.
The configuration controller 102 may be an SDN (Software Defined Network, software custom network) controller. The SDN controller may be an application in the SDN responsible for flow control. The SDN controller is based on a protocol such as OpenFlow, allowing the server to tell the switch where to send the packet.
Optionally, the device type information corresponding to the secondary device 103 is one device type information of protection device information for a primary device in the substation, an electrical performance data measurement device for the primary device in the substation, and a control device for controlling operation of the primary device in the substation.
The electric performance data measuring device for primary equipment in a transformer substation mainly refers to a voltage measuring device and a current measuring device.
Optionally, the configuration data type information for the secondary device 103 is at least one configuration data type information of monitoring time information for the primary device in the substation and reporting condition information of monitoring results for the primary device in the substation.
The configuration data type information for the secondary device 103 is monitoring time information for the primary device in the transformer substation, and mainly refers to what time to monitor and how long to monitor period; at least one configuration data type information in the reporting condition information of the monitoring result of the primary equipment in the transformer substation mainly refers to the monitoring result of the first primary equipment, and when what kind of conditions are met, the monitoring result is uploaded.
A configuration controller 102, configured to obtain the identification information of the secondary device 103 and the configuration data for the secondary device 103 from the first configuration command, obtain configuration data type information for the secondary device 103 according to the configuration data for the secondary device 103, obtain a configuration file template corresponding to the device type information and the configuration data type information for the secondary device 103, fill the configuration data for the secondary device 103 into the configuration file template, generate a configuration file for the secondary device 103, and send the first configuration file to the secondary device 103.
After the configuration file template is generated, parameters in the configuration file template can be changed according to different configuration data of the secondary device 103, for example, monitoring time information of the primary device in the transformer substation needs to be obtained, and the parameters related to the monitoring time information in the configuration file template can be changed.
In practical applications, as shown in fig. 2, one implementation manner of the configuration system for the secondary device in the substation may be that the application plane is responsible for sending configuration data for the secondary device to the control plane, and the control plane generates a configuration file for the secondary device according to the configuration data for the secondary device and sends the configuration file for the secondary device to the forwarding plane. Specifically, the functions of the application plane may be implemented by an APP or the like, and the application in fig. 2 may correspond to the client 101 in fig. 1. The functions of the control plane may be implemented by SDN control, which may correspond to configuration controller 102 in fig. 1. The functionality of the forwarding plane may be implemented by a secondary device, which may be understood herein as secondary device 103 in fig. 1.
In addition to the configuration system, the embodiment of the application also provides a configuration file generation method. As shown in fig. 3, the implementation flow of the method is as follows: the configuration controller 102 in fig. 1 obtains configuration data for the secondary device 103 provided by the client 101 in fig. 1, and searches for a configuration template matching the configuration data. If no matched configuration template is found, the configuration data is discarded, and the configuration file generation flow is ended. If a matching configuration template is found, a configuration file for the secondary device 103 in fig. 1 is generated according to the configuration data and the matching configuration template, and the configuration file generation flow ends.
After the configuration file is generated, the configuration file is sent to the secondary device 103. After performing the configuration file generation and the issuing, the client 101 is further configured to generate a problem-checking command for the secondary device 103 in response to detecting a problem-checking operation for the secondary device 103, and issue the problem-checking command to the configuration controller 102.
Optionally, the controller 102 is configured to obtain, according to the problem checking command, problem information to be checked for the secondary device 103, determine feedback data that needs to be provided by the secondary device 103 for the problem information, send a data feedback command for obtaining the feedback data to the secondary device 103, obtain the feedback data provided by the secondary device 103, perform a checking operation for the secondary device 103 according to the feedback data and the problem information, obtain a checking result, and send the checking result to the client 101.
Optionally, the problem information to be checked for the secondary device 103 includes at least one of local authentication problem information, DHCP service status problem information, FTP service status problem information, TLENET service problem information, SNMP service version problem information, SNMP service status problem information, security login protocol problem information, and security timeout service problem information.
For example, when the TLENET service is a high risk level, the secondary device 103 should disable the TLENET service; when the security timeout service is of high risk level, the security timeout service is started and a reasonable security timeout time is set.
Optionally, the configuration server 102 is further configured to compare the configuration data for the secondary device 103 with the previously backed up historical configuration data for the secondary device 103, if the configuration data for the secondary device 103 is not the same as the historical configuration data for the secondary device 103, fill the configuration data for the secondary device 103 into the configuration file template, generate a configuration file for the secondary device 103, send the first configuration file to the secondary device 103, and if the configuration data for the secondary device 103 is the same as the historical configuration data for the secondary device 103, stop generating the configuration file for the secondary device 103.
Optionally, the secondary device 103 is further configured to send a configuration result of performing the configuration operation to the configuration controller 102; the configuration controller 102 is further configured to send the configuration result to the client 101; the client 101 is further configured to present the configuration result. For example, the client 101 may display the results of the successful configuration.
Optionally, the client 101 is further configured to issue a backup command to the configuration controller 102 for backing up configuration data for the secondary device 103; the configuration controller 102 is further configured to backup the configuration data for the secondary device 103 according to the backup command.
The embodiment of the application also provides a configuration file backup method. As shown in fig. 4, the implementation flow of the method is as follows: the configuration controller 102 in fig. 1 traverses the configuration data for the secondary device 103 in fig. 1 that is not backed up, and if there is configuration data that is not backed up, backs up the configuration data that is not backed up. Whether the backup is successful or not is judged, if yes, the configuration file backup flow is ended, otherwise, the step of traversing the configuration data of the secondary device 103 in fig. 1, which is not backed up, again is returned.
While the application has been described in terms of preferred embodiments, it is not intended to be limiting, but rather, it will be apparent to those skilled in the art that various changes and modifications can be made herein without departing from the spirit and scope of the application as defined by the appended claims.

Claims (10)

1. A configuration system for secondary equipment in a transformer substation is characterized by comprising a client, a configuration controller and the secondary equipment in the transformer substation;
the client having an APP for generating a first configuration command for a target secondary device in a substation in response to detection of a trigger operation for identification information of the target secondary device and an input operation for configuration data of the target secondary device, according to the identification information of the target secondary device and the configuration data for the target secondary device, issuing the first configuration command to the configuration controller,
the configuration data for the target secondary device is used for configuring the monitoring operation of the target secondary device for the primary device in the transformer substation;
the configuration controller is an SDN controller, and is configured to obtain, from the first configuration command, identification information of the target secondary device and configuration data for the target secondary device, obtain device type information corresponding to the target secondary device according to the identification information of the target secondary device, obtain configuration data type information for the target secondary device according to the configuration data for the target secondary device, obtain a configuration file template corresponding to the device type information and the configuration data type information for the target secondary device, fill the configuration data for the target secondary device into the configuration file template, generate a configuration file for the target secondary device, and send the first configuration file to the target secondary device;
the target secondary equipment is used for obtaining the configuration data aiming at the target secondary equipment from the first configuration file, and executing configuration operation according to the configuration data aiming at the target secondary equipment.
2. The configuration system of claim 1, wherein the monitoring operation comprises monitoring electrical performance data of primary devices in the substation.
3. The configuration system of claim 1, wherein the configuration controller is a software defined network SDN controller.
4. The configuration system according to claim 1, wherein the device type information corresponding to the target secondary device is one of protection device information for a primary device in the substation, electrical performance data measurement device for the primary device in the substation, and control device that controls operation of the primary device in the substation.
5. The configuration system according to claim 1, wherein the configuration data type information for the target secondary device is at least one of monitoring time information for a primary device in the substation and reporting condition information of a monitoring result for a primary device in the substation.
6. The configuration system of claim 1, wherein the client is further configured to generate a problem-checking command for the target secondary device in response to detecting a problem-checking operation for the target secondary device, and issue the problem-checking command to the configuration controller;
the configuration controller is configured to obtain, according to the problem checking command, problem information to be checked for the target secondary device, determine feedback data to be provided by the target secondary device for the problem information, send a data feedback command for obtaining the feedback data to the target secondary device, obtain the feedback data provided by the target secondary device, perform a checking operation for the target secondary device according to the feedback data and the problem information, obtain a checking result, and send the checking result to the client.
7. The configuration system of claim 6, wherein the problem information to be checked against the target secondary device includes at least one of local authentication problem information, DHCP service status problem information, FTP service status problem information, TLENET service problem information, SNMP service version problem information, SNMP service status problem information, secure login protocol problem information, secure timeout service problem information.
8. The configuration system of claim 1, wherein the configuration server is further configured to compare the configuration data for the target secondary device with historical configuration data for the target secondary device that was backed up before, if the configuration data for the target secondary device is different from the historical configuration data for the target secondary device, populate the configuration data for the target secondary device into the configuration file template, generate a configuration file for the target secondary device, send the first configuration file to the target secondary device, and if the configuration data for the target secondary device is the same as the historical configuration data for the target secondary device, stop generating the configuration file for the target secondary device.
9. The configuration system of claim 1, wherein the target secondary device is further configured to send a configuration result of performing a configuration operation to the configuration controller;
the configuration controller is further configured to send the configuration result to the client;
the client is also used for displaying the configuration result.
10. The configuration system of claim 1, wherein the client is further configured to issue a backup command to the configuration controller for backing up the configuration data for the target secondary device;
the configuration controller is also used for backing up the configuration data aiming at the target secondary equipment according to the backup command.
CN202011341201.XA 2020-11-25 2020-11-25 Configuration system for secondary equipment in transformer substation Active CN112600300B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011341201.XA CN112600300B (en) 2020-11-25 2020-11-25 Configuration system for secondary equipment in transformer substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011341201.XA CN112600300B (en) 2020-11-25 2020-11-25 Configuration system for secondary equipment in transformer substation

Publications (2)

Publication Number Publication Date
CN112600300A CN112600300A (en) 2021-04-02
CN112600300B true CN112600300B (en) 2023-09-12

Family

ID=75183971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011341201.XA Active CN112600300B (en) 2020-11-25 2020-11-25 Configuration system for secondary equipment in transformer substation

Country Status (1)

Country Link
CN (1) CN112600300B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113613099A (en) * 2021-08-06 2021-11-05 国网浙江省电力有限公司检修分公司 Secondary equipment test system based on internet of things

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009053309A1 (en) * 2007-10-25 2009-04-30 Abb Research Ltd System level testing for substation automation systems
CN104135069A (en) * 2014-07-08 2014-11-05 广东电网公司电力科学研究院 Method for configuring operating parameters of secondary equipment of intelligent substation
CN104537572A (en) * 2014-12-08 2015-04-22 广东电网有限责任公司电力科学研究院 Transformer substation secondary device parameter configuration method and system
CN105427048A (en) * 2015-11-28 2016-03-23 国网河南省电力公司郑州供电公司 Intelligent substation secondary equipment information collection method
CN106532690A (en) * 2016-11-30 2017-03-22 国网江苏省电力公司淮安供电公司 Online verification and intelligent diagnosis method for state of substation secondary equipment
CN106597947A (en) * 2016-12-23 2017-04-26 国网浙江宁波市鄞州区供电公司 Substation equipment test method and system, server and tester
CN107786000A (en) * 2017-10-18 2018-03-09 南京能云电力科技有限公司 The intelligent generation method of digital relay protection tester configuration file
CN108988496A (en) * 2018-08-01 2018-12-11 南方电网科学研究院有限责任公司 A kind of diagnostic method, device and the equipment of secondary system of intelligent substation failure
CN109687985A (en) * 2017-10-18 2019-04-26 中国电力科学研究院 A kind of Substation Process layer network method of automatic configuration and system
CN110308944A (en) * 2019-05-15 2019-10-08 广州供电局有限公司 Configuration file processing method, system, computer equipment and storage medium
WO2019198041A1 (en) * 2018-04-13 2019-10-17 Abb Schweiz Ag Method for engineering and configuring equipment in substation and device thereof
CN110601901A (en) * 2019-09-24 2019-12-20 贵州电网有限责任公司 Remote control method for configuration file of intelligent substation

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11327114B2 (en) * 2018-06-15 2022-05-10 State Grid Hebei Electric Power Research Institute Fully-automatic closed-loop detection method and device for intelligent substation

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009053309A1 (en) * 2007-10-25 2009-04-30 Abb Research Ltd System level testing for substation automation systems
CN104135069A (en) * 2014-07-08 2014-11-05 广东电网公司电力科学研究院 Method for configuring operating parameters of secondary equipment of intelligent substation
CN104537572A (en) * 2014-12-08 2015-04-22 广东电网有限责任公司电力科学研究院 Transformer substation secondary device parameter configuration method and system
CN105427048A (en) * 2015-11-28 2016-03-23 国网河南省电力公司郑州供电公司 Intelligent substation secondary equipment information collection method
CN106532690A (en) * 2016-11-30 2017-03-22 国网江苏省电力公司淮安供电公司 Online verification and intelligent diagnosis method for state of substation secondary equipment
CN106597947A (en) * 2016-12-23 2017-04-26 国网浙江宁波市鄞州区供电公司 Substation equipment test method and system, server and tester
CN107786000A (en) * 2017-10-18 2018-03-09 南京能云电力科技有限公司 The intelligent generation method of digital relay protection tester configuration file
CN109687985A (en) * 2017-10-18 2019-04-26 中国电力科学研究院 A kind of Substation Process layer network method of automatic configuration and system
WO2019198041A1 (en) * 2018-04-13 2019-10-17 Abb Schweiz Ag Method for engineering and configuring equipment in substation and device thereof
CN108988496A (en) * 2018-08-01 2018-12-11 南方电网科学研究院有限责任公司 A kind of diagnostic method, device and the equipment of secondary system of intelligent substation failure
CN110308944A (en) * 2019-05-15 2019-10-08 广州供电局有限公司 Configuration file processing method, system, computer equipment and storage medium
CN110601901A (en) * 2019-09-24 2019-12-20 贵州电网有限责任公司 Remote control method for configuration file of intelligent substation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨林等.变电站一、二次设备间的联系.《220kV变电运维技术》.2018, *

Also Published As

Publication number Publication date
CN112600300A (en) 2021-04-02

Similar Documents

Publication Publication Date Title
CN107074351B (en) Control method, device, flight controller and the unmanned vehicle of unmanned plane
US11216047B2 (en) System and method for detecting relationship between intelligent power strip and device connected thereto
US7430688B2 (en) Network monitoring method and apparatus
KR101211118B1 (en) System and method for managing power system dynamic monitoring apparatus
CN106300679A (en) The system and method for transformer substation remote monitoring
CN104937578A (en) Uninterruptible power supply communication
CN112600300B (en) Configuration system for secondary equipment in transformer substation
CN104067599A (en) Network state monitoring system
CN111756111B (en) Power monitoring system and power monitoring method
EP3444834A1 (en) Electronic status reporting circuit breaker
CN115208065A (en) Power supply unit operation monitoring system
JP6124612B2 (en) Engineering apparatus and engineering method
JP7220231B2 (en) network diagnostics
CN110611596A (en) Local area network fault positioning system
CN108604993B (en) Power droop compensation for DC power supply apparatus
CN116974941A (en) Testing method for management interface function of intelligent platform of baseboard management controller
CN110749840A (en) Detection method and device for improving safety of converter and converter
CN109286240A (en) Power distribution unit monitoring system and method
JP2018102024A (en) Check device for removing grounding for work and control system
JP2022533868A (en) Apparatus and method for monitoring electric vehicle charging
EP2430501B1 (en) System and method of communication for electronic apparatuses
CN112867978B (en) System and method for detecting a relationship between a smart power strip and a device connected to the smart power strip
CN106332078B (en) dot1x user authentication system, method and device
CN109450653B (en) Ethernet power supply protection method and device
CN108844580A (en) Transmission line of electricity environmental abnormality analysis method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant