CN112554069B - Bridge steel box girder construction platform - Google Patents

Bridge steel box girder construction platform Download PDF

Info

Publication number
CN112554069B
CN112554069B CN202011462712.7A CN202011462712A CN112554069B CN 112554069 B CN112554069 B CN 112554069B CN 202011462712 A CN202011462712 A CN 202011462712A CN 112554069 B CN112554069 B CN 112554069B
Authority
CN
China
Prior art keywords
box girder
platform
gear
shaped steel
rotating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011462712.7A
Other languages
Chinese (zh)
Other versions
CN112554069A (en
Inventor
邱练军
朱文勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yiyang Zhenyu Intelligent Machinery Co ltd
Original Assignee
Yiyang Zhenyu Intelligent Machine Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yiyang Zhenyu Intelligent Machine Co ltd filed Critical Yiyang Zhenyu Intelligent Machine Co ltd
Priority to CN202011462712.7A priority Critical patent/CN112554069B/en
Publication of CN112554069A publication Critical patent/CN112554069A/en
Application granted granted Critical
Publication of CN112554069B publication Critical patent/CN112554069B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type

Abstract

The invention relates to the technical field of steel box girders and discloses a bridge steel box girder construction platform which comprises a main bridge box girder, a platform and a traveling mechanism, wherein H-shaped steel rails are welded and fixed on the upper surface of the platform, the number of the H-shaped steel rails is two, the two H-shaped steel rails are oppositely distributed on the left and right, a plurality of suspension assemblies are horizontally placed above the two H-shaped steel rails, the lower surfaces of the suspension assemblies are fixedly connected with lug plates, the traveling mechanism is detachably connected below the lug plates, and the traveling mechanism comprises a rotating shaft, a second gear, a connecting piece, a nut, a rotating wheel and a shaft disc; the H-shaped steel rails are respectively installed on two sides of the upper surface of the platform, the rotating wheels are arranged in the H-shaped steel rails, the hanging box girder hook is arranged above the hanging assembly, the quick-release bolt is arranged, the traveling mechanism is arranged below the hanging assembly, and the automatic traveling of the construction platform can be realized through the transmission of the motor, the first gear, the second gear and the rack around the traveling mechanism.

Description

Bridge steel box girder construction platform
Technical Field
The invention relates to the technical field of steel box girders, in particular to a bridge steel box girder construction platform.
Background
The steel box girder is also called steel plate box girder, and is a common structural form of a large-span bridge. The steel box girder is generally used on bridges with large span and is called as a steel box girder because the steel box girder is shaped like a box. After 2000 years, the figure of the steel box girder bridge in the highway bridge frequently enters the visual field of people, and the steel box girder bridge is widely applied to urban overpasses and overpasses in particular. For example, in the nine polder port bridge engineering of a traffic main road in the Nantong city G204 national route diversion crossing the nine polder port river and directly entering the Nantong city area, the main bridge section is a single-box multi-chamber variable-height three-span continuous steel box girder bridge, the bridge span is arranged to be 50+80+50m, and the total span of the steel box girder is 179.8 m.
The conventional scheme of bridge steel box girder construction platform utilizes bridge inspection car track, makes the platform length and width bigger, and this scheme has following not enough: the construction utilizes the limitation, must install the inspection car track and just can use, in addition, the platform is bulky, weight is big, leads to the security to descend, and the cost is higher.
The construction platform for manually walking the steel box girder of the bridge utilizes the steel box girder bottom plate as a carrier and can walk longitudinally along the steel box girder, and the scheme has the following defects: the walking is pulled by the chain block, the speed is slow, the efficiency is very high, the construction progress is influenced, and the crane is matched when the chain block is hung, so that the equipment waste is large.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a bridge steel box girder construction platform, which solves the problems in the background technology.
(II) technical scheme
In order to achieve the purpose, the invention provides the following technical scheme: a bridge steel box girder construction platform comprises a main bridge box girder, a platform and a traveling mechanism, wherein H-shaped steel tracks are fixed on the upper surface of the platform in a welded manner, the number of the H-shaped steel tracks is two, the two H-shaped steel tracks are oppositely distributed on the left side and the right side, a plurality of suspension assemblies are horizontally placed above the two H-shaped steel tracks, the lower surfaces of the suspension assemblies are fixedly connected with lug plates, the traveling mechanism is detachably connected below the lug plates and comprises a rotating shaft, a second gear, a connecting piece, a nut, a rotating wheel and a shaft disc, a supporting plate is positioned between the two lug plates and detachably connected with the two lug plates through bolts, the connecting piece is fixedly connected below the second gear and far away from the inside of the supporting plate, the rotating shaft is fixedly connected on the left side and the right side of the outer side wall of the connecting piece, one side of the outer side wall of the connecting piece is close to the rotating shaft is in threaded connection with the nut, two the opposite side of pivot is rotated respectively and is connected with the reel, one side fixedly connected with of reel the runner, just the runner inlays to be established orbital inside of H shaped steel, and the runner with H shaped steel track sliding connection is in left the lateral wall of reel rotates and is connected with the second gear is in the upper surface left side the place ahead of platform curb plate one side fixedly connected with support, the last fixed surface of support is connected with the motor, the internal rotation of motor is connected with the pivot, the pivot runs through to the inside of curb plate, just the first gear of lateral wall right side fixedly connected with of pivot, first gear with the meshing of second gear is connected, the outside cover of first gear is equipped with the rack, just the inside rear and another of rack first gear meshing is connected, the inside left and right sides of hanging the subassembly can be dismantled through the bolt respectively and be connected with and hang case roof beam couple The hanging box girder hook is provided with a plurality of hooks, the main bridge box girder is clamped between the hanging box girder hooks, the shear pin penetrates through the inside of the hanging box girder hook, and the bottom end of the shear pin is attached to the main bridge box girder.
Preferably, the left side and the right side of the upper surface of the platform are respectively provided with a railing, and the railings are welded and fixed with the platform.
Preferably, the number of the travelling mechanisms is eight, and every two travelling mechanisms are distributed below the suspension assembly in a left-right mode.
Preferably, four rotating wheels are arranged between the two rotating shafts, and the rotating wheels are arranged inside the H-shaped steel track.
Preferably, the platform is formed by welding a plurality of square pipes with different lengths, and the main section of the platform is an inverted isosceles trapezoid.
(III) advantageous effects
The invention provides a bridge steel box girder construction platform which has the following beneficial effects:
(1) according to the construction platform, the two sides of the upper surface of the platform are respectively provided with the H-shaped steel track, the rotating wheels are arranged in the H-shaped steel tracks, the hanging box girder hook and the quick-release bolt are arranged above the hanging assembly, the travelling mechanism is arranged below the hanging assembly, automatic travelling of the construction platform can be realized through the transmission of the motor, the first gear, the second gear and the rack around the travelling mechanism, meanwhile, the quick-release bolt and the hanging box girder hook are intermittently disassembled and move forwards, intermittent travelling of the platform can be realized, in addition, the hanging assembly is provided with various intervals, so that the platform can be applied to steel box girders with bottom plates of various widths, and the cost is greatly saved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic left-side plan view of FIG. 1 according to the present invention;
FIG. 3 is an enlarged view of the structure at A in FIG. 2 according to the present invention;
FIG. 4 is an enlarged view of a portion of FIG. 1 according to the present invention;
FIG. 5 is a schematic illustration of the platform structure of FIG. 1 according to the present invention;
FIG. 6 is a schematic view of the present invention showing the hook structure of the hanging box girder of FIG. 2;
FIG. 7 is a schematic view of the shear pin configuration of FIG. 1 in accordance with the present invention;
FIG. 8 is a schematic view of the quick release latch of FIG. 1 according to the present invention;
FIG. 9 is a schematic illustration of the suspension assembly of FIG. 1 according to the present invention;
FIG. 10 is a schematic view of the ear plate of FIG. 2 according to the present invention;
FIG. 11 is a schematic view of a portion of FIG. 2 according to the present invention;
FIG. 12 is a schematic cross-sectional view of the H-shaped steel rail of FIG. 1 according to the present invention.
In the figure: 100. a traveling mechanism; 1. a main axle box girder; 2. an H-shaped steel track; 3. a platform; 4. hanging a box girder hook; 5. a suspension assembly; 6. a support; 7. a motor; 8. a rotating shaft; 9. a side plate; 10. a rack; 11. a first gear; 12. a second gear; 13. a connecting member; 14. a support plate; 15. a nut; 16. a rotating wheel; 17. an ear plate; 18. a shear pin; 19. a quick release latch; 20. and a shaft disc.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1 to 12, the present invention provides a technical solution: a construction platform for steel box girders of a bridge comprises a main bridge box girder 1, a platform 3 and a traveling mechanism 100, wherein H-shaped steel rails 2 are welded and fixed on the upper surface of the platform 3, the number of the H-shaped steel rails 2 is two, the two H-shaped steel rails 2 are oppositely distributed left and right, a plurality of suspension assemblies 5 are horizontally placed above the two H-shaped steel rails 2, the lower surfaces of the suspension assemblies 5 are fixedly connected with lug plates 17, the traveling mechanism 100 is detachably connected below the lug plates 17, the traveling mechanism 100 comprises a rotating shaft 8, a second gear 12, a connecting piece 13, nuts 15, a rotating wheel 16 and a shaft disc 20, a supporting plate 14 is positioned between the two lug plates 17 and detachably connected with the two lug plates 17 through bolts, the connecting piece 13 is fixedly connected below the supporting plate 14, which is far away from the second gear 12, the rotating shaft 8 is fixedly connected to the left side and the right side of the outer side wall of the connecting piece 13, one side of the outer side wall, which is close to the rotating shaft 8, is in threaded connection with the nut 15, opposite sides of the two rotating shafts 8 are respectively and rotatably connected with a shaft disc 20, one side of the shaft disc 20 is fixedly connected with a rotating wheel 16, the rotating wheel 16 is embedded in the H-shaped steel track 2, the rotating wheel 16 is in sliding connection with the H-shaped steel track 2, the outer side wall of the shaft disc 20 on the left side is rotatably connected with a second gear 12, one side of a side plate 9 on the front left side of the upper surface of the platform 3 is fixedly connected with a support 6, the upper surface of the support 6 is fixedly connected with a motor 7, the inner part of the motor 7 is rotatably connected with a rotating shaft 8, the rotating shaft 8 penetrates through the inner part of the side plate 9, the right side of the outer side wall of the rotating shaft 8 is fixedly connected with a first gear 11, the first gear 11 is meshed with the second gear 12, a rack 10 is sleeved on the outer part of the first gear 11, the rear part of the inner part of the rack 10 is meshed with another first gear 11, the left side and the right side of the inner part of the suspension assembly 5 are respectively and detachably connected with a suspension box beam hook 4 through a quick release bolt 19, hang case roof beam couple 4 totally a plurality ofly, a plurality ofly hang and hold main bridge case roof beam 1 between the case roof beam couple 4, the inside of hanging case roof beam couple 4 runs through there is shear pin 18, and shear pin 18's bottom and main bridge case roof beam 1 laminate mutually.
Further, the upper surface left and right sides of platform 3 is equipped with the railing respectively, railing and 3 welded fastening of platform, and the railing is the metal material, and the railing is connected with platform 3 and can plays the guard action.
Furthermore, the number of the traveling mechanisms 100 is eight, every two traveling mechanisms 100 are distributed below the suspension assembly 5 from left to right, the traveling mechanisms 100 can move on the H-shaped steel track 2, and the rotating wheels 16 on the traveling mechanisms 100 cannot be separated from the H-shaped steel track 2 from the front side and the rear side.
Furthermore, four rotating wheels 16 are arranged between the two rotating shafts 8, the rotating wheels 16 are arranged inside the H-shaped steel track 2, and the rotating wheels 16 can move flexibly.
Further, the platform 3 is formed by welding a plurality of square pipes with different lengths, and the main section of the platform 3 is an inverted isosceles trapezoid.
In conclusion, the working process of the invention is as follows: because respectively install an H shaped steel track 2 in platform 3 upper surface both sides, set up runner 16 in this H shaped steel track 2, there is hanging box girder couple 4 suspension subassembly 5 top, quick detach bolt 19, there is running gear 100 suspension subassembly 5 below, through motor 7 around running gear 100, first gear 11, second gear 12 and rack 10 transmission, can realize construction platform 3's automatic walking, and simultaneously, quick detach bolt 19 is unpacked apart to intermittent type nature and hanging box girder couple 4, and move forward, can realize platform 3's intermittent type walking.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a bridge steel box girder construction platform, includes main bridge box girder (1), platform (3), backup pad (14) and running gear (100), its characterized in that: the upper surface welding of platform (3) is fixed with H shaped steel track (2), the quantity of H shaped steel track (2) is two, and two relative distribution about H shaped steel track (2), two a plurality of subassemblies (5) that hang have been placed to the top level of H shaped steel track (2), the lower fixed surface who hangs subassembly (5) is connected with otic placode (17), the below detachable connection of otic placode (17) has running gear (100), running gear (100) includes pivot (8), second gear (12), connecting piece (13), nut (15), runner (16) and reel (20), backup pad (14) are located two between otic placode (17), and with two otic placode (17) can dismantle the connection through the bolt, the inside of backup pad (14) is kept away from the below fixed connection of second gear (12) has connecting piece (13), the outer side wall left and right sides of the connecting piece (13) are fixedly connected with the rotating shaft (8), one side of the outer side wall of the connecting piece (13) close to the rotating shaft (8) is in threaded connection with the nut (15), the opposite sides of the two rotating shafts (8) are respectively in rotating connection with the shaft disc (20), one side of the shaft disc (20) is fixedly connected with the rotating wheel (16), the rotating wheel (16) is embedded in the H-shaped steel track (2), the rotating wheel (16) is in sliding connection with the H-shaped steel track (2), the outer side wall of the shaft disc (20) on the left side is in rotating connection with the second gear (12), one side of the side plate (9) in front of the left side of the upper surface of the platform (3) is fixedly connected with the support (6), the upper surface of the support (6) is fixedly connected with the motor (7), and the inner part of the motor (7) is connected with the rotating shaft (8), the rotating shaft (8) penetrates into the side plate (9), a first gear (11) is fixedly connected to the right side of the outer side wall of the rotating shaft (8), the first gear (11) is meshed with the second gear (12), a rack (10) is sleeved outside the first gear (11), and the rear part of the inner part of the rack (10) is meshed with the other first gear (11), the left side and the right side inside the suspension component (5) are respectively detachably connected with a suspension box girder hook (4) through a quick-release bolt (19), the number of the hanging box girder hooks (4) is multiple, the main bridge box girder (1) is clamped between the hanging box girder hooks (4), a shear pin (18) penetrates through the interior of the hanging box girder hook (4), and the bottom end of the shear pin (18) is attached to the main bridge box girder (1).
2. The bridge steel box girder construction platform of claim 1, characterized in that: the guardrail comprises a platform (3) and is characterized in that railings are arranged on the left side and the right side of the upper surface of the platform (3) respectively and are fixed to the platform (3) in a welded mode.
3. The bridge steel box girder construction platform of claim 1, characterized in that: eight walking mechanisms (100) are provided, and every two walking mechanisms (100) are distributed below the suspension assembly (5) in a left-right mode.
4. The bridge steel box girder construction platform of claim 1, characterized in that: the rotating shafts (8) are arranged in parallel, four rotating wheels (16) are arranged between the two rotating shafts (8), and the rotating wheels (16) are placed inside the H-shaped steel track (2).
5. The bridge steel box girder construction platform of claim 1, characterized in that: platform (3) are formed by the welding of a plurality of square pipe not of uniform length, just the owner of platform (3) looks the cross-section and is the isosceles trapezoid that handstands.
CN202011462712.7A 2020-12-14 2020-12-14 Bridge steel box girder construction platform Active CN112554069B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011462712.7A CN112554069B (en) 2020-12-14 2020-12-14 Bridge steel box girder construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011462712.7A CN112554069B (en) 2020-12-14 2020-12-14 Bridge steel box girder construction platform

Publications (2)

Publication Number Publication Date
CN112554069A CN112554069A (en) 2021-03-26
CN112554069B true CN112554069B (en) 2022-05-17

Family

ID=75062796

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011462712.7A Active CN112554069B (en) 2020-12-14 2020-12-14 Bridge steel box girder construction platform

Country Status (1)

Country Link
CN (1) CN112554069B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005330693A (en) * 2004-05-19 2005-12-02 Jfe Engineering Kk Working device and method for inspection and repair of steel structure
CN103663300A (en) * 2012-09-02 2014-03-26 江苏雄宇重工科技股份有限公司 Track type telescopic hanging basket special for bridge
CN205591116U (en) * 2016-02-24 2016-09-21 中国一冶集团有限公司 A two roof beam travelling car operation platform that is used for overpass steel case breast portion to be under construction
CN207079469U (en) * 2017-07-03 2018-03-09 滨州交通工程公司 A kind of mobile construction platform of bridge girder steel detection
CN110029589A (en) * 2019-04-19 2019-07-19 中铁宝桥集团有限公司 Walking Hanging Basket and method for the construction of Steel Bridge cantilever
CN110587188A (en) * 2019-10-22 2019-12-20 九冶建设有限公司 Tool type auxiliary platform for installing and welding steel box girder open

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005330693A (en) * 2004-05-19 2005-12-02 Jfe Engineering Kk Working device and method for inspection and repair of steel structure
CN103663300A (en) * 2012-09-02 2014-03-26 江苏雄宇重工科技股份有限公司 Track type telescopic hanging basket special for bridge
CN205591116U (en) * 2016-02-24 2016-09-21 中国一冶集团有限公司 A two roof beam travelling car operation platform that is used for overpass steel case breast portion to be under construction
CN207079469U (en) * 2017-07-03 2018-03-09 滨州交通工程公司 A kind of mobile construction platform of bridge girder steel detection
CN110029589A (en) * 2019-04-19 2019-07-19 中铁宝桥集团有限公司 Walking Hanging Basket and method for the construction of Steel Bridge cantilever
CN110587188A (en) * 2019-10-22 2019-12-20 九冶建设有限公司 Tool type auxiliary platform for installing and welding steel box girder open

Also Published As

Publication number Publication date
CN112554069A (en) 2021-03-26

Similar Documents

Publication Publication Date Title
CN201003145Y (en) Upward and self-walking type mobile die carrier
CN103898832A (en) Bridge cable hanging anchoring end detection working platform
JP3318549B2 (en) Working scaffold for existing bridge
CN112554069B (en) Bridge steel box girder construction platform
CN102635066B (en) Hanger articulated bridge inspection vehicle
CN113211617A (en) Energy-saving spray system for precast beam maintenance
CN110565531A (en) Construction channel structure and installation method
CN207775634U (en) Empty iron track girder
CN114622498A (en) Self-walking operation platform for construction of cable-stayed bridge bottom and installation method
CN212388316U (en) Special emergency traffic maintenance operation vehicle
WO2019047304A1 (en) Protection roof for use in cantilever form traveler construction
KR20060116405A (en) The launching and removing method of hanging scaffold for bridge slab using rail and roller type device
CN210151602U (en) Railway operation line-crossing highway beam body dismantling beam bottom protection platform
CN201292512Y (en) Suspended cable sliding table for spraying main steel box beam of overpass
CN105804449B (en) Stability component when being cleaned for train and preparation method thereof
CN114737479B (en) Protection system, dismounting device and construction method for existing traffic of upper cover of composite beam
CN111519503A (en) Special emergency traffic maintenance operation vehicle
CN106677054B (en) A kind of air partition and the bridge with the air partition
KR200402793Y1 (en) Rail and roller Type device for hanging scaffold of bridge slab
CN2337186Y (en) Hoisting machine for ecrecting bridge flooring
CN205399227U (en) Water flange plate construction special stand behind whole both sides
CN219260758U (en) Trolley for cast-in-situ cover plate culvert wall construction
CN217201794U (en) Precious bridge three-five single-track turnout worm gear speed reducer overturning and installing tool
CN219240319U (en) Anti-overturning system for hanging basket
CN211769896U (en) Derailing prevention device suitable for gantry crane

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 413000 north of Gaoxin Avenue, Gaoxin District, Yiyang City, Hunan Province

Patentee after: Yiyang Zhenyu Intelligent Machinery Co.,Ltd.

Address before: 413000 north of Gaoxin Avenue, Gaoxin District, Yiyang City, Hunan Province

Patentee before: Yiyang Zhenyu Intelligent Machine Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A Construction Platform for Steel Box Girders of Large Bridges

Effective date of registration: 20230904

Granted publication date: 20220517

Pledgee: Industrial and Commercial Bank of China Limited Yiyang Heshan Branch

Pledgor: Yiyang Zhenyu Intelligent Machinery Co.,Ltd.

Registration number: Y2023980055228