CN112539075A - Preset internal anchor rod structure for tunnel in-situ extension project and supporting method thereof - Google Patents

Preset internal anchor rod structure for tunnel in-situ extension project and supporting method thereof Download PDF

Info

Publication number
CN112539075A
CN112539075A CN202110054312.0A CN202110054312A CN112539075A CN 112539075 A CN112539075 A CN 112539075A CN 202110054312 A CN202110054312 A CN 202110054312A CN 112539075 A CN112539075 A CN 112539075A
Authority
CN
China
Prior art keywords
anchor rod
tunnel
hole
expanded
small
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110054312.0A
Other languages
Chinese (zh)
Inventor
吴学震
关振长
邓涛
蒋宇静
刘思宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou University
Original Assignee
Fuzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou University filed Critical Fuzhou University
Priority to CN202110054312.0A priority Critical patent/CN112539075A/en
Publication of CN112539075A publication Critical patent/CN112539075A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/025Grouting with organic components, e.g. resin
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/028Devices or accesories for injecting a grouting liquid in a bore-hole
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/008Anchoring or tensioning means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a preset internal anchor rod structure for tunnel in-situ extension engineering and a supporting method thereof, which are characterized in that: the preset internal anchor rod structure for the tunnel in-situ extension project comprises an expanded bore hole drilled between an in-situ tunnel and an extension tunnel contour line and a small-bore hole drilled in the deep surrounding rock outside the extension tunnel contour line, an anchor rod body penetrates through the small-bore hole, the outer anchoring end of the anchor rod body extends out of the small-bore hole and is provided with a locking nut, a pull rod and a rotating sleeve sleeved on the pull rod are arranged in the expanded bore hole, the first end of the pull rod is connected with the outer end of the anchor rod body, the second end of the pull rod is connected with the moving end of a jack arranged outside the expanded bore hole, the first end of the rotating sleeve is sleeved on the locking nut, and the second end of the rotating sleeve is connected with the jack.

Description

Preset internal anchor rod structure for tunnel in-situ extension project and supporting method thereof
The technical field is as follows:
the invention relates to a preset internal anchor rod structure for tunnel in-situ extension engineering and a supporting method thereof, belonging to the field of tunnel engineering.
Background art:
because the traffic volume is increased at present, a plurality of roads need to be expanded on the basis of the existing tunnel; because the extension tunnels are located in cities, the stability control of surrounding rocks is an important subject in the tunnel extension process, and the existence of the in-situ tunnels makes the pre-support of the surrounding rocks of the newly-built tunnels possible.
However, the traditional tunnel pre-support method for expanding a tunnel has a great problem in practical application, for example, in the patent "a three-dimensional reinforcement construction method suitable for expanding a collapsed tunnel, CN 110397458A", the preset anchor rod interferes with the excavation construction, and the excavation efficiency is reduced; in addition, at the moment of newly-built tunnel excavation, the outer anchor end of stock can be destroyed or lose the holding power point, loses the supporting effect basically.
The invention content is as follows:
the invention aims to solve the technical problems and provides a method which does not interfere with excavation construction and can effectively support and expand tunnel surrounding rocks in advance, namely a preset internal anchor rod structure for tunnel in-situ expansion engineering and a supporting method thereof.
The invention discloses a preset internal anchor rod structure for tunnel in-situ extension engineering, which is characterized in that: the method comprises the steps of drilling an expanded diameter drilling hole between an in-situ tunnel and an expanded tunnel contour line and drilling a small-aperture drilling hole deep in surrounding rocks outside the expanded tunnel contour line, wherein an anchor rod body penetrates through the small-aperture drilling hole, the outer anchoring end of the anchor rod body extends out of the small-aperture drilling hole and is provided with a locking nut, the outer anchoring end of the anchor rod is arranged at the excavation contour line position of a newly-built tunnel inside the surrounding rocks, and an anchoring agent is arranged between the small-aperture drilling hole and the anchor rod body.
Furthermore, a pull rod and a rotating sleeve sleeved on the pull rod are arranged in the diameter-expanded drill hole, the first end of the pull rod is connected with the outer end of the anchor rod body, the second end of the pull rod is connected with the moving end of a jack arranged outside the diameter-expanded drill hole, the first end of the rotating sleeve is sleeved on a locking nut, and the second end of the rotating sleeve is connected with the jack, so that the locking nut is driven by the rotation of the rotating sleeve to move towards the inner end of the anchor rod body and the jack pulls the anchor rod body outwards, and the anchor rod body in the small-bore drill hole generates prestress; the first end of the pull rod is provided with an internal threaded hole channel which is in threaded connection with the external thread of the anchoring end outside the anchor rod body; and the second end of the pull rod is in threaded connection with the moving end of the jack.
Furthermore, the first end of the rotating sleeve is provided with an inner hexagonal hole matched with the locking nut, and the second end of the rotating sleeve is arranged on top of the jack shell.
Furthermore, the locking nut comprises a circular ring-shaped sheet and a nut fixed on one side surface of the circular ring-shaped sheet.
Furthermore, after the pull rod, the rotary sleeve and the jack are removed, a grouting device is arranged in the hole expanding drill hole and comprises a grouting pipe and a sealing bag fixedly arranged on the grouting pipe, the sealing bag blocks the hole expanding drill hole, and a grouting hole is formed in a space, located in the hole expanding drill hole, between the sealing bag and the locking nut, of the grouting pipe.
The invention discloses a support method of a preset internal anchor rod structure for a tunnel in-situ extension project, which is characterized by comprising the following steps: the supporting method comprises the following steps: 1) drilling small-aperture drill holes outwards on the lining of the in-situ tunnel, wherein the small-aperture drill holes extend from the original tunnel lining to the depth of surrounding rocks outside the contour line of the expanded tunnel; 2) constructing an expanded borehole at the position of the lining borehole of the in-situ tunnel, wherein the expanded borehole extends from the original tunnel lining to the contour line of the expanded tunnel, and the diameter of the expanded borehole is slightly larger than that of the anchor head outside the anchor rod; 3) the anchor rod is anchored in the small-bore hole through the anchoring agent, and the outer end of the anchor rod is fixed at the bottom end of the expanded-bore hole through the locking nut.
Furthermore, when the resin anchoring agent is adopted as the anchoring agent, firstly, a cartridge of the resin anchoring agent is put into the small-aperture drill hole, and then the anchor rod is rotationally drilled through a drilling machine, so that one end of the anchor rod is anchored in the small-aperture drill hole; the anchoring agent is required to be ensured not to overflow out of the small-aperture drilled hole after the anchor rod is installed.
Further, when the resin anchoring agent is adopted, prestress is applied to the anchor rod through a prestress applying device; the prestress applying device comprises a pull rod and a rotary sleeve, wherein the pull rod and the rotary sleeve are arranged in the diameter-expanding drill hole, the rotary sleeve is sleeved on the pull rod, the first end of the pull rod is connected with the outer end of the anchor rod body, the second end of the pull rod is connected with the moving end of a jack, the moving end of the jack is arranged outside the diameter-expanding drill hole, the first end of the rotary sleeve is sleeved on the lock nut, and the second end of the rotary sleeve is connected with; during operation, namely after the step (3), applying tension to the anchor rod through a jack and a pull rod of the prestress applying device, and enabling the outer anchoring end of the anchor rod to generate certain outward displacement; meanwhile, the rotary sleeve continuously rotates to enable the locking nut to gradually move towards the inner side of the anchor rod and realize fastening
Furthermore, grouting is carried out through a grouting device besides the supporting method, the grouting device comprises a grouting pipe and a closed bag fixedly arranged on the grouting pipe, the closed bag blocks the expanded borehole, and a grouting hole is formed in a space, located in the expanded borehole, between the closed bag and the locking nut, of the grouting pipe; when the device works, the closed bag is pressurized to be tightly attached to the expanded drill hole; then injecting grout through a grouting pipe, wherein the grout enters the small-aperture drill hole through the expanded drill hole, fills rock body cracks around the small-aperture drill hole and anchors the anchor rod in the small-aperture drill hole; and finally, the pressure of the closed bag is removed, and the grouting device is taken out.
Furthermore, in order to prevent the damage to the surrounding rock of the internal extension tunnel during blasting excavation and further influence the supporting effect of the anchor rod, after the step (2), a water jet device is inserted into the bottom of the hole-expanding drill hole and comprises a tee joint connected with the end of the water pipe, one end of the tee joint is connected with the end of the water pipe, outlets at the other two ends of the tee joint are perpendicular to the axial lead of the hole-expanding drill hole, and when the support method is used, water injected into the water pipe is ejected from the outlets at the two ends so as to manufacture a pre-crack at the position of the excavation contour line of the extension tunnel; the pre-cracking can reduce the damage degree of blasting to the expanded tunnel surrounding rock inside the locking nut, so that the effective anchoring of the outer anchoring end of the anchor rod is ensured.
The invention has the following advantages:
1. the mode of firstly excavating and then supporting in the prior tunnel construction is broken through, the space of the in-situ tunnel is utilized for pre-supporting, and the deformation of the surrounding rock can be controlled to the maximum extent;
2. the outer anchoring end and the anchoring nut of the anchor rod are directly arranged at the contour line position of the newly-built tunnel in the surrounding rock, so that the excavation construction of the newly-built tunnel is not interfered, the outer anchoring end is prevented from being damaged by the excavation construction of the newly-built tunnel, and the surrounding rock of the tunnel can be effectively supported and expanded in advance.
Description of the drawings:
figure 1 is a general schematic view of the present invention used to extend a tunnel support;
FIG. 2 is a schematic view of the drilling of a hole according to the present invention;
FIG. 3 is a schematic view of the anchor rod of the present invention in a drilled hole installation;
FIG. 4 is a schematic view of a grouting apparatus according to the present invention;
FIG. 5 is a schematic view of the pre-crack construction of the present invention;
FIG. 6 is a schematic illustration of the prestressing application of the present invention;
FIG. 7 is a schematic view of the construction of the jack in connection with the mooring body;
1-lining of in-situ tunnel; 2-expanding an excavation contour line of the tunnel; 3, pre-excavating rock mass; 4-expanding tunnel surrounding rocks; 5-drilling with small aperture; 6-expanding the hole; 7-the anchor rod body; 8-an anchoring agent; 9-outer anchoring end; 10-grouting pipe; 11-slurry outlet holes; 12-a closed capsule; 13-a pressurized line; 14-a water jet device; 15-pre-cracking; 16-a jack; 17-a pull rod; 18-a rotating sleeve; 19-locking nut, 1901-circular ring sheet, 1902-nut, 20-internal thread hole, 21-jack moving end, 22-internal hexagonal hole.
The specific implementation mode is as follows:
the present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
The preset internal anchor rod structure for the tunnel in-situ extension project comprises an expanded bore 6 drilled between an in-situ tunnel and an extension tunnel contour line and a small-aperture bore 5 drilled in the depth of surrounding rocks outside the extension tunnel contour line, wherein an anchor rod body 7 penetrates through the small-aperture bore 5, and the anchor rod body can adopt a hollow anchor rod or a traditional anchor rod; the outer anchoring end 9 of the anchor rod body extends out of the small-bore hole and is provided with a locking nut 19 (the locking nut 19 comprises a circular ring piece 1901 and a nut 1902 fixed on one side of the circular ring piece), a pull rod 17 and a rotary sleeve 18 sleeved on the pull rod are arranged in the diameter-expanding hole 6, the first end of the pull rod 17 is connected with the outer end of the anchor rod body 7, the second end of the pull rod 17 is connected with the moving end of a jack 16 arranged outside the diameter-expanding hole, the first end of the rotary sleeve 18 is sleeved on the locking nut 19, and the second end of the locking nut 19 is connected with the jack 16, so that the locking nut is driven by the rotation of the rotary sleeve to move towards the inner end of the anchor rod body and the jack pulls the anchor rod body outwards, and the anchor rod body positioned in.
Before the newly-built tunnel is excavated, an anchor rod is installed to a surrounding rock drill hole through an in-situ tunnel so as to play a supporting role at the moment of newly-built tunnel excavation, the anchor rod body is fixed in the deep position of the surrounding rock through an anchoring agent, and the outer anchoring end of the anchor rod is arranged at the excavation contour line position of the newly-built tunnel in the surrounding rock; when the layout of the anchor rods is designed, according to the layout of the excavation contour line of the newly-built tunnel, the pre-support anchor rods are ensured to be uniformly distributed at the excavation contour line of the newly-built tunnel, and the anchor rods are basically perpendicular to the excavation contour line of the newly-built tunnel.
An anchoring agent 8 is arranged between the small-aperture drill hole 5 and the anchor rod body 7; the anchoring agent can be resin anchoring agent or mortar anchoring agent, and can be directly coated on the small-aperture drill hole 5 or made into a flaky roll and then plugged into the small-aperture drill hole 5; the first end of the pull rod 17 is provided with an internal threaded hole channel 20, and the internal threaded hole channel 20 is in threaded connection with the external thread of the anchoring end outside the anchor rod body; the second end of the pull rod 17 is in threaded connection with the moving end 21 of the jack, the threaded connection can be realized by that the second end of the pull rod 17 is provided with external threads and is in threaded connection with an internal threaded hole of the moving end 21 of the jack, the first end of the rotating sleeve is provided with an inner hexagonal hole 22 matched with the locking nut, and the second end of the rotating sleeve is arranged on top of the shell of the jack; when the jack moving end 21 contracts relative to the jack housing, the rotating sleeve rotates to drive the locking nut to move towards the inner end of the anchor rod body and the jack moving end 21 pulls the anchor rod body 7 to be pulled outwards.
After the pull rod, the rotary sleeve and the jack are removed, a grouting device is placed in the expanded bore hole, the grouting device comprises a grouting pipe 10 and a closed bag 12 fixedly arranged on the grouting pipe, the closed bag is annularly wrapped around the grouting pipe, the closed bag blocks the expanded bore hole 6, a grouting hole 11 is formed in a space between the closed bag and a lock nut in the expanded bore hole of the grouting pipe, and the closed bag 12 can be connected with a pressurizing pipeline 13 connected with an air compressor so as to drive the closed bag 12 to expand to block the expanded bore hole 6 when the air compressor works. The small-aperture drilling hole is positioned in the deep surrounding rock and has a narrow space, so that the traditional in-hole grout stopping device cannot be arranged, and the device overcomes the problem by sealing outside the hole.
The invention relates to a support method of a preset internal anchor rod structure for a tunnel in-situ extension project, which comprises the following steps: 1) drilling small-aperture drill holes outwards on the lining of the in-situ tunnel, wherein the small-aperture drill holes extend from the original tunnel lining to the depth of surrounding rocks outside the contour line of the expanded tunnel; 2) constructing an expanded borehole at the position of the lining borehole of the in-situ tunnel, wherein the expanded borehole extends from the original tunnel lining to the contour line of the expanded tunnel, and the diameter of the expanded borehole is slightly larger than that of the anchor head outside the anchor rod; 3) the anchor rod is anchored in the small-bore hole through the anchoring agent, and the outer end of the anchor rod is fixed at the bottom end of the expanded-bore hole through the locking nut.
When the anchoring agent is a resin anchoring agent, firstly, a chemical coil of the resin anchoring agent is placed in a small-aperture drill hole, and then the anchor rod is rotationally drilled through a drilling machine, so that one end of the anchor rod is anchored in the small-aperture drill hole; the anchoring agent is required to be ensured not to overflow out of the small-aperture drilled hole after the anchor rod is installed.
When the resin anchoring agent is adopted, prestress is applied to the anchor rod through a prestress applying device; the prestress applying device comprises a pull rod and a rotary sleeve, wherein the pull rod and the rotary sleeve are arranged in the diameter-expanding drill hole, the rotary sleeve is sleeved on the pull rod, the first end of the pull rod is connected with the outer end of the anchor rod body, the second end of the pull rod is connected with the moving end of a jack, the moving end of the jack is arranged outside the diameter-expanding drill hole, the first end of the rotary sleeve is sleeved on the lock nut, and the second end of the rotary sleeve is connected with; during operation, namely after the step (3), applying tension to the anchor rod through a jack and a pull rod of the prestress applying device, and enabling the outer anchoring end of the anchor rod to generate certain outward displacement; meanwhile, the rotary sleeve continuously rotates to enable the locking nut to gradually move towards the inner side of the anchor rod and realize fastening
The supporting method can also be used for grouting through a grouting device, the grouting device comprises a grouting pipe and a closed bag fixedly arranged on the grouting pipe, the closed bag blocks the expanded borehole, and a grouting hole is formed in a space between the closed bag and the locking nut in the expanded borehole of the grouting pipe; when the device works, the closed bag is pressurized to be tightly attached to the expanded drill hole; then injecting grout through a grouting pipe, wherein the grout enters the small-aperture drill hole through the expanded drill hole, fills rock body cracks around the small-aperture drill hole and anchors the anchor rod in the small-aperture drill hole; and finally, the pressure of the closed bag is removed, and the grouting device is taken out.
Furthermore, in order to prevent damage to surrounding rocks of the internal extension tunnel during blasting excavation and further influence the supporting effect of the anchor rod, after the step (2), a water jet device is inserted into the bottom of the hole-expanding drill hole and comprises a tee joint connected with the end of the water pipe, one end of the tee joint is connected with the end of the water pipe, outlets at the other two ends of the tee joint are perpendicular to the axial lead of the hole-expanding drill hole, and when the support method is used, water injected into the water pipe is ejected from the outlets at the two ends so as to manufacture pre-cracks at the position of the excavation contour line of the extension tunnel; the pre-cracking can reduce the damage degree of blasting to the expanded tunnel surrounding rock inside the locking nut, so that the effective anchoring of the outer anchoring end of the anchor rod is ensured.
The invention has the following advantages:
1. the mode of firstly excavating and then supporting in the prior tunnel construction is broken through, the space of the in-situ tunnel is utilized for pre-supporting, and the deformation of the surrounding rock can be controlled to the maximum extent;
2. the outer anchoring end and the anchoring nut of the anchor rod are directly arranged at the contour line position of the newly-built tunnel in the surrounding rock, so that the excavation construction of the newly-built tunnel is not interfered, the outer anchoring end is prevented from being damaged by the excavation construction of the newly-built tunnel, and the surrounding rock of the tunnel can be effectively supported and expanded in advance.
Finally, it should be noted that: the above examples are only intended to illustrate the technical solution of the present invention and not to limit it; although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art will understand that: modifications to the specific embodiments of the invention or equivalent substitutions for parts of the technical features may be made; without departing from the spirit of the present invention, it is intended to cover all aspects of the invention as defined by the appended claims.

Claims (10)

1. The utility model provides a predetermine inside stock structure for tunnel normal position enlargement engineering which characterized in that: the method comprises the steps of drilling an expanded diameter drilling hole between an in-situ tunnel and an expanded tunnel contour line and drilling a small-aperture drilling hole deep in surrounding rocks outside the expanded tunnel contour line, wherein an anchor rod body penetrates through the small-aperture drilling hole, the outer anchoring end of the anchor rod body extends out of the small-aperture drilling hole and is provided with a locking nut, the outer anchoring end of the anchor rod is arranged at the excavation contour line position of a newly-built tunnel inside the surrounding rocks, and an anchoring agent is arranged between the small-aperture drilling hole and the anchor rod body.
2. The preset internal anchor rod structure for tunnel in-situ enlargement project according to claim 1, characterized in that: a pull rod and a rotary sleeve sleeved on the pull rod are arranged in the diameter-expanded drill hole, the first end of the pull rod is connected with the outer end of the anchor rod body, the second end of the pull rod is connected with the moving end of a jack arranged outside the diameter-expanded drill hole, the first end of the rotary sleeve is sleeved on a locking nut, and the second end of the rotary sleeve is connected with the jack so as to drive the locking nut to move towards the inner end of the anchor rod body and pull the anchor rod body outwards by the jack in a rotating mode, so that the anchor rod body in the small-bore drill hole generates prestress; the first end of the pull rod is provided with an internal threaded hole channel which is in threaded connection with the external thread of the anchoring end outside the anchor rod body; and the second end of the pull rod is in threaded connection with the moving end of the jack.
3. The preset internal anchor rod structure for tunnel in-situ enlargement work according to claim 1 or 2, wherein: the first end of the rotating sleeve is provided with an inner hexagonal hole matched with the locking nut, and the second end of the rotating sleeve is arranged on top of the jack shell.
4. The preset internal anchor rod structure for tunnel in-situ enlargement project according to claim 1, characterized in that: the locking nut comprises a circular ring-shaped sheet and a nut fixed on one side face of the circular ring-shaped sheet.
5. The preset internal anchor rod structure for tunnel in-situ enlargement project according to claim 1, characterized in that: and after the pull rod, the rotary sleeve and the jack are removed, a grouting device is placed in the hole expanding drill hole and comprises a grouting pipe and a sealing bag fixedly arranged on the grouting pipe, the sealing bag blocks the hole expanding drill hole, and a grouting hole is formed in a space between the sealing bag and the locking nut in the hole expanding drill hole of the grouting pipe.
6. A supporting method of a preset internal anchor rod structure for a tunnel in-situ extension project is characterized by comprising the following steps: the supporting method comprises the following steps: 1) drilling small-aperture drill holes outwards on the lining of the in-situ tunnel, wherein the small-aperture drill holes extend from the original tunnel lining to the depth of surrounding rocks outside the contour line of the expanded tunnel; 2) constructing an expanded borehole at the position of the lining borehole of the in-situ tunnel, wherein the expanded borehole extends from the original tunnel lining to the contour line of the expanded tunnel, and the diameter of the expanded borehole is slightly larger than that of the anchor head outside the anchor rod; 3) the anchor rod is anchored in the small-bore hole through the anchoring agent, and the outer end of the anchor rod is fixed at the bottom end of the expanded-bore hole through the locking nut.
7. The method for supporting the preset internal anchor rod structure for the tunnel in-situ extension project according to claim 6, wherein: when the anchoring agent is a resin anchoring agent, firstly, a chemical coil of the resin anchoring agent is placed in a small-aperture drill hole, and then the anchor rod is rotationally drilled through a drilling machine, so that one end of the anchor rod is anchored in the small-aperture drill hole; the anchoring agent is required to be ensured not to overflow out of the small-aperture drilled hole after the anchor rod is installed.
8. The method for supporting the preset internal anchor rod structure for the tunnel in-situ extension project according to claim 6, wherein: when the resin anchoring agent is adopted, prestress is applied to the anchor rod through a prestress applying device; the prestress applying device comprises a pull rod and a rotary sleeve, wherein the pull rod and the rotary sleeve are arranged in the diameter-expanding drill hole, the rotary sleeve is sleeved on the pull rod, the first end of the pull rod is connected with the outer end of the anchor rod body, the second end of the pull rod is connected with the moving end of a jack, the moving end of the jack is arranged outside the diameter-expanding drill hole, the first end of the rotary sleeve is sleeved on the lock nut, and the second end of the rotary sleeve is connected with; during operation, namely after the step (3), applying tension to the anchor rod through a jack and a pull rod of the prestress applying device, and enabling the outer anchoring end of the anchor rod to generate certain outward displacement; meanwhile, the locking nut is gradually moved towards the inner side of the anchor rod through continuous rotation of the rotary sleeve, and fastening is realized.
9. The method for supporting the preset internal anchor rod structure for the tunnel in-situ extension project according to claim 6, wherein: the supporting method is characterized in that grouting is carried out through a grouting device, the grouting device comprises a grouting pipe and a sealing bag fixedly arranged on the grouting pipe, the sealing bag blocks an expanded borehole, and a grouting hole is formed in a space between the sealing bag and a locking nut in the expanded borehole of the grouting pipe; when the device works, the closed bag is pressurized to be tightly attached to the expanded drill hole; then injecting grout through a grouting pipe, wherein the grout enters the small-aperture drill hole through the expanded drill hole, fills rock body cracks around the small-aperture drill hole and anchors the anchor rod in the small-aperture drill hole; and finally, the pressure of the closed bag is removed, and the grouting device is taken out.
10. The method for supporting the preset internal anchor rod structure for the tunnel in-situ extension project according to claim 6, wherein: in addition to the supporting method, in order to prevent damage to surrounding rocks of the internal expanded tunnel during blasting excavation and further influence the supporting effect of the anchor rod, after the step (2), a water jet device is inserted into the bottom of the expanded bore hole and comprises a tee joint connected with the end of a water pipe, one end of the tee joint is connected with the end of the water pipe, outlets at the other two ends of the tee joint are perpendicular to the axial lead of the expanded bore hole, and when the supporting method is used, water injected into the water pipe is ejected from the outlets at the two ends so as to manufacture a pre-crack at the position of an excavation contour line of the expanded tunnel; the pre-cracking can reduce the damage degree of blasting to the expanded tunnel surrounding rock inside the locking nut, so that the effective anchoring of the outer anchoring end of the anchor rod is ensured.
CN202110054312.0A 2021-01-15 2021-01-15 Preset internal anchor rod structure for tunnel in-situ extension project and supporting method thereof Pending CN112539075A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110054312.0A CN112539075A (en) 2021-01-15 2021-01-15 Preset internal anchor rod structure for tunnel in-situ extension project and supporting method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110054312.0A CN112539075A (en) 2021-01-15 2021-01-15 Preset internal anchor rod structure for tunnel in-situ extension project and supporting method thereof

Publications (1)

Publication Number Publication Date
CN112539075A true CN112539075A (en) 2021-03-23

Family

ID=75017212

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110054312.0A Pending CN112539075A (en) 2021-01-15 2021-01-15 Preset internal anchor rod structure for tunnel in-situ extension project and supporting method thereof

Country Status (1)

Country Link
CN (1) CN112539075A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113047878A (en) * 2021-04-15 2021-06-29 山东理工大学 Unloading, anchoring and buffering regulation and control method for underground engineering dynamic disaster
CN113137257A (en) * 2021-04-08 2021-07-20 苏州中车建设工程有限公司 Treatment structure for transfinite convergence deformation in shield tunnel operation period and construction method thereof
WO2022151774A1 (en) * 2021-01-15 2022-07-21 福州大学 Pre-set internal anchor cable support method used for tunnel in-situ expansion engineering projects
CN116220733A (en) * 2023-05-08 2023-06-06 济南轨道交通集团有限公司 Internal anchoring combined protection technology for lower existing tunnel under top unloading

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306680A (en) * 2013-03-23 2013-09-18 中铁二院工程集团有限责任公司 Construction method for extending single-track tunnel to multi-track tunnel
CN105822311A (en) * 2016-05-17 2016-08-03 中铁十五局集团有限公司 In-situ extension construction structure and method for extra-large-section tunnel with opening formed inside to enlarge working face
CN106284344A (en) * 2016-10-18 2017-01-04 中国船舶重工集团公司第七�三研究所 A kind of hydraulic single-cylinder tensioner
CN109630135A (en) * 2019-01-16 2019-04-16 交通运输部公路科学研究所 A kind of method for tunnel construction of system supporting
CN110397458A (en) * 2019-07-03 2019-11-01 中铁四局集团第五工程有限公司 A kind of three-dimensional reinforced construction method suitable for the tunnel enlarging that caves in

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306680A (en) * 2013-03-23 2013-09-18 中铁二院工程集团有限责任公司 Construction method for extending single-track tunnel to multi-track tunnel
CN105822311A (en) * 2016-05-17 2016-08-03 中铁十五局集团有限公司 In-situ extension construction structure and method for extra-large-section tunnel with opening formed inside to enlarge working face
CN106284344A (en) * 2016-10-18 2017-01-04 中国船舶重工集团公司第七�三研究所 A kind of hydraulic single-cylinder tensioner
CN109630135A (en) * 2019-01-16 2019-04-16 交通运输部公路科学研究所 A kind of method for tunnel construction of system supporting
CN110397458A (en) * 2019-07-03 2019-11-01 中铁四局集团第五工程有限公司 A kind of three-dimensional reinforced construction method suitable for the tunnel enlarging that caves in

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022151774A1 (en) * 2021-01-15 2022-07-21 福州大学 Pre-set internal anchor cable support method used for tunnel in-situ expansion engineering projects
CN113137257A (en) * 2021-04-08 2021-07-20 苏州中车建设工程有限公司 Treatment structure for transfinite convergence deformation in shield tunnel operation period and construction method thereof
CN113137257B (en) * 2021-04-08 2022-04-26 苏州中车建设工程有限公司 Treatment structure for transfinite convergence deformation in shield tunnel operation period and construction method thereof
CN113047878A (en) * 2021-04-15 2021-06-29 山东理工大学 Unloading, anchoring and buffering regulation and control method for underground engineering dynamic disaster
CN113047878B (en) * 2021-04-15 2022-05-20 山东理工大学 Unloading, anchoring and buffering regulation and control method for underground engineering dynamic disaster
CN116220733A (en) * 2023-05-08 2023-06-06 济南轨道交通集团有限公司 Internal anchoring combined protection technology for lower existing tunnel under top unloading
CN116220733B (en) * 2023-05-08 2023-08-18 济南轨道交通集团有限公司 Internal anchoring combined protection technology for lower existing tunnel under top unloading

Similar Documents

Publication Publication Date Title
CN112539075A (en) Preset internal anchor rod structure for tunnel in-situ extension project and supporting method thereof
JP4288331B2 (en) Rock bolt and supporting method using the same
CN206352481U (en) Pipe-following drilling system and the anti-collapse aperture apparatus of steel floral tube
CN110130334B (en) Self-drilling high-pressure rotary-jetting bag grouting expanding anti-floating anchor rod construction method
US11913338B2 (en) Support method of preset internal cable for in-situ tunnel expansion project
CN107740410A (en) The full-length prestress bolt-grouting support device and technique for expanding internal anchoring body can be combined
WO2014028973A1 (en) A packing plug
CN214303884U (en) A predetermine inside stock structure for tunnel normal position enlargement engineering
WO2014055049A2 (en) A deep foundation pile (jet coating pile), a production method thereof and equipments according to the method
CN103321222B (en) Recoverable type anchor rod, pressure-bearing plate type anchor pile and anchoring method
CN206396745U (en) Long spire stake machine with the Counterboring apparatus that spins
CN105507867B (en) A kind of device and method for generating wellbore crack
CN105134127A (en) Anti-collapse grouting consolidation device and using method thereof
WO1992001141A1 (en) Drillable ground support bolt
CN210315529U (en) Self-drilling high-pressure rotary-jetting bag grouting expanding anti-floating anchor rod
CN105201447A (en) Quick-setting slurry grouting consolidation system and application method thereof
CN210194627U (en) Hole wall guniting device
CN213928393U (en) Expandable anchoring device and tunnel supporting structure
KR100498536B1 (en) Method for costructing anchors under the ground using high pressure grouting
CN103306280A (en) Stirring anchor pile implanted in inner hole of drill rod and anchoring method
CN110984144B (en) Prestress hollow anchor rod reinforcing system
CN112610255A (en) Tunnel construction method for penetrating through weak and broken surrounding rock
KR101018890B1 (en) Grouting method utilizing anchor apparatus for direct-boring
CN112832833A (en) Glass fiber anchor rod mounting device, self-advancing glass fiber anchor rod and mounting method
KR101112149B1 (en) Micro-pile method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210323

RJ01 Rejection of invention patent application after publication